Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #83610
next resume »»
CONTACT INFORMATION:
View contact information...
30 NOPEMBER 1978
BANDUNG INSTITUTE OF TECHNOLOGY (ITB) - 2001
MECHANICAL ENGINEERING (BACHELOR)
JL. NUSA INDAH DALAM I NO. 60, RT 12/02
JAGAKARSA, JAKARTA SELATAN
PHONE: +628176488665
EMAIL: ssugiyarto@gmail.com; zugzart@gmail.com
07/2007 - PRESENT PT. PETROSEA BID MANAGER / SENIOR ESTIMATING ENGINEER
04/2007 ¡V 07/2007 PT. CERIA WORLEY SENIOR ESTIMATING ENGINEER
11/2004 ¡V 03/2007 PT. THIESS CONTRACTOR INDONESIA SENIOR ESTIMATING ENGINEER
07/2004 ¡V 10/2004 PT. PUNJ LLOYD INDONESIA PROPOSAL AND ESTIMATING ENGINEER
07/2003 ¡V 06/2004 PT. TECHNIP INDONESIA PROPOSAL AND MECHANICAL PIPING ENGINEER
07/2002 ¡V 06/2003 UNOCAL INDONESIA COMPANY FIELD TRAINEE ENGINEER
Bandung Institute of Technology (ITB):
- Software Development to Predict Temperature Distribution on Suspension Preheater (2001) ¡V Thesis
UNOCAL INDONESIA COMPANY
- Centrifugal Pump Selection and Hydrocyclone Application (May 2003)
- Written and Spoken English
- Written and Spoken Bahasa Indonesia
- Written and Spoken Java
- Clough Estimating Software (CES)
- Leighton Estimating Software (CATS)
- Quest Estimating Software
- AutoCAD
- Visual Basic
- MS. Project
- MS-Windows & Office (word, excel, etc)
Persatuan Insinyur Indonesia (PII): 0905 ¡V 09 ¡V 019391
- Seven (7) years experience in Project Estimation & Costing and Piping Mechanical for major EPC Oil & Gas Project of process plant facilities (onshore and offshore), Pipelines project, Power Plant Project and Conveyor Project
- Strong knowledge in Piping and Mechanical Equipment (both static and rotating equipment) and familiar with ASME, API, ASTM and other related discipline standard
- Leadership, fast learner, smart worker, team working, good problem solving abilities and able to work independently
07/2007 ¡V PRESENT
PT. PETROSEA (www.petrosea.com)
Bid Manager / Sr. Estimating Engineer
Responsibility:
* Manage Estimating team resource
* Prepare and review mechanical equipment list, piping material take off, structural material take off, review mechanical specification and data sheets and perform Technical and commercial Bid Evaluation from Vendors / Subcontractors submission.
* Preparation the split scope of work / battery limit for EPC contract for Joint venture / consortium partner, subcontracted works and procurement packages.
* Preparation of project organisation chart, manning chart, construction equipment schedule, setup project execution strategy, generates / review Work Breakdown Structure (WBS), and assists in the preparation of project schedule.
* Pricing direct cost which cover material and labour cost.
* Pricing indirect cost which cover Project Management Cost, Mobilisation and demobilisation cost, project set-up cost, project duration cost, construction equipment cost and other miscellaneous cost.
* Assisting risk and opportunity analysis to finalize project costing.
Project Review:
„X PT. Indominco Mandiri ¡V Indominco Power Plant Project. Indirect monthly rate and hour rate for Civil Works. Project Value: US$ 2M
„X PT. Indominco Mandiri ¡V East Block Development Project in Bontang, East Kalimantan. EPC to build EPC to build stacking system. Project Value: US$ 11M
„X PT. Adaro Indonesia ¡V 64 km Overland Conveyor Project in Tanjung, South Kalimantan. EPC Project to build 64 km Overland Conveyor 6,000 TPH capacity which consist of 8 straight flight ranging from 6km to 10km. Project Value: US$ 256M.
