CONTACT INFORMATION:
View contact information...
PROFILE
More than 30 years combined experience maintenance in Process Plant, familiar with various systems that used in Process Plant such as Smelter, Converter, Kiln, Dryer, S.A.G. mill, Ball mill, Crusher, Apron Feeder, Screen, Grizzly, Conveyor, EP, Pre Heater, Leaching, Flotation, Heap Leach, Thickener, Pumps (Warman, G.I.W, KSB Ajax, Blakers, Southern Cross, and Galinger), Lightnin Agitator etc.
Experience background including:
* Gold & Copper Mine (AAM ¡V Anglo Asian Mining with position Plant Construction Manager, ABM ¡V Avocet Bolaang Mongondow with position Senior Mechanical Maintenance Process Plant, KEM ¡V Kelian Equatorial Mining with position Senior Mechanical Maintenance Process Plant, Freeport Indonesia ¡V with position Mechanic 1 (Act Supervisor)
* Nickel Mine (INCO ¡V Soroako with position Foreman Mechanical Plant Maintenance.
* Cement Plant (PT Semen Gresik ¡V with position Mill Wright Foreman (during expansion project with Main contractor MKI-America) before operation Pengolahan Bahan (raw material), Semen Andalas ¡V Lhok Ngah Aceh with position Mill Maintenance Supervisor.
EXPERIENCED
Has been worked with AIMC (Azerbaijan International Mining Company) at Azerbaijan, Anglo Asian Mining Group, 1.5 MTPA Gold and Copper project, Heap Leach system, with position Plant Construction Manager.
November 2007 ¡V Augustus 2008 As a Plant Construction Manager
Activities:
Preparation for construction as follow up PI&D drawing for selection all equipment list, find all spec of equipment, find quote all equipment and follow up with procurement to purchase also heavy equipment for mine. Preparation tender for contractor Mechanical (Steel fabrication structural and tanks), Electrical (Genset, Control panel Synchronization, MCC until install to equipment), Civil (Concrete base plant building, base of tanks and office building also accommodation).
Report
Direct to Director (CEO)
PT ABM (Avocet Bolaang Mongondow) Gold Mine at North of Sulawesi, Indonesia. Avocet Mining Group.
2.0 MTPA Gold Mine Heap Leach system, April 2004 ¡V October 2007
November 2004 ¡V October 2007 As a Senior Supervisor Mechanical Process Plant.
Activities:
* Supervised and organized 3 Supervisor 4 leading hand and 42 personal (mechanical, electrical, operations), responsibility to Manager Department, report to Manager Process Plant.
* Release Manager position (if Manager R&R or Annual leave)
* Supervised and responsibility all asset Process Plant for production prevents doesn't often breakdown such (main pumps, mixing agitator, elution column, adsorption, gold room facility, also generators)
* Safety: we apply safety system by the way of applying (tagging procedure, work permit, confine space, code color, safety talk, safety topic, SOP)
* Submitted Weekly report & Monthly report to Manager & General Manager
* Distributed and organized job orders (emergency jobs, daily -weekly-monthly jobs,. PM. schedule jobs) based on schedule from Process Plant Planning section.
* Conducted safety induction for new employee for Process Plant Department and regular safety meeting (daily, weekly, inspection etc.).
* Organized with purchasing section looking parts stock level and controlled material
April 2004 ¡V November 2004 As a Project Coordinator
Activities:
* Organized with: Drafter consultants, purchasing section, supplier, logistic section, supply section and others contractor ( H&H, ODG Balikpapan) for build in plant include equipments.
* Supervised and organized 2 Supervisors (expatriate), 4 foremen and more than hundred labours for this project.
* Responsibility safety for all construction crew to general manager / director.
