M.Sc. P.Eng.

A professional (M.Sc.Degree) well qualified Instrumentation / Process Control Engineer, with 28 years in-depth design, management, consulting, maintenance, and teaching experience.
Membership: Professional Engineers Ontario – License No: 90549635; APEGGA (Alberta Province) - License No: 58716

NATIONALITY: Canadian

EDUCATION

M.Sc. Precise Mechanics Engineering 1979 University of Warsaw, Industrial Automation & Metrology

TRAINING

Functional Safety Engineering Course (TUV) 2009 ACM Automation, Calgary
Smart Plant Instrumentation (SPI) User Training 2007 Intergraph, Calgary
Honeywell PKS Experion R300 Overview 2007 Honeywell, Calgary
Honeywell Safety Manager SIS Overview 2007 Honeywell, Calgary
DeltaV DCS design and configuration 2005 Spartan Controls, Edmonton
PlantScape DCS ctrl design and configuration 2003 Honeywell Canada, Calgary
Modicon Quantum PLC config. & programming 2001 Schneider Automation, Calgary
Petroleum Technology 1997 Canadian Petroleum Institute, Calgary,
Bailey Infi 90 DCS 1997 Southern Alberta Institute of Technology
Allen - Bradley PLC Programming Applications 1996 Southern Alberta Institute of Technology
Siemens PLC (Simatic S5 family) 1994 Siemens, Co., Poland
Design, Service, and Operation of Solenoid Valves 1990 ACSO Co., Netherlands

PRESENT POSITION

AMEC – Calgary, Canada (January 2007 – till present)
Senior Automation Engineer – Kearl Oil Sands project (Imperial Oil). FEED phase. Project cost estimate creation for Infrastructure, project specifications generation for PCS, PSD, communication, and security systems. P&IDs, control philosophy, shutdown philosophy, fiber optic communication block diagrams creation in coordination with Emerson DeltaV DCS/SIS systems. Detailed analysis and control systems approval process for the infrastructure of the project. Safety Integrity Level (SIL selection) for all safety functions across the whole project.

EMPLOYMENT HISTORY

1) FLUOR CANADA LTD. – Calgary, Canada (May 04 - March 05; April 06– Jan 2007)
Senior Instrumentation / Control Systems Engineer – Fort Hills Oil Sands Project – hydrotreater and hydrogen plant portion FEED phase.
Instrumentation and control systems cost estimation; P&IDs review & development in cooperation with licensor – Chevron Lummus Global (CLG), database creation for Instrument Index, Cause & Effect diagrams generation. Control philosophy development for the project.

Opti Canada/Nexen - Long Lake Bitumen (Oil sands) extraction and upgrading project. Asphaltenes gasification process – detailed engineering design of Safeguarding Systems (SIS), Safety Instrumented Function performance determination (SIL selection process) - SILect - Exida's SIL selection tool.
Layer of Protection Analysis, Required Risk reduction Target SIL calculation. Creation of the Safety Requirements Specification (SRS tool).
SIL Verification by using SILver™ 2.0 web-based software, ISA 84.01, and the new IEC61511 functional safety standards. Vendor bids evaluation control system architecture design.

2) TRI-OCEAN ENGINEERING – Calgary, Canada Apr 2005- Apr 2006
Lead Instrumentation / Control Systems Engineer – Kerr McGee North Slope Development FEED phase of the project – DBM, EDS generation, control philosophy and I&C specs creation.
Lead Instrumentation / Control Systems Engineer - BullMoose Development for Shell Canada – SCADA project. Gas wells and gas processing facilities
I&C detailed design, instrument specification selection and sizing, control system architecture design, assisting with HAZOP and SIL classification, project budget and time schedule control. Supervision/leadership of three I&C engineers.

