Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #69007
next resume »»
CONTACT INFORMATION:
View contact information...
Electrical QA/QC Inspector - Offshore/Onshore
CAREER SUMMARY
With extensive 5 years & 9 months experience as an Electrical Field Inspector with 7 years & 1 Month in Electrical Foreman and 8 Months Electrical Technician, with UPS System, Direct Heater Controls, Switchgears, MCC 's and other Electrical system and also in-charge for Overhauling of all Electrical system in Offshore and Onshore. A part in Construction and Installation of Electrical units such as Switchgears, MCC's, High and Low Voltage Motors, Distribution Transformers and other Electrical Systems.
Worked with companies like MAZCO (Mohamed Al-Zoabi Company) as supplemental manpower for Khafji Joint Operation Projects in Oil & Gas Production Facilities, McConnel Dowell Saudi Arabia, Ltd. (Aramco Riyadh Project), Safari Company, Ltd. (King Abdullaziz Int'l Airport Project), Han Youngshin Plant Company, Ltd. (Formosa Project Taiwan), Philnico Mining Corp., Manila Mining Corp. and Surigao Consolidated Mining Corp. (Philippines).
Well experienced as an Electrical Field Maintenance and Construction QA/QC & Foreman in Oil and Gas Facilities, Refineries, Airport and Mining Industries with a demonstrated ability to lead Maintenance and Construction Projects.
EMPLOYMENT HISTORY
* Mohammed Al-Zoabi Company (MAZCO) P. O. Box 882, Al-Khafji 31971, K. S. A.
Electrical Foreman Maintenance
Apr 2005 – Apr 2008
Project Assignment:
Al-Khafji Joint Operations (KJO) P. O. Box 254, Al-Khafji 31971, K. S. A.
A joint venture of Aramco Gulf Oil Co. (AGOC) & Kuwait Gulf Oil Co. (KGOC)
- Supervision and plan maintenance daily activities.
- Supervision installation, testing and commissioning of new equipment.
- Maintain and update records on all installation modification and maintenance jobs.
- Ensure electrical safety rules and regulations are followed.
- Ensure electrical maintenance procedure and preventive maintenance (PM) program are properly followed.
- Monitor spare parts compatibility.
- Review electrical wiring diagrams.
- Prepare regular inputs on work activities.
- Troubleshooting any electrical problem.
- Highlighting major jobs.
* Safari Comp, Ltd. P. O. Box 21444, Jeddah 15005, K. S. A.
Electrical QA/ QC Inspector
Dec 2001 - Dec 2004
Project Assignment:
King Abdullaziz Int'l Airport Project Jeddah, K. S. A.
- Makes inspection of electrical installations; receives complaints in regard to defective electrical work and personally disposes of difficult enforcement problems; investigates condition of electrical installation in buildings where fires have occurred and authorize re-connection of service; instructs electricians as to the proper location of incoming services and wiring centers; prepares reports and maintains records of work performed; supervises the inspection of electrical installations during construction and the examination of completed installations for workmanship and use of proper materials; appears in court as a witness.
- May participate in section operational processes including procedure development and implementation.
* McConnel Dowell Saudi Arabia, Ltd. P. O Box 30487, Al-Khobar 31952, K. S. A.
Electrical/Instrument QA/QC Inspector
Jan 1999 - Oct 2001
Project: ER 3755 Control System Replacement Saudi Aramco, Riyadh Refinery # 2
- Assigned in QA/QC Department and in-charge for inspection of Electrical/Instrument works and others related functions on this section.
- Prepares Request for Inspection (RIF) to Saudi Aramco Project Management (SAPMT) and Riyadh Refinery Project Inspection Group (RRPIG) for the completion of installed instrument with installation certificates and drawings including items like junction boxes, conduits, cable trays, stands and other related equipment ready for inspection.
- Receives delivery/purchased materials and compiled reports for any defects found or any non-conformance with reference to specifications of Saudi Aramco Engineering Standard (SAES) and Saudi Aramco Materials Systems Specification (SAMSS).
* Han Youngshien Plant Cons. Company, Ltd. (Taiwan)
Electrical/Instrument Foreman
Jan 1998 - Sept 1998
Project: Pvc/Miem Project Formosa Plastic Corporation
- Over all in-charge in all related woks for five areas 100, 400, 500, 7200 and Silo Area.
- Monitoring and Scheduling of works with respect to materials availability and manpower to a peak of forty-five (45) men.
- Responsible for reviewing revised plan and extracting all necessary details in order to submit for any conflicts and for any verification.
- Monitors and reviews civil, piping and mechanical plan to foresee any possible conflicts for immediate disposition of other group.