„X PT. Ilthabi Bara Utama ¡V Pakar Project in East Kalimantan. EPC project to build ROM facilities, 39km haul road and barge loading facilities. The main facilities are Conveyor equipment, water system and fire system. Project Value: US$ 71M.
„X AKR ¡V Vopak: EPC Project for 1 (one) km of 7 lines (bundle) pipeline project ranging from 6" dia. To 14" dia. Project Value: US$ 7M.
04/2007 ¡V 07/2007
PT. WORLEYPARSONS INDONESIA (www.worleyparsons.co.id)
Sr. Estimating Engineer
Responsibility:
* Preparation of project organisation chart, manning chart, construction equipment schedule, setup project execution strategy, generates / review Work Breakdown Structure (WBS), and assists in the preparation of project schedule.
* Pricing direct cost which cover material and labour cost.
* Pricing indirect cost which cover Project Management Cost, Mobilisation and demobilisation cost, project setup cost project duration cost, construction equipment cost and other miscellaneous cost.
* Assisting risk and opportunity analysis to finalize project costing.
Project Review:
„X Orica ¡V Orica Ammonium Nitrate Plant Project to build AN and NA plant located in Bontang, East Kalimantan. Support Brisbane Estimating Team
„X INCO ¡V Scooping Study for Coals Fired Plant from 25MW up to 200 MW. Projects are located in various location in INCO Site, South Sulawesi. Project Value: US$ 42M.
11/2004 ¡V 03/2007
PT. THIESS CONTRACTOR INDONESIA (www.thiess.co.id)
Sr. Estimating Engineer
Responsibility:
* Involved in the preparation of technical proposal which include attending the pre-bid meeting, site visit, carefully study of the bid documents, assist in the preparation of technical proposal, clarification to client and finalizing of the proposals
* Prepare and review mechanical equipment list, piping material take off, structural material take off, review mechanical specification and data sheets and perform Technical and commercial Bid Evaluation from Vendors / Subcontractors submission.
* Preparation the split scope of work / battery limit for EPC contract for Joint venture / consortium partner, subcontracted works and procurement packages.
* Preparation of project organisation chart, manning chart, construction equipment schedule, setup project execution strategy, generates / review Work Breakdown Structure (WBS), and assists in the preparation of project schedule.
* Pricing direct cost which cover material and labour cost.
* Pricing indirect cost which cover Project Management Cost, Mobilisation and demobilisation cost, project set-up cost, project duration cost, construction equipment cost and other miscellaneous cost.
* Assisting risk and opportunity analysis to finalize project costing.
Project Review:
„X Boral 2 x 25 MW Coal Fired Power Plant, Budget Estimate to build Coal Fired Power Plant located in Bayah, Lebak, Banten. Equipment would be installed are Steam Turbine, Boiler, Cooling Tower and Balance of Plant. Project Value: US$ 80M.
„X Amerada Hess ¡V Phase 2: Ujung Pangkah Development Project EPC to build Oil Treating Facility and LPG Facility. The major mechanical equipments are Gas Turbine Compressor, Turbo Expander, Column, Pressure Vessel, Spherical Tanks, Pumps, Heat Exchanger, etc. Project Value: US$ 150M.
„X TSJV: Dawson North and Overland Conveyor Project: Steel Fabrication of 250 Ton Steel Structure of Drive Tower, Galleries and Trestles using AS material. Project Value: US$ 7M.
„X NSW Sugar Milling Co-operation: Steel Fabrication of 300 Ton Steel Structure of Conveyor Galleries and Trestles using AS material. Project Value: US$ 2M.
„X PLN: 2 x 15 MW Poigar II Hydropower Project Plant. EPC work for new development of 2 x 15 MW Hydropower Project Plant located at Poigar, North Sulawesi. The major mechanical works are supply and install Francis Turbine, Penstock Guard Valve, steel penstock and gates. Project Value: US$ 35M.
