CURRENT POSITION: MEP PROJECT MANAGER
Mechanical, Electrical, Plumbing And Civil
Other Duties
Follow up Manager ¡V
Sales and Procurement
Planning and Estimating
Site Mobilization and Demobilization
Client Care

Included a summary of myself and my work experience gained in South Africa, Africa And The UAE

TASKS AS PROJECTS MANAGER
1.1 PROJECT INITIATION
* Establish Project Charter
* Appoint Project Team
* Set up Project Office
* Perform Phase Review
1.2 PROJECT PLANNING
„« Create a Project plan
„« Create a Resource plan
„« Create a Financial plan
„« Create a Quality plan
„« Create a Risk plan
„« Create a Acceptance and Communication plan
„« Create a Procurement plan
„« Contact Suppliers
„X Define selection process
„X Negotiate Suppliers contracts
* Create a Project plan. The creation of a comprehensive Project Plan for the success of the project. Identifies the activities and tasks to be undertaken to complete the project. Identifies the sequencing, duration and dependencies of tasks as well as the generic resources and financial expenditure require to complete the project.
* Create a Resource plan. Do a detailed assessment of the resources required to undertake the project, such as material and labour.
* Create a Financial plan. Determine the total quantity required during each stage of the project. The total cost of each item of labour, Equipment and materials, as well as the total cost of undertaking each activity within the Project Plan.
* Create a Quality plan. Ensure that the project deliverables meet customer requirements. Lists the quality targets that must be achieved,
* Create a Risk plan. Identified all foreseeable project risks within the Project Lifecycle and rated them in terms of their likelihood of occurrence and potential impact on the project. Prioritized the risks and set an action plan in place to reduce the likelihood
* of each risk and its impact on the project should it occur.
* Create a Acceptance and Communication plan. Ensure that customer acceptance is sought for each deliverable produced by the project. keep the stakeholders informed of the progress of the project. Listed each stakeholder and their requirements for information.
* Create a Procurement plan and contract suppliers. Acquire procurement items (such as products, services and specific results) from external suppliers. Plan which items will be sourced from external suppliers and the timeframes and methods for delivery.
1.3 PROJECT EXECUTION- (Monitor and Controls)
* Time management
* Cost management
* Quality management
* Change management
* Risk management
* Procurement management
* Acceptance management
1.4 PROJECT CLOSURE
* Documents
* Final cost, claims and profit review
* Demobilization
* Final project review and closure.
SKILLS / ACHIEVEMENTS
2.1 PROJECT MANAGEMENT, PROCUREMENT, ESTIMATING AND BUDGET CONTROLLING.

ľ STRONG MANAGERIAL, SUPERVISING AND TEAM BUILDING EXPERIANCE
ľ CIVIL AND BUILDING:
PROJECT MANAGER / CONSTRUCTION MANAGER
CONSTRUCTION, MAINTENANCE AND ESTIMATING
(LAY OUTS, BUILDING, PLUMBING & CARPENTRING) (15 YEARS)
ľ ELECTRICAL:
PROJECT MANAGER / CONSTRUCTION MANAGER / SITE SUPERVISOR
INSTALLATION, CONSTRUCTION AND MAINTENANCE,
ESTIMATING AND PLANNING / CONSULTING (24 YEARS)
ľ MECHANICAL: MAINTENANCE, INSTALLATION AND CONSTRUCTION / ESTIMATING AND PROJECTS MANAGEMENT
(10 YEARS)
ľ INSTRUMENTATION: INSTALLATION AND CONSTRUCTION
(3 YEARS)
ľ STEEL STRUCTURALS AND WELDING:
INSTALLATION AND CONSTRUCTION / PROJECT MANAGEMENT, ESTIMATING AND PLANNING
(5 YEARS)
ľ MAINTENANCE ENGINEER AND MAINTENANCE MANAGER
ELECTRICAL, MECHANICAL AND INSTRUMENTATION (13 YEARS)
2.2
ľ COMPUTER LITERATE (S.A.P. R3, EXCEL, MICROSOFT OFFICE, POWER POINT, VISIO, MS PROJECTS AND INTERNET)
ľ PEOPLE MANAGEMENT AND STRONG TEAM BUILDING EXPERIENCE.
ľ FLAME PROOFING EQUIPMENT. (7 YEARS)

2.3
ľ PROCUREMENT FOR ALL DISCIPLANES (Budged control)

