Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #88148 next resume »»
CONTACT INFORMATION:
If you don"t see contact information, please log in first.

PROFILE
Accomplished Plant and Project Manager with successful worldwide
Experience working in diverse locations

➢ Proven record of leadership with critical thinking and decision-making talent, ability for visualizing the big picture, managing the details, training and motivating a team to achieve optimum results.
➢ Adept at various aspects of financials including cash flow management, budget development and administration, and due diligence audits.
➢ Expertise in analytical trouble shooting; resolving complex problems; managing logistics, cost tracking, and scheduling.
➢ Excellent communication skills to easily build relationships across diverse cultures and disciplines within major corporations and the government, including senior management; technical, operational, subcontractors, crafts, and clients/owners.
➢ Demonstrated ability for ensuring a smooth flow of operations, bringing projects in on time and within budget, as well as maintaining the highest standards of quality, safety, efficiency and client satisfaction.

➢ PROFESSIONAL QUALIFICATIONS in the Mining Industry
Plant Management, Project Engineering and Management

Plant Manager
ISP Minerals, Pembine, Wisconsin
Promoted to Plant Manager to operate the day to day operations of a minerals processing plant and mine. Safely managed 250 union mill workers and 75 contract employees in the day to operation of this plant. Provide leadership of production, technical and maintenance teams in processing of colored materials used in the construction industry. Produced 488,000 tons of material annually in an open pit operation under severe to moderate climatic conditions. Reduced energy costs by 22% by reducing natural gas consumption and electrical consumption modifications.
Project Manager
ISP Minerals, Pembine, Wisconsin
Retained to manage the engineering, procurement, construction and start up of a 12.5 million dollar plant expansion. This expansion included the selection and purchase of new excavators and haul trucks, installation of primary and secondary gyratory crushers and screens along with new rock dryers that replaced in entirety an existing parallel operation. The project included the complete conversion of all controls and instrumentation from 1950 era pneumatic control to the state of the art electronic DCS and PLC operation. Project further modified the colorization and kiln firing of the process minerals. Installed indirect pre dryers that reduced gas consumption by 15% plant wide.

Plant Engineer Manager
Ormet Corporation, Burnside, Louisiana,
Retained to establish technical engineering plant engineering, capital engineering and maintenance department for this Bayer based alumina refinery. While reporting to the vice president of operations, I developed the manpower and staffing necessary to provide engineering and maintenance functions to the 750,000 ton per year metallurgical refinery. The refinery had been idled three years during bankruptcy and required extensive refit of all systems. Installed new boilers and gas turbines to lower the operating costs and to remove the plant from purchased power. Combined under one set of DCS controls the mill DCS and PLC structure to reduce cost and lower personnel requirements. Managed this staff and trades group of 200 personnel in a safe manner while reducing maintenance costs and lowering utility and electrical costs. Developed and installed a new process where gas turbines were used to provide electrical power and the exhaust gas was used for drying thereby reducing cost of drying and calcining by about 6.2 million dollars annually.

Project Consultant
Confidential Client
Professional Services Contract
Provided the process and mechanical expertise for the installation and modification of rotary calciners to utilize elemental oxygen supplemental firing to reduce fuel consumption and to provide NOX reductions. Implementation of the system allowed the client the recovery of 7 % reduction in fuel costs plant wide and reduced NOX load thereby maintaining emission criteria.

Project Manager
Mineracao Rio de Nortes, Trombetes, Para, Brazil
Managed the installation completion and commissioning of a new bauxite mine and processing unit in the upper Amazon area of Brazil. This expansion valued at 156 million US dollar provided a 3.4 million tonne per year increase in bauxite capacity providing a total capacity of 12.6 million tones per year. Managed an expat staff and Brazilian team members in the tie in and connection of this processing unit. The plant was completed on time and commissioning occurred with an up time of 94% availability within 21 days of the commissioning start date. After entire project had 100% uptime within 45 days of the start.