„X PGN: Pagardewa ¡V Grissik - Pagardewa Pipeline Project (Onshore). EPC work for 36 inch x 193 km pipeline from Grissik to Pagardewa. Project Value: US$ 50M (material supplied by PGN).
„X PGN: Pagardewa ¡V Labuhan Maringgai Pipeline Project (Onshore). EPC work for 32 inch x 295 km pipeline from Pagardewa to Labuhan Maringgai. Project Value: US$ 70M (material supplied by PGN).
„X PLN: Lahendong II Geothermal Power Plant Project EPC work for new development of 1 x 20 MW Hydropower Project Plant located at Lahendong, North Sulawesi. The major equipments are Steam Turbine Generator, Condenser, Cooling Tower and Hot Well Pump. Project Value: US$ 35M.
„X PLN: LNG Bojonegara Receiving Terminal ¡V EPC for Marine Facilities located at Bojonegara, West Java. The major Mechanical Equipments are Crane, Loading Arms, Hooks and Fender. Project Value: US$ 52M.
07/2004 ¡V 10/2004
PT. PUNJ LLOYD INDONESIA (www.punjlloyd.com)
Proposal and Estimating Engineer
Responsibility:
* Preparation of administrative and technical proposal which include activities of attending the pre-bid meeting, site visit, carefully study of the bid documents, coordinating for preparation of administrative document, preparation of technical documents with support from project/related department, preparation of procedures as per Client requirement, correspondences to client/subcontractors and finalizing of the administrative & technical proposals
* Preparation the split scope of work / battery limit for EPC contract for Joint venture / consortium partner, subcontracted works and procurement packages.
* Preparation of project organisation chart, manning chart, construction equipment schedule, setup project execution strategy, generates / review Work Breakdown Structure (WBS), and assists in the preparation of project schedule.
* Pricing direct cost which cover material and labour cost.
* Pricing indirect cost which cover Project Management Cost, Mobilisation and demobilisation cost, project set-up cost project duration cost, construction equipment cost and other miscellaneous cost.
* Assisting risk and opportunity analysis to finalize project costing.
Project Review:
„X Total E&P Indonesie: Tunu Field Development Project ¡V TP 10 / EPSC 1. EPC for 6 (six) New GTS platforms (unmanned) and modifications / tie-ins to existing facilities and their related remote wellhead, adjacent wellhead platforms. Project Value: US$ 60M.
„X Amerada Hess ¡V Phase 1: Ujung Pangkah Development Project EPC to develop a new Onshore Processing Facility (OPF) and 20" x 8 km onshore sales gas pipeline from OPF to PLN power generation facility. Project Value: US$ 80M.
„X Chemoil Singapore: Chemoil Tankage Terminal Project for 17 x 25,000 m3 located at Jurong Island, Singapore. Project Value: US$ 270M.
07/2003 ¡V 06/2004
PT. TECHNIP INDONESIA (www.technip.com)
Proposal and Piping Mechanical Engineer
Responsibility:
* Preparation of administrative and technical proposal which include activities of attending the pre-bid meeting, carefully study of the bid documents, coordinating for preparation of administrative document, preparation of technical documents with support from project/related department, correspondences to client/subcontractors and finalizing of the administrative & technical proposals
* In-house Project Costing for engineering tender.
* Involved in Client Budget Pricing which include benchmarking.
* Review mechanical data sheet and pipe stress analysis
Project Review:
„X Total E&P Indonesia: EPC of Tambora Field Development Project TB2/EPSC1 for 3 (three) New GTSs platform (unmanned) and modifications / tie-ins to existing facilities and their related remote wellhead, adjacent wellhead platforms.
