Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #82642
next resume »»
CONTACT INFORMATION:
View contact information...
Summary of Experience
I have over 17 years design and operations experience in the mining industry, having worked on a variety of projects both in Australia and overseas. My primary experience includes Nickel, Gold, Copper, Lead and Tantalum. I am also very experienced in Metsim modeling.
My operations experience was gained in South Africa where I worked for Gencor on various gold plant operations including BIOX, CIP, CIL and Merrill Crowe for 5 years. I was Production Superintendent at Gencor's Winkelhaak Gold Mine in South Africa prior to moving into engineering.
My design experience commenced in 1996 when I joined Fluor South Africa. I moved with Fluor to Australia in the middle of 1997. I have been involved as lead process engineer on numerous studies and projects in South Africa, Zimbabwe, Guatemala, Zambia, the DRC and Australia. I have also been involved in the commissioning and commissioning management of various plants in South Africa, Zimbabwe, Guatemala, Bolivia and Australia.
I have held a number of technical management positions.
Specific Experience
COMPASS RESOURCES (February 2008 to Present)
STUDY MANAGER METALLURGY
Responsible for the development of a pre feasibility study for a complex polymetallic deposit located in the Northern Territory. In addition to overseeing the PFS study engineer I was responsible for coordinating, reviewing and overseeing all testwork being performed for the study and managing other sub-consultants including mine planning, water and environmental.
For a short period (2 months) I assumed the role of Metallurgical Manager for the Browns Oxide processing plant in Batchelor NT to assist with plant commissioning and operation.
FLUOR AUSTRALIA (November 2000 to January 2008)
MANAGER, PROCESS TECHNOLOGY
In October 2004 I was appointed Manager of the Process Technology Group for Australia. I had 16 process engineers and 3 designers reporting to me. My management duties include staff performance reviews, budget preparation, training, recruitment and project/study staffing. In addition to this I was involved on projects and studies at various levels as required and also assisted with proposal preparations.
LEAD PROCESS ENGINEER, BOZSHAKOL COPPER-MOLY PFS
Lead process engineer for the Bozshakol PFS located in Kazakhstan. The deposit comprises a large low grade Cu-Mo deposit in Kazakhstan. The expected treatment rate is 25 to 30 mtpa. Focus was on sample selection and testwork development to progress the PFS study.
LEAD PROCESS ENGINEER, PROMINENT HILL PROJECT
Lead process engineer for the Prominent Hill Copper project. The plant, located in South Australia, designed for 8mtpa included primary crushing, stockpiling, milling, flotation, concentrate regrind, thickening (concentrate and tails), concentrate filtration and tailings disposal.
LEAD PROCESS ENGINEER, FRONTIER PROJECT
Lead process engineer for the Frontier copper project. The plant, designed for 8mtpa included primary crushing, stockpiling, milling, pebble crushing, flotation, concentrate regrind, thickening (concentrate and tails), concentrate filtration and tailings disposal. Assisted with commissioning of the plant in September 2007.
COMMISSIONING MANAGER, MARLIN PROJECT
Commissioning manager for Glamis Gold's Marlin project located in Guatemala. Responsible for the successful commissioning, start up and system turnover of a 5000 tpd Gold/Silver project. Facilities include crushing, SAG/Ball milling, gravity recovery, thickening, leaching, CCD, Merrill Crowe, cyanide recovery and tailings detoxification.
LEAD PROCESS ENGINEER
San Bartolome Silver Project
The plant, located in Bolivia at an elevation of 4200masl, is designed to process 5,400 tpd of silver ore. Facilities include crushing, scrubbing, stockpiling, SAG/Ball milling, leaching, CCD, Merrill Crowe and paste tailings disposal. Subsequently traveled to Bolivia to assist with the commissioning planning for the facility.
PROJECT MANAGER
Kansanshi Crusher Design
Project manager for the design of a 10 mtpa gyratory crusher and conveyor installation at the Kansanshi copper project located in Zambia.
PRINCIPAL PROCESS ENGINEER
Marlin Gold Project
Seconded to the Vancouver office for the Marlin EPCM project. The plant, located in Guatemala, is designed to process 5,000 tpd of gold/silver ore. Facilities include crushing, SAG/Ball milling, gravity recovery, thickening, leaching, CCD, Merrill Crowe, cyanide recovery and tailings detoxification.
LEAD PROCESS ENGINEER
Martabe Gold Project
Lead process engineer for the Martabe Pre-Feasibility study. The study included review of all the metallurgical testwork, performing a trade-off between heap leaching and CIL treatment, and determination of capital and operating costs for a CIL plant treating 5, 7.5 and 10 Mtpa. Gold recovery was via zinc precipitation.
