CONTACT INFORMATION:
View contact information...

Age: 42 years old
Birth Date: July 16, 1966
Birth Place: Aloguinsan, Cebu
Religion: Roman Catholic
Citizenship: Filipino
Civil Status: Married

Profession: Professional Mechanical Engineer, Masters of Science in
Mechanical Engineering and Business Management Practitioner
PhD - Technology Management
Preferred Position: 1. First priority: - Plant Technical Services & Planning
Manager or Power Contract Administrator
- Operation/Maintenance Manager
- Plant Manager
2. Second priority – Assistant Manager/Executive Technical
Staff/Assistant Project Manager
3. Third priority – Operation/Maintenance Head
- Technical Planning & Scheduling
Head/Supervisor
- Power Plant Combustion Engineer/Head
Desired salary: Industry Standards

2. Educational Attainment

Post Graduate: Cebu State College of Science and Technology
Cebu City
2000 - 2004
Graduated -Doctor of Philosophy in Technology
Management

Dissertation Paper "Operations Management of Leyte
Geothermal Power Plant: Enhanced Corporate Performance
Standards"

: University of San Carlos
Cebu City
1998 - 2000
Graduated - Master of Business Administration
(Availed NPC Scholarship Program)
Thesis/Research Paper "The Managers and Supervisors of Leyte
Geothermal Power Plant 1: A Change Inventory for Leaders" ;
"The Investment Decisions."

: University of the Philippines
Diliman, Quezon City
1994 - 1996
Graduated - Master of Science in Mechanical Engineering
Major in Heat Power
(Availed NPC-DOST Scholarship Program)

Thesis/Research Paper "Turbine Water Washing Technology";
"Solar Radiation and Atmospheric Clearness Number at Certain
Atmospheric Condition;"

College: University of San Jose Recoletos
Cebu City
1982 - 1986
Graduated - Bachelor of Science in Mechanical Engineering

: University of San Jose Recoletos
Cebu City
1986 - 1987
4th Year Level - Bachelor of Science in Electrical
Engineering

Secondary: Abellana National School
Cebu City
1978 - 1982
Graduated – Secondary

Elementary: Zapatera Elementary School
Cebu City
1972 - 1978
Graduated - Primary (Best in Art)

3. Civil Service Eligibility

Registered Mechanical Engineer (License no. 0035752)
Professional Mechanical Engineer (RA 8495, ME Law)

4. Employment Record

2007 to Present Manager, Plant Technical Services and NPC, PDPP
Head Quality Management, Environmental, Complex
Health & Safety Management System
(ISO 9001:2000, EMS 14001:2004;
OSHAS 18001:2007)

2004 to 2006 Officer-In-Charge/Acting Manager/ NPC, IPPCM
Contract Administrator Manager Visayas

2001 to 2003 Principal Engineer A/Supervisor NPC, IPPCM
Visayas

12/99 to 2000 Principal Engineer A/Supervisor
(or Operation Superintendent
"Acting Capacity") NPC, LGPP1

10/97 to 11/99 Principal Engineer B
(Middle Supervisor, "Senior Control
Engineer.") NPC, LGPP1

10/92 to 09/97 Principal Engineer C
(Junior Supervisor, Turbine Generator
Engineer.") NPC, LGPP1

07/90 to 08/92 Principal Engineer C
(Junior Supervisor "Electrical Control
Engineer.") NPC, LGPP1

08/89 to 06/90 Junior Engineer NPC, VRC

07/88 to 07/89 Engineering Assistant NPC, VRC

Legend: NPC – National Power Corporation
PDPP – Panay Diesel Power Plant Complex
IPPCM – Independent Power Producer Contract Management of
Power Purchase Agreement, Rehabilitate Operate Managed &
Maintain Contracts and Energy Conversion Agreement
LGPP1 – Leyte Geothermal Power Plant 1

6. Work/Job description

I. Position: Manager & Head of Quality, Environmental, Health & Safety Management
System (ISO QMS 9001:2000; EMS14001:2004; OSHAS 18001:2007)
II. Work Station: Plant Technical Services Division (PTSD), Panay Diesel Power Plant
Complex (PDPPCx), Visayas region
III. Work Experience: 2007 - Present

General Function:

Responsible for the effective and efficient management of the Plant Technical Services Division that covers from Planning & Scheduling up to the implementation of the policies/guidelines related to Plant Safety/Health, Quality Management System Assurance, Environmental and Information Technology aspects which include fuel management/spare parts supply of the PDPPCx.