„X Conoco Phillips ¡V Kerisi Development Project: E&P Project for Wellhead Platforms (WHP) and Central Processing Platform (CPP)
„X CNOOC: SES Gas FEED Project
„X Unocal Indonesia Company: Serang 2nd Compressor Project
07/2002 ¡V 06/2003
UNOCAL INDONESIA COMPANY (www.unocal.com)
Field Trainee Engineer
Responsibility:
* Three months training in PUSDIKLAT MIGAS Cepu on Maintenance and Production
* Involved in Field Engineering team for Attaka, Yakin and Santan Area. The works include preparation of maintenance schedule, preparation of Standard Operating Procedure (SOP), equipment / facilities optimization and Subcontractor Supervision.
TRAINING:
- Thiess MDP (Management Development Program) Workshop: Know your contract and identify risk, Plan Project Scope, Contract Handover Meetings and Project Planning, Jakarta, February 2007
- MS Project 2003 Level 2, Jakarta, July 15, 2005
- Excel 2000 Visual Basic Application, Jakarta, June 16, 2005
- Microsoft Excel 2003 Level 3, Jakarta, June 10, 2005
- Contractor Selection and Contract Management Program for end Users and Procurements Staff, Jogjakarta, May 2 ¡V 4, 2005
- Estimating In-House Training in PT. Thiess Contractor Indonesia, Jakarta, January 2005
- Piping In-House Training in PT. Technip Indonesia, Jakarta, March 14, 2004
- Mechanical In-House Training in PT. Technip Indonesia, Jakarta, December 28, 2003
- Logistic Training in Unocal Indonesia Company, Balikpapan, December 2002
- Maintenance and Production Training in Pusdiklat MIGAS Cepu, July ¡V September 2002
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 1551 to 1600 of 3494)
Go to Search Parameters...
Brief Description
Successful quarrying operations manager, team player and profit oriented, Hands on leader of quarrying operations. Turning vision into profit. Operating at strategic board level and tactical field problem solving, setting and achieving goals.
Experience field mapping (geologic and structural maps) in Alabama, Idaho, and Nevada. One year experience correlating well logs using Landmark Geographix. Working knowledge of other programs includes AutoCAD, ArcView GIS, Rockworks, CorelDRAW and Corel PhotoPaint, Excel, PowerPoint, and Word.
I am B.Tech in mining and I have total experience of more than 6 years 6 months in mine operations, mine planning, operation of benefication, wet and dry screening plants in large mechanized opencast iron ore mines,
EXPERIENCE 1999–present Holt McDermott Mine, Barrick Gold, Kirkland Lake, ON Mine Engineer 1997–1998 Williams Operating Corp. Marathon, ON Underground Miner EDUCATION 1995–1999 Queen’s University Kingston, ON Bachelor of Science in Mining Engineering
Education: BEng (Hon): Mining Engineering (2001 Adelaide, Australia). GPA 5.8 (out of 7) BEng: Mechanical Engineering (1992 Moscow, Russia). GPA 6.3 (out of 7) Employment: 1992-1997 Mechanical Engineer. Moscow Bauman State Technical University, Russia.
Excel economic/financial modeling, project/company valuation, financial statements, budgets and planning, economics, credit analysis
I have many years experience in the open pit mining sector in several African countries working with several commodities. Starting as a shift foreman, I reached a level of Mine Services Manager based on my extensive experience with load and haul, drill and blast, dewatering and auxilliary works.
Senior Grade Control Coordinator--Specialist in Managing Remote Field Exploration, Resource Development and Grade Control for Mining Operations
I am likely to be something of a perfectionist and will sacrifice pleasure ells where in order to accomplice my work to a set standard, I am determined and have high standards set my work. Combined with my positive no-nonsense style of work I always get positive results from my work. I can work unsu
Mining Geologist
Trade Qualified Boilermaker with over 15 years experience
Highly skilled graduate Project Manager/Civil Engineer and Project Controls Lead with more than 25 years related domestic and international experience in project and construction management.