SENIOR PROCESS ENGINEER
Goro Nickel Project
Performed a process review of the Goro Nickel Project for the pressure acid leach, CCD thickening and partial neutralization facilities.
SENIOR PROCESS ENGINEER
Esquel gold project
Senior process engineer for a definitive study for the Esquel gold project located in Argentina. Responsibilities included development and management of a metallurgical testing program to fully evaluate alternate processing routes for the highly preg-robbing ore body and establishment of design parameters. Preparation of a definitive capital and operating cost estimate for 3,000 tonnes per day gold Resin in Leach plant.
LEAD AREA ENGINEER
Murrin Murrin Litigation
Responsible for the technical evaluation, review and compilation of defence of various claims made against Fluor for the Murrin Murrin Nickel project. Liased and worked with various world-renowned experts for the provision of technical assistance for the autoclave circuit. Performed operational reviews of the Acid Pressure Leach facility of the Murrin Murrin nickel plant.
COMMISSIONING ENGINEER
Target Gold Project
Responsible for preliminary commissioning of the AVGOLD Target gold plant in South Africa. The project comprised a 105,000 t/month SAG/Ball CIP circuit.
SIGNET ENGINEERING PTY LTD (Nov 1999 to October 2000)
LEAD PROCESS ENGINEER
Wodgina - 2.5MTPA Tantalum Project
Provided Process Engineering and design input for the development of a 10 % capital and 5% operating cost estimate for the expansion of the existing Wodgina tantalum plant. Assisted in preparing the Lump Sum proposal for construction of the same project.
LEAD PROCESS ENGINEER
Wodgina - 3MTPA Tantalum Project
Provided Process Engineering and design input for the development of a 20 % capital cost estimate for a brownfields expansion of the existing tantalum gravity plant as well as for a greenfields tantalum plant.
LEAD PROCESS ENGINEER
Wodgina - 1.7MTPA Upgrade Project
Provided Process Engineering and design input for the development of a 10 % capital and 5% operating cost estimate for the expansion of the existing Wodgina tantalum plant.
SENIOR PROCESS ENGINEER
Helix Resources Vermiculite Study
Provided process assistance for the Hillview Vermiculite Study to produce a 35% capital and operating cost estimate for a vermiculite plant located in Queensland.
FLUOR DANIEL PTY LTD, AUSTRALIA (Aug 1997 to Oct 1999)
COMMISSIONING TEAM LEADER
Murrin Murrin Project
Seconded to Anaconda as Team Leader for the commissioning of the milling circuit, 4 acid pressure leach autoclave trains, CCD and neutralisation circuit. Duties involved optimising plant DCS control logic, staff operator training, process engineering for design changes, mini-Hazop's, plant investigations and relieving as Fluor's Commissioning Ramp-up Manager.
PRE-COMMISSIONING TEAM LEADER
Murrin Murrin Project
Team Leader for all pre-commissioning activities involved with the slurry milling circuit, pressure acid leach circuit and plant fire water system. Activities included controlling construction activities to achieve pre-commissioning target dates, DCS logic and interlock testing and circuit pre-commissioning and operability checks.
PROCESS ENGINEER
Murrin Murrin Project
Process engineering for the design of the pressure acid leach circuit for Anaconda's Murrin Murrin project. Duties included process engineering calculations, PID/PFD review, Hazop's, mass balance and PDS design review.
PROCESS ENGINEER
QNI Nickel Project
Process engineering for a 25% capital and operating cost estimate for a Lateritic Nickel/Cobalt project situated in Indonesia. Duties involved PFD definition for the entire circuit, development of the metallurgical mass balance, preliminary equipment sizing and process input to the cost estimate and final report.
FLUOR DANIEL, SOUTHERN AFRICA (January 1996 - July 1997)
SENIOR PROCESS ENGINEER
* Project Engineer for design, construction and commissioning of Barberton Mines Ltd. neutralisation plant, lime slaking and tailings thickening.
* Joint Proposal Manager for Barberton Mines Ltd. neutralisation plant.
* Process Engineer for the Wetar Copper Biox® Project pre-feasibility study in Indonesia.
* Lead Process Engineering for expansions and extensions of the milling, leaching, elution and regeneration areas of the Freda Rebecca gold mine in Zimbabwe and subsequently commissioning manager for the expansion.
* Metallurgical plant audit for Kinross Gold Mines in Zimbabwe.
* Process Engineer for Type II economic feasibility estimate for a milling / CIL plant in Tanzania.
* Process Engineer for due diligence study of Pb/Zn/Au/Ag/Cu concentrator located in Argentina.
* Study manager for 30% estimate for gold heap leach project in Zimbabwe.
* Commissioning Engineer for the Harmony Gold Mine elution plant.