Project Manager
Mineracao Rio de Nortes, Trombetes, Para, Brazil
An additional project of tailings management and tailing dewatering and silt control involved the installation and operation of a dewatering and silt control system to reduce or eliminate tailing discharge and fines into tributary waters. Project involved the installation of retention ponds with pump stations and primary and secondary settling clarifiers. Four miles of 42 inch HDPE piping was installed with four pump stations with a connected 25,000 HP pumping capacity.

Production Coordinators(Interim)
Corporacion Nacional del Cobre de Chile
At Chuquicamata, Chile
Assigned on a temporary basis to this position to operate the chemical process of this new project which included SX/EW, primary and secondary leaching, of refractory sulphide copper ores. Operated with a Chilean crew the milling and extraction complex of this new project. I developed training and physically trained all new and old operators in the operation of this new expansion. Control logic was changed from filed mounted pneumatic manual controls to electronic control thru PLC control.

Project Manager
Corporacion Nacional del Cobre de Chile
At Chuquicamata, Chile
Retained to provide the upfront engineering and the start up commissioning of a new copper unit in an existing operation. The existing operation was based upon both oxide and sulphide ore extraction using SX/EW. A new underground mine was being installed as apart of this project. Provided process engineering leadership to a Dutch Engineering firm to develop the process surrounding the process unit. Directed the construability phase and the maintenance and engineering requirements during construction. Commissioned, started up and turned over the operating unit to Codelco. Provided a unique talent for control instrumentation changes from pneumatic to electronic.

PROFESSIONAL QUALIFICATIONS in the PAPER INDUSTRY
Plant Management, Project Engineering and Management

Plant Manager
Directed startup of Egyptian manufacturing plant operation, including establishing organization and structure, hiring Egyptian and expatriates to fill key positions. Negotiated with German contractor to provide engineering, maintenance management and personnel. After facility was online, equipment availability was 91%, and a new speed record was established. At end of professional services contract, transitioned project to locals; interviewed and hired permanent plant manager.

Project Engineer
TRS Staffing, Houston, Texas
Contracted to Fluor Daniels
Established a start-up and commissioning plan for all trades and disciplines for the restart of two machine Kraft paper operation that had been idled for a three year period.

Production Manager
Expertise as Owner's Representative and Production Manager for startup operation for a Kraft mill in Russia. Directed daily management and oversight to ensure owner that project was operating correctly and effectively. Supervised over 350 employees including laborers, engineers and technicians.

Project Consultant on this short-term job I manage the engineering and construction needs of this paper machine project. Primary thrust is the completion effort of all work that has been postponed and to develop a viable plan for steam and electrical generation.

Project Manager of special projects group. In special projects the emphasis is the development and implementation of Capital Projects that depart dramatically from corporate classical capital projects management and operation. Managed and directed the implementation of:
* Installation of 35 Meg backpressure steam generator and turbine. Project included the retrofit conversion of all electrical systems to 13.8 K Primary feed. Value 67.77 Installation and startup of a 35 TPD chlorine dioxide generator.
* Managed and directed the installation of an AQ pulping system conversion with the mill in full production. Value 16.56 million dollars
* Assignment as Maintenance Manager Paper Machines to align and reestablish electrical and mechanical maintenance programs, management, supervision and crews for the paper machine maintenance group.
* Managed and directed the upgrade of a waste paper recycling plant from 250 TPD to 350 TPD by installation new wet lap, presses, screens, cleaners, peroxide bleaching. Value 11.2 million dollar
* and directed the rebuild and conversion of a paper machine all of which was done with the plant in full operation, consisting of: installation of a new press section, calendar rebuild, installation of a new broke system, installation of machine gauging system, new hood ventilation. Value 21.1 million

Capital Project Manager, assigned from Corporate Engineering, for the installation of a complete coated board machine in an existing facility. Removed existing machine and installed board machine with Temsec press and coating section. While assigned from Corporate Engineering, included turnkey engineering packages for the upgrade and modernization of tissue machines. Additionally, provided engineering and program for upgrade of paper machine dryer system. Provided conceptual engineering process design, develop equipment specs, developed drawings, obtained construction bids, and prepared budget and funding requests. Debottle necked production problems on all tissue machines.