Skilled in trouble shooting and maintenance of various types of equipment Cleaned, lubricated and performed routine maintenance work on machinery Performed safety checks on various types of equipment Repaired stationary industrial machinery and mechanical equipment
Supervising for coal exploration include mapping, regional, drilling in the coal mining, I supersived over coal quality control, include sampling in pit, ROM and shipment include blending program. in Gold Mining, I supervised for regional and detail exploration include mapping, and drilling
I have 30+years in the heavy equipment field service. I work on all parts of any machine diesel or gas that is construction or mining related. Don't let the years fool you. I can work circles around the younger guys and teach them more than they have ever learned.
Qualified diesel mechanic with 12 years experience in a commercial and mining environment and 3 years Maintenance supervisor experience.
Experience in Metrology and Quality Assurance, Instrumentation and Process Control. MSc. In Applied Physics - University of Zimbabwe
Industrial Electrical, Instrumentation, Power Generation Systems, PLC and Scada design and programming, Construction and Maint.
•Over 9 years experience preparing detailed estimates for Capital Projects involving all engineering disciplines including process design, civil, structural, mechanical, piping, electrical, instrumentation, and process control for Mining and Heavy industrial Projects.
Sr. Piping Design, Lead Des, ACAD 3D, Microstation 3D
Estimating
Land surveyor, Road, Stormwater, Sewer, Subdivision designer
Metallurgical Engineer
back hoe ,skiddre, harvester, porter, off road trucks cat 769,773,777
Career Objective: To contribute to the growth of mining industry in a position where I will have opportunities to utilize my interpersonal and professional skills to apply my knowledge and experience in mining technology.
Accomplished technical and managerial career qualified by 24 years of measurable achievements in the construction and mining industries. Highly skilled in identifying, evaluating and negotiating joint venture and other international business opportunities with government officials, the private sect
Metallurgical Engineer, Project Engineer, Operations Manager, Primary metals, petrochemicals.
Diamond and gold mining, Diamond and Gold producer, Diamond and Gold Purchaser
management of R&D programmes, technology strategy, consulting and evaluation
Project Engineer - Proposal
Petroleum Engineer
Am a male compentant Auto-LHD Electrician with 5years working exposure in different machine and vehicle
I am an experienced mining engineer in the field of coal as well as stone mine.
Certified in Heavy Equipment Operating, AZ, Hard Rock Mining Certified, Welder Cert.
Project engineering/managment
A solid operations/manufacturing/sales/marketing/quality control/administration background within large and small firms with responsibility to orchestrate numerous M&A and turnarounds of trouble companies and divisions. A complimentary proven risk management background within Middle Office and Tra
Joint Venture Accountant for four oil and gas companies
drilling on a atlas l8
Degree in Mining Engineering with MBA having 7 years experience in financial, commercial, operations and improvement related activities in mining sector.
Several Years experience as drafter, on board last 15 on AutoCAD
Exploration Geologist. Worked in China and Australia on Gold and Tantalum projects respectivly.
Managing Mine Resources, Maintenance Planning, Mine Start-Up,
Electrical Project/Construction Management
I have completed diploma in mechanical engg with first class and also have 8yrs exp in the field of engineering and manufacturing
25+ years experience as Operations Manager in the Resources and Oil & Gas Sectors. Formal qualifications in Engineering and Business.
A competent leader with 3 years of experience within HSE Management in the upstream and downstream Oil & Gas Industry
Mining degree, 6 years hard rock track and trackless mining experience, planning
20+ years in Control Systems Engineering/Design. Experienced Intools user.
Metallurgist and Materials engineer with 3 years of experience. Wide range of skills in metallography techniques, SEM, TEM, Stastical tools and design softwares. Good communication and presentation skills. Published papers in journals and presented work at conferences.
Free ! YOUNG POTENTIAL in FINANCE & ADMINISTRATION
First
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
[ 32 ]
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Next
Last
Seach Parameters
Change search parameters...
INDUSTRIES:
Mining;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com