* Marketing of the IBC superlig molecular recognition technology (MRT) aimed at recovery of gold from Merrill-Crowe and tailings dam solutions.
GENGOLD (Jul 1995 to Dec 1995)
PRODUCTION SUPERINTENDENT
Winkelhaak Gold Mine
Responsible for the metallurgical operations in the extraction section of the gold plant. Duties included metallurgical accounting, annual and monthly budgets, production planning, plant security, metallurgical training and plant safety.
GENCOR (Nov 1993 to Jun 1995)
SENIOR PLANT METALLURGIST
Barberton Mines
Senior metallurgist for the Fairview metallurgical plant. Duties included metallurgical optimisation of the milling, flotation, Biox® and leach CIP circuits.
Relieved as plant superintendent on numerous occasions.
Responsible for and involved with the following projects:
* Neutralisation plant preliminary design
* Flotation reagent mixing, storage and dosing system
* Biox® plant extensions preliminary design
GENCOR HEAD OFFICE, PROJECTS DIVISION
Responsible for capital and operating cost estimates for various metallurgical processes.
Involved in the design and implementation of approved projects.
Responsible for and involved with the following projects:
* Definitive design for the San Gregorio Gold Plant in Uruguay
* Design and installation of an Osmiridium scrubber at the Gencor Group laboratories.
* Order of magnitude capital cost estimate of an Ilmenite smelter
* Order of magnitude capital and operating cost estimate for a magnesia recovery plant.
GENCOR (Jan 1991 to Oct 1993)
PLANT METALLURGIST
St Helena Gold Mine
Responsible for metallurgical optimisation, problem identification and solution implementation.
Duties included relieving as plant superintendent and plant foreman.
Was also involved in metallurgical accounting.
Responsible and involved with the following projects:
* Design and installation of a PLC controlled solution sampling system for the filter and Merrill Crowe section.
* Evaluated the performance of wave liners and lifter bars in both the St Helena and Beatrix mines ROM mill and presented the paper at a MMMA conference.
* Computerised metallurgical accounting system for the St Helena Gold Plant
Publications
MMMA – Evaluation of mill liner/lifter bar performance (1994)
References
Will be provided
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 301 to 350 of 1267)
Go to Search Parameters...
Brief Description
Senior bilingual mining geologist/analyst available on contract basis, international project management, Exploration & Mining, training, business development.
I am looking for work in the mining industry as an Equipment Manager.
Having experience in Maintenance and Management of large Caterpillar Equipment working in Copper Open Cast Mining. I am extremely confident that with my experience, I can do a thoroughly professional and highly efficient job in any related assignment.
Mechanical superintendent/equipment manager skilled in all aspects of mining equipment, preventative maintenance, purchasing and procurement of equipment and parts, and the hiring, training and supervision of mechanics.
I would like to find a position where I could use the experience gained over the last thirty three years. Capable of supervising the many disciplines and crafts found in the mineral processing industry.
proven TEAM leader who can mentor, motivate and improve the functions of all depts. Excellent references to include the CEO, Presidents and Vice Presidents hands - on type of manager with a strong mechanical, customer, quality and administrative background. Total P&L resp.
I am a certified Maintenance Manager. While in the military I have operated numerous battalion maintenance facilities, trained personnel and foreign troops in several fields and was the NCOIC at the embassy in Dar EsSalaam, Tanzania.
Heavy Equipment Maintenance Manager with extensive experience in the repair of all major plant and heavy equipment (open pit/underground.)
Dynamic leader with excellent engineering skills. Widely experienced in various countries from pulp and paper, structural steel to specialist in maintenance, safety, all aspects of mining, program writing.
Superintendent with over 25 years experience in maximizing performance and profits in a mill environment. Strengths include diversified technical engineering skills, large scale project management and ability/expertise in leading large teams of hourly and exempt personnel.
Expertise in Multidisciplinary Integrated Uranium exploration,Airborne Geophysical Surveys, Remote sensing, GIS, MIS, Exploration Geochemistry, Field Geology, Exploratory Drilling
Maintance foreman cheif electrician certified electrician high med. low voltage certified mineforeman emt-m
A Site Area Manager presently on an overseas assignment with over 25 years of experience, a broad background in site construction, project management and contract administration. Highly developed people skills, interfacing with vendors, clients, owners and virtually all project stake-holders.
30 + years in Security and Law Enforcement. Extensive management experience having worked in several positions throughout the world
If you are looking out for someone who can 'Make a difference', Daring, Challenging, 'Thinking out of the box', Multi-tasking ability, is not afraid to speak up his mind plus Business Development, People Management proven experience & skills, please read this application.
Experienced metallurgist with extensive design and operations experience in gold, copper, nickel and silver,
Sr. Project Manager - pipelines, mining, heavy oil, oil and gas. International experience. Projects to $12B USD.