Rebuild Project Manager, in the rebuild of a tissue machine. Developed schedule for all trades, purchased all materials and parts, supervised all construction crews and sub-contractors. Project started ahead of schedule and was within budget. Additionally, provided in shop supervision of the final fabrication and pre-erection of a second tissue machine in vendors Swedish shop.

Engineering Manager in the installation, erection of board machines, off machine coaters, and pressurized ground units sold by this firm worldwide. Managed a staff of 200 engineers, and technicians during the installation periods.
* Provide the owner daily representation and provide production management of a startup pulp mill and pulp dryer operation in Russia. Provide daily management and oversight to ensure the owner that this co-owned project was operating correctly and effectively.
* Managed the daily operation of a three-machine newsprint and ground wood operation in Northern Finland. Maintained a record 97% machine availability during my tenure.
* Supervised the selection/design/process around a waste fuel and coal utility boiler used in a new pulp mill.
* Selected and recommended the equipment and design necessary for installation to waste fuel and coal utility boiler in an existing mill. Performed miscellaneous engineering for revamp and modernization of Ground wood pulping system. Installed pressurized ground wood prototype system.

PROFESSIONAL QUALIFICATIONS in other industry
Plant Management, Project Engineering and Management

➢ Retained as Construction Plant Manager for $278 million U.S. Government project encompassing the installation of two sewage treatment and dewatering plants in Alexandria, Egypt. Served as liaison between owner and U.S. Government; supervised staff of Egyptian, German and U.S. engineers in the daily activities of all contractors in all disciplines. Developed schedules and cost tracking tasks for the entire program. Project was completed on time, within budget and safety guidelines.

➢ Provided management and engineering oversight, as well as conducted due diligence audits of two manufacturing firms for Swedish Bank. Audits were accomplished in the manufacturing and corporate offices in Sweden, Brazil, and Spain.

➢ Provide engineering management for the design, installation and startup of a 600PSI wasteful boiler located in Chile.

➢ Provide onsite engineering for the repairs of structural steel and waste fuel damaged in earthquake, location Chile

➢ Provide process engineering management in the technology transfer of a DMSO plant from Sweden to the United States.

➢ Provide Project management for the installation, startup and turnover of an alcohol steam stripper and an alcohol-fired boiler in Egypt.

Prior positions encompassed successful experience as Owner Rep and Production Manager, Senior Engineer, and Project Manager for manufacturing company in Tampere, Finland; also worked various foreign classified postings for the U.S. Government. Served in U.S. Marine Corps, Force Recon Marine Unit; rank at discharge—Major.

EDUCATION
Bachelor of Mechanical/Marine Engineering – Helsinki University of Technology
Masters Physics- US Navy Post Graduate Program

