1995 – 2005 FT. MCDOWELL INDIAN COMMUNITY - Fountain Hills, AZ
Construction Engineer - Managed construction of 1500 acre pecan farm. Items included, clearing, main line piping, distribution piping, pump station(s), backup well field, tree layout and fencing. Total cost $6 Mil. Also managed construction of 50 new home additions, $3 mil water, electric and phone upgrades along with new subdivisions and roads. Recently competed a new 10.7 Million dollar wastewater treatment plant and have started a 4.4 Million water upgrade and a 5 Million sewer upgrade.

1993 – 1994 STATE OF ARIZONA, DEPT. OF ADMINISTRATION Phoenix, AZ
Project Manager - Temporary position assisting in building projects. Duties included negotiating and contracting for professional services, preparing bid documents and construction administration.

1984 – 1993 KS ENGINEERING & CONSTRUCTION Tempe, AZ
Partner/ Owner/ Public Works Contractor - Specialized in school work and industrial projects. Design/ Built custom homes. Performed all phases of work including the bidding, project management, supervision, accounting and all items necessary to run a successful business.

1979 - 1984 ARIZONA PUBLIC SERVICE, NUCLEAR CONSTRUCTION Phoenix, AZ
Senior Civil Engineer/ Owners Representative - Reviewed all plans/equipment/procurement/costs of a civil or architectural nature. Gained specific knowledge in nuclear design and construction as well as quality assurance and licensing.

1979 DAMES AND MOORE, Phoenix, AZ
Geotechnical Engineer - Earth dam design

1977 MACHINERY ERECTION Ajo, AZ
Boilermaker - Trade labor for Local 627

1976 M. W. KELLOGG Donaldsonville, LA
Field Engineer - Field work on new Ammonia Plant

1973 - 1976 M. W. KELLOGG New Orleans, LA
Field Engineer - Performed plant layout and coordinated subs. Prepared schedules, purchased materials, performed testing at new Shell Oil Refinery.

EDUCATION:
Arizona State University M.S. Civil Engineering 1979
Arizona State University B.S. Construction 1973

PROFESSIONAL ASSOCIATIONS:
Registered Civil Engineer, Arizona, No. 15280
Registered Land Surveyor, Arizona No. 16154
Member, Panel of Arbitrators, American Arbitration

DETAILED BACKGROUND:
I began my career working in industrial construction after graduation from Arizona State University in 1973.

I was first assignment was in New Orleans, LA, at the Shell Oil Refinery working on-site as a field engineer for M.W. Kellogg. At Shell, I performed foundation layout and coordinated subcontractors. I later prepared schedules, made minor design modifications, purchased materials, and conducted hydro tests.

In 1976, I returned to Arizona for graduate studies in Civil Engineering. During my term at ASU, I worked part-time throughout the year. Positions included additional field work for Kellogg, analysis and design for Dames and Moore, and as a trade labor boilermaker for Phelps Dodge.

Upon graduation in 1979, I joined the Nuclear Project Management Staff of Arizona Public Service. My responsibilities included review of all engineering, design, equipment, costs and procurement of all items of a civil or architectural nature and coordination of any additional review which was necessary.

During my term with the Project, I gained specific knowledge and experience in contract administration, procurement methods, nuclear power plant design, construction and engineering standards, cost estimating, quality assurance, and nuclear power plant licensing.

In 1984, I began as Owner and Project Manager at KS Engineering and Construction. Since that time, KS performed public works contracting with most of the major municipalities and school districts in the Phoenix area. All projects have covered the broad spectrum of commercial and industrial construction. The diverse nature of these projects include; stadium renovations, waste water dechlorination facilities, an emergency chlorine scrubber, water well modifications, computer and remote telemetry units, and hazardous waste storage facilities. KS also built school modifications, additions, and sports facilities.

In January, 1993, KS ceased operations and I accepted a temporary position with the State of Arizona, Department of Administration to assist in a 15 million dollar build out of newly purchased buildings and to augment the needs of the prison construction program. Duties included negotiating and contracting for professional services, preparing and competitively bidding for construction services and administering construction contracts. Project responsibility included office space renovation, gas line replacement, installation of plate and frame heat exchangers, purchase of HCFC chiller units, fire safety systems, and voice\data systems.

After completing projects for the State, I accepted the position of Construction Engineer with the Ft. McDowell Indian Community in 1995. In this position, I have managed construction and helped design a Bureau of Reclamation funded 1500 acre mist irrigated pecan farm. Activities included clearing, fencing, construction of roads and drainage structures, overseeing testing, building two VFD electric turbine pumping plants, a 5 plant backup well field, over 15 miles of mainline piping and over 150 miles of distribution piping. Approximate cost - $6Mil. During and after project construction, I have also managed bidding and construction of 50 new homes, a $3Mil Community water, electric and telephone upgrades, along with new subdivisions and roads.