Intensive experience in heavy equipment workshop management,in service at Caterpillar agency and in client requests for repairs and implementation of warraty.Awarded "Man Of The Year in 1997 by Caterpillar Switzerland.
Mechanical maintenance management expert with experience on control systems and I/O devices. Training preparation and delivery experience. Planning experience. Troubleshooting experience. Management experience. CMMS, RCFA, and FMEA experience.
Versatile senior manager with extensive experience in maintenance, operations, and general management in both union and non-union mining and heavy industrial environments seeking a senior management position in either maintenance or operations.
With more than 12 years in Petrochemical and Paper industry and in various positions and discipline.
Mining engineer, MBA, presently mine manager in coal mine in India.
A Quality Assurance Professional Professional with Over 25 years of experience in Health, Safety & Environmental, Quality assurance, Quality control system development, implementation and maintenance of project HSE & QA/QC Standards. Preparation of Project HSE and QA Plan & procedures, Job Safety Al
30 years experience in large underground coal mine with modern tech., techno-economic study of mine project
10 years Mining and Construction - International Operations and Management experience, Bilingual mining engineer (English, Spanish).
13 years in various senior financial roles with Rio Tinto in Australia, Indonesia and China. Currently with Arnotts as Financial Controller in Papua New Guinea.
Omar graduated with a B.Sc of Accountancy from science & Technology University, Yemen in 2007. He joined PricewaterhouseCoopers “Jordan” in Jan 2008 and he is currently a experience associate, in the Assurance and Business Advisory Services.
I am a graduate mining engineer from the most reputed mining engg college in India(Indian school of mines) and holding a First class colliery Manager Certificate from Director General of mines safety, India.
Commercially minded, minerals industry professional with proven managerial ability, drive and entrepreneurial flair. An accomplished senior level negotiator, project manager and concise communicator with mature report-writing and analytical skills. Proven competency to Executive Director level.
20+years of open pit mining and process experience in lime, cement, aggregate and industrial minerals. Registered Professional Engineer, former Director of Operations for a $220,000,000 industrial minerals division. Trained in ISO, Lean, Total Quality Management and other methodologies.
I offer extensive experience in construction and heavy industry in a wide range of roles and positions with a detailed theoretical and practical working knowledge of the following that I have developed over the previous 22 years of my career as both an OHS&E Professional and a team leader.
electrical/mechanical maintenance supervisor
I have a diploma in mining engineering with 1st class manager's certificate, and15 years of experience in opencast mining operations. Skills like active role in mine production planning, cost control, inventory management ,equipment productivity, team-building & training, statutory requirement.
Experienced (11 years) General Manager, Plant Manager, Maintenance Manager, H&S Manager
Well experienced Financial Director with CA(SA) and Masters Degree in Accounting. Vast African and International experience. Was in charge of 18 African operations in 10 countries. Gets the job done within deadlines. Very accurate and technically astute.
Experienced Oil and Gas HSE professional
Looking for a position with your company in Il. I have 20+ years in the mining industry. I have been a face boss- shift mine manager and general mine manaqger.
Experience summary: Mergers and Acquisitions Advisory, Investment Banking, Valuations, Strategy Formulation and Implementation, Quantitative Analysis, Budget Planning, Commerical Proposals, Business Development, Competitve Strategy
Mechanical Engineer, Project Manager
25 years experience. Plant Manager and Area Production manager.
Implementation Manager or Technical Project Manager
OBJECTIVE: A position as an Environmental, Health and Safety Manager.
ERZ Controller (Underground Deputy)
20+ years exp and Involved in the commissioning of Copper/Gold Mine, Barrick Buzwagi
Competent Mine Geologist, Key skills - Analytical, underground mapping, core logging, Resource estimation using Datamine as well as leadership skills
Sr. Geotechnical Engr, Design and Construction of Underground Structures, Mgmt of Multidisciplinary Projects, Numerical Modeling, Rock Mechanics, Ground Support Design, Tunnel Inspections, Hands-on Experience in Applying FLAC, FLAC3d, UDEC and 3DEC Codes in Design, Work Under NQA-1 Q A Program
Managment, Project Managment, Geological and Ore Body Modelling Skills
Overseas experience Truck shovel operations Dragline operations Mechanical and electric trucks to 240 ton capacity Cat and Letourneau loaders. Electric and hydraulic shovels and excavators.
12 year experience in mining industry regarding international contracting, tendering, Project Planning and monitoring, Research and development activities, Mine Production , management, co-ordination.
HR Generalist with 14 years of experience
1
2
3
4
5
6
[ 7 ]
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
Seach Parameters
Change search parameters...
CATEGORIES:
Management;
INDUSTRIES:
Mining;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com