COMPUTER LITERACY

* Gems, Gems Math Pack, AutoCAD LT, Microsoft Projects, Primavera, Algor FEA, SAPFAG CMMS Module, Maximo CMMS Module, Apipro CMMS Module
* C++,
* SAP, Ansysis, Fluidsys, Yieldsys, CFD
* MOST/MTL DCS Configuration, AB Contrologix
* Mas 2000 (Best software), Wonderware, and all common Microsoft programs
* Gemcom, Surpac, Mintec
* Hardware, Bailey Net 90, Honeywell TDC 2000/3000 and MTL, AS400
«« previous resume next resume »»
Search Results (Resumes 101 to 150 of 1870)Go to Search Parameters...
Brief Description
Plant operations, process design and engineering, flowsheet development, and consulting to the gold, precious metals, base metals, and ferrous metals industry. Extensive experience in comminution, specializing in autogenous, semiautogenous, and conventional grinding.
Professional Geologist with 29 years worldwide experience in all aspects of exploration geology, wants an interesting and challenging position.
A Master of Science Mining Engineering (Project Management) and a Bachelor of Science Mining Engineering coupled with 20 years of underground mining, supervisory and technical experience in massive and narrow vein gold and base metal deposits.
Presently working in At the post of MANAGER. Before M/s Bhushan I was in M/s MSP steel and power limited.(Jan. 2006 to Aug. 2006) and M/s Jindal steel & power Ltd.(1996 to 2004). I have experience in project, operation, maintenance and commissioning of heavy me
Engineering Manager, Project Manager, Engineering Specialist
1. Oil and gas EPC experience for four years. 2. Design and engineering of static equipment. 3. 10 plus years' experience in mining industry. 4. Expertise in maintenance of static, rotating and utility systems. 5. Bachelor's degree in Mechanical Engineering and Master's degree in Maintenance Mgmt.
I am a Geologic Engineer with more than 9 years of experience. I have worked for multiple mining companies in Peru. Basically I have worked for open pit operations, but I also have experience with underground mines. I am experienced whit mine geology (ore control), porphyries of Cu-Mo, epithermal.
Chemist/Metallurgist - Graduated from the western Australian School of Mines; Australian resident status; Experience in characterization and processing of rocks, minerals and coals; strong background in analytical chemistry.
VP exploration of several junior mining companies. Responsible for the discovery and development of 3 MOZ (+) Au Charaat deposit in Kyrgyzstan. Twenty six years experience in Ore deposits discovery and development with emphasis on Au as well as Cu, Mo and W
Post Graduate in Geology in 1992 with 13 year experience as a Exploration & Mine Geologist also well versed with Datamine, Surpac & GIS.
PhD in Minerals Engineering, MSc and BSc in Mining Engineering. Experience and training in mining companies. Proven ability of teaching and research at universities. Capable of adapting to changing environments, strong team player, hardworking, honest and reliable. .
Modeling and estimation deposits, planning, optimization open pit in mining software. Scoping, prefeasibility, feasibility stages. Strategic development.Market research. Participation in exhibitions and conferences. Supervision of production process.Design & testing of new equipment.
A Geotechnical Engineer with 8 years experience in well known coal & mining companies
My international exposure in the industry reflect my ability in delivering in a cross culture environment is contributed to my cross cultural, international exposures and my ability to work at remote sites; I am presently managing a bulk site oper
Maintenance Manager
Free! Seasoned project manager and plant manager
I am seeking position in Metallurgical Engineering, Materials Engineering to use my extensive experience with a broad range of products and processes development. Expertise in materials characterization, projects management, design of experiments, patents, and equipment development.
Results orientated, hands on multitasked, multifunctional, dedicated manager. Experienced in materials. systems, logistics, & operations management. I am the go to guy to save you from losses in time or money. Please e- mail or call me so we can get together on filling your current opening.
Metallurgical / Process Engineer with operating , design and project management skills
Geologist/Geotechnican. 24 years experience in geological investigation with surveying, drill control of air percussion, diamond drills experience. Soil and Rock mechanics instrumentaion and testing. Grade Control for coal colliery. Alluvial diamond mining. Highly computer literate, MSOffice, etc.
Mining Engineer - Technical Sales
I am a Mechanical engineer with over 30 years working with steel, and anything technical.Spent the last two years contracting after spending ten years with a local company as their Technical manager.