Duties and responsibilities:

1. Provide direct staff works to the Plant Manager with regards to Planning, Leading, Organizing and Controlling aspects of the power plant complex Operations, Maintenance & Administrative/Finance management.
2. Direct implementation of the established policies and guidelines to ensure and maintain the optimum performance of the PTSD in coordination with Maintenance, Operations and Admin/Finance divisions.
3. Recommends solution and participate in clear-cut decision making to NPC top management pertaining to unresolved issues/claims and attaining plant performance targets;
4. Formulate short term and long term plan in line with the corporate mission and vision which include budget operational plan of the power plant's generating unit, power generation forecast, preventive and predictive maintenance and manpower utilization of the power plant;
5. To coordinate and extend assistance with other corporate functional groups and external customers in tackling the main objective of the corporation.
6. To ensure a smooth operation of the Plant Technical Services Division's business process.
7. To act as Quality Management Representative: Quality Management System ISO 9001:2000, Environmental Management System ISO 14001:2004, Occupational Safety & Health Aspects 18001:2007, and to lead/direct the Internal Quality Audit in the power plant which relates to the requirement of the Quality Annual Plan and Targets.
8. To prepare & finalize the over-all budget annual requirement of the power plant such as Annual Procurement Plan of Capex and Opex.
9. To perform other assigned managerial (Power Plant OIC-Plant Manager) & technical task in line with the Mission, Vision, Quality, Environmental & Safety Policy of the plant
10. To lead/prepare/implement technical services projects related to power plant modification system, major operation & maintenance requirement (e.g. Major Engine Overhauling, Preventive/ Predictive Maintenance), and upgrading projects in line with the bar schedule, budget/cost / manpower requirement.
11. To lead/direct in the preparation of the following technical plant reports:
11.1 Monthly operational Report (covers from Force Outage, Plan/Maintenance Outage, Heat Rate, Energy Generation, Net Utility Revenue up to fuel/lube oil/chemical cost, total plant production cost, accounting of Station use, Station loss, etc.,Safety & Environmental report
11.2 Daily Plant Status Report, Daily Fuel Inventory Report, Monthly Fuel Billing report, Daily Fuel/Water/Lube oil Analysis Report, Fuel ordering report, Prepare/approved Requisitions pertaining to the approved project/program related to Technical Services, Environmental, Health & Safety aspects.
12. Ensure proper channeling of upward/downward/circular form of plant level, corporate communications and office protocols;
13. Ensure proper implementation of 5s Good Housekeeping;

I. Position: Acting Division Manager/ Contract Performance Manager
II. Work Station: Independent Power Producer Contract Management (IPPCM) Division
Visayas Region
III. Work Experience: 2004 - 2006

General Function:

Responsible for the contract administration of Visayas Independent Power Producer or IPP Plants through the implementation of policies, guidelines and provisions as provided in the Power Purchase Agreement (PPA) and Rehabilitate Operate Manage and Maintain (ROMM) contract between NPC and IPP Owner.

ROMM coverage at Naga Power Plant Complex (NPPCx) – Consists of Two Coal Fired Thermal Plants, Two Land Base Gas Turbines, Six Units of Diesel Engines, Plant Wide Water Treatment Station, Fuel Tanks Farm, Coal Yard and Mooring Facilities with total plant combined capacity of 203 Mw.

PPA coverage – Energy Fee accepted by NPC from Philippine National Oil Company-Energy Development Corporation (PNO-EDC) that covers the Nine Geothermal Power Plants built, operate and managed by California Energy Company with total combined capacity of 500 MW.