* Manila Mining Corporation- (Philippines)
Electrical Foreman
Mar 1994 - Aug 1997
Project: Construction of 5-km Double Circuit Power Distribution line Project
- Charge for new double-circuit power Distribution Line Project ranging from National Power Corporation (NPC) Substation to the Gold Mining Project Plant.
* Surigao Consolidated Mining Co. Inc.
Industrial Electrician
Jun 1993 - Feb 1994
Project: Maintenance of Plant, Housing and Office buildings Projects
- Responsible for the structural Preventive Maintenance of Controls, Boilers, Panel Board, Relays and other related equipment.
Supervision Skills
- Supervise installation, testing, commissioning and maintenance of following electrical fields.
- Computer skills like MS Word, MS Excel and Outlooks.
Special Skills
- Maintenance policies
- Professional standards
- Work Planning
- Report writing
- Scope of work preparation
- Electrical drawing review
SEMINAR/TRAINING
Hydrogen Sulfide Course Industrial Security & Safety Dep't July 16, 2007
Safety Division, AGOC & KGOC
Al-Khafji Joint Operations
Work Permit Receiver Course Industrial Security & Safety Dep't July 30-31, 2006 Safety Division, AGOC & KGOC
Al-Khafji Joint Operations
Portable Fire Extinguishers Industrial Security & Safety Dep't Sept 22, 2005
Training Course Safety Division, AGOC & KGOC Al-Khafji Joint Operations
Safety Warden Seminar Loss Prevention Department Feb 21, 2000
Saudi Aramco Riyadh Refinery No. 2
Riyadh, K. S. A.
Permit Receiver's Course Loss Prevention Department Jul 12, 1999
Saudi Aramco Riyadh Refinery No. 2
Riyadh, K. S. A.
Fire Extinguisher Training Loss Prevention Department Apr 07, 1999
Course Saudi Aramco Riyadh Refinery No. 2
Riyadh, K. S. A.
First Aid Training Course Seminar by Health Department Aug 12-14, 1996
Manila Mining Corporation
Placer, Surigao del Norte, Philippines
EDUCATION
* Immaculate Conception College Mar 1993
Bachelor of Science in Electrical Engineering (BSEE) - Undergraduate
* Surigao State College of Technology Mar 1991
Certificate of Technology
REFERENCES
Available upon request.
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 1151 to 1200 of 1734)
Go to Search Parameters...
Brief Description
I have previously worked as a Mechanical Engineer for a Japanese EPCC Company (Shinryo Malaysia Pty Limited) for five (5) years specializing in Quality Assurance / Quality Control. My last project for Shinryo Malaysia was for Malaysia’s largest Oil & Gas Company Petronas in Helsinki, Finland.
Hands-on engineering and construction individual with extensive experience in all stages of the industry, project & site support, field & maintenance engineering, technical expertise and interpersonal skills in order to function within a multi-discipline team or operate within a stand-alone environm
Civil, heavy, industrial, International, Construction
25 yrs mining experience. Engineering. Operations. Supervised heavy equipment. Team player. Give job 100%. Quick learner. Show respect to all individuals. Represent employer with professionalism. Impeccable attendance & safety. Open to international positions
Licensed professional civil engineer. Have worked mostly in construction as either an owner or an owner's representative. Enjoy doing field work and would like to work in a foreign country.
This is Rishikesh D from CHENNAI - INDIA, working in Ford India having 5 years Experince in Maintanence Field. Knowledge about breakdown maintanence, Preventive Maintanence, Predicitive, Condition monitoring, TPM systems and exposure in hydraulics, Pneumatics, Bearings and effective communicator
B.E Mechanical Engineer
MIT educated program manager/engineer seeks full-time employment in engineering, financial modeling/investing, or engineering management involving optimization, system identification, simulation, graphical user interface design/implementation, and/or control system design/analysis.
A competent and enthusiastic hydrogeologist with 4+ years of experience in the field of earth science. Specialises in dewatering, recharge and groundwater management projects. Has experience in project management, river basin management plan, drilling and pumping test supervision,
Entry Level mechanical engineer
QS/ISO 9000, FMEA/ Control Plan/PPAP
Procurement, Materials and Logistics Manager (SCM): 20 years international experience in gas & oil and energy projects.
Sr. Planner, Scheduler, Risk Management using Monte Carlo Simulation
2 years experience in power plant chemist, 3 years experience in industrial water treatment, well known water chemistry and corrosion chemistry, process and troubleshooting
Pabx installation engineer technician radio telecommunications telecoms
Service Support/ Product Support Heavy Equipment Maintenance Manager
Long experience, professional skills, mastered business sectors: Oil - Petrochemical plants, Banks, Government organizations, Multinational organizations, Hotels & Commercial companies all with its different type of applications, working environments and unique needs.
