Senior level assignments in Project Management(Electrical) in the Industrial Sector.

Professional Summary
* An Electrical Engineering Graduate with over 19years' experience in the areas of Project Management and Maintenance & Operations in industry.
* A strategic planner with expertise in reviewing engineering drawings & designs, resource planning and contract administration to ensure completion of projects within the time & cost norms.
* Proficient in managing the erection, testing, commissioning & maintenance of a wide range of electrical control systems and equipments including MV VVVF drives (up to 4000 KW drives).
* Involved in Erection & Commissioning of Brownfield Copper Smelter -III of 250000 TPA capacity (Project value Rs 1450 crores). Basic Engineering by M/s Mitsubishi Matel Corporation, Japan. Commissioned in June 2005.
* Have been involved in the commissioning of the Greenfield Copper Smelter-II of 70000 TPA Capacity. (Project Value Rs 350 Crores). Basic Engineering by Ausmelt, Australia
* Have been involved in the commissioning of the Greenfield Copper Smelter-I of 100000 TPA Capacity. (Project Value Rs 1900 Crores). Basic Engineering by M/s Outokumpu Engineering Contractors, Finland.
* Well versed with ISO Quality Standards and the concepts of TPM, TQM, 5S and World Class Manufacturing Practices.
* A keen planner and strategist with skills in team building, organisation building capability and proven abilities in planning and managing resources.
* Electrical Head of Smelter & SAP-III Project & Maintenance Team of Smelter & SAP-I & II.
* Presently working as General Manager (Elect. & Inst) for projects & Maintenance with Chemaf S.P.R.L, DRC, AFRICA.

Organisational Experience

Since July 15, 2006 with Chemaf S.P.R.L DRC

Joined Chemaf in July 2006. Chemaf is having very big exploration rights in DRC for Copper, Cobalt, Gold, Siver, Cadmium etc. I was on deputation from Aug 15, 2006 to May 2007 to Australia for relocation of a Leaching, SX & EW plant to DRC.

My basic job was to supervise the dismantling activities, marking all component in identifiable manner, coordinate with Logistics, Identify missing links for new ordering, preparation of drawings for assembly at DRC etc.

I am presently responsible for all activity such as design, procure, install and commission the Electrical and Automation system such as 220kV switchyardm Substation DCS, PLC etc required for Cu Sx, Cobalt EW and SX, copper leaching plant and Floatation plants.

May'96; to July 6,2006 with Hindalco Industries Ltd. (Birla Copper)
Key Result Areas;
Project Planning & Management
* End to end project management from planning to site mapping to monitoring on-site activities and final execution of modernisation & capacity expansion projects.
* Monitoring projects with respect to Cost, Resource Deployment, Time over-runs, Quality Compliance and Manpower Planning to ensure timely execution of projects.
* Managing contracts with national & international engineering consultants / contractors.
* Conducting project review meetings for evaluating project progress & taking adequate corrective actions if required.

Technical Inputs
* Panel Room & other related Layout Engineering
* High & Low Voltage system design review
* Cable Scheduling & Cable Tray Routing
* Equipment Specifications finalisation
* Finalizing Bill of Material.

Operations & Maintenance
* Managing overall activities pertaining to erection and commissioning of a wide range of electrical machinery, systems and equipments.
* Involved in preventive & predictive maintenance scheduling and Computerized Maintenance Management System (CMMS) system including routine, preventive and predictive maintenance (e.g. infrared, and power quality), operational methods and procedures to include, but not limited to,
* Performing the functions of breakdown / preventive / corrective / routine maintenance for reducing machinery downtime to minimum.

* Verification of building inventory, P.M. task development, annual and special P.M. task development, annual and special P.M. scheduling, P.M. program automation and P.M. program administration and procedures.

* Ensure that work requests are consistently monitored, performed, and electronically closed out within established guidelines. Monitor and inspect completed work.

Materials Management
„P Designing, implementing and monitoring effective procurement schedules along with finalising the specifications to ensure ready availability of materials.
„P Handling project procurements along with target based negotiations.
„P Developing cost effective indigenous import substitutes for imported machinery/spare parts.

Quality Assurance/ Trouble Shooting
„P Ensuring complete in-process quality control and continuous improvement in process capabilities.
„P Proactively identifying the areas of quality failure and taking appropriate corrective measures.