Duties and Responsibilities:
1. To establish the long/short term plan at least cost and optimized resource budget utilization of the business cycle/process of IPPCM-Visayas operation in line with the corporate mission and vision;
2. To direct in getting the division's subordinates/members to move in the direction that will achieve objectives and deals with establishing standards for plant performance, measuring performances against target;
3. To maps out courses of action that will commit individuals, other functional groups in achieving the common corporate goals.
4. To lead/organize in the implementation of the following office and field works activities:
OFFICE WORKS:
4.1 Approval/confirm/feedback of the memoranda/letters and ensure the accuracy of payment/claims reflected in the disbursement voucher that within the capacity of the Division Manager:
4.1.1 Give feedback and prepare Internal and External memoranda;
4.1.2 Ensure proper channeling of upward/downward/circular form of corporate communications and office protocols;
4.1.3 Ensure proper implementation of 5s Good Housekeeping;
4.1.4 Ensure that the specific applicable provisions are reflected/covered in the annual Tender Documents and Terms of References for the supply of fuel (Bunker C/Diesel and Imported/local coal) requirements at NPPCx;
4.1.5 Energy fee and operation/maintenance fee base on Energy Minimum Off-Take;
4.1.6 Power Purchase billings based on nominated capacity fee;
4.1.7 Fuel Efficiency Bonus Claims;
4.1.8 Customs Duties and Taxes claims;
4.1.9 Ash pond maintenance/Calibration sharing fee;
4.1.10 Coal/Oil Fuel regular billings;
4.1.11 Energy and Fuel billings Inflation Fee adjustments.
FIELD WORKS:
4.2 Leading/directing in the implementation of the following:
4.2.1 Plant/Capacity Performance Testing;
4.2.2 Power Plant Outage/Unserved Energy reconciliation;
4.2.3 Plant site inspection/monitoring of contractual obligations/guarantees;
4.2.4 Fuel Supply Management Agreement curve determination & validation;
4.2.5 Naga Power Plant Complex Warehousing guidelines/procedures;
4.2.6 Fuel receiving, Tank farm, Mooring Facilities & Ash Pond monitoring.
5. To attend meetings/negotiations/re-negotiations and participate/recommend clear-cut decision makings and solutions;
6. To initiate improvements of the Division's business process/cycles;
7. To lead/direct in the monitoring of IPP activities pertaining to the Environmental, Health and Safety compliance in line with the Philippine National Clean Air Act provisions.

Job Position: Principal Engineer A (Supervisor or Section Head)
Work Station: Independent Power Producer Management (IPPCM) - Visayas
NPC, 4th Floor BF Building, N. Escario St.., Cebu City
Work Experience: 2001 – 2004

General Function:

Responsible for the direct efficient supervision towards the implementation of the activities in the contract provisions entered by NPC and to the following Independent Power Producers (IPP), namely: Rehabilitate Operate Manage and Maintain (ROMM) between NPC and Salcon Power Corporation, Power Purchase Agreement (PPA) between NPC and PNOC-EDC, and Energy Conversion Agreement (ECA) between NPC and Toledo Power Corporation (TPC), and PNOC-EDC Steam Sales Contract entered by NPC

ROMM coverage at Naga Power Plant Complex (NPPCx) – Consists of Two Coal Fired Thermal Plants, Two Land Base Gas Turbines, Six Units of Diesel Engines, Plant Wide Water Treatment Station, Fuel Tanks Farm, Coal Yard and Mooring Facilities with total plant combined capacity of 203 Mw.

PPA coverage – Energy Fee accepted by NPC from PNOC-EDC that covers the Nine Geothermal Power Plants built, operate and managed by California Energy Company with total combine capacity of 500MW.

ECA coverage – Energy Fee and Fuel Supply Expenses borne by NPC and TPC to operate and maintain their respective Coal/Bunker Fired Power plants with total combined capacity of 90MW.

Philippine National Oil Company – Energy Development Corp. Steam Sales Contract with NPC's Visayas Leyte and Palimpinon Geothermal Power Plants.

