Twelve (12) years of accumulated experience in construction engineering, project planning and management, using Primavera P3 ver. 3.1 for more than eight (8) years. Ten (10) years with Saudi Arabian Oil Company (Saudi Aramco), Saudi Electricity Co. - Eastern Region Branch (SEC-ERB) and Saudi Basic Industries Corporations (SABIC) project; refineries, offshore metering platform, HV & MV substations, petrochemical, mining facilities and infrastructures (oil & gas, petrochemicals and mining). Conversant with Industry Standards, Codes and Specifications. Fully conversant with project safety and quality procedures.
OBJECTIVE
To be associated with a company as Senior Planning Engineer where my interest and aptitude can mutually benefit me and the company, and to further enhance my qualifications and advance in the demands of the engineering profession.
EDUCATIONAL BACKGROUND
Bachelor of Science in Electrical Engineering, 1995
Bulacan State University, Philippines
PROFESSIONAL AFFILIATIONS
Fellow, The Int'l Association of Planning Engineers
Singapore
Registered Electrical Engineer, Professional Regulatory Commission
Manila Philippines
Member, Institute of Integrated Electrical Engineers
Manila Philippines
SPECIAL ACHIEVEMENTS/TRAININGS/SEMINARS
ACCPAC Project Costing Management Training, 2004
MONU-TECH, Al-Khobar, K. S. A.
Quality Management System Internal Auditor Training (ISO 9001: 2000), Cert. # 9005/02, 2003
IRCA - Det Norske Veritas (DNV), Dubai
ISO Awareness Training, 2001
JAL International Co. Ltd., K.S.A.
Basics of Supervision Training, 1995
IPCMI, Philippines
SPECIAL SKILLS: SOFTWARE PACKAGES
Planning Software: Primavera Planner P3 Version 3.1
Design/Drafting: AutoCAD 2002
Spreadsheet/Presentation: Microsoft Word / Excel / Outlook / PowerPoint
MAIN SPECIALTIES
MV/LV Switchgears, Power Transformers, voltage and current transformers, power and lighting system, cathodic protection system, DCS System, UPS System, Power Transmission's SCADA System, cables, electrical and process instrumentation, materials for industrial plants, and relevant control system.
PROFESSIONAL EXPERIENCE
FOSTER WHEELER (QLD) Pty. Ltd.
Queensland, Australia
E&I Planning Engineer, July 2007 – September 2008
- GORO NICKEL PROJECT (VALE-INCO)
Goro Nickel is a world-class mining project by any standard and a key part of Vale-Inco's growth strategy. It is located on the South Pacific island of New Caledonia, an overseas territorial community of France, Goro is among the best undeveloped laterite orebodies in the world, with excellent average grades, 55 million tonnes of estimated measured and indicated mineral reserves, and a very large resource base.
- Reports to the Lead Site Planning Engineer.
- Review and verify contractor's periodic schedule updates as they relate to the assigned facilities.
- Attend to the periodic Contractor's Progress Meetings and relevant project coordination meetings.
- Reconcile contractors' progress schedule with the monthly progress report and claim quantities. Inconsistencies, if any, to be reported to the Construction Manager thru the Lead Planning Engineer for follow up action with the contractor.
- Updating the Master Control Schedule as per assigned Facilities.
- Keeping the Lead Planner and Facility Manager abreast of concerns and/or potential problems and recommends possible solutions.
JAL INTERNATIONAL Co. Ltd.
Al-Khobar, Saudi Arabia
Projects Planning Manager, January 2006 – December 2006
Sr. Planning Engineer, November 2004 – December 2005
Planning Engineer, March 2000 – November 2004
- SAUDI STEEL (HADEED), STEEL PLANT EXPANSION PROJECT
- ARAMCO RIYADH REFINERY, SWITCHGEAR & CONTROLGEAR REPLACEMENT PROJECT
- SNC LAVALIN EUROPE B.V. - GULF FARABI PETROCHEMICAL CO. LTD., n-PARAFFIN & LAB PROJECT
- GULF STABILIZER INDUSTRIES, ANOX 20 EXPANSION PROJECT
- ARAMCO UPS SYSTEM UPGRADE, EXLORATION & PETROLEUM ENGINEERING CENTER, DHAHRAN, K.S.A
- SAUDI ELECTRICITY-ERB, 115/13.8KV SOUTH HOFUF SUBSTATION EXPANSION
- SABIC, SAUDI METHANOL CO. REVAMPING PROJECT (AR-RAZI)
- SABIC, AL-JUBAIL FERTILIZER CO. ELECTRICAL REVAMPING PROJECTS (SAMAD)
- SAUDI ELECTRICITY-ERB, 34.5KV &13.8 KV SCADA SYSTEM MODIFICATION FOR DOA, HOA & NOA SUBSTATIONS
- Lead the Planning and Scheduling team and be initially responsible for developing the detailed schedules for the Procurement or Construction phases (Level IV) of the project, and Interrogating interdisciplinary schedule requirements and restraints to ensure logical work sequences across all disciplines of the project and will be required to co-ordinate the plan formulation across the project phases.
- Establish reporting tools, attend progress meetings and analyze critical paths and restraints to determine effect of change or deviation from the plan and recommend workarounds to mitigate impacts, and maintain an awareness of the risk profile of the schedule.
- Preparation of project budget, Work Breakdown Structure and Percent Weight allocations, project construction schedule (Level 4), overall manpower and equipment loading, develop histograms, s-curves and among others.
- Project tracking and monitoring, preparation of technical and project progress reports. Submit daily activity report and look ahead schedule as per contract requirement.
- Evaluation of change order request for client's approval. Other relevant engineering calculations and duties as directed by the General Manager, Projects & Estimation.
- Evaluate potential problems that maybe encountered by the project and recommend possible solutions to the Project Manager.
- Project job costing and preparation and submission of Project's Monthly Invoice to client.
MOHAMMAD AL-MOJIL GROUP
Dammam, Saudi Arabia
Electrical Engineer – Level IV, October 1996 – December 1999
- SAUDI ARAMCO, JUAYMAH AXL EXPORT FACILITIES PROJECT,
- SAUDI ARAMCO, RAS TANURA REFINERY UPGRADE PROJECT PACKAGE-2, UTILITIES
- SABIC, EASTERN PETROCHEMICAL COMPANY (SHARQ) 1 & 2 PE DEBOTTLENECKING PROJECT
- Implement project engineering plan, project specifications, contracts, Saudi Aramco Standard and various industry standards.
- Responsible for materials quantity take-off, determination of subcontract items, and interpretation of construction drawings.
- Check design tolerance for adequacy to specification; resolve field engineering problems related to lighting, conduiting, motors, LV switchgears and process instrumentation, cathodic protection system.
- Initiates changes to accommodate existing conditions of plant utilities in accordance with Saudi Aramco Standard and Specifications.
- Preparation of cost estimates for revision and additional works.
- Check and prepare schedules for various works covered by the contract.
- Preparation of Electrical and Instrument Loop Packages for use in Combined Instrument loop checks with Saudi Aramco Representatives.
- Project as-built preparations.
G. MARRSO BUILDERS CORP.
Laguna, Philippines
Field Electrical Engineer, May 1995 – July 1996
LIGHT INDUSTRY & SCIENCE PARK OF THE PHILIPPINES PROJECT
- Project supervision on tasks related to electrical i.e. low voltage power system, lighting system, grounding system, among others.
- Conduct evaluation of actual construction activities and report on a regular basis to the Project Manager.
- Evaluation of tender documents, preparation of technical reports and provides assistance to project management.
- Assist in completion of design package and preparation of material quantity take-off associated with the project.