Achievements
„P Achieved savings to the tune of Rs 55.56 Cr. through completion of Copper-1 expansion project in Rs.75.34 Cr. against approved CP of Rs. 130 Cr
„P Successfully executed Copper-II Project at optimal cost of 350 Cr. As against industry norms of Rs. 700 Cr.
Successfully adapted target-based approach viz., Questioning the need & specifications, Zero base costing, Indigenisation, On site fabrication i.e. non-turnkey concept, Limiting overseas assistance & Target based negotiations for optimizing resource utilization.

Highlights;
As Sr Manager - Electrical (Projects & Maintenance)
As Manager - Electrical (Projects & Maintenance)
* Heading the Smelter & SAP-I & Smelter & SAP-II teams for managing electrical maintenance works.
* Managing the Phase-III of the Copper Plant Expansion Project in coordination with Mitsubishi, Japan (for basic engineering) and KPGIL, Mumbai (for detail engineering).

As Dy. Manager - Electrical (Projects & Maintenance)

* Successfully executed the Phase-II of the capacity expansion project to increase the productive capacity of the Copper Plant by 70,000 TPA in coordination with M/s Ausmelt (for basic engineering) and M/s Mecon Ltd. (for detail engineering).
* Core Member of the team involved in executing the capacity expansion project to increase the capacity of the Smelter Complex to 180000 tons per year entailing:
- Setting up of 200 TPD Oxygen Plant, 35KA/90V Rectifier for Electrolytic Refinery & Copper Converter.
- Installation of new equipments in the Flash Smelting Furnace for upgrading the capacity from 100000TPA to 180000TPA.

As Dy. Manager - Projects
* Successfully executed all the activities for setting up Di-Ammonium Phosphate Plant with a rated capacity of 1200 TPD. (Presently the plant is operating at 120% of rated capacity)

As Dy. Manager - Electrical

* Managed the operations & maintenance of Smelter and Sulphuric Acid Plant.
* Successfully implemented TPM, TQM, 5S and World Class Manufacturing Practices and ISO 9000 System in the plant; achieved minimum motor failure rate in the unit.
* Designed and implemented Condition Monitoring System in the plant utilising SPM 2010 Data Logger, Raytek make Laser Temperature Gun, Engineering Stethoscope and EMC Motor Checkers.

As Asst. Manager - Electrical Joined in May'96;
* Played a major role in the commissioning of the Greenfield Copper Smelter of 100000 TPA capacity in coordination with M/s Outokumpu Engineering Contractors entailing:
- Smelter, Material Handling & Jetty.
- Sulphuric & Phoshoric Acid Plant.
- Electrolytic Refinery & CC Rod Plant.
- Cogeneration Power Plant.
- Oxygen Plant.
The project was rated as the fastest executed Greenfield Copper Project.
(Project Value Rs 1900 Crores)

Oct'90; to Apr'96; with Hindustan Zinc Ltd (Integrated Project Division)

- Joined Hindustan Zinc Ltd in 1990 in Integrated Project Division for the project of R.A.Mines & Chanderiya Lead Zinc Smelter.It was a 617 crores project.
Handled the erection, testing, commissioning and maintenance operations of 132 KV Switchyard & Beneficiation Plant at the Integrated Project Division, Udaipur and R.A. Project.

Commenced career with HH Elcon (I) Ltd. as Engineer (Mar'90; to Sep'90;)
Involved in testing of all type of switches & contactors/RCCB

Maintenance Purview: Major Area / Equipments

* Smelter -
„« Flash Smelting Furnace
„« Copper Converter (Rotary) & Anode Furnace (Rotary)
„« Material Handling System
„« Anode Casting Shop
„« EOT Cranes including Ladle cranes
„« HOT & Wet Electrostatic Precipitators

* Mines & Beneficiation Plant -
„« Crushers
„« Floatation cells, Floatation blower, Ball mills, Rod mills etc.
„« DC Drives
„« Pressure Filters
„« Thickners etc

* Electrical equipments -
„« Power & Distribution Transformers upto 40MVA
„« HT 33kV, 11kV & 3.3kV Switchboard
„« LT PCC with 5 Incomers & MCCs
„« 7.7MW 11KV Auto-transformer start HT Motor
„« 11kV & 3.3kV HT Motors - 92 no's
„« A.C. Variable Drives (VVVF drives upto 4000kW) - 132 no's,
„« Hot & WET Electrostatic Precipitator's - 6 no's,
„« DC Drives, beside others

Education

* B.E. (Electrical) from Malviya Regional Engineering College, University of Rajasthan (Now NIT, Jaipur) in 1989. (Secured 71%)

* Functional knowledge of MS window, MS project & Primavera project management package

* Recipient of Company's Excellent Achiever Award in 1998-99.
* Adjudged Fast Track Employee for last three years.
* Rated as Excellent in 2004-2005 Performance appraisal.