3) SYNCRUDE CANADA LTD. / HONEYWELL – Calgary/Ft McMurray, Mar 02 – May 04
Senior I&C Engineer - Upgrader Expansion Project (UE-1) for Syncrude Ltd.
Bitumen (Oil sands) extraction and upgrading project (CDN $4.5bln); utilities and offsites at Fort McMurray (Alberta Province)– project budget and schedule management; detailed engineering design review, correction and modifications, bids evaluation – instruments sizing, selection and specification (InTools), control narratives, logic diagrams, SAMA diagrams, C&E tables, control system architecture modification (PlantScape, Modicon PLC, Triconex SIS
– Modbus TCP/IP). FAT, SAT and integration tests participation, commissioning and start-ups); CO Boilers (BMS), soot blowers, precipitators, utility boilers, boiler feed water pumps, steam turbines, power generators, water demin. system, precoat filters, water-cooling tower, air compressors, storage tanks.
Managed up to thirteen I&C staff – engineers, designers, and field-based maintenance technicians.

4) SNC LAVALIN INC. – Calgary, Canada Aug 2001 – Mar 2002
Rabigh Refinery (ARAMCO – Saudi Arabia) ESD System Replacement Project
Instrumentation Lead Engineer; Project scheduling and budget control; (PM+), SIL analysis, Logic Diagrams, Cause & Effect Matrix, and Logic Narratives creation, P&ID dwgs modifications, Project Database design -(InTools); Triconex PLC, Bently Nevada 3500 system - hardware specifications and bid preparation. TMR ESD system integration with Foxboro I/A DCS system. Mentored and supervised four mid-level control systems engineers.

5) KUWAIT OIL COMPANY (KOC), Kuwait Mar 2001 – Aug 2001
Oil Gathering Centres revamp and modernization projects, heavy crude 36" pipeline with booster station construction project.
Senior Instrument./Control Systems Consultant; Scope of Work creation; project schedule and budget estimate; KOC Corporate standards creation for instruments selection, sizing; installations and layouts; Control philosophy, control system (Fisher Delta V DCS) architecture and database design.

6) COLT ENGINEERING CORP. – Calgary, Canada Oct 2000 – Mar 2001
(SAGD) MacKay River crude extraction from oil sands project for PETRO CANADA.
Instrument./ Control Systems Lead Engineer; Instrument specifications development; Technical guidelines creation for instrument selection, specification, and sizing; EDBM, Control Philosophy and Control Diagrams generation. Control System architecture design (Honeywell – PlantScape; AB PLC-5), A-B PLC
application development for multi-port switching valves (spider valves). Supervison/leadership of seven I&C engineers at the detailed phase of the project.

7) BANTREL INC. (Bechtel) – Calgary, Canada Jan 1999 – Oct 2000
Shell Oil - Canada. June2000 – October 2000, Athabasca Oil Sands Downstream Project
Instrument./ Control Systems Engineer; Instrument Specifications Development; Control Philosophy and Logic Narratives generation.
Union Carbide Inc. Jan2000 – May2000, Petrochemical Plant Expansion Project (LP7) Red Deer, Canada
Control Systems Engineer; Modicon Quantum PLC programs troubleshooting, Moore Quadlog SIS testing and simulation. Integrating PLC applications with Honeywell
TDC 3000 DCS system.
Suncor Energy Inc. August 1999 – Jan2000 Fort Mc Murray - Millennium Project. Crude oil production facility and bitumen upgrade project.
Senior Instrument./ Control Systems Engineer; QA/QC - Quality Check/Assurance providing for instrumentation design; control philosophy determination, instrument sizing, specification, instrument installation details drawings, P&ID and loop drawings creation and modification
Suncor Energy Inc. Jan 1999 – Aug 1999 Fort Mc Murray PEP (Synthetic Crude Oil Production Enhancement Phase Project)
Senior Instrument./ Control Systems Engineer; QA/QC - Quality Check/Assurance providing for instrumentation design and specification, instrument installation details drawings, P&ID and loop drawings creation and modification. Instruments selection and sizing.