* Report to General Manager / director (daily, weekly, monthly )
* October 2004, prepared for commissioning plant Heap Leach system
* Responsibility to General Manager / Director, supervised and organized more than hundred people during this project included with safety regular
PT. KEM (Gold Mining in East Kalimantan) Rio Tinto Group Indonesia 7.5 MTPA CIL and Gravity system June 1996 ¡V June 2003 (second period), Dec 1991 ¡V March 1996 (first period) Total joint with PT KEM 12 years.
Jan 2000-June 2003 As a Senior Supervisor of Process Plant Mechanical Maintenance (acting Superintendent).
Activities:
„X Supervised and organized 2 Supervisors (Crushing, Conveying, Water supply, Gold room, Workshop and Milling, Classification, Gravity, Flotation, Tailing), 4 Foremen ( Crusher, Conveying, Water supply + Milling, Classification, Gravity + Flotation, Gold room, Tailing = + Work shop, Rubber worker, Material Handling) and 6 leading hand and 42 personal (fitters, boiler marker, rubber worker, crane operators, riggers and tool store men).
„X Two weeks Visited to WA ( Perth, Kalgoorlie, Boddingtons )
„X Release Superintendent position during he on leave ( R&R or Annual leave)
„X Submitted Weekly report & Monthly report to Superintendent & Manager
„X Supervise and co-ordinate fabrication, installation repair maintenance, breakdown all equipment in the Process Plant from Crushing, Conveying, Milling, Leaching, Flotation, Thickening, Gold Room, Water treatment system until tail dump to dump pond. Also material handling equipment ( mobile crane 45 and 75 tons, link crane 150 tons, forklift, crane truck (hyap).
„X Weekly meeting with all section ( Operation, Electrician, Planner and Laboratory), about production
„X Monthly meeting with all section ( Operation, Electrician, Planner and Laboratory), about safety
„X Follow up safety issue for all crew, submitted safety report to NOSA inspection
„X Distributed and organised job orders (emergency jobs, daily -weekly-monthly jobs,. PM. schedule jobs) based on schedule from Process Plant Planning section.
„X Conducted safety induction for new employee for Process Plant Mechanical Maintenance section and regular safety meeting (daily, weekly, inspection etc.). Also we apply safety system by the way of applying (tagging procedure, work permit, confine space, code colour, safety talk, safety topic, SOP)
„X Monitored parts stock level and controlled of material and labour cost
Jan 1998-Jan 2000 As a Supervisor of Process Plant Mechanical Maintenance.
Activities:
* Supervised and organized 4 Foremen ( Crusher, Conveying, Water supply + Milling, Classification, Gravity + Flotation, Gold room, Tailing + Work shop, Rubber worker, Material Handling) and 6 leading hand and 40 personal (fitters, boiler marker, rubber worker, crane operators, riggers and tool store men).
* Release Superintendent position during he on leave ( R&R or Annual leave)
* Supervise and co-ordinate fabrication, installation repair maintenance, breakdown all equipment in the Process Plant from Crushing, Milling, Leaching, Flotation,Thickening, Gold Room, Water treatment system until tail dump to dump pond. Also material handling equipment (mobile crane 45 and 75 tons, link crane 150 tons, forklift, crane truck (hyap).
* Distributed and organised job orders (emergency jobs, daily -weekly-monthly jobs,. PM. schedule jobs) based on schedule from Process Plant Planning section.
* Responsibility about breakdown, minimise down time for all plant equipment
* Conducted safety induction for new employee for Process Plant Mechanical Maintenance section and regular safety meeting (daily, weekly, inspection etc.).
* Daily and weekly meeting with all section ( Operation, Electrician, Planner and Laboratory)
* Submitted Weekly report & Monthly report to Superintendent.
* Monitored parts stock level and controlled of material and labour cost.
*
June. 1996-Jan 1998 As a Foreman of Process Plant Mechanical Maintenance.
Activities:
„X Managed and leaded 6 Leading Hand 36 personal (fitters, boiler marker, crane operators, riggers and tool store men).
