Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #2542
next resume »»
CONTACT INFORMATION:
View contact information...
BIRTHPLACE: Surigao City
BIRTHDATE: June 02, 1955
AGE: 47
SEX: Male
EDUCATIONAL ATTAINMENT:
PRIMARY -Surigao West Elem. School 1962 - 1968
Surigao City
HIGH SCHOOL -St. Peter's Seminary 1968 - 1972
Butuan City
COLLEGE - Cebu Institute of Technology 1972 - 1977
Cebu City
Mining Engineer
License No. 1260
WORK EXPERIENCE:
Company Position Year
Marinduque Mining Jr. Engineer 1978 – 1979
& Industrial Corp. Open Pit Drilling and Blasting Dept.
Sipalay, Negros Occ.
Atlas Cons. Mining Jr. Pit Geologist 1979 – 1980
& Devt. Corp.
Lutopan, Toledo City
- Same - Driller – Trainee 1980 – 1981
- Same - Driller 1981 – 1982
- Same- Acting Drilling Supervisor 1982 – 1984
- Same - Supervisor 1984 – 1986
- Same - Drilling Foreman 1986 – 1988
Explo. Drilling and Waterwell
- Same - Asst. Drilling Supt. 1988 – 1990
- Same - Drilling Superintendent 1990 – 1992
Self Employed Drilling Contractor 1992 – 1993
Diamond Drilling Corp Asst. Manager 1993 - 1997
of Phils. Drilling Group
345 Bo. Sto. Nino,
So. Super Highway
Paranaque, Metro Manila
Philex Mining Corp. Production Supervisor 1997 – 1999
Hinobaan Gold Project Mine Underground Dept.
Negros Occidental
Mines and Geosciences Engineer III 1999 - 2001
Bureau, Regional Office Mine Monitoring and Evaluation
No. 6, Iloilo City
United Paragon Mining Drilling Supv. 2001 – Present
Corp.,Paracale, Camarines Norte
SEMINARS ATTENDED:
1. Decision Making Techniques for Drilling Supervisors
Conducted by Australian Drilling Assn. In cooperation with Australian Embassy
2. Waterwell Drilling and Maintenance
Conducted by Waterwell Association of the Phils.
3. Productivity Improvement Circle
Conducted by Atlas Mining HRD
4. Planning and Decision Making
Conducted by Atlas Mining HRD
5. Management by Objective
Conducted by Atlas Mining HRD
Position Brief Job Description Year
Junior Engineer Acted as assistant to the Shift Blasting 1978 - 79
Engineer. In charge of logistical support of blasting section. In charge of drilling blast holes with Marion drill rig and loading of diesel fuel mixed ammonium nitrate and explosives primer into blast holes. Number of men supervised – 6.
Junior Pit Acted as assistant to the pit geologist: 1979 - 80
Geologist mapping geological data inside pit, transfer of data into level plans and sections, did also geo-engineering geotechnical study of pit. Number of men supervised – 4.
Driller-Trainee Subjected to ten months trainee as exploration 1980 - 81
driller under three driller-trainors of Sprague and Henwood diamond drills (US made).
Driller Drilled for almost a year at various explo- 1981 - 82
ration sites at the periphery of open pit of
Atlas Mining. Had also undergone reverse cir-
culation drilling at Masbate Gold Project using
HD-13 Gemco drills.
Drill Supervisor Supervised two to three drilling rigs in a 1982 - 84
shift. Number of men – 6 to 9 (@ 3 men per rig)
Responsibilities included logistics for con-
tinuous operation, analysis of ground forma-
tion encountered so that proper drilling pro-
cedures are implemented, correct drilling mud and additives are used to avoid possible prob-
lems. In charge also of preparation of next drill pad to provide ready site, mobilization procedure aside from the usual supervision of daily drilling activities. This position also entails on the job /hands-on activities on the repair and preventive maintenance schedule of the equipment. This means acting also as super-
visor to mechanics/mechanical section of the drilling operation.