In January, 2002, Ft. McDowell constructed an $11Mil SBR Wastewater Treatment Plant using a modified Design/build contract. I had the full responsibility for overseeing the design and construction of the facility. The plant completed, on time with no change orders and has functioned excellent. After the completion of the facility, I oversaw completion of design and bidding for $4.5Mil domestic water upgrade. This upgrade consisted of refurbishing two existing wells, installing 4 storage tanks with about 1Million gallons of storage, 7 miles of new waterline and an automated booster pump station. This project completed in October, 2004. Currently, I have started construction on a $5.3 million sewer system and lift structures.

Completed Projects 1995 - 2005

PROJECT NAME DATE COST CONTRACTOR

RV Park 9/1/2004 $5,000,000 W.E. O'Neil
Dry Conduit for Fiber Optic and Cable 8/1/2004 $188,000 Hunter Contracting
Sewer Design CM at Risk - design portion 3/3/2004 $57,000 Hunter Contracting
Driveway and Road Improvements 3/3/2004 $1,100,000 LTC
Golf Course Irrigation Line 1/11/2004 $100,000 LTC
Sewer Construction - CM at Risk 1/10/2004 $5,300,000 Hunter Contracting
Out of Africa Reclamation 1/6/2004 $100,000 Ft. McDowell S&G
Water Delivery System Design and CA 10/10/2003 $450,000 Stantec
Water Delivery System Construction 10/10/2003 $4,600,000 MGC
Recreation Center Ramp and Drainage 5/19/2003 $25,000 C&W Restoration
Sewer Design Casino to Grande Wash 4/12/2003 $506,000 Stantec
Utility Rate Study 4/6/2003 $50,000 L. Gold and Assc.
Waste Water Operations 4/1/2003 $240,000 Severn Trent
City of Phx - Wellfield Turn Over 1/27/2003 City of Phoenix
Casino Remodel 12/12/2002 $2,300,000 Kitchell
Adventures Roof Study 10/13/2002 $1,000 Landa & Assc.
Foundation Underpinning 3/14/2002 $18,000 AZ Helical Piers
Natural Gas Line 3/12/2002 $175,000 Southwest Gas
New Orchard Development - BOR 2/2/2002 $2,500,000
Clubhouse Booster Pump Station 10/22/2001 $35,000 Stantec
Clubhouse Booster Pump Station 10/22/2001 $150,000 Wespac
Waste Water Plant Design Build 5/12/2001 $10,800,000 Hunter/ Wilson
Recreation Center Remodel and Painting 5/3/2001 $82,500 JAR Construction
Shipping and Receiving remodel 2/15/2001 $130,000 Agate, Inc.
Scoreboard 12/20/2000 $20,000 Agate, Inc.
Adventures remodel and water supply 12/1/2000 $175,000 JAR Construction
Golf Course Sewer and dry conduits 12/1/2000 $200,000 LTC
Golf Course Irrigation Well and Infrastructure 10/10/2000 $250,000 LTC
Earl Stratton House 8/8/2000 $50,000
Waste Water Treatment Plant Design 8/1/2000 $900,000 Malcolm Pirnie
Water Needs Study 6/7/2000 $52,200 Stantec
Hotel Feasibility studies 3/3/2000 $500,000 Bergman Walls
Temporary Fire Station 2/28/2000 $100,000 Agate, Inc.
City of Phx - Wellfield Evaluation 1/7/2000 $18,000 Stantec
School Building Site Plan 7/21/1999 $25,000 CMX
Javalina Water Lines 3/1/1999 $40,000 LTC
Dodgers Spring Training Site Planning 2/18/1999 $50,000 Speedie/ CMX
Waterline/tank fire protection Phase II 12/8/1998 $1,400,000 T&T Construction
New Well Rodeo Grounds 10/10/1998 $20,000 SW Water and Min.
New Water Services 7/14/1998 $104,291 Ft. McDowell S&G
Community Well Improvements 4/28/1998 $40,000 Yost and Gardner
Community Well Improvements 4/28/1998 $250,000 T&T Construction
Jomax Quarry Investigation 3/14/1998 $30,000 SW Water and Min.
Boundary Pond Study 2/2/1998
Yavapai Hills phII Road and Infrastructure 1/9/1998 $302,000 Monks
South Farm Road 9/20/1997 $595,000 Banicki Construction
Yavapai Rd. Dry Conduits 8/19/1997 $161,915 Ft. McDowell S&G
Surama Dry Utilities 8/19/1997 $162,000 Ft. McDowell S&G
Acid Injector 8/4/1997 $25,000 Ag Acid Inc.
Yavapai Rd. Dry Utiltites 6/24/1997 $140,000 Hard Rock Const.
South Area Orchard Irrigation System 4/28/1997 $729,000 Rain for Rent
South Area Pipeline Delivery System 4/16/1997 $2,600,000 T&T Construction
Tribal Farm Well Pumps and pipelines 1/20/1997 $300,000 T&T Construction
Weir Modification 12/17/1996 $11,000 Cactus Con.
Land Smoothing and Ripping 12/12/1996 $100,000 Ft. McDowell S&G
Well Design for Farm 9/20/1996 $35,000 SW Water and Min.
Well 3 Pump, motor, and piping 9/10/1996 $57,000 Watt-Irr
Farm Road Surveying 7/22/1996 $10,000 Ansco
35 New Homes 7/17/1996 $3,700,000 ABR
Casino water tie in 4/16/1996 $20,000 Cactus Con.
Fire Protection Phase 1 4/4/1996 $578,000 Lee's Backhoe
South Area Farm Irrigation Line 2/14/1996 $353,000 Watt-Irr
North Area Pipeline Delivery System 1/19/1996 $845,000 T&T Construction
South Area Farm Fencing 1/16/1996 $139,000 Associated Fence
Well Drilling 1/4/1996 $289,000 Weber Pump
North Area Farm Fencing 12/15/1995 $48,000 Acme Fence
Community Health Center 12/1/1995 $2,200,000 Summit Builders
Electric Line to Rodeo Grounds 10/10/1995 $144,000 SRP
New Baja Gas Station 9/15/1995 $1,700,000 B.L. Weber Group
Baja Gas Remediation 9/14/1995 $611,000 Groundwater Tech.
Rodeo Ground Development 9/9/1995 $101,000 Gladstone
Daycare Center 6/28/1995 $400,000 BCS
Landfill Closure 4/1/1995 $365,000 Kajima
Main Farm Road 4/1/1995 $729,000 Hunter Contracting
Orchard Development Planning 3/1/1995 Ecoplan