8) KENONIC CONTROLS (EMERSON) – Calgary, Canada Jan 1996 – Jan 1999
Wascana Energy Inc. 1996 - 1997, Plover Lake, Court, and Senlac oilfield batteries and satellites SCADA project.
Instrumentation Lead Engineer, Instrumentation corporate standards development, instrumentation design and specification, instruments installation details drawings generation, SCADA systems design, (Fisher ROC RTUs), P&ID modification, Allen Bradley PLC 5 program development and commission. for oil batteries, satellites and well-sites, Wonderware HMI graphics creation, project database development.
TransCanada Pipeline 1997 – 1999, I&C design for gas compression station
Instrumentation Lead Engineer. Instrumentation design and specification, project database design (MS Access), Control philosophy creation,
Modicon and GE Fanuc PLC programming, FAT, SAT and commissioning, Sterling valves sizing and specification, project budget and tiem schedule control.
Supervision of 7 intermediate engineers.

9) ARABIAN GULF OIL COMPANY – Sarir Oil Field, Libya Jan 1991 – Dec 1995
I&C Maintenance Team Supervisor. Maintenance of oil/gas/water production facility, water/gas/oil separation, wash-water injection, crude desalination,
LPG gas compression plant, oil refinery, and power generation plant. Participation in new projects commissioning and start-ups.
Instruments installation inspection. On - Job training provided for local staff.

10) GARYOUNIS UNIVERSITY - Benghazi, Libya Jan 1987 – Sep 1990
Lecturer, Lab Instrument Engineer - Lecturing of Mechanics of Machines, Fluid Mechanics, and Physics labs. Installation, starting-up scientific equipment and testing machines, scientific research participation.

11) MEDICAL EQUIPMENT FACTORY – Poland Jun 1979 – Dec 1986
Head of Production Department, Production department management – more than 100 employees, quality products and production time schedule execution, technological progress programs implementation and monitoring
Design Engineer, Control systems and instrumentation design for medical equipment manufacturing machines and assembly lines.

EXPERTISE
Industries Conventional oil and gas production; Crude oil/gas/water separation, pumping and storage; Transmission pipelines; Natural gas compression;
Condensate and LNG processing, LNG transmission pipelines; Gas distribution utilities; Oil refining; Refined product transportation;
Gasoline/Diesel/Jet fuel blending; Electrical power generation, transmission and distribution; Petrochemical Plant – polyethylene production;
Water purification, Plant utilities; ESD, Fire & Gas detection systems, Bitumen extraction and processing, naphtha & heavy gas oil hydrotreating (hydrocracking)

Studies: Preliminary engineering, Conceptual Design; Cost Benefit Analysis; Strategy Planning Studies; Facilities Control Philosophy Development & DBM
creation; Front End Engineering, Year 2000 Business Risk Assessment

Management Consulting: Process Optimisation; Strategy Planning Studies,

Information Systems: Requirement Specifications and Identification; System Evaluation; Procurement and Implementation; Object Oriented Design and Analysis

Systems Applications: Maintenance and Material Management

Instrumentation and Controls: Instrument Installation Details Drawing; Loop Dwg, Instrument Layout Dwg Generation; Instruments Selection, Specification and Sizing; Construction Work Packages; Commissioning and Maintenance Planning; Hot Changeovers; P&ID Development and Modification;
Control Philosophy Documents Creation; Control System Architecture development, PLC programming, DCS design & configuration, loop tuning
Liquid and Gas Custody Transfer Design and Engineering, Installation and Commissioning, Troubleshooting

QA/QC Program Development Instrumentation Engineering Standards, Equipment Specification, Instrumentation Design Practices,
Preventive and Predictive Maintenance Planning, Workshop Safety Standards

Industrial Plant Processes: Boilers, Compressors, ESD Systems, Fired Heaters, Pumps, Tanks, Gas Turbines, Heat Exchangers, Burner Management,
Fire and Gas Detection and Protection, Hydrocarbons Fractionation, Bitumen Coking & Hydrocracking; Mechanical Manufacturing, Assembly Lines

PLC and Human Machine: Allan Bradley Control Logix, A-B Control View, Siemens - Simatic S5, S7; Modicon – Concept; Moore Quadlog, Triconex SIS, DeltaV SIS;
Honeywell Safety Manager.