Foreman Due to diligence, was promoted to Foreman. 1986 - 88
This position handles 3 to 6 rigs in a shift
Number of men handled – 18). Drill rigs handled now included Longyear 44. However, all down the hole accessories were Longyear. In charge also of waterwell drilling at the source of industrial water for the mine. These holes are of 150 to
200 meters depth. Size of hole is usually 12 inch, with 4 inch filtration/gravel packing composed of uniformly sized pea gravel placed around the casing, which is in turn composed of blank casing and perforated Johnson screens. Johnson screens are placed opposite aquifer or water zone. End of casing is either closed or open ended. Casing is cleaned at the perforation by swabbing and jetting for 48 hours. Then cleansing (potassium hypochlorite)
is jetted also for 48 hours. To determine the capacity of the water well, dynamic and static water level tests are conducted. The first is done for 24 continuous hours monitoring the water levels at gradually increased water pump capacity until the maximum rate of pumping is attained. This test is followed by static water level test measuring the water level at every pumping rate.
This will determine the cone of depression as affected by nearby wells. The riser 8-inch pipe with the right capacity pump is installed. Pump is lowered 3 meter below the lowest perforation level and should not be on the perforation level. However, the pump must also be at least 6 meters from the bottom which serve as catch basin for the sand par-
ticles that enters the casing and settles. Water well should be rehabilitated and cleaned at least
3 to 5 years.
Assistant Supt. In charge of the over-all drilling operation 1988 - 90
in the mine from personnel hiring, firing, promotion; open pit/surface diamond drilling and underground; Underground drilling involves uphole drilling, horizontal and down holes;
makes recommendations to the Supt.; Also makes time and motion study and PERT/CPM schedules of drill rigs, monitoring and analysis of the drilling performance, analysis of drill equipment, drilling tools/parts and down-the-hole items, and machine parts and supplies monitoring and useful life analysis. All these studies are per-
formed to upgrade continuously the efficiency and cost consciousness of the operation.
Drilling Supt. In charge of all drilling operation inside 1990 - 92
the mines, outside exploration drilling, under-
ground drilling, waterwell drilling and well rehabilitation and geotechnical/engineering holes.
Geotech drilling included SPT, piezometer moni-
toring holes, dewatering holes, foundation or grout holes and anchor bolting holes to support mine walls. All these duties are in consonant with the geology department or any outside client.
All other drilling position ( excluding mining related) The job was just repetition of the above work accomplishment.
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 351 to 400 of 3489)
Go to Search Parameters...
Brief Description
Experienced Mining Operations Manager/Construction Project Manager
Trade quallified boilermaker with 26 years experience
Worked in the Mining industry for more than ten years. Proficiency in AAS Analysis
Commissioning, establishing and managing Non ferrous metal laboratory
I administered an environmental restoration program for the State of North Dakota for over twenty years.
HEAVY EQUIPMENT OPERATOR with over 24 years experience in handling and operating different types of Heavy Equipment such as CAT Excavator 330, Crawler Crane 65 Toner, Mobile Crane, Tower Crane, Bulldozer at any type, Front Loader, Dump Truck and Light Vehicles
Trouble shooting, repair and maintenance of moblie mining equipment
36 years of expierance in the open pit mining field . 1.5 years of supervision of a 25 pluss cew. expierance in opperating all heavy equipment pertaining to open pit mining.
PRINCIPAL ENGINEERING GEOLOGIST-GR LEADER
To offer quality management services related to mining and quarrying covering the aspects of mine planning and engineering, development and operations, including among others activities such as formulation of short and long term plans and implementation; drilling and blasting design and optimization
Bachelor of Engineering Batch 1978 From Punjab Engineering College – Chandigarh – India.
i` ve got 10 years of work experience within which I` ve collected data base on around 1 000 000 samples, that were sorted and put in spreadsheets.
Ph.D. materials engineer with 23 years of R&D experience in: a) Program management; b) Measurement of material properties Test method development and fixture design; c) Polymers, composites and their processing; d) Laboratory supervision and management of technical personnel.
Senior Manager / Director / Consultant / AVP - Customer Service & Support
11 years exploration experience from grassroot to advanced stage programs in Archaean greenstone terrane of Tanzania and Sedimentary terrane of the Congolese Copper belt
30+ years in the mining field worked on a vast and varied range of machinery
I have been involved in the safety field for 14 years, either in training or as a safety coordinator. I have my MSHA certification as a surface instructor and my OSHA 500 certification as an instructor. I also have experience in creating SOR's, JSA's along with accident and incident reports.
