Experience

39 years engineering, design, specification, procurement, construction, commissioning and maintenance of process control systems for a wide variety of process plants.

For details of my education and experience, please refer to the attached " Addendum to Curriculum Vitae ".

Professional Experience

July 2002 to Present Qatar Petroleum, Mesaieed, Qatar.

Senior Instrument Engineer

Mesaieed Refinery

Management and execution of maintenance engineering in the Refinery with specific responsibilities of the new Refinery utilising the Reflux Fluid Catalyst Cracking plant, and the Sulphur Recovery unit.

May 1995 to July 2002 Halliburton KBR ( South Africa )

February 2002 to July 2002

Lead Instrument & Control Engineer

Ammonium Sulphate Compaction Plant - Sasolburg, Freestate, South Africa

Client: Sasol Agri.

Management of design and engineering, software development, construction and commissioning of a new fertilizer compaction plant.

January 2001 to April 2002

Lead Instrument & Control Engineer

Expansion of Chlorine Production Plant - Sasolburg, Freestate, South Africa

Client: Sasol Polymers, Midlands Plant.

Management of design and engineering, software modifications, construction and commissioning of the Expansion Project of Chlorine Production Plant plus an 18" Steam Line complete with De-superheater Stations.

August 2000 to December 2000

Lead Instrument & Control Engineer

Optimisation of Paper Mill Effluent Plant - Mandini, Kwa-zulu Natal, South Africa

Client: SAPPI Craft, Tugela Mill.

Management of optimisation project, including open channel flow engineering, data logging, construction and commissioning.

January 2000 to August 2000

Lead Instrument & Control Engineer

New Pebble Crusher – Mapumalanga, South Africa

Client: Phalaborwa Mining Company.

Complete turnkey project involving fieldbus instruments, PLC control and SCADA interface for two new pebble crushers in the autogenous mill circuit of the open cast mining section.

October 1999 to January 2000

Lead Instrument Engineer

Kipevu Fuel Loading Station – Mombassa, Kenya

Client: Kenya Pipeline Company.

Basic proposal phase of a new storage and road loading facility for petrol, diesel and paraffin. Responsible for control and instrument design, budget and resource management and instrument project control.

April 1999 to August 1999

Lead Instrument Engineer

Kimberly – Clark -- Enstra Mill – Upgrade of existing Effluent Plant.

Engineering, design and construction supervision of new instrumentation for the upgrading of the existing Effluent Plant.

January 1999 to April 1999

Electrical Engineer / Project Engineer

Coca-Cola (Angola) – Coke Bom Jesus Plant

On this project I was responsible for the electrical engineering until such time that we could recruit a suitable electrical engineer. Amongst my responsibilities were the liaison with the Angolan Authorities on all matters of electrical interface and tariffs.

October 1996 to January 1999

Lead Instrument Engineer

Uplifting the existing United Brewery in Pretoria and re-locating it in Thika, Kenya.

Client -- SAB

My duties included the instrumentation and control design and engineering management, construction engineering assistance as well as commissioning of the total plant, plus the development of a new SCADA / PLC control system for the control of the Utilities as well as the Process plant.

April 1996 to September 1996

Control Systems Project Manager and Consultant

Sappi – Enstra Mill.

Conversion of the existing Bleach Plant, Brown Stock Washing and Black Liquor screening from local control to " ABB " DCS control, plus the upgrading of the Copeland, Bale Repulper and Effluent Plant control systems.

May 1995 to April 1996

Control Systems Project Manager and Consultant

Sappi – Ngodwana Mill.

Introduction of the first Pulp Ozone Bleaching plant in the Southern Hemisphere, plus increasing the Buffer Storage capacity of the total plant, the complete upgrade of the Number 1 Fibre Line from local pneumatic control to a DCS control, upgrading of the Boiler instrumentation and the implementation of a Hi Kappa Screening Process on the Number 1 Fibre Line.

February 1994 to April 1995 Alprom ( Pty ) Ltd

Senior Instrument Engineer

Alusaf -- New Hillside smelter -- Richardsbay

Primarily responsible for the design and site engineering support of the Cast House Area instrumentation which included the following:

Five Continuous Casting Machines plus eight Holding Furnaces in the Cast House, Cooling Water plant for the Cast House, eight Weigh Bridges, complete with communication and auto-tracking of ladles containing molten aluminium, Ladle and Tube Cleaning Machines, Ladle Pre-heating and Drying Equipment, and a Dross Treatment plant

October 1992 to October 1993 L & C Steinmüller ( Africa )

Senior Instrument Engineer

Mossgas -- Third Auxiliary Boiler -- Mosselbay

Responsible for the introduction and implementation of a control systems design and engineering office procedure.

November 1987 to September 1992 L T A Process Engineering

November 1991 to September 1992

Principal Instrument Engineer

Genref – Durban -- Off sites Project -- Rail Car Loading

Primarily responsible for rendering assistance to the lead engineer, with particular emphasis on technical adjudication and procurement of instrumentation as well as the design and implementation of assized metering systems and intrinsically safe loops.

