Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #83829
next resume »»
CONTACT INFORMATION:
View contact information...
QUALIFICATION:
Bachelor of Mechanical Engineering, 1991,
1st Class, D.Y.Patil College of Engineering
& Technology, Shivaji University, Kolhapur
TOTAL YEARS OF EXPERIENCE: 17+ Years
SUMMARY OF EXPERIENCE:
Lead Mechanical Engineer in PMC engineering team for Ma'aden Phosphate Project having more than 17 years of working experience in preparation of Specification/ Material Requisition/ Proposal/ Scope of Work; Preparation & Review of Design Basis and calculations, Technical & Cost Evaluation; Vendor Drawing Review, Interfacing coordination with Client / EPC Contractor / Vendor; Establishes work plan, Review project status for various Static, Rotating and Material Handling Equipment and Mechanical Packages in LNG, Petrochemical, Refinery/ Fertilizer /Chemical Plants in PMC consulting, EPC, Oil & Gas Companies. Have varied experience and worked in all phases of projects from conceptual, FEED and detailed design engineering.
INTERNATIONAL ASSIGNMENTS:
* WorleyParsons, Al-Khobar, Saudi Arabia from Sep-06 till present as PMC Lead Mechanical Engineer on Ma'aden Phosphate Project.
* Technip, Abu Dhabi UAE from Feb-05 to Sep-06 as Senior Static Equipment Design engineer on various projects listed below in detail.
* Bechtel, Houston USA from 1-March-04 to 26-May-04 and from 12-July to 28-Sep-04 for Marathon LNG project.
* UOP Des Plaines, USA from Dec-01 to June-02 for on the job training for design of Vessels and columns for Schedule A projects.
* Daelim Engineering, Seoul, South Korea from Aug-97 to Feb-98 for HDPE and PP plant for Haldia Petrochemicals projects.
CODES FAMILIARITY:
ASME, ASTM, ANSI, AWS, BS, TEMA, API, NFPA, ISO
COMPUTER ABILITY:
Having varied experience of design software Programs like Compress, PV-elite, Caesar II and B-Jac. Worked on various EDMS like Smart Plant Foundation, Info-Works, and Lotus Notes.
WORKING EXPERIENCE:
1. September 2006 - Till date: Worley Parsons, Al-Khobar, KSA
I have Joined WorleyParsons as Lead Mechanical Engineer in September 2006 and working for PMC engineering team for Ma'aden Phosphate Project in various phases of the project.
Projects handled:
A) MA'ADEN Phosphate Project from Sep-2006 till present: Lead Mechanical Engineer in PMC engineering team of the project. The Phosphate Chemical Complex is being developed by a Ma'aden subsidiary - the Ma'aden Phosphate Company (MPC) and consists of four Chemical Plants including a Phosphoric Acid Plant, a Sulfuric Acid Plant, Ammonia Plant, a Diamonium Phosphate Plant, and associated infrastructure facilities. The Phosphate Complex will be supplied with phosphate concentrate shipped by rail from a MPC Phosphate ore beneficiation plant situated at Al Jalamid approximately 1,400km North West of the complex location.
Responsibilities include preparation of Ma'aden Mechanical specifications and ISBL conceptual design, data sheets, Requisitions, TBE, and cost estimation during FEED phase of the contract. During FEED phase, technically reviewed EPC contractor's open book estimates and provided input to EPC contract scope of work. After award of EPC contracts, during detailed engineering phase responsible for review of EPC's standards, specifications, datasheets, requisitions, vendor proposals, TBE and vendor detail drawings providing PMC review comments. Also reviewing and responding to EPC contractors technical queries on behalf on client. Responsible for finalizing railway loop layout for Acid loading and phosphate unloading at Ras Az Zawr site, also coordinating and meeting with Saudi Railway Authority in Riyadh for design issues related with Acid loading and phosphate unloading facilities. Participate in 3-D model review prepared by EPC contractors. Responsible for attending and providing PMC inputs in technical matters related with Pressure Vessels, Heat Exchangers, Waste Heat Boilers, Process Columns, Storage Tanks, material handling equipment etc.
WP is also responsible for detailed design of ISBL facilities which includes Sea Water Supply System, Natural Gas System, Gypsum Mobile Conveyors and Radial Stackers and various other package equipments. I am responsible for detailed design activities for Gypsum Mobile Conveyors and Radial Stackers, pH Adjustment unit, Safety Showers and providing support to other packages on need basis.