Underground miner and supervisor
Blasting license for general blasting works. blasting of large-diameter borehole, blasting of constroction, and more.
cad / surveyor
Extensive hands on experience in all aspects of Safety, Environmental training, risk and HR including extensive interstate and overseas experience.
Metallurgical engineer, Technical consultant, multi-task,
I am currently working with Australian Multinational Gold Exploration Company as a Geologist with Indo Gold Mines Pvt. Ltd., Bangalore. Our Exploration target is Gold Prospect in Rajasthan, India involved with grassroots Gold Exploration. Working within a small team has allowed me exposure.
I am hardworking, self reliance and an independent person. Ability to work under pressure to meet deadline demand and an excellent administration skill has assure me to fit in any position to manage to best performance with minimize supervision.
Metallurgy engineer, Master Management Information System, Certificate in Geographic Information Systems, gold mining
Consulting Process Metallurgist with 30 years experience in the evaluation, design, construction, and management of process projects. Extensive experience in development of laboratory investigations, feasibility studies, detailed design, construction management, start-up, and operations supervision
Maintenance Manager/ Superintendent, Specialising in Mobile Plant.
Have worked in the field for over 25 years.
Jumbo operator
Seeking employment as a foreman,trainer or miner
I was a Contracts Manager with extensive experience in road construction in Africa for Grinaker/LTA. I have 15 years of experience in drilling, blasting and crushing. In this role, I was also in charge of the loading and hauling of aggregate materials used for road construction.
A PhD in Minerals Engineering with an MSc in Mineral Processing and a BSc in Mining Engineering. Work experience and training in mining companies. Proven ability of teaching and research at universities. Capable of adapting to changing environments, strong team player, hardworking, honest and reliab
Shift Superintendent
Experienced Mining Engineer and MBA with vast experience in underground and opencast coal mining operations , HR management and business development.
Exploration for Gold ,Basemetals & PGM in Archaean Granite- Greenstone Schist BeltsOf Karnataka for 17 Years&having Double PostGraduation In GeoSciences(M.Sc Geology&M.Tech GeoEngineering)
Engineer (mining) 30 years international experience. Responsibilities to General Manager level. Experienced in all aspects of mining including feasibility, operations, permitting and labor relations. Private investor and market analyst. Small business owner. Fully bilingual English/ Spanish.
20+ years Civil Engineering experience on Public Works, Utilities, Industrial, Commercial and Residential projects. Experienced in streets, highways, water systems, sanitary & industrial sewers, airports, site development, grading, drainage, underground piping and specifications
DRILLING SUPERINTENDENT
Professional Electrical Engineer with 30+ years experience. In the latter 20 years my experience has been in a wide range of areas of project engineering predominantly in heavy industry. Looking for new challenges in the international arena
I am Chemical Engineer over 18 years of experience in all aspects of combined cycle chemistry, chemical/water treatment operation, quality control and analytical services as Plant Chemist/ Quality Control Supervisor in co-generation power stations. I am a Canadian citizen and willing to relocate.
I have developed over the years a very good and unique network in Africa and have had a chance to only work for multinational companies and one institutional investor company, business development and expansion, sales, corporate strategy, management are my fields.
-
Manager for techno commercial jobs in mining machinery
I have twenty five years mining/supervisory experience in exploration,construction,mining, and reclamation. A true professional in my field
Underground fitter/machinist, with hydraulic experience, and am proficient in all types of welding. Reliable, motivated, self-starter, that is safety oriented. I have great interpersonal skills and work well with others. I go that extra mile to get the job done efficiently.
I have over 22 years in the underground mining industry in all aspect of operations
I would like to continue my career in mining as an equipment operator or a supervisor/foreman. I have worked in or around mines for the last 25 years, the last 5 as a supervisor.
Metallurgical process supervisor/trainer Experianced on Gold ,Copper and Uranium
Having served 7.5 years as a Mine Manager, 5 years as a Plant Manager, 8 years as a Purchasing Manager , 5 years as a Sales Manager and interact with ethnic diverse populations, I am confident that I can make a valuable contribution to your organization’s future projects.
underground coal longwall development continuous miners
First
1
2
3
4
5
6
7
[ 8 ]
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Next
Last
Seach Parameters
Change search parameters...
INDUSTRIES:
Mining;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com