$55,581,906

View contact information...
«« previous resume next resume »»
Search Results (Resumes 151 to 200 of 467)Go to Search Parameters...
Brief Description
Multi lingual professional with MBA in Supply Chain Logistics. A proven effective communicator and negotiator with extensive experience in field operations supporting military, humanitarian and commercial operations.
Currently working as a Mining Technical Services Superintendent with 10years underground mining expeirence. I hold a B.Min.Sc. in Geology.
Master in management, law enforcer, founder of community service organization APO St. Anne College Lucena City
Supervisor Field Geology responsible for the non-geological aspects of diamond deep drilling program and reverse circulation grade control drilling program as well as in sampling.
Im msc chemistry qualified chemist worked in iron ore mine in diff field as sampling,chemical and physical analysis, administration
Senior Contract Engineer Trilingual English/French/Spanish Oil and Gas industry, experience in Africa, South America, Europe. Working for a major international engineering company. Mainly contract formulation and admin. but also project and construction management, cost control and planning.
I am B.Tech-(Mining Engineering- Indian School of Mines-Dhanbad-India).I have approx 10 yrs of experience in iron ore and bauxite mining.I am working as Mines Manager(Project Incharge )in smooth operation of the mining activities.I also have experience in iron ore processing.
Country Manager, Nigeria, The Olive Group. Formerly Chief of Security, River Ranch diamond mine Zimbabwe, corporate security manager, Riyadh, security manager KPC Indonesia, Graphtan Tanzania, 23 years in British Army Int Corps, Worldwide experience in military security operations.
I am a highly qualified, experienced and creative professional seeking a Design/ Drafting Engineer position in your Organization to utilize my excellent skills and passion for challenging work.
HSE - Occupational Health Doctor / HSE management / First Aid Instructor / clinical doctor with interest in environmental health , public health and tropical medicine
Catering Specialist
3 decades of environmental, health and safety experience in the private and government sectors
I have worked in a Management Roll for 6 years & the mining industry for 3 years as a site manager, My duties include recruitment, Budget setting, Managing 30 staff, Purchasing, Accounts, Customer service, Management of the village on a day to day bases. I have excellent computer skills.
Communicator, negotiator, manager, natural leader
Field Security Management and CorporateConsulting in Oil & Gas Industry and United Nations Organizations in several african, european and american countries.
Logistics Manager, Rig Manager, Materials Manager
A position with a construction company which requires skills in field engineering, cost controlling, planning, scheduling, and estimating
Camp Manager / Logistics
Over 25 years of design and engineering experience; providing design, engineering and management services for a variety of projects and fields. Expertise includes estimating, conceptual and finalized layouts, piping design, instrumentation, process, P&ID development, sizing/specifying/requisitioning
I have several years of experience working in administration and industrial positions, during my career I worked as a metallurgy consultant for a period of four years in gold and silver industry for different projects
Exceptional Facility and Construction Management Executive
21 years EPC experience Reading and Interpreting Contract Drawings, Defining Project Scope, Creation of EPS/OBS/WBS, Performing Detailed Quantity Surveys, Cost Estimating, Identifying Resource Requirements, CPM Scheduling, Cost/Resource Management & Implementation of ANSI/EIA-748-A EVMS Guidelines.
SHELL International' trained, technical specification, Sourcing, negotiating, Inventory, Costing, Planning & Logistics, and Warehouse management
Seeking business development position with multinational organization involved with turnkey type projects where my background of over 16 years progressive oil and gas industry experience will provide value creation to grow business.