B) MA'ADEN Phosphate Project "Material Handling MH1 Contract" from December-2007 till July-2008: In the absence of regular material handling project manager filled in role of material handling manager and performed responsibilities like evaluation of EPC bids, coordinating with inter departments, Client and bidders; issuing post tender clarifications, technical negotiation with tenderers, preparation of technical recommendation report for contract award and updating the scope of work for contract award. Material Handling MH1 contract includes a facility for rail/road unloading of raw materials like Phosphate Concentrate, Kaolin and Reactive Silica. After the unloading material is conveyed to intermediate storage which includes a phosphate concentrate storage building and storage silo for Kaolin and Reactive Silica. From intermediate storage material is reclaimed and sent to battery limit of Phosphoric Acid Plants to meet operational needs of the plants. Also actively involved in finalizing layout for the facility.
WP project management recognized my work and awarded me Employee of the Year for 2007-2008.
2. February 2005 – September 2006: TECHNIP, Abu-Dhabi, UAE
During this period worked in Technip Abu-Dhabi as Senior Design Engineer in Static Equipment group and worked in various types/phases of the projects like FEED, EPC for Petrochemical, Refinery and LNG plants.
Projects handled:
A) QATARGAS II LNG Project (Chiyoda Technip Joint Venture Project for Qatargas) From July-2005 till Sep-2006: As part of this project Chiyoda (Japan) Technip (France) joint venture (CTJV) was constructing the world's 2 largest LNG (Liquefied Natural Gas) trains for the Qatar Liquefied Gas Company Limited (II) ("Qatargas II"). Under this project, the joint venture partners were engineering and building Trains 4 and 5 at the Qatargas plant in Ras Laffan. Each train of 7.8 million tons per annum of LNG.
Worked as Deputy Lead Static Equipment engineer, responsible for Preparation of Mechanical data sheets and Material Requisitions for P.O., Vendor Print Checking, Co-ordination with inter department as well as with vendor for Site Fabricated Storage Tanks, Pig receivers and Slug catcher. Also responsible for engineering expediting of Storage tank subcontractor Belleli Energy S.p.A., situated in Dubai/Sharjah for engineering and shop prefabrication activities of 25 nos. storage tanks for the project.
B) HP FEED GAS CONDITIONING SYSTEM (EPCM project for ADGAS, Abu-Dhabi) From Feb-2005 – July 2005: The Project consisted of existing 3-trains of LNG Plant and associated utilities at Das Island. Plant products are LNG, LPG, Pentane and molten sulphur. To overcome the foaming problem in the HP Feed Gas system, ADGAS provided two new vessels Gas Scrubber and Feed Gas Liquid Knock Out Drum and added demisters in existing Slug Receiver vessels based on the recommendation by Technip.
Worked as a Senior Discipline engineer for two new vessels Gas Scrubber and Feed Gas Liquid Knock Out Drum and providing demisters in existing Slug Receiver vessels. Responsible for preparation of Material requisitions, Specifications, Mechanical datasheets for Enquiry and Purchase. Reviewed vendor's offers and Prepared TQs and Technical Bid Tabulation, replies to Client comments, Co-ordination of vendor meetings. Review of vendor's drawings, Design calculations, Procedures, Data books etc. and co-ordination with all related disciplines for Technical matters.
C) CSP DEBOTTLENECKING PROJECT (FEED project for ADMA-OPCO, Abu-Dhabi) From March-2005 – July 2005: ADMA-OPCO operates the offshore oil and gas producing facility at Zakum West Super Complex (ZWSC). The crude produced from the offshore field of Lower Zakum and processed at ZWSC. As a result of ADMA-OPCO's increased future production target and also increasing Gas-Oil ratio, Collector Separator Platform at ZWSC required to handle increased throughput in the coming years over its original design capacity. As part of CSP Debottlenecking FEED project, existing four Separator internals and two Gas Scrubber internals needed to be replaced.
Worked as a Senior Discipline engineer for replacement of internals of existing Separator and Gas Scrubber Vessels. Responsible for preparation of Specifications, Mechanical Datasheet for Modified Separator and Modified Gas Scrubbers. Review of Vessel inspection reports and adequacy check of existing vessels. Co-ordination with Client and inter-disciplines for Technical matters.
3. October 2001 – February 2005: BECHTEL, New Delhi, INDIA
During this period worked as a Pressure Vessel Design Engineer in various types/phases of projects like FEED, LSTK for Petrochemical, Refinery and LNG plants.