Supplier Quality Assurance Engineer
Mining engineer, Long and Short Range Planning, Advanced Minesight User, Strong background Microsoft Apps, as well as CAD design. Underground and surface mine development, construction and operations. Overseas experience
Worked in the Mining industry for more than ten years. Proficiency in AAS Analysis
Bachelor of Engineering Batch 1978 From Punjab Engineering College – Chandigarh – India.
i` ve got 10 years of work experience within which I` ve collected data base on around 1 000 000 samples, that were sorted and put in spreadsheets.
Ph.D. materials engineer with 23 years of R&D experience in: a) Program management; b) Measurement of material properties Test method development and fixture design; c) Polymers, composites and their processing; d) Laboratory supervision and management of technical personnel.
Blasting license for general blasting works. blasting of large-diameter borehole, blasting of constroction, and more.
cad / surveyor
Metallurgical engineer, Technical consultant, multi-task,
I am currently working with Australian Multinational Gold Exploration Company as a Geologist with Indo Gold Mines Pvt. Ltd., Bangalore. Our Exploration target is Gold Prospect in Rajasthan, India involved with grassroots Gold Exploration. Working within a small team has allowed me exposure.
Metallurgy engineer, Master Management Information System, Certificate in Geographic Information Systems, gold mining
Hands on experience on High Pressure Mobile Hydraulic Systems (Closed Loop & Open Loop Systems), which includes Variable & Fixed Displacement Hydraulic Pumps & Motors, Various types of Hydraulic Valves, Proportional Valves, and Electro Hydraulic Actuators, Hydraulic Cylinders.
Consulting Process Metallurgist with 30 years experience in the evaluation, design, construction, and management of process projects. Extensive experience in development of laboratory investigations, feasibility studies, detailed design, construction management, start-up, and operations supervision
A PhD in Minerals Engineering with an MSc in Mineral Processing and a BSc in Mining Engineering. Work experience and training in mining companies. Proven ability of teaching and research at universities. Capable of adapting to changing environments, strong team player, hardworking, honest and reliab
Exploration for Gold ,Basemetals & PGM in Archaean Granite- Greenstone Schist BeltsOf Karnataka for 17 Years&having Double PostGraduation In GeoSciences(M.Sc Geology&M.Tech GeoEngineering)
20+ years Civil Engineering experience on Public Works, Utilities, Industrial, Commercial and Residential projects. Experienced in streets, highways, water systems, sanitary & industrial sewers, airports, site development, grading, drainage, underground piping and specifications
Professional Electrical Engineer with 30+ years experience. In the latter 20 years my experience has been in a wide range of areas of project engineering predominantly in heavy industry. Looking for new challenges in the international arena
I am Chemical Engineer over 18 years of experience in all aspects of combined cycle chemistry, chemical/water treatment operation, quality control and analytical services as Plant Chemist/ Quality Control Supervisor in co-generation power stations. I am a Canadian citizen and willing to relocate.
-
Having served 7.5 years as a Mine Manager, 5 years as a Plant Manager, 8 years as a Purchasing Manager , 5 years as a Sales Manager and interact with ethnic diverse populations, I am confident that I can make a valuable contribution to your organization’s future projects.
Coal Quality, Bulk Commodity Supply Chain Logistics, Coal Technology & Utilisation, Coal Marketing / Technical Marketing, Coal Processing, Bulk Commodity Inspection and Testing, Marine Surveying, Metallurgical Testing, Laboratory Management, Quality Assurance, Training Development and Delivery
PRINCIPAL GEOLOGIST-GR LEADER
20 Years Experience in Mechanical Maintenance, Budgeting and control, Computer literate, Man Management, all up to senior level.
cad operator using micro station. detailing and some design in 3D
Willing to do the job as a geologist in Major Corporation and apply all my skills and knowledge for the growth of the corporation
plc ,cement plant sponge iron ,flexible packaging unit
I am a SENIOR GEODETIC ENGINEER with experiences 15 years in Mining, Oil & Gas and Consulting Bisnis. I want to work with the International Company with the position is a Senior Surveyor
Experienced base/precious metal Exploration/Mining Geologist
1   2   [ 3 ]   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38  
Seach Parameters

Change search parameters...
CATEGORIES: Engineering/Technicians;
INDUSTRIES: Mining;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com