COMMENCING WITH MOST CURRENT
LOCAL MEP PROJECTS Company (UAE) (04-2008 /CURRENT)
MEP PROJECT MANAGER
1) CAT III B AGL Upgrade of Existing Runway
Abu Dhabi Airport (ADAC, SCADIA)
(Resident Engineers ¡V PARSONS; Consultants ¡V HALCROW)
„« AED 31,000,000 ¡V 00
„« From Oct 2008 ¡V Current
-------------------------------------------------------------------------------------------------
2) 2K runway AGL fixtures
Subcontract to CCH
Abu Dhabi Airport (ADAC, SCADIA)
(Resident Engineers ¡V PARSONS; Consultants ¡V HALCROW)
„« AED 68,600,000 ¡V 00
„« From April 2008 ¡V June 2008 ¡V (Start Cat IIIB and International city Projects.)
-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
3) Street lighting Installation - (International City Phase 2 stage 2 and 3)
Subcontract to Al - Kharafi & Sons ¡V Nakeel
(Resident Engineers ¡V Bovis; Consultants ¡V Wilbur Smith
„« AED 25,888,660 ¡V 00 ( stage 2)
„« AED 33,048,020 ¡V 00 (stage 3)
„« From April 2008 ¡V Dec 2008
-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Job Description on Above projects
„« Submissions and Approvals
* Material Submittals
* Suppliers
* Safety Plan
* Logistical Plan
* Shop Drawings
* Method Statements
* BOQ
* Cost Control

„« Scope Installation: Project 1
* New pits installation,
* Installation of Primary and Secondary transformers and controlling devices,
* Earth looping systems.
* Primary cable circuits,
* Ducting installation as per design,
* Secondary cable circuits,
* Extensive re-circuiting, Core drilling and slot cutting for the Follow me milestone.
* Taxiway Centre Lighting,
* New Siemens fitting (8") in existing 12" Siemens base with adaptor rings,
* Thorn fittings in existing Thorn bases,
* Substation Modifications,
* Aprons - Omni-directional active / passive light installations.
„« Scope Installation: Project 2
* Installation of Primary and Secondary transformers and controlling devices,
* Earth looping systems.
* Primary cable circuits,
* Secondary cable circuits,
* Installation and Wiring of o Center Lights o Elevated edge Lights o Inset Lights o Touch down Lights o Threshold lights o Approach Lights (12" inset, Elevated Pole and Mast)
* Logitracts
* Sign Boards

„« Staff
* Project and site Engineers x 6
* Planning Engineer x2
* Draughtsman x2
* Site supervisors x 7
* Electrical Foreman's x 10
* Safety officer x2
* QA / QC Engineer x2
* Secretary / Site Clerk x2
* Electricians' x18
* Labourer's x37
* Drivers x5
------------------------------------------------------
„« Scope Installation: Project 3
* Digging and Laying of LV Cable's
* Installation of 630A and 160A Feeder Panels
* Earthing systems.
* Installation of 6, 10 and 12 m Lamp poles
* Design and installation of over 600 controlling circuits,
* Traffic Control lighting systems,

General Duties on all above Projects.
„« Study & review Contract Documents.
„« Study & analyze scope of work
„« Plan execution of project top match the completion period.
„« Coordination & follow up with project engineers for daily activities
„« Coordination with project consultants.
„« Attend daily/weekly/monthly meetings with consultant & client.
„« Plan the requirement of work force & machineries to match project goals.
„« Report to management in Head Office for project progress.
„« Study & analyze scope of work.
„« Dealing with Suppliers in obtaining the best prices.
RBA (PROPERTY DEVELOPERS ¡V ELECTRICAL AND RESIDENTIAL BUILDING CONSULTANTS
PTY LIMITED) RSA (South Africa)
AREA PROJECT MANAGER and CONSULTANT (JAN 2001 ¡V MARCH 2008)
Major electrical installations (For Industrial Business parks and residential areas)
CLIENTS
RBA. (own projects)
Private investors.
Star properties.
Khutala projects.
Coltex Investments.
JV Investments.
Sasol Petrol and Oil Refinery.
Sasol (SMX) Chemical Explosives
Anglo American (Coal and Diamond divisions)
South Africa Government Low cost residential projects.
„« Major electrical installations ( Electrical Consultants work for residential areas and Minor Airports)
In the Democratic Republic of the Congo (Kasai and Katanga Lubumbashi provinces)
„« Rand 483,730,000 ¡V 00 (In total for all Projects)
„« Electrical
* Installation of HT and LT transformers
* HT Switch gear (Sub Stations) ABB and Siemens
* DC Drives, Taco motors & Frequency control motors
* Motors 380V. 525V
* HT & LT Cable
* Sub Station reticulations
* Generators