Projects handled:
A) LNG project (Marathon, EG LNG Train 1 Project) From December-2003 till February 2005: Worked as vessel engineer in EPC phase for EG LNG Train 1 project (Marathon LNG). Responsible for Preparation of Mechanical data sheets, Material Requisitions, Technical Bid Evaluation, cost estimation, Vendor Print Checking, Co-ordination with inter department as well as with vendor for Pressure Vessels, Tray Internals, Storage Tanks, Filters and Gas Separators. Worked on assignment to Houston office from 1-March-04 till 28-Sep-04 for bid evaluation, finalization of vendors and vendor print review of static equipment.
B) UOP Schedule A Project (From Oct-01 to March-03, Aug-03 till Feb-04): Worked as Vessel Design Lead Engineer for the preparation of Pressure Vessel specifications of Basic Engineering Design Schedule A Packages for Technology Licensor UOP. Responsible for preparation of project specifications for Pressure Vessels, Column Internals, Mesh Blankets, Tower Packing, Inert Ceramic Balls and Material Handling Equipment. Job activity includes vessel sizing calculation, specifying support type, design code, mechanical check, sizing calculations for various internals, vendor print checking for compliance of Licensor's requirements. Ensuring adherence of all specifications to technical and standard requirements of Licensor. Also underwent 6 months (December 2001 to June 2002) of on the job training at Technology Licensor's office in USA.
C) LNG feed (Marathon, Alba Phase 3 Project) From April-2003 to July-03: Worked as Lead vessel engineer during feed and estimation phase for Alba Phase 3 project (Marathon LNG). Responsible for Preparation of Mechanical data sheets, Requisitions, Technical Bid Evaluation, cost estimation, Co-ordination with inter department as well as with vendor for Pressure Vessels, Storage Tanks, Filters and Gas Separators.
D) Darwin LNG Project (from July-2003 to Aug-03): Responsible for vendor drawing and calculation review/approval for Pressure Vessels. Also reviewed weld procedures, weld maps, paint procedures, NDE procedures.
4. APRIL1999 - Sep 2001: M/s SIMON INDIA LIMITED, New Delhi,
(A subsidiary of Simon-Carves of UK)
Worked as Assistant Manager Design supervising team of two engineers and one designer for Mechanical Design, Preparation of Mechanical data sheets / detail design drawings, Requisitions, Technical Bid Evaluation, Vendor drawing review, cost estimation, Co-ordination with inter department as well as with client and vendor for Pressure Vessels, Heat Exchangers, Process Columns, Storage Tanks, FRP equipment.
Frequently visited Vendor shops for FRP equipments and Third party agency for expediting of project being jointly engineered, procured and constructed by Simon India and Simon-Carves UK.
Trained in pipe stress analysis software Caesar-II and assisted piping lead in Pipe stress analysis for Chlor alkali project.
Projects handled:
* Chlor-Alkali and Titanium di Oxide project for Arabian Chlorine Company
(CRISTAL), Saudi Arabia
* Supply of Pressure Vessels to Simon Carves, U.K. for Zeneca project.
5. JULY ' 97 - MARCH ' 99: DAELIM E & C INDIA LTD., Delhi.
( South Korean MNC )
Worked as Senior Engineer Design and deputed to Seoul, South Korea in their parent organization from Aug-97 to Feb-98 to work on HDPE and PP Projects for the front end and detail engineering work. Responsible for dealing directly with International Bidders/Vendors, Organizing technical clarification meetings with client / consultant and Vendors, Preparation of requisition, Technical Evaluation, Assisting procurement for cost evaluation and selection of vendor, Inter department coordination, Vendor drawing review, Extensive expediting with vendors, Frequent vendor shop visit to monitor manufacturing progress, Assisting project manager for progress of project. Equipment handled include Process Reactors, Pressure Vessels, Heat Exchangers, Air Fin Coolers, Filters, Silos & Blenders, Trays & Tower Internals, Waste Heat Boiler, Acid Gas Flare System, Site Fabricated Tanks etc.
Projects handled:
* High Density Poly Ethylene (HDPE) and Poly Propylene (PP) project for M/s
Haldia Petrochemicals, West Bengal.
* Hydrogen Generation Unit, M/s IOCL, Mathura.
* Diesel Hydro Desulpherisation Unit ( DHDS unit ) for M/s IOCL, Baroda.
6. APRIL' 95 - JULY ' 97: Kinetics Technology India Limited,
New Delhi (Now taken over by Technip)
Worked as senior design engineer responsible for Mechanical Design, Preparation of Mechanical data sheets / detail design drawings, Requisitions, Technical Bid Evaluation, Vendor drawing review, Preparation of B.O.M., cost estimation, Co-ordination with inter department as well as with client and vendor for Pressure Vessels, Heat Exchangers, Process Columns, Storage Tanks, Air Coolers, FRP equipment, Fire fighting system. I was also associated with preparation of many proposals.