„X Follow up work order from planning section for jobs
„X Organized wit planning section, make plan for P/M schedule: weekly, monthly 3 monthly, six monthly and yearly
„X Reduced / minimize breakdown for all plant equipment
„X Organized for Mill reline with other contractor (Murchison Liners) and process plant crew
„X Repaired, maintenance and fixed the troubleshooting of Process Plant Equipment ( Mill and Crusher area)
„X Ordered spare parts, controlled and reported all jobs (waiting parts, waiting labour, in progress and completed) to supervisor.
„X Organized with Purchasing Department for stock level, ROP, ROQ in warehouse.
PT. NMR (Newmont Minahasa Raya) North Sulawesi, Newmont Group, Indonesia.
March 1996-June 1996 with position Maintenance Mechanical Supervisor (only 4 month), prepare for commissioning.
PT. KEM (Gold Mining in East Kalimantan) Rio Tinto Group. Indonesia. 7.5 MTPA CIL and Gravity system Dec1991 - March 1996 (first period)
July. 1993-March 1996 As a Foreman of Process Plant Mechanical Maintenance.
Activities:
„X Managed and leaded 4 leading Hand.
„X Follow up work order from planning section for jobs
„X Organized wit planning section, make plan for P/M schedule: weekly, monthly 3 monthly, six monthly and yearly
„X Reduced / minimize breakdown for all plant equipment
„X Organized for Mill reline with other contractor (Murchison Liners) and process plant crew
„X Repaired, maintenance and fixed the troubleshooting of Process Plant Equipment ( Mill and Crusher area)
„X Ordered spare parts, controlled and reported all jobs (waiting parts, waiting labour, in progress and completed) to supervisor.
„X Organized with Purchasing Department for stock level, ROP, ROQ in warehouse.
Dec. 1991-June 1993 As a Leading Hand of Process Plant Mechanical Maintenance.
Activities:
„X Managed and leaded 8 mechanical crew.
„X Managed and organized P/M ¡V Preventive Maintenance with Planning section ( weekly, monthly, 3 monthly and breakdown)
„X Repaired, maintenance and fixed the troubleshooting of Process Plant Equipment ( ROM Bin, Apron Feeder, Grizzly, Crusher, Conveyor, Gearbox Drive Conveyor, Splice Conveyor)
„X Ordered spare parts, controlled and reported all jobs to Foreman Expat
„X Start up / Commissioning Plant, we responsibility area 221 and 231 (start from ROM Bin until discharge slurry to Leaching Tank) included SAG Mill and Ball Mill, also Cyclone Feed Pumps
„X Before commissioning worked together with Main contractor BMM and Nedpag Engineering for installed ROM Bin, Apron Feeder, Grizzly, Crusher, Conveyor system (with Krupp Engeeniring Australia).
„X During the project report direct to Project Manager, and I lead more than 20 people. During the project responsibility to Crusher plant (ROM Bin, Apron Feeder, Grizzly, Crusher, Conveyor system) around one year for construction and erection Crusher Plant.
„X After commissioning, continue to Mechanical maintenance for operation under Process Plant Department.
PT. FREEPORT INDONESIA (IRIAN JAYA). FREEPORT MC MORAN
Oct.1988 - Nov. 1991 with last position as Mechanic 1 Mill Maintenance (Act. Supervisor)
Activities:
„X Supervised, organised, managed and leaded teamwork (around 20 personal) with tasks as follows: Repairing, reconditioning, regular maintenance and servicing component such as: crusher, conveyor, slurry pump, ball mill, water pump etc.
„X For Conveyor: maintenance more than 30 conveyor, changed rollers, pulley, gearbox, motor drive, conveyor etc.
„X Co-ordinated distributed and planned of all mill maintenance jobs mainly to support process plant production.
„X Produced or submitted daily, weekly and monthly report to supervisor
PT. ANDALAS CEMENT INDONESIA (NORTH SUMATRA), INDONESIA
May 1985-Dec 1987 As a Mill Maintenance Supervisor
Activities:
„X Supervise, organize, lead the team with tasks as follows: Repair, recondition, regular maintenance and service components of crusher, conveyor, slurry pump, water pump, service components of Raw/Ball Mill such as dust collector, bucket elevator, screw conveyor, cooler system etc. etc.