Duties and Responsibilities:

1. To review and validate the SPC's, TPC's and PNOC-EDC's claims based on the respective ROMM, ECA and Power Purchase contract entered by NPC;
2. To lead in the participation/witnessing of the Plant Performance Testing/Instrument Calibration activity that to be conducted by IPP plants through the determination of the contracted Plant Heat Rate, Plant Efficiency and Guaranteed Nominated Capacity/Energy;
3. To direct/supervise the Warehousing and Ash pond maintenance activity at Naga Power Plant Complex;
4. Recommends solution and participate in making clear-cut decision making to NPC top management pertaining to SPC's, TPC's and PNOC-EDC's unresolved issues and claims;
5. To ensure smooth implementation of guiding principles and policies of IPPM –Visayas office business process;
6. To coordinate and extend assistance with IPPCM Fuel section in tackling the main objective of division.
7. To direct/supervise in the conduct of Power Plant Outage/Unserved Energy reconciliation between the IPPs and Transco (as load dispatcher);
8. To direct/supervise the Plant site inspection/monitoring of contractual obligations/guarantees;
9. To prepare/check the IPPCM-Visayas annual budget proposal;
10. To act as Officer-in-Charge of IPPCM division in case the Division Manager is on Travel.

Job Position: Plant Operation Superintendent (Acting Capacity)
Work Station: Leyte Geothermal Power Plant 1, Barangay Lim-ao, Kananga, Leyte
Work Experience: 2 years (1999-2001)

General Function:

Responsible in leading the implementation of policies, guidelines, work procedures which include safety environmental aspects during the shift operation in order to ensure an economic, safe, continuous and reliable generation of electricity for transmission due care to the society.

Duties and Responsibilities:

1. To direct/supervise the shift control engineers, operators and chemical analysts during the shift, as well as to monitor and to conduct trending/root cause analysis of the operating condition of the power plant systems equipment and its auxiliaries, such as:

Total Power Plant Output: 3 x 37.5 MW = 112.5 MW;

Power Plant Systems and Controls:

Turbine system and Controls:
- Main steam turbine impulse/reaction double flow type at rated speed of 3600rpm, output 37.5 MW, steam inlet pressure and temperature of 5.4 kg/sq cm and 160 oC respectively;

Generator system and Controls:
- 3 phase Generator, 60 Hz, Air cooled type with brushless exciter and permanent magnet, output of 37.5MW, 46,875 MVA, 80% Power Factor, rated voltage of 13.8 KV;

Cooling Water System and Controls:
- Direct contact spray type Condenser designed to operate a vacuum of 96mmHg at 100% generator output, with 13,400 cu. m/hr of cooling water and steam flow of 332,860 kg/hr of steam;
- Hotwell Pump with 3 phase induction motor, 60Hz, 590 rpm, 700Kw vertical type designed to pump out 7,500 cu. m/hr of condensate;
- Cooling Tower, double cross, induced type with 150KW/unit, 3 phase induction fan motors, designed to cool 13.91 cu. m/hr of circulating water at 47.9 to 35 degree C with draft and evaporation losses of 0.08% and 2.22% respectively;

Steam Ejection System and Controls:
- Steam Gas Ejector, two stages of four elements each designed with suction pressure of 0.127kg/ sq cm abs., and discharge pressure of 0.40 kg/sq cm abs.;

High/Medium/Low Voltage Systems and Controls:
- Transformer, 3 phase, 60Hz Main Generator, Interconnect, Station, Unit, Service and Auxiliary Power Transformer at 47 MVA, 30 MVA, 7.5 MVA, 4000 KVA, 1500 KVA and 250 KVA respectively;
- Switchyard, Indoor type, 138 KV, with SF-6 gas insulation;

Power Back-up System and Controls:
- Emergency Diesel Engine-Generator, 3 phase, 60 Hz, Tandem Compound Generator, 1200 rpm, 1.33 MW capacity;
- DC systems, industrial battery to back-up the AC system and to supply the DC controls auxiliaries.

Centralized Air-conditioning and Air Dryer System and Control.

Lube oil and main steam admission systems and controls.