Projects handled:
P.S.A. H2 Plant for M/s. GAIL, Auraiya
MS Maximization project for M/s. HPCL, Bombay
H.V.U. revamp project for M/s. BPCL, Bombay
Ammonia Plant revamp project for M/s. SPIC, Tuticorin
Ferric Oxide Plant for M/s. NMDC, Vishakhapatnam
P.S.A. N2 Plant for NRL, Numaligarh
Caustic Soda Plant for M/s. NIRMA, Baroda
7. APRIL' 92 - APRIL ' 95: ATV Projects India Ltd., Mathura
ATV Projects India Ltd, was an ASME "U" Stamp fabrication organization. Worked as Design Engineer responsible for mechanical detailed Design of Pressure Vessels, Heat Exchangers, Process Columns, Storage Tanks, LPG Bullets, Horton Spheres; Preparation of fabrication detail drawings & design calculations ; Technical scrutiny of tenders; inquiry preparation ; preparation of B.O.M. ; cost estimation ; co-ordination with client and shop etc. Shop and site inspection of Pressure vessels and heat exchangers for a period of one and a half years.
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 601 to 650 of 3494)
Go to Search Parameters...
Brief Description
Filipino licensed geologist with almost ten years combined experience in mineral exploration, mine operation and research. Knowledgeable in Microsoft Office programs, familiar with Autocad and Mapinfo basic commands, and currently orienting on Gemcom software.
Geologist
Over 12 years experience in the mineral resources sector having worked in Canada, Central America, South America, and South East Asia. Wide range of experience from exploration, feasibility studies, block model wire framing, resource calculation, and open pit mine operations.
Geological Database Administrator, Exploration Geologist, 8 Years Experience in Mineral geology, Exploration & Drilling Programs, and Geological Database management. , Proficient in Acquire,MS Office,Familiar with MapInfo and Micromine. Ready to work all over the world ,Sweden Permanent Resident
My objective is to be a leader who places the safety of the worker and integrity of the company in high esteem. The value of Zero accidents and no loss time incidents affect the bottom line dramatically, in employee and company attitudes.
Technical and Business Analysis of coalmining businesses for JV/Acquisition/Development. Mining Professional and Business Manager with experience in Mine Management.
Innovative career in the field of electrical power engineering: Installation, Service and Commissioning
Intermediate ( Hyderabad) 1999 Grade “B DAE (CIVIL) SBTE.KARACHI 2003 First class B.E (CHEMICAL) DAWOOD COLLEGE OF ENGINEERING.KARACHI 2007 First class Experience in GEOTCHNICAL WORK Experience in to install the pezometers. Pumping test and proper monitoring of draw down
A proactive, versatile and committed Executive Manager with extensive experience spanning throughout the world and accustomed to project and people management, coordinating resources effectively to achieve targets often within stringent deadlines. A skilled problem-solver
I am a Post - Graduate Mineral Processing Engineer with +20 years of rich experience in the field of Beneficiation of Iron Ore -both Magnetite and Hematite , Lead ore, Zinc ore and Chromite ore and Pelletisation and Sintering of Chromite ore. Presently handling Mineral & Met.
Project Manager with 19 years of hands on Experience of Executing Green field projects of Hydro & Pyrometallurgy- Zinc, lead & Copper, Cu SX & EW, Cobalt SX &EW, Leaching & Flotation plant, Copper Smelter. Transmission lines, HT & LT motors upto 7700KW, VVVF upto 5MW, Hot & Wet ESP's.
10 years experience, design and draughtting, using autocad and microstation. Most delt with materials handling, and underground and surface steelwork.
A result oriented mining engineer with experience in open pit gold & chrome mining as well as underground asbestos mining. Has been involved in Mine Planning, Mining Projects Evaluation & Management, Production Budgeting & Control. Operations Feedback
Civil Construction Engineer
Been worked mostly in the mining company here in the Philippines as a Parts and Warehouse Incharge and just recently as a Maintenance Planner / Expediter in Barrick Kainantu Limited in Papua New Guinea and also familiar with the Parts of Sandvik Tamrock Drills and Loaders
Quality control inspector
I am a graduated of Mineral processing engineer with 5 years experience in Mineral processing engineering.
Geologist from India having a 5 years of experience in prospecting exploration. Versatile as a geologist to learn other mineral exploration skills and a Strong will to Re-locate. Kindly view my CV for more details on my capabilities, job orientations and skills.