September 1990 to November 1991

Lead Instrument Engineer

Richards Bay Minerals -- Mineral Separation Plant Uprate

My duties included the instrumentation and control design and engineering management, construction engineering assistance as well as commissioning of the total plant, plus the development of a new SCADA / PLC control system for the control of the above plant.

May 1989 to November 1990

Principal Instrument Engineer

Richards Bay Minerals -- Dry Mill Expansion Project

On this project I was responsible for leading the Instrumentation design and engineering team of the field engineering and commissioning, as well as being the construction contractor's Instrument Consultant.

November 1987 to May 1989

Senior Instrument Engineer

Mossgas -- Refinery Project

Managed all instrument CAD work including development of intelligent MFD's, manpower and budget, personnel training, production control, activity control and standards generation

August 1986 to November 1987 Alpret ( Pty ) Ltd

Lead Instrument Engineer

ESCOM -- Kendal Power Station – Water Treatment Plant

My duties included the instrumentation and control engineering design and construction management, engineering assistance as well as commissioning of the total plant.

January 1984 to July 1986 SASTECH -- Secunda

Senior Instrument Design Engineer

SASOL II & III -- Various

The various projects I was involved in on these two plants were as follows;

SASOL Explosives Plant – Responsible for engineering and design as well as construction engineering assistance and commissioning SCADA / PLC controlled.

Product Despatch Revamp -- Responsible for engineering and design as well as construction engineering assistance and commissioning. SCADA / PLC controlled system, as well as the integration with the overall plant DCS control.

Two Out Of Three trip and alarm voting systems trouble shooting for both SASOL II & III -- Responsible for field trouble shooting and engineering plus implementation and commissioning of solutions for the revamping of these systems.

SASOL II Oxygen Plant -- Engineering, implementation and commissioning of the optimising of flow and level instrumentation.

SASOL II & III Boiler Plants -- Engineering, implementation and commissioning of the optimising of temperature monitoring and control instrumentation.

SASOL II & III Plant wide -- Co-ordinating the implementation of DCS loops.

December 1982 to December 1983 Security Fencing and Electrification Business

Owner

Specialised in security fencing, alarm and electrification systems.

March 1980 to November 1982 Fluor South Africa

Instrument Design and Commissioning Engineer

SASOL II

Member of a specialised task force in electrical and control systems to optimise plant efficiency.

SASOL II & III

Two Out Of Three Shutdown and alarm systems, engineering and construction supervision.

SASOL III

Catalyst Preparation Unit -- Control Systems and 525 Volt distribution, engineering and construction supervision.

January 1972 to February 1980 Engineering Management Services / Uranium Enrichment Corporation

Instrument Designer / Design Engineer

Safari Two Project -- Valindaba

Client -- UCOR

This was a Uranium Enrichment plant and the details of this project are classified. Technical tasks included design, engineering, construction supervision, commissioning and site management.

January 1969 to December 1971 GEC English Electric

Trainee Engineer

Large Motor Division
Transformer Division
Switchgear & Fusegear Division

December 1967 to November 1968 Johannesburg Municipality

Quantity Surveyor's Assistant.

January 1965 to November 1966 South African Defence Force

Cadet officer.