„« Civil Construction and Maintenance
* Piling and Foundation Works
* Foundation drill rigs, hydraulic crawler cranes, hydraulic vibrators and bentonite desanders.
* Concrete work o Specialized concrete work (Culms and slabs)
o Shuttering construction o Steel Reinforcing (up 32mm)
o Strip foundations ( Under plinthing)
o Raft Foundations o Roads, excavations, Sewage systems and rain and storm water distribution
* Building construction o Building of Superstructure as a service to other developers o Building of complete units as a turnkey solution o Building 6860 houses and Accommodation units
MINTEK
SENIOR PROJECT MANAGER / ENGINEER ( ESTIMATING AND CONSTRUCTION) (FEB 1998 ¡V DEC 2000)
OPTAINING INTERNAL NASTIONAL DIPLOMA IN PROJECT MANAGEMENT
Experience on following:
„« Civil project
As above
„« Mechanical project and Estimating
* Hydraulic systems
* Presses, Ovens & Rotary ovens
* Oven refectories such as High alumna, Silicon carbide & Hard cast materials
* Diesel forklifts, Vehicles & Cranes
* Pressure vessel & Air blowing systems
* Multi stage pumps HP & LP
* Gearboxes & Bag filters, Bucket elevators & Centrifuges
* Zulser water-cooling towers & Clarifiers
* Rot Mills and Ball Mills
* Jaw / roller Crushers
* Stirrers (agitators)
* Mechanical seals (Burgmann, John Crane & Chesterton)
* Conveyor belts structures
* Air compressors
* Hydraulic power packs, pumps & cylinders
* Bloblulator plants. Bar casting machines. Apic Jigs and silver / God Refinery's

„« Structural steel and pipe project and Estimating.
* Projects ¡V steel structures welding and major Fabrications. Mild and Stainless steel.
* Bloblulator plants. Bar casting machines. Apic Jigs and Silver / Gold Refinery
* Pultruded structures
* PVC< Fiber Glass and all type of Plastics estimations
* Bought Outs and Consumable's

TRIDELTA MAGNETS SA, KWAZULU NATAL
MAINTENANCE / ESTIMATING SUPERVISOR 1989 - 1990
CONSTRUCTION AND MAINTENANCE SUPERINTENDENT 1990 - 1992
PLANT MAINTENANCE AND CONSTRUCTION MANAGER 1992 ¡V 1998
Project manager for new R175,000,000-00 Slurry and Magnet powder Plant (Isithebe Kwazulu Natal SA.(oversee a team of 50 people + Contractors, Sub Contractors, Project management and Consultants teams)
Maintenance Manager / Plant and Utilities
Managed all aspects of the maintenance organization to support the Production Department. Drive the completion of successful capital projects. Orchestrate the preventative maintenance program, including electrical, mechanical and instrumentation aspects. Designed and developed reliability-improvement projects and asset-Breakdown prevention programs. Coordinate major maintenance plant shutdowns. Serve as technical trainer for plant maintenance and capital project. Supervise several engineers, mechanics, and contractors. Drive reliability-improvement efforts and cut breakdown costs by implementing scheduled plant preventative maintenance and plant risk analysis practices.
Manage maintenance budget of SA.Rand5M.
Total control of the Engineering Department and support divisions:
„« Submitting regular monthly maintenance reports
„« Record regular technical plant inspections
„« Controlling and regulating downtime and report to Operational Director
„« Buying
„« Projects planning
„« Estimations of Projects and shutdown estimations
„« Budget control to estimations
„« ISO 9002 and writing of procedures for Quality control
„« Maintenance Planning
„« Breakdowns
„« Planning new installations
„« Shutdowns and shutdown planning
„« Project & work out Bar charts + Scope of work
„« Computer Literate (SAP R3, Excel, Microsoft Office & Power point)
„« Civil project and Estimating (material and labor / man hour)
* Reading drawings
* Foundation Layouts
* Reinforcing design
* Superstructures and Plastering
* Rainwater and sewage reticulation

Experience on following equipment (Electrical)
„« HT Switchgear ACB & OCB Breakers 6.6KV and 32KV
„« HT & LT Transformers
„« Harland DC drives and ABB. AC drives
„« DC Drives, Taco motors & Frequency control motors.
„« Siemens LT motor control 380V, 525V
„« HT & LT Cable Joints
„« Rectifiers
„« PLC fault finding and program changes (Siemens S5, Mitsubishi and DCS control)
„« Power factor corrections
„« Panel wiring, Control & Main circuit design
„« Instrument controllers (ER)) PID, TEMP, Shirt control)
„« Taco motors & Frequency control motors (Dynapar)
„« 380V, 525V, 6.6KV Motor control, HT & LT cable joints
„« SPAM & SPAJ Motor protection units
„« FMCG and Pneumatic Automation systems
„« UPS installations and systems