2. Responsible for the implementation of the operations system operating procedures in line with ISO 9002 systems elements, Total Quality Management, Manage Maintenance Program, Operation Management Program, which include the Environmental, Health and Safety Management programs;

3. Recommends solution and participate in making clear-cut decision making pertaining to the over all power plant unresolved issues and performance improvement aspects;

4. To prepare management reports, issues memoranda/letters regarding to operational plant and manpower matters;

5. To act as power plant Officer-in-Charge in case the Operation Manager is on Travel.

d variation.

View contact information...
«« previous resume next resume »»
Search Results (Resumes 1 to 50 of 1117)Go to Search Parameters...
Brief Description
Free! A certified professional coal geologist with over 15 years of domestic and international experience in exploration and mine production. Also have 10 years of management experience in the manufacturing sector
Free! Project Manager with established record of successfully completing large-scale drilling programs. Proficient in prioritizing and directing complicated logistical operations, synthesizing abundant data, and optimizing mineral resource potential.
Free! Twenty five years of mining and construction experience in both surface and underground. Lead Quality Engineer for MTA East Side Access NYC. Chief Inspector for Construction Management on The Heartland Corridor Project in West Virginia. Chief Inspector for the city of Atlanta on the West Area CSO.
Free! Geologist (Ph. D.), 10 years industry experience in exploration, mining and JORC-like reserve/resource estimation projects in Europe, Middle East and East Africa is interested to support and strengthen a new international team. Surpac experienced, hands on approach, bulk commodity experience.
Free! Experienced hard working Geologist, Underground and open pit experience, Resource development modelling and drill program design and implementation, Very experienced mapping and strong structural background.
Cement Manager Operations / Engineering
Mechanical Engineer with 21 years experience in cement manufacturing industry.I had broad experience in Operation Management,Project Management Mechanical Maintenance Management and Mechanical Designing.
Post Graduate Drilling Engineer having 24 + Experience in Mining Balst hole , Water Well, Exploratory, Core Drills, Compressors - incharge of Operation and Maintenance
This letter is to announce my interest for a position corresponding to my career profile: mining engineer.
Process Engineer/Metallurgist/Consultant - Mineral Processing, Hydrometallurgy, R&D - MS, PE, 20-years operating experience; precious metals expert.
Expert in aluminum smelting, mainly Potline and Casthouse, start-ups, production, process
Hands on Metallurgist with diversified experience in copper/cobalt refining as well as Sulphuric Acid Plants. I hold a B Min Sc(Met and Min processing) with over 26 yrs experience, 16 yrs at senior level
Production Superintendent
Drill & Blast specialist with a licence to manufacture explosives; worked in numerous countries doing oil & gas exploration; extensive experience in all aspects of open cut mining particularly in the areas of drill & blast
22 years experience in milling & mineral processing operations, laboratory testworks and project studies in both large and small-scale operations.
Senior Manager - Domestic & International Mining Experience - Strategic Planning / Mine Planning / Technical Evaluation / Permitting / EPCM / Project Development / Mine Operations / Project Evaluation
A registered Professional Mining Engineer with 25 years of progressive experience in surface, underground and overseas operations.
A good candidate for Mill Superintendent, Mill General Foreman, Mine or Mill Supervior, Mill Trainer or Environment coordinator. 25 yrs experience in Copper, Nickel, Gold, Zinc, Lead, Silver, Palladium, Platinum, Potash mines.
Detail oriented leader with over 25 years in the industry. Motivated leader and trainer. Work well with multinational teams
Power plant operation and maintenace management, power contract performance administration; Quality Management System Representative ISO 9001:2000, EMS 14001:2004, OSHAS 18001:2007
Ihave varied U/G experience as a Supervisor and have honed my communicative skills, with a constant focus on regulatory compliance.
Base metal and Gold extractive metallurgist, General Mill foreman. Non metallic project manager. Training and multilingual communication abilities.