DCS: Emerson DeltaV; Honeywell EPKS Experion C200&300, TPS, TDC 3000, A/I Foxboro, Bailey Infi 90 & NET 90

Engineering/Maintenance: InTools, Instrument Information System (IIS), Material Applications Management (MatMan), FormTool, CAIES (Bechtel),

Sizing Software: Fisher-FirstVue, Masoneilan-Dresser control valves Sizing, Crosby/Anderson-Greenwood Consolidated PSV Sizing,
FloWell - orifice plates sizing.

Pipeline applications: Metering, Leak Detection

Relational database management: MS Access 7, IIS (Instrument information System), MatMan systems (Materials Management), FormTools, CAIES (Bechtel),
INtools,

Data collection protocols: A - B Remote I/O, A - B DF1, A - B DH+, Modbus, Modbus +, Modbus TCP/IP (Ethernet), ASCII
Documentation control: Revision Processes, Word Processing, Editing, QA, Convero, Fusion

Drawing Tools: Power Point, Visio, Smart Sketch

Project Management Tools: MS Project, TriFinity Pro,

Instrumentation Hardware: Pneumatic and electronic loop powered analogue, digital with software based communication, fieldbus (FF) compatible.
(Rosemount, Honeywell, Foxboro, Yokogawa, Endress Hauser, Johnson and Siemens etc). Gas and liquid meters - Oil Gear, orifice, positive displacement, mass flow, turbine type, ultrasonic, magnetic, vortex shedding, annubar, thermal; rotating equipment temperature and vibration monitoring
(IRD, Shenk, Vibrocontrol 2000, Bently Nevada 3500); Computerised oil flow metering (proving) - Waugh 1120

LANGUAGES
Fluent in English, good in Russian, limited in Arabic and Spanish.
NATIONALITY: CANADIAN
Married, no dependants; all diplomas, certificates and references are available on requests.