Experience on following equipment (Mechanical)
„« Hydraulic systems fault finding, modifications and new installations
„« Presses, Ovens & Rotary ovens (REIDHAMMER)
„« Oven refectories such as High alumina, Silicon carbide & Hard cast materials
„« Diesel forklifts, Vehicles & Cranes
„« Pressure vessel & Air blowing systems
„« High Speed Grinders
„« Multi stage pumps HP & LP
„« High speed Gearboxes & Bag filters, Bucket elevators & Centrifuges
„« Zulser water-cooling towers & Clarifiers
„« Rot Mills and Ball Mills
„« LP & HP multi stage Pumps slurry as well as water
„« Jaw / roller Crushers & Stirrers
„« Mechanical seals (Burgmann & Chesterton)
„« Conveyor Belts
„« Air Compressors
„« Hydraulic Power packs, pumps & Cylinders
„« Projects ¡V steel structures welding and major Fabrications (pipelines & steel / plate)

General Duties on all above Projects.
„« Study & review Contract Documents.
„« Study & analyze scope of work
„« Plan execution of project top match the completion period.
„« Coordination & follow up with project engineers for daily activities
„« Coordination with project consultants.
„« Attend daily/weekly/monthly meetings with consultant & client.
„« Plan the requirement of work force & machineries to match project goals.
„« Report to management in Head Office for project progress.
„« Study & analyze scope of work.
Dealing with Suppliers in obtaining the best prices.

ISCOR NEWCASTLE, KWAZULU NATAL
APPRENTICE ELECTRICIAN, MILLWRIGHT (MILITARY TRAINING INCLUDED)1980 ¡V 1984
ELECTRICAL PLANNER 1985 ¡V 1987
ELECTRICAL FOREMAN 1987 - 1989

CAREER OBJECTIVE
1) It is clear from the above that I have the technical expertise necessary to continue my track record of success. Please accept this attached resume as a humble promise of what I can offer your organization

2) To transfer the vast experience that I obtained in South Africa and Africa to any Company and it's personal. In South Africa I been exposed to a very wide field of training and experience, and from a young age been exposed across the engineer field from Electrical, Mechanical and Civil engineering, and through my work experience and the knowledge together with my strong ability to achieve and maintain deadlines of the projects that was assigned to me, I know I will be an asset to any Company.

For a more detailed explanation of my background, feel free to contact me at your earliest convenience. Thank you in advance for your consideration, and I look forward to our conversation.