30 years experience in Metallurgical Investigations and Concentrator Operations processing base metals.
I am experienced Metallurgical Engineer with unique experience in a broad range of metals/gasars/alloys/composites processing, including alloying, casting, melting, heat treatments, microstructure design. Able to work in quality control, research and development facilities.
I am male, 42 years of age and I was working with ASL Marine Holding, Tiong Woon Corporation Holding Ltd, ASL Shipyard Pte Ltd, Beng Soon Machinery Pte Ltd, PAE Singapore Pte Ltd, Unocal Petroleum Myanmar, Amoco Petroleum Myanmar, BHP Petroleum Myanmar. I had my experiences Asst: Superintendent, Wor
Experienced Mining Guru(Mine Overseer) with an educational career spanning 23 years, with a myriad of capacities and skills in underground Gold and Platinum hard rock mining.
Operations of Zinc Lead Cadmium Sulphuric Acid Phosphoric Acid Fertiliser
Application for the post of Executive Director (Operation ) / G.M. ( Operation )
Belt man, bolter helper, bolter operator, shuttle car operator, face drill operator, shot fire, Joy cutting machine operator, miner helper supply man and LHD operator, face boss, production foreman, shift foreman, pillar coordinator, and captain of a mine rescue team.
MAINTENANCE MECHANIC
Senior metallurgist in copper heap leach SXEW process
step up supervisor, mine foremans papers,dragline operator, equipment operator, 1 year certificate in business managment,emt-b license,welder in dragline erection,
Gold Plant Operations / Management
I am a serious minded individual seeking a new environment that has a challenging and rewarding future. I can offer you 29 years of experience in the mining industry (phosphate/open pit). I have obtained my experience from working the ground level up to management.
Open Pit Managerial Supervisory Position, Community Relations Officer,
An experienced daimond core drilling engineer seeks employment.24 years wide range experience in daimond, rotary and DTH drilling methods.Operation,maintanance and fishing,trouble shooting.Had overseas experience in Tanzania during 1995.
Working on Marion 8050 and 8200 draglines. Responsible for safe operations, following mine plans and maintenance of machines.
Senior drilling supervisor with 30+ years project experience in remote areas of the world.
I have been working in the mining industry for the past 30 years.
Material Handling Operation (Coal Handling System; Ash Handling System; Limestone System; Gypsum Area; Waste Handling Area; Fuel Oil System and Heavy Equipment), hard worker with 14 years hand on experiences in Power Plan Operation, commissioning, trouble shooting and root cause analysis.
Mining Engineer from with 24 years experience in underground as well as opencast mines. I have exposure in Lead-Zinc, Chromate Mines, Bauxite Mines and Limestone Mines. Presently, working as functional head of Limestone Mines captive to Cement plant.
Diamond Drill Operator, surface drilling with the use of various types of machinery
I have basic education, knowledge and experience as for Project Metallurgist
Experienced (+29 years) professional geologist with field and laboratory background and prospecting/exploration for gold, PGE and base metals.
SR PROCESS CONTROLLOR,LAB INCHARGE,FIRE ASSAY TECHNICIAN,PRECIOUS PLANT SHIFT INCHARGE,SUPERVISOR
I have 25 years experience in mining. My day-to-day output reflects a high level of motivation, efficiency, and ability to meet any objective. I have a proven ability to troubleshoot, perform under a minimum amount of supervision, and demonstrate a high degree of initiative and good judgment.
Underground Production Miner
Modeling and estimation deposits, planning, optimization open pit in mining software. Scoping, prefeasibility, feasibility stages. Strategic development.Market research. Participation in exhibitions and conferences. Supervision of production process.Design & testing of new equipment.
PhD in Structural Geology with 20+ years Senior/principal Geologist experience in mineral exploration. 15 years experience geomodelling using GoCad and Project Generation.
Business-oriented geologist experienced in exploration, development, and operation of mineral projects. International experience including extended stays at remote sites. Experienced in due dilligence investigations for mergers and acquisitions, mineral rights valuations, mine planning.
[ 1 ]   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23  
Seach Parameters

Change search parameters...
CATEGORIES: Operations;
INDUSTRIES: Mining;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com