SUMMARY OF EXPERIENCE
Twenty plus years in Machine Controls (PLC's & MMI's), Instrumentation,
Electronics, Electrical, and Computer experience involving Automotive,
Commercial and DOE facilities Start-up Operations and Maintenance. Specific responsibilities encompass: PLC Design, Ladder Logic Programming, Instrument
Design, Fabrication, Startup and Walkdown, Procedure Development/Reviews,
Supervision and Management. A sample of equipment encountered follows: Allen Bradley PLC-2, PLC-3, PLC-5, SLC 5/03, SLC 5/04, SLC 5/05 and ControlLogix, Man Machine Interface/Operator Interfaces, Rockwell RSView32, RSView Studio, Panelview 550, 600, 1000, 1400 and Wonderware. GE Fanuc 90-70 Hardware.
Software packages used in conjunction with the control equipment and
Computers consist of RSLogix 50000, RSLogix 5000, RSLogix 5, A.I Series, Allen Bradley 6200. Other software includes Excel, Access, AutoCAD 14 through 2005, Cimplicity Machine and Plant edition, as well as many others.
EMPLOYMENT HISTORY:
Sept 08 American Electric Power Dresden, OH
Dec 08 Under Contract
Controls Engineer / PLC Programmer: Worked at AEP Power plant. I worked mainly in water pretreatment area. I coordinated ladder logic programming and startup of machines. Some of the hardware I used are GE Fanuc 90-70 PLC's, HMI, remote I/O, genius I/O, Ethernet and other devices. Software include Cimplicity machine Edition for the PLC and Cimplicity Plant edition for the HMI.
Sept 06 Jacobs Engineering Appleton, WI
July 08 Under Contract
Controls Engineer / PLC Programmer: Worked at various plants through the USA.
Some of the plants are coal power plant at a paper mill, paper converting ant diaper machines. I coordinated ladder logic programming and startup of machines. Some of the hardware I used are Allen Bradley PLC's (ControlLogix and PLC 5), HMI, remote I/O, DeviceNet, ControlNet and other devices. Software includes RSLogix 5000, RSView32 and RSView Studio.
July 05 Tennessee Rand Corp Chattanooga, TN
Sept 06 Under Contract
PLC Programmer/Controls Engineer: Coordinated ladder logic programming and startup of Weld machines. Allen Bradley ControlLogix, Ethernet to plc, HMI, remote I/O and other devices. Used RSLogix 5000 software for ladder logic. RSView32,RSView Studio software and Allen Bradley 550 and 1400 operator interface are used in the performance of the control functions.
Feb 05 Berstroff Industries Florence, KY
July 05 Under Contract
Controls Engineer/ PLC Programmer: Coordinated and program ladder logic and startup of single screw and twin screw extruding machines. The processors used were Rockwell PLC ControlLogix and SLC 5/05. The software was RSLogix 5000 and RSLogix 500. We use Ethernet, data highway, PID loops temperature and pressure, several other analog points. Variable speed drivers, 5 to 1000 hp AC & DC motors with PowerFlex 700 and PowerFlex 700S. RSview32 software and Allen Bradley 550 and 1400 operator interface are used in the performance of the control functions.
Page 2
James Sanders
Dec 01 AEDC Air Force Base Tullahoma, TN
Sept 03 Under Contract
PLC Programmer/Controls Engineer: Coordinated ladder logic programming, MMI programming and startup of a Wind tunnel process involving eight 27,500 hp motors, four 44,000 hp motors and all the interconnecting points. Some PID loops, several other discrete and analog points. Most PLC programming I used GE 90/30 PLC. Simplicity MMI software was used.
July 98 Wright Industries Nashville, TN
Dec 01 Under Contract
PLC Programmer/Controls Engineer: Coordinated ladder logic programming and startup of a coating process production line. Allen Bradley PLC 5/40, data highway, PID loops, several other analog points, and variable speed drivers were utilized in controlling stations and dial stations. RSLogix 5 ladder logic, WonderWare software and Allen Bradley 550 and 1400 operator interface are used in the performance of the control functions.
Nov 97 Allied Signal Maryville, TN
July 98 Under Contract
PLC Programmer/Controls Engineer: Coordinated ladder logic programming and modification of production machines. Siemens Step 5. Allen Bradley PLC 5/20, data highway, SLC 5/03 and SLC 5/04. A.I. series 8.01, Rockwell RSLogix 5, RSLogix 500 ladder logic software, and Allen Bradley 600 and 1400 operator interface are used in the performance of the control functions.
Jun 96 Wright Industries Nashville, TN
Nov 97 Under Contract
PLC Programmer/Controls Engineer: Coordinated ladder logic programming and startup of a battery production line. Allen Bradley PLC 5/40, data highway, Control Net, Device Net, and variable speed drivers were utilized in controlling stations and dial stations. ICOM version 8.01 ladder logic software and Allen Bradley 550 and WonderWare for operator interface are used in the performance of the control functions.
Jan 96 Klockner Bartel Sarasota, FL
Apr 96 Under Contract
PLC Programmer/Controls Engineer: Coordinated ladder logic programming and startup of a packaging production line. Allen Bradley PLC 5/60, data highway, Remote I/O, and variable speed drivers were utilized in controlling stations. AB 6200 8.01 ladder logic software and Wonderware operator interface are used in the performance of the control functions.