I am a recent graduate mining engineer that possesses the following skills: analyzing complex numerical information, working enthusiastically and productively under pressure, dealing professionally with teammates, and working efficiently in a variety of teams and on my own initiative.
Chemical Engineering 5 years degree with Production Management specialization
Chemical engineer with more that 6 yrs of experience in the field of process and projects
Industrial Marketing & Sales; Mining; Explosives; Business Strategy; CRM; BPR
Experienced with pumps, fans, turbines and compressors and all support equipment
Electrical and Instrument system design and commissioning, Project Engineering, Control and Automation Engineering. I am degree qualified in Electrical and Instruments
Results Driven Project Manager w/16yrs Industry Experience. Master of Civil Engineering/BSc Petroleum Engineering/Certified PMP/EPC Management/AFE Management/Contracts Review/Risk Analysis/Global Client Experience/Global Team Development: Lead by insistence on personal accountability and growth.
Well experienced as an Electrical Field Maintenance and Construction QA/QC & Foreman in Oil and Gas Facilities, Refineries, Airport and Mining Industries with a demonstrated ability to lead Maintenance and Construction Projects.
I have spent about 8 years, applying innovative approaches to spatial data development, Integration and Management practices in my various capacities.
Cwi/QA/QC Manager
Mineral Processing Engineer with in-depth knowledge and hands on experience in Analytical Laboratory Operations; Metallurgical Unit Process Operations
Since April 2004: Aeronautic Source Inspector “hardware” in Bourges and Méru (only 1 to 2 missions of 4 hours/month) for a diversified technology and manufacturing leader, serving customers worldwide with aerospace products and services (40% of sales); control technologies for buildings, etc
EE + Internatianal contracts egotiatins from proposal to contract concluding.
Trilingual Electrical Engineer
QUALIFICATION: DIPLOMA IN CIVIL ENGINEERING, GIS CERTIFICATE FROM JNTU UNIVERSITY, EXPERIENCE OF 7 YEARS IN DGPS TRIMBLE 5700, LEICA 1200, AUTOCAD2006
BSME Mechanical Engineer
Experienced and hands on work on MTS, SEM, XRAY, Hardness, Optical Microscopy, Metallography, Lecos etc.
Engineering Service Manager
I completed a Master Degree in Business Adminitration and Bachelor of Science Degree in Mining Engineering, and have more than eight (8) years experience working in the mining environment.
Mechanical Engineer
Welding and electrical and management and mining class 32 hour certified fork lift operator
9+ years of experience in Civil/Structural and Mining fields in Canada, Mauritius and UK.
I would describe myself as a flexible and energetic engineer. My strength is in the use of reservoir engineering’s software Eclipse and Stars. I also have a good understanding of the reservoir engineering’s techniques, and of petrophysic and the interpretations of the information’s. In my final thes
To secure a position in Environmental Health and Safety (EHS) Compliance with an established organization utilizing my 20 years of EHS skills, knowledge and experience.
20+ years of experience with the environmental aspects of major energy projects - power plants, pipelines, transmission lines, refineries.
Piping and Welding Supervisor QA
More than 9 years of experience in the GIS Industry.
I served my apprentership with Suir Electric an qualified in 2003. Since then i have worked in all areas of Domestic, Commercial & Industrial electricial work. In the last 18 months I have been employed as a Lifts & doors engineer installating and maintaining.
SKILLS SUMMARY Manager, with strong electrical and mechanical background, 15 yrs construction and maintenance electrical experience, 9 years mechanical experience, performed purchasing and business development skills,. Proficient in Microsoft Word, Excel,
I have over 27 years in mechanical repairs
I¡¦m a Canadian/ Syrian citizen with Business, Engineering, Water/Wastewater and (HSE) Health Safety Environment Background I have been working in the field of HSE (Health Safety Environment) management for past 10 years/ 5 yr Management HR BUS PR Project GS ADM OPS
Siemens , Allen Bradley PLC programming, Honeywell TDC 2000 and Foxboro DCS programming and troubleshooting. Profibus Certified installer and troubleshooting. Project management. Wonderware InTouch and Citech SCADA systems. Excellent troubleshooting skills.
I am looking forward to a challenging opportunity exponential growth in Mining. During my experience till date I have larnt a lot about the Industry.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
[ 24 ]
25
26
27
28
29
30
31
32
33
34
35
Seach Parameters
Change search parameters...
CATEGORIES:
Engineering/Technicians;
INDUSTRIES:
Mining;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2008 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com