„h UNIVERSITY OF ARIZONA, Tucson, Arizona BS MINING ENGINEERING 1985
Major course work in mining and mineral processing engineering. Minor course work in civil, environmental and geological engineering. Awarded American Institute of Mining Engineering Scholarship Tucson Sector. Financed education through summer work and Co-op positions in the mining industry. Summer Co-op position in Mining Engineering department for Phelps Dodge Copper Company, Morenci Branch 1983.
EMPLOYMENT HISTORY:
MARTIN MARIETTA MATERIALS October 2002 ¡V May 2003
Jones Mill Quarry, Malvern, Arkansas
PLANT MANAGER / PROJECT MANAGER:
Responsibilities included the start up and operation of a new state-of-the-art crushed stone facility. Project Management accomplishments included, the close out of two company owned operations, and one contract crushing plant, while bring on-line a 3MM ton per year operation.
Plant managerial responsibilities included: assisting with budget and capital preparation, mine planning, production and maintenance, compliance with governmental agencies, company policies, and quality standards. Operations included, contract drilling and blasting, loading and hauling, crushing and screening, stockpiling and load-out (rail and truck) of products used in the road base, concrete and asphalt markets.
CENTEX CONSTRUCTION PRODUCTS November 1999 ¡V May 2002
Centex Materials Inc, Austin, Texas
PLANT MANAGER / PROJECT MANAGER, Georgetown Aggregate Plant:
Responsibilities included the start up and operation of two crushed limestone facilities over the course of two years. Accomplishments include permitting of the new green field site, and Project Management duties involving: engineering, and drafting new plant specifications for a $13 MM, one thousand ton per hour ¡§turnkey¡¨ capitol project. Project came in 10% under approved budget.
Plant managerial responsibilities included: P & L budget and capital preparation, reserve estimations, mine planing, production and maintenance, compliance with governmental agencies, company policies, and quality standards.
PLANT MANAGER, Buda Aggregate Plant: August 1995 ¡V October 1998
Responsible for a 1.5 million ton per year crushed limestone facility. Accomplishments: Reduced operating cost by 20% through increasing productivity, and plant design modifications. Operations included, drilling and blasting, loading and hauling, crushing and screening (wet and dry), stockpiling and load-out. Duties included budget and capital preparation, mine planing, coordination of production and maintenance schedules, compliance with governmental agencies, and quality assurance. Other duties included employee development: recruiting, training / mentoring and discipline. Products used in the road base, concrete, and asphalt markets.
GRANITE CONSTRUCTION COMPANY
October 1998 ¡V November 1999
Arizona Branch, Tucson, Arizona
COMMERCIAL PLANTS MANAGER
Area Manager position with top line and bottom line responsibility for all commercial operations with a combined annual out put of 1.5 million tons of aggregates, and 5 hundred thousand tons of asphalt.
Responsibilities include:
Green-field development of mining reserves, site development, plant set up, and compliance with all company and governmental regulations.
Engineering: plants design/ layout, process flow calculations, equipment selection, requisition, and construction. Management: preparation of annual budgets, and monthly forecasts.
Products used in the concrete, asphalt, road base, and specialty sands markets.
KAISER CEMENT CORPORATION, HANSON PLC
June 1992 ¡V August 1995
Cupertino, California
AGGREGATES MANAGER
Department Head positions, responsible for general operations of three aggregate processing facilities, with a combined annual production of 4 million tons. Duties included coordination of department production and maintenance to insure maximum plant availability, inventory management in cooperation with sales department requirements, and cost reduction through automation.
Highlights include:
„h Start up and managed a 600 TPOH fractionated aggregate processing facility, that included an automated 800 TPH silo load out system.
„h Implementation of computerized quality control testing program to ensure compliance with specifications and to assist in trending plant performance.
„h Instrumental in maintaining market share during phase out of an older operation and construction of a new plant by erecting and operating a temporary facility.
CALIFORNIA SILICA PRODUCTS
July 1991 ¡V May 1992
San Juan Capistrano, California, a subsidiary of Oglebay Norton Company
ASSISTANT PLANT SUPERINTENDENT
Areas of responsibility included production supervision, maintenance scheduling, and quality assurance for a high quality industrial sand facility. Other duties involved process engineering to reduce waste and increase plant productivity. Products used in the industrial coatings, sand blasting industry and recreation sectors.
EL TORO MATERIALS COMPANY
May 1988 ¡V June 1991
El Toro, California
PLANT SUPERINTENDENT
Responsible for production and maintenance of a one million ton per year sand and gravel aggregate processing facility. Other areas of responsibility included: plant engineering, equipment selection, ore reserve calculations, mine planning, quality control, and safety coordination. Products used in the ready mix, road base, plaster sand, and golf course sand markets.
UNITED STATES GYPSUM COMPANY
May 1985 ¡V May 1987
Plaster City, California
PROJECT ENGINEER, QUARRY, AND MILL DEPARTMENTS
Quarry engineering responsibilities included: major ore reserve analysis program, open pit mine surveying, mapping, claim patenting, core drilling, and core logging. Other duties included plant engineering and safety.
Mill engineering responsibilities included: plant energy coordinator, responsibility for combustion engineering, and energy conservation projects.
Products used in the construction, cement, agriculture, and medical markets.