View contact information...
«« previous resume next resume »»
Search Results (Resumes 51 to 100 of 1870)Go to Search Parameters...
Brief Description
A self-motivated mechanic with over twenty years worldwide experience, in mechanical engineering, on slow, medium, and high-speed diesel, generators, pumps, auxiliaries, hydraulics, and transmissions. I can work by myself, or part of a team with a proactive approach in the work environment.
has 18 years of experience in design and Projects in different disciplines, Mechanics, Piping and Structures, especially in Projects Mining, Industrial, Metal-mechanics, Design Systems CAAD (2D) and PDMS (3D), also Works in Land and Assembly
Metallurgist with more than 15 years of experience.
MASTER OF APPLIED SCIENCE IN MINERAL PROCESSING, 15YEARS EXPIRIENCE
Graduate of Colorado School of Mines, BS Mining Engineering (First in Class 1998), experience in surface and underground mines as well as construction management. Looking for a position of responsibility in operations or engineering with a mining company or large underground construction company.
Project management executive with experience in project management, coordination, planning, monitoring and controlling projects.
Mining Engineer. Management of costs and Budgets. Application of methodology PDCA of Deming. Selection of Mining Equipment. Handling of Explosives. Management of Contractors. Application of the Environmental Standards and Normative
Mining Engineer in area of Mine Planning- Surpac
Electrical Supervisor Mining
Prospecting,Boaring and Rotary Drilling, Geological Log and core-log Preparation Exploratory mining pit, Liaisoning, Estimation of Reserve, Sampling, Stacking, Environment pollution control & study, Preparation of Mining Plans in co-ordination with R.Q.P., Celebration of Envirnment and safety week,
MINING ENGINEERING,M.B.A(MARKETING)
Process economist for complex chemical and metallurgical processes
Mechanical engineer, with 15 years experience in mining mobile equipment maintenance
An experienced industrial minerals processor with vast knowledge of kaolin and talc processing. Work experience include 10 years in R&D (process and new product development) and 10 years in academia. Looking for the right opportunity outside the USA and Canada.
Diverse background in underground & surface exploration, underground production & ore control, resource modeling, geologic mapping, core & chip logging, process metallurgy & mineralogy, mineral analysis & geochemistry, laboratory operations, project management, mine planning, crew supervision
Dipl.-Engineer (Uni); Mining Ingenieer; underground Engineer
Mechanical Engineer mines maintenance
Chemical Engineer 25+ years experience in SCADA / PLC based Control Systems
with extensive experience in maintenance planning work, can initiate strathegic planning. with good knowledge in mechanical works and handled planning work on stationary and mobile fleet machines.
Exploration Geologist
Project Manager, BTech Business Management Degree, Trade Tested Fitter.
Maintenance & Operations, Commissioning & Testing of Power Plant H.F.O and Gas Based ,Mining equipment, CAT Equipment / Resource Management
I have a PhD in Rock Mechanics and Rock Engineering and have practical experiences in both mining and civil engineering. I am very competent in numerical methods in geomechanics.
Dynamic, energetic, results oriented, Geologist/Technologist with extensive supervisory and field experience seeks a technical/management position in a progressive thinking mineral resources organization.
I am a Geologist with an experience of over 23 years in Mineral Exploration,Mine Development and Environmental Studies.
GEOLOGIST WITH A WIDE EXPERIENCE IN MINING EXPLORATION
Skilled mining enginner (blasting engineer) and of upto 12 to 13 years experiance
I have master degree in mining engineering and i have 10 years experience in mining engineering field such as open pit mining and underground.I worked in coal underground mines, marble,florin,copper andmanganeze mines.i was the member of American society of minning ,metalurgy and petrolium engineer
I did my diploma in mining engineering from schools of mines , kolar gold fileds, board of technical examinations, karnataka, india. 30 years experience in underground field.
Electrical/Instrumentation. Design, supervise, commission and maintenance. 44 years experience. Tech Cert. T3, Nat.cert electrical N5, Prod. Mgr. Dipl. (4year). SAMTRAC,ITIS(Safety certificates, licence to train).etc.
Sr. Geologist / GIS Analyst / Mine Geologist / Structural Geologist
Current position held: Project Exploration Geologist, Reefton Gold Project. Gold exploration 1993 - 1995, 2000 - present. Oil exploration 1996 - 1998
22 Years of experience in Granite and Minerals Industry. Project Head and Managerial cadre experience.
Over 15 years mining experience in underground hard rock gold mine. Good computer, training and supervisory skills.
MEP Project Manager, Estimator, Procurement, Mechanical, Electrical, Civil, Plumbing
I am a qualified Mechanical Design Draughtsman and a Fitter Turner Machinist. I have also completed the Management Development Programme through The University of Stellenbosch.
Diploma in High voltage switching-Maintenance Planner-Electrical maintenance
25 years of professional experience in the Front-end and Detailed Design and Engineering, Projects Engineering, PMC, Factory & Site Acceptance Testing, Supervision of Installation, Testing and Commissioning of state-of-art DCS, SCADA, Safety Shutdown and F&G Systems and field instrumentation
Senior Mechanical Engineer (M.Sc.) having experience as plant manager and project manager, specialist in mining, safety glass, manufacturing plant and brewery investments.
To Secure a position with an established organization, to utilize my knowledge and experience in the field of Heavy Duty Equipment.
Marine engineer with all training necessary and green card
Senior mechanical engineer with experience in engineering for material handling, industrial installations and conveying machines in steel industry, mining, cement & chemicals. Start-up assistance for steel industry.
Extensive field application and R&D experience in hard rock drilling rigs, rock tools, DTH hammer, strong trouble shooting skills of hydraulics
A professional (M.Sc.Degree) well qualified Instrumentation / Process Control Engineer, with 28 years in-depth design, management, consulting, maintenance, and teaching experience.
20 years experience in mine planning and mine operations in several countries including Australia, India, Japan, Jordan, Indonesia, South America and North America.
A professional Mining Engineer with 15 years experience in mine ventilation
Masters in aviation and Wing Commander
Senior Hydrogeologist
B.E(mining),MBA, Marketing,14+ yrs experience in Mining Industry in Underground,opencast coal mines.
An experienced metallurgist position in R&D in mineral processing/gold extraction /mining waste remediation and/or technical improvement on mill operations in concentrators
1   [ 2 ]   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38  
Seach Parameters

Change search parameters...
CATEGORIES: Engineering/Technicians;
INDUSTRIES: Mining;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com