Russian speaking geologist with an MBA in finance seeking position with an international mining company, specifically in the former USSR, in corporate planning, project management, finance or data management.
A Professional Engineer with design, sales, plant, project, and application engineering experience.
Remote Site Expert : Global Experience.
Senior Training Officer, Mechanical with 17 years of extensive knowledge and experience in all aspects of technical training. Planned, developed, designed, conducted, mechanical training programs following the approved Competence Development Programs, ensuring mechanical fitters, tradesmen and techn
Underground operator for 13 years Enjoy doing services work ..operated trucks boggers service vehicles and very competant in development charging and production charging
A hard core Mining Engineer, innovative, dynamic, 37 years experience in mining and mechanization projects in India and abroad. Green field projects – conception to completion. A powerful manager, negotiator and administrator. Worked in Coal and non-coal mines. Successfully steered profit centers,
Qualified Welder, Specialised Welding, Semi skilled Boilermaker, Line boring, Supervisor, Jnr. Plant Operator
Project Controls, Cost and Planning
I have involved in petrochemical, oil/gas, and heavy industrial projects. I have strong academic achievements, excellent interpersonal skills, and positive attitude, Commitment and desire to perform engineering design. I am also exceptionally well organized and highly motivated and able to pull toge
A Mining Engineer completing an MSc in Rock Engineering. Also in possession of a Blasting Ticket and a South African Chamber of Mines Strata Control Certificate. Have got 5 years underground mining experience
20 yrs exp in heavy equipment
chemical engineer,15years experience in copper solvent extraction& electro winning,worked 2yrs in central africa DR congo for copper & cobalt upgradation process as copper cathode & cobalt hudroxide,
Environmental geoscientist (hydrochemistry/hydrogeology) role
I have been involved in mine mobile equipment maintenance for the past 16 years. Have handled different equipment brands from Tamrock, EJC, Toro, Eimco, JCI, Rammer, Atlas Copco and Wagner load-haul-dump (LHD) and low profile trucks(LPT) to underground jumbo drilling rigs, longhole drills,rockbolter
Lead Mechanical Engineer, 17 years of experience in preparation of Specification/ Material Requisition/ Proposal/ Scope of Work; Design Basis and calculations, Technical & Cost Evaluation; Vendor Drawing Review, Static, Rotating and Material Handling Equipment and Mechanical Packages
Seeking entry level positions as project engineer, planning and operational duties. Willing to relocate
Good Surpac skill, over 3 year experience, supervision drilling campaign, geological assessment
Underground Miner Dedicated professional with a proven record of accomplishments and consistent contributions that increase efficiency and productivity. Fluent in the operation and maintenance of bolter, buggy, miner, belts, diesel scoops, jackleg drills, etc.
Skills: Shift Supervisor, Air Jumbo, Electric Hydraulic Jumbo, Remote Control Electric and Diesel Scoops, Haulage Trucks, Boart Long Hole Drilling, Blasting, Jack leg, Rock Bolting, Cavo, Timbering, Staging, Slusher, Development, Raise Mining, Mine Rescue, Fire Fighting, First Aid
Over twenty one years experience as Heavy Duty Mechanic, seventeen years with underground mining contractors. Over eleven years experience as Master Mechanic and Lead Hand.
I am a experienced industrial electrician/electrical supervisor of fifteen years. My electrical experience is in the mining and rolling mill industries. I also Possess my MSHA and West Virginia electrical certifications up to and including high voltage for underground and surface work.
I am applying for a Maintenance Supervisor, Chief Mechanic or Rig Mechanic position. Please see my attached C/V. I am very interested in working offshore but have 7 years experience on land rigs. I do have my BOSET course and have updated my other certificates. I realize that I don’t have the offsho
National Registered Construction Site Safety Technician
6 years in exploration of Industrial Minerals
Quality Assurance/Quality Control, IRCA Registered Lead Auditor with over 20 years of experience
MSHA Instructor,Exp papers in KY,IL IN,Boss papers in IL
Optimization / Resource Planning / Cost Control / Quality Assurance & Control / Compliance Performance Management / Turnaround / Safety / MSHA / Reclamation / International
Provide structural engineering, construction management, real estate due diligence and expert witness services.
Mining engineer with a diverse range of experience is seeking a technically challenging position.
I have been working in Africa for the last 6 years on managerial level in the security industry. I have the ability and experience to work in a general management position.
chemical and process engineer with mining and environmental experience
I have an extensive back ground in mining exploration. GEMCOM, SURPAC, and Mapinfo are some of the software products I have