View contact information...
«« previous resume next resume »»
Search Results (Resumes 51 to 100 of 1870)Go to Search Parameters...
Brief Description
A self-motivated mechanic with over twenty years worldwide experience, in mechanical engineering, on slow, medium, and high-speed diesel, generators, pumps, auxiliaries, hydraulics, and transmissions. I can work by myself, or part of a team with a proactive approach in the work environment.
has 18 years of experience in design and Projects in different disciplines, Mechanics, Piping and Structures, especially in Projects Mining, Industrial, Metal-mechanics, Design Systems CAAD (2D) and PDMS (3D), also Works in Land and Assembly
Metallurgist with more than 15 years of experience.
MASTER OF APPLIED SCIENCE IN MINERAL PROCESSING, 15YEARS EXPIRIENCE
Graduate of Colorado School of Mines, BS Mining Engineering (First in Class 1998), experience in surface and underground mines as well as construction management. Looking for a position of responsibility in operations or engineering with a mining company or large underground construction company.
Project management executive with experience in project management, coordination, planning, monitoring and controlling projects.
Mining Engineer. Management of costs and Budgets. Application of methodology PDCA of Deming. Selection of Mining Equipment. Handling of Explosives. Management of Contractors. Application of the Environmental Standards and Normative
Mining Engineer in area of Mine Planning- Surpac
Electrical Supervisor Mining
Prospecting,Boaring and Rotary Drilling, Geological Log and core-log Preparation Exploratory mining pit, Liaisoning, Estimation of Reserve, Sampling, Stacking, Environment pollution control & study, Preparation of Mining Plans in co-ordination with R.Q.P., Celebration of Envirnment and safety week,
MINING ENGINEERING,M.B.A(MARKETING)
Process economist for complex chemical and metallurgical processes
Mechanical engineer, with 15 years experience in mining mobile equipment maintenance
An experienced industrial minerals processor with vast knowledge of kaolin and talc processing. Work experience include 10 years in R&D (process and new product development) and 10 years in academia. Looking for the right opportunity outside the USA and Canada.
Diverse background in underground & surface exploration, underground production & ore control, resource modeling, geologic mapping, core & chip logging, process metallurgy & mineralogy, mineral analysis & geochemistry, laboratory operations, project management, mine planning, crew supervision
Dipl.-Engineer (Uni); Mining Ingenieer; underground Engineer
Mechanical Engineer mines maintenance
Chemical Engineer 25+ years experience in SCADA / PLC based Control Systems
with extensive experience in maintenance planning work, can initiate strathegic planning. with good knowledge in mechanical works and handled planning work on stationary and mobile fleet machines.
Exploration Geologist
Project Manager, BTech Business Management Degree, Trade Tested Fitter.
Maintenance & Operations, Commissioning & Testing of Power Plant H.F.O and Gas Based ,Mining equipment, CAT Equipment / Resource Management
I have a PhD in Rock Mechanics and Rock Engineering and have practical experiences in both mining and civil engineering. I am very competent in numerical methods in geomechanics.
Dynamic, energetic, results oriented, Geologist/Technologist with extensive supervisory and field experience seeks a technical/management position in a progressive thinking mineral resources organization.
I am a Geologist with an experience of over 23 years in Mineral Exploration,Mine Development and Environmental Studies.
GEOLOGIST WITH A WIDE EXPERIENCE IN MINING EXPLORATION
Skilled mining enginner (blasting engineer) and of upto 12 to 13 years experiance
I have master degree in mining engineering and i have 10 years experience in mining engineering field such as open pit mining and underground.I worked in coal underground mines, marble,florin,copper andmanganeze mines.i was the member of American society of minning ,metalurgy and petrolium engineer
I did my diploma in mining engineering from schools of mines , kolar gold fileds, board of technical examinations, karnataka, india. 30 years experience in underground field.
Electrical/Instrumentation. Design, supervise, commission and maintenance. 44 years experience. Tech Cert. T3, Nat.cert electrical N5, Prod. Mgr. Dipl. (4year). SAMTRAC,ITIS(Safety certificates, licence to train).etc.
Sr. Geologist / GIS Analyst / Mine Geologist / Structural Geologist
Current position held: Project Exploration Geologist, Reefton Gold Project. Gold exploration 1993 - 1995, 2000 - present. Oil exploration 1996 - 1998
22 Years of experience in Granite and Minerals Industry. Project Head and Managerial cadre experience.
Over 15 years mining experience in underground hard rock gold mine. Good computer, training and supervisory skills.
MEP Project Manager, Estimator, Procurement, Mechanical, Electrical, Civil, Plumbing
I am a qualified Mechanical Design Draughtsman and a Fitter Turner Machinist. I have also completed the Management Development Programme through The University of Stellenbosch.
Diploma in High voltage switching-Maintenance Planner-Electrical maintenance
25 years of professional experience in the Front-end and Detailed Design and Engineering, Projects Engineering, PMC, Factory & Site Acceptance Testing, Supervision of Installation, Testing and Commissioning of state-of-art DCS, SCADA, Safety Shutdown and F&G Systems and field instrumentation
Senior Mechanical Engineer (M.Sc.) having experience as plant manager and project manager, specialist in mining, safety glass, manufacturing plant and brewery investments.
To Secure a position with an established organization, to utilize my knowledge and experience in the field of Heavy Duty Equipment.
Marine engineer with all training necessary and green card
Senior mechanical engineer with experience in engineering for material handling, industrial installations and conveying machines in steel industry, mining, cement & chemicals. Start-up assistance for steel industry.
Extensive field application and R&D experience in hard rock drilling rigs, rock tools, DTH hammer, strong trouble shooting skills of hydraulics
A professional (M.Sc.Degree) well qualified Instrumentation / Process Control Engineer, with 28 years in-depth design, management, consulting, maintenance, and teaching experience.
20 years experience in mine planning and mine operations in several countries including Australia, India, Japan, Jordan, Indonesia, South America and North America.
A professional Mining Engineer with 15 years experience in mine ventilation
Masters in aviation and Wing Commander
Senior Hydrogeologist
B.E(mining),MBA, Marketing,14+ yrs experience in Mining Industry in Underground,opencast coal mines.
An experienced metallurgist position in R&D in mineral processing/gold extraction /mining waste remediation and/or technical improvement on mill operations in concentrators
1   [ 2 ]   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38  
Seach Parameters

Change search parameters...
CATEGORIES: Engineering/Technicians;
INDUSTRIES: Mining;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com