Training Programmes Attended

* Allen Bradley PLC and DC Drive.
* ABB's Astat 84 for EOT Cranes.
* Installation & Maintenance of LV & MV VVVF drives of ABB make.
* 15 Days Training at OEC, Finland for Operation and Maintenance of Copper Smelters.
* 15 Days Training at Mistsubishi Copper Smelter, Naoshima, Japan in Oct'04;.

Date of Birth: 20th February 1966

View contact information...
«« previous resume next resume »»
Search Results (Resumes 201 to 250 of 1871)Go to Search Parameters...
Brief Description
Registered Professional Engineer in the Province of Manitoba 4 years engineering and 2 years supervisory experience Possess strong computer skills Experienced in all aspects of longhole mine planning from long range layouts through to stope reconciliation.
Environmental & Water Resources Engineering Specialist - Mining
Blasting Engineer, Mining Engineer, Mineral Resources Engineer, Drill and Blast Engineer
Solution mining, salt geology, leaching, salt cavern, storage cavern, geology
Certified tradesman in Automotive Engineering
2008 -MSc. Mining Engineering- To defend Thesis by December 2008. - University of Mines and Technology, Tarkwa. Ghana Strong Human Relationship Skills . Sound written and communication skills. Strong Technical Mine Planning and Production skills. Strong computer skills,MS Office, AutoCad, Surpac
I am expert in maintenance , over hauling and truble suiting of diesel engine of various make e.g. cat, cummins , pekins etc, air comperassor of various make and capacity e.g i.r, atlas copcco etc.
Metallurgist 15+years experience. Process, project, and supervisory experience. Holds Master's Degree. Proven track record of improving process, recovery and throughput. I take pride in on time and sticking to budget.
I have developed good communication and analytical skills required for a good engineer through my leadership roles during my undergraduate studies and my involvement in various projects. I further sharpened my skills while working as a Metallurgist at Konkola Copper Mines.
I am a graduate of Geodetic eng'g and have 13 years of experience as land surveyor
Senior Geologist
Experienced, dynamic professional seeking career opportunities in a consulting, senior engineering, or technical supervisory position involving planning, development, construction, or operations.
Dynamic professional geologist with proven US/international success in strategic planning, project management, start-ups, engineering, exploration, mine planning and development, environmental remediation, permitting and civil construction.
I am originating from Congo D.R., engineer in metallurgy and production planning, with a valuable experience as Production Manager at Nova Mining of the Group New World Alloys, chief engineer at Luilu Hydrometallurgical Plant (Gecamines), coupled with a strong backg
History of Machine Design, Hydraulics, Structures, Transmission Designs, Project Management.
Job Title : Software Enginer Education : Ordinary Degree in Bachelor of Science Previous Employer: Motorola Australia Software Centre
I am a graduate in Mining Engineering having experience of 14 years. I had worked in Opencast Mines of limestone of Cement plants.
Geological Engineer. 17 Years Experience in Mining and Civil Geotechnics. Australian Citizen. Member Institute of Engineers Australia.
Indonesia Civil Engineer, 9+ years experiences in Civil Project Design Engineering, Planner, Scheduler and Controller, Develop Design for Construction and Execution
4 years in mineral processing: mill operation, metallurgical research, process control, project management, process design; 8 years in technical sales: grinding media, rock support, drilling equipment; 1 year in I.T.
Seasoned professional with significant experience in process development and beneficiation activities.
I am a Goldmedalist postgraduate in Geology from Karnatak University Dharwad India. I did my M.Sc. (Geology) in 1995 I have got altogether 11 years of experience in the field of Exploration and Mining. Presently working as a Sr. Geologist in Zambia (Central Africa) looking a Geologist job.
Mining engineer or blasting engineer, right planning of the accomplishments to see to it the company will make money as the companies main objective and for the progress of the the nation as well.
I am a qualified Mining Engineer and am keen to further develop my skills in a western environment. During my time at Vasilkovsky Gold Mine I have been working closely with Australia and Swedish expats in operational and planning roles.
Filipino licensed geologist with almost ten years combined experience in mineral exploration, mine operation and research. Knowledgeable in Microsoft Office programs, familiar with Autocad and Mapinfo basic commands, and currently orienting on Gemcom software.
Geologist