View contact information...
«« previous resume next resume »»
Search Results (Resumes 351 to 400 of 1729)Go to Search Parameters...
Brief Description
To ensure the safe utilizing of assigned equipments by assigned subordinates, resources, competencies and skill to meet daily planned productions targets.
I hold a BSc. Honours Degree in Mining Engineering from the University of Zimbabwe. I am currently employed by Portland Holdings as a Technical Advisor in Mining. I have about three years previous experience in Surface and Underground mining including drill & blast, production planning/scheduling.
Qualification is Diploma in Mining Engineering and having surveyor certificate under indian mine act 1952, having your required experience is 15 years remaining details are given in resume.
As a experienced professional, I have the management and leadership skills to lead and motivate the team accomplished and attained scheduled work in adherence to company's safety, health and environment policies and standards.
I am an adaptable exploration geologist that has two years experience working in remote parts of Australia. During this time I have managed both RC and DD drilling programmes, carried out geological mapping, analysed historic data, and completed groundmagnetic surveys.
Core Logging, Bore Hole Logging, Rock Identification, Reserve Estimation & Calculation, Liasioning With Govt.
BSc Hohours Degree in Mining Engineering, Now working as Planning Manager for an Open Pit operation. Very good in Planning , using Surpac Mining software.
My experience in construction 6 years with contactor company.
Mine engineer with unique and varied experience for education level
Mechanical engineer doing master in mechanical and mining
CAD drawings AutoCAD2007, Design of metal structures, repair and maintenance of plant Equipment
B.S. Mining Engineering Tech., 27 Years Exp. in Coal and Related Industries. Administration, Engineering, and Safety Experience
Experienced, long and short range, production planner for open cut gold and copper mines in California and Arizona. Skilled professional with supervisory experience. Twelve years MEDSystem experience. Team player with excellent communication skills and perfect safety record.
Recent geological engineering graduate (EIT). Cooperative education background includes various forms of exploration, open-pit and underground mining experience, construction supervision and inspection, monitoring programs, and general geological, environmental, and civil engineering practices.
To obtain a position as an Engineer within a company where my experience and education will provide the opportunity for further growth.
Field and Exploration Geologist in Opencast mines on Beach Placer Deposit.
Mining Engineer
PhD and MD in Mining Engineering, Environmental Pollution due Mining Activity, Assesment Impact of the Mining Industry on the Environment
3 years of professional experience in Excavation, Drilling & Blasting,
Honours Engineering Degree. 2 Years quarry management experience. Computer Skills: Pro-Engineering, AutoCAD, and Ansys . I am also proficient on all Microsoft general software packages having completed ECDL 3.0.
Operates laboratory instrument like ICP-OES, XRF Spectrometer, AAS
Dual Post Graduate with Mechanical + Management with 8 years of Industry Experience is looking for fresh chanllenges.
11 years experience in various projects includes design, costing, construction and control. Project support experienced working in fast-paced environmental demand strong organization, technical and interpersonal skills
Lead / principal instrument engineer, technical equivalent of a Bsc degree in Electrical engineering. My experinece in brief :14 yrs Petro-chem, 5 yrs Mining, 2 yrs Paper,4 yrs Beverages, 1 yr Smelter, 1 yr Boilers, 1 yr Power, 8 yrs Nuclear
Safety Trained, Engineering Disciplined, Production Oriented, Cost Conscious
Geological Mapping - surface and underground. GIS, 3D CAD/mine planning software, computer programming C, C++, Fortran. Rock Mass Stability - including mechanical and geophysical properties. Technical and business writing, public speaking, and teaching skills. Knowledge of seismic risk assessment.
B.S. - Mining Engineering. 20+ years experience as a mining engineer and staff supervisor in open cut copper mining utilizing earth-moving, drilling, blasting, drainage maintenance, and dewatering equipment. Also have several years experience with open-cut coal mining. Willing to relocate.
Good experience in the operation of mining and quarry activities
Piping Designer PDS CAD
An enthusiastic and dedicated professional with extensive experience across all areas of land surveying with exception leadership skills who is able to develop and motivate others to achieve targets.
GIS, Oracle, SDE, ARCGIS, Data Model, Administration, Senior GIS, CMMI
Mechanical Engineer - 15 years of professional experience: of which 10 years as Project Manager for implementation of industrial plants and major expansions (Steel plant and Brewery) and 5 years as quality engineer and design engineer.
Design and Cam program.
Surface Mine Engineer
21 Yr Exp Power Electronics - Electrical Engineer, Large Variable Speed Drives & Motors, Automation
I consider myself a resposable and reliable professional, I always give the best of me to the company that i work for. My priority in life is to seek my family's and my own wellbeing
Highly experienced in heavy mining equipment, welding, electrical(including PLC's), and mechanical. Large hydraulic and electrical shovels.
I am Vibrant Metallurgical Engineer who loves new challenges and meets deadlines without comprimise on quality of work
Objective: positions utilizing my extensive knowledge and expertise in the field.
Please find herewith the enclosed resume of mine for the post of Mechanical engineer. As I have more than 10 years full experience in the field Heavy earth moving equipment.
Metallurgical engineer seeking an extractive metallurgy or mineral processing position. Interested in areas where the main objectives are process improvements and quality control. Analytical and inquisitive with a Midwest work ethic.
COMPUTER GEOLOGIST Databases, GIS & 3D Modelling Project & Quality Management
x
13MONTHS - SAFETY 7 YEARS - SHAFT 5 YEARS - DRIFTS 6 MONTHS - STOPES
I am an industrious, innovative, intelligent, success driven, and self-motivated university graduate. Dependability, poise, humility, very optimistic and above all God fearing are my hallmarks. I am a good team player with good communication and interpersonal skills
I am looking to join a mining company as a geotechnical Engineer, i am very interested in underground and open pit engineering.
Engineering Maintenace Management, Project Management, Production Management
Technical and Operations Experience. Currently Long Range Planner / Dispatch Engineer. BEng educated at Laurentian University School of Engineering in Sudbury, ON, Canada. I am looking for advancement opportunities, in a fast-paced and team-oriented workplace.
Exploration Geologist
I am a CWI, Level II in MT, UT, PT and RT film interpretation. I have US and overseas QA/QC project and manufacturing supervisory experience in the construction, petroleum, mining and aerospace industries. References and copies of certs. will be provided upon request.
1   2   3   4   5   6   7   [ 8 ]   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35  
Seach Parameters

Change search parameters...
CATEGORIES: Engineering/Technicians;
INDUSTRIES: Mining;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2008 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com