15 Years in Procurement/Shipping/Logistics/Import Export
Strong Technical Backgrounds developed through course and work leading to Bachelor’s Degree in Electrical Engineering and Computer.
Continous Improvement Engineer / Blackbelt : I am a Six Sigma Academy trained DMAIC BlackBelt. I have a detailed knowledge of DMAIC methodology and 15 years successful practical experience of applying Lean/ Continuous Improvement Techniques in the demanding automotive engineering sector.
Professional engineer with wide ranging international experience in project, engineering, reliability, business development, sales and commissioning of refinery.
Buainess Development, Risk Mqnagement, operations, Finance, Trade
I am PhD in Geotechnical Engineering from Japan.
I am Professional Logistician (CITT), Certified Purchaser and Journeyman, H/D-Partsman (automotive and mining equipment-including underground) and Warehouseman.
Possess excellent interpersonal skills and organization skills;• Able to adapt and work within a dynamic environment;,Willing to work under pressure
A Senior Financial, Systems and Accounting Manager with significant experience in the development, creation and management of accounting and reporting systems gained both internationally and domestically. Have worked in the United States and the United Kingdom for Citibank, Xerox, Yale, Louis Dreyf
Supervisor / Foreman / Project Manager
Financial accountant - 12 years experience - oil & gas
Mechanical engineer (4 yrs degree) with appx 15 yrs exp in Contract & Project management. LOOKING FOR CHANGE IN MIDDLE-EAST, CANADA OR INDIA (AVAILABLE FOR IMMEDIATE START)
Seeking a Management position where my considerable experience and knowledge of Construction civil estimating and project management that can be fully utilized to help drive employer profit margins and complete contracts on time.
accounting administration
10 years of experiences at administration, academic and operation line
I am a seasoned American Registered Professional Civil Engineer with a record of repeated success on diverse Administration & Management career experiences through out the United States, Central America, and the Middle East.
Professional Geologist; Qualified Person;Mining and Exploration; Integrity
Human Resources professional with over 15 years experience. Areas of expertise include benefits administration, employee relations, payroll, reporting, records management and project management. Responsible, detail oriented with strong organizational, analytical, problem solving, communication, an
I have 12 years of experience working all aspects of Supply Warehouse Logistics to include warehouse up to management.
Licensed professional civil engineer. Have worked mostly in construction as either an owner or an owner's representative. Enjoy doing field work and would like to work in a foreign country.
Sales, Communication, Customer Relations, Computer Operations, Microsoft Office, Equipment Transport & Operation, Interpersonal Skills, Extreme Procurement, Project Management/Planning, Quality Control, Quality Testing, Chemical Analysis, Troubleshooting, Problem solving, Safety, Hazmat, Hazardous C
Manager / Supervisory position in the field of Administration, Personnel, Finance Accounting, Business
Procurement, Materials and Logistics Manager (SCM): 20 years international experience in gas & oil and energy projects.
Self stater and takes full charge of enterprise
Accountant Objective: To be a part of a professional organisation, work for the progress of the company, as well as for self development.
I have special ability to work methodically and accurately under pressure and meet deadlines. I have ability in human resource management and acquiring sound degree of interpersonal managerial skills and work as a part of team.
1   2   3   [ 4 ]   5   6   7   8   9   10  
Seach Parameters

Change search parameters...
CATEGORIES: Administration;
INDUSTRIES: Mining;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2008 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com