Over 12 years experience in the mineral resources sector having worked in Canada, Central America, South America, and South East Asia. Wide range of experience from exploration, feasibility studies, block model wire framing, resource calculation, and open pit mine operations.
Geological Database Administrator, Exploration Geologist, 8 Years Experience in Mineral geology, Exploration & Drilling Programs, and Geological Database management. , Proficient in Acquire,MS Office,Familiar with MapInfo and Micromine. Ready to work all over the world ,Sweden Permanent Resident
Innovative career in the field of electrical power engineering: Installation, Service and Commissioning
I am a Post - Graduate Mineral Processing Engineer with +20 years of rich experience in the field of Beneficiation of Iron Ore -both Magnetite and Hematite , Lead ore, Zinc ore and Chromite ore and Pelletisation and Sintering of Chromite ore. Presently handling Mineral & Met.
Project Manager with 19 years of hands on Experience of Executing Green field projects of Hydro & Pyrometallurgy- Zinc, lead & Copper, Cu SX & EW, Cobalt SX &EW, Leaching & Flotation plant, Copper Smelter. Transmission lines, HT & LT motors upto 7700KW, VVVF upto 5MW, Hot & Wet ESP's.
10 years experience, design and draughtting, using autocad and microstation. Most delt with materials handling, and underground and surface steelwork.
A result oriented mining engineer with experience in open pit gold & chrome mining as well as underground asbestos mining. Has been involved in Mine Planning, Mining Projects Evaluation & Management, Production Budgeting & Control. Operations Feedback
I am a graduated of Mineral processing engineer with 5 years experience in Mineral processing engineering.
A Professional Engineer with design, sales, plant, project, and application engineering experience.
Senior Training Officer, Mechanical with 17 years of extensive knowledge and experience in all aspects of technical training. Planned, developed, designed, conducted, mechanical training programs following the approved Competence Development Programs, ensuring mechanical fitters, tradesmen and techn
I have involved in petrochemical, oil/gas, and heavy industrial projects. I have strong academic achievements, excellent interpersonal skills, and positive attitude, Commitment and desire to perform engineering design. I am also exceptionally well organized and highly motivated and able to pull toge
A Mining Engineer completing an MSc in Rock Engineering. Also in possession of a Blasting Ticket and a South African Chamber of Mines Strata Control Certificate. Have got 5 years underground mining experience
chemical engineer,15years experience in copper solvent extraction& electro winning,worked 2yrs in central africa DR congo for copper & cobalt upgradation process as copper cathode & cobalt hudroxide,
I have been involved in mine mobile equipment maintenance for the past 16 years. Have handled different equipment brands from Tamrock, EJC, Toro, Eimco, JCI, Rammer, Atlas Copco and Wagner load-haul-dump (LHD) and low profile trucks(LPT) to underground jumbo drilling rigs, longhole drills,rockbolter
Lead Mechanical Engineer, 17 years of experience in preparation of Specification/ Material Requisition/ Proposal/ Scope of Work; Design Basis and calculations, Technical & Cost Evaluation; Vendor Drawing Review, Static, Rotating and Material Handling Equipment and Mechanical Packages
Seeking entry level positions as project engineer, planning and operational duties. Willing to relocate
Good Surpac skill, over 3 year experience, supervision drilling campaign, geological assessment
Provide structural engineering, construction management, real estate due diligence and expert witness services.
Mining engineer with a diverse range of experience is seeking a technically challenging position.
chemical and process engineer with mining and environmental experience
I have an extensive back ground in mining exploration. GEMCOM, SURPAC, and Mapinfo are some of the software products I have utilized in my career.
Engineering manager with experience in: Developing internal teams. Controlled a 35 multi-disciplined trades people. Contractor relations. Commercial awareness. Designed and project managed a US$1.6 million Waste fuel facility installation. Managed a maintenance budget of US$2 million.
Experienced exploration geologist available for overseas posting. Have worked for large foreign exploration companies during the past six years.
Mining Engineer, 30 yrs+ experience in Mining Management, (Coal, Hard Rock, Copper, Nickel)
1   2   3   4   [ 5 ]   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38  
Seach Parameters

Change search parameters...
CATEGORIES: Engineering/Technicians;
INDUSTRIES: Mining;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com