„X Report to Maintenance Superintendent.
PT. INCO-SOROAKO (SOUTH SULAWESI), INDONESIA.
May 1980 - Dec 1985 with last position as a Plant Maintenance Foreman.
Activities:
„X Started with low level mechanic and last promoted to foreman of Process Plant Maintenance
„X Repair, PM check, overhaul, servicing of Electrode smelter (Hydraulic system), Kiln, Rotary Dryer, Cooling tower system, EP- Electrostatic Precipitators, many kind of pumps, overhead crane (75 tone), granulation equipment etc.
PT.CEMENT-GRESIK (EAST JAVA). INDONESIA
May 1974 - April 1980 with last position as a Burner Operator.
Activities:
„X Jan. 1979 - Feb. 1980 Operate & running dryer to support production.
„X March 1977 ¡V Dec 1978 As a Mill Wright Foreman under contracted by MKI Company. Responsible Repair, install, and maintenance of Apron feeder, conveyor, electrostatic Precipitator, dust collector, loading pump, preheater etc.
„X Aug. 1974 - Feb 1977 As a Burner Operator, Responsible Operate and running cement kiln system as a main support production.
STRENGTHS.
„X Relate well with a wide variety of people.
„X Well understanding in cross culture especially between Indonesian and Australian.
„X Well in commitment, reliable and patient.
„X Willing to learn to improve capability.
EDUCATION.
Start from Elementary School, Secondary School, Senior Technical High School (certificated)
Industrial Technical Academy (not complete) 1976. Technical Industry.
MANAGEMENT TRAINING.
Leadership Training.
„X Supervisory Leadership by DDI, Experiential Leadership and Team Building by ACEL Australia, Train The Trainer by Austraining, WIS (What Is a Supervisor) by PT. INCO.
„X Supervisory Induction Program by PT INCO Completed
„X Train The Trainer by PT INCO Completed
„X Supervisory Leadership by PT KEM Completed
„X Experiential Leadership by PT. KEM Completed
„X Train the Trainer by PT. KEM Certificated
„X Intensive English (Level 2) by PT. KEM Completed
„X Personal Development by PSD (Jkt) Completed
„X Team Building by PSD (Jkt) Completed
„X Leadership Development by PSD (Jkt) Completed
„X Etc.
Safety Training.
„X STOP (Safety Training Observation Program), Hazard Spotting, SSIP (Supervisory Safety Induction Program) by PT. INCO, KesKem 2 day Training by PT. KEM. First Aid, Fire Protection.
„X First Aid courses by Freeport Completed
„X First Aid Courses by PT INCO Completed
„X First Aid Courses by PT KEM / AEA Jkt Completed
„X Confined Space by PT KEM Completed
„X Incident Investigation by PT KEM Completed
„X Chemical Handling by PT KEM Completed
„X Chemical Alert by PT KEM Completed
„X Etc.
Technical Training.
„X B.L.K.I. Singosari (Malang) by Gresik Cement Certificate
„X Electrode Handling system by PT. INCO Certificate
„X Electrode Power System by PT. INCO Completed
„X Slinging and Lifting by PT. KEM Certificate
„X P.K.P by PT. KEM Certificate
„X Warman Pump (Centrifugal & Horizontal) by PT. KEM Certificate
„X Rubber Liner by PT. KEM Certificate
„X Conveyor System by ALKON Certificate
„X Hydraulic & Lubricating System by PALL (Aust) Certificate
„X Sling, Welding & Leader by PT KEM Certificate
„X Etc.
Computer Skills.
„X Mainpac and MIMS network.
„X Ms Office
„X AutoCAD
PERSONAL.
53 years old with excellent health, married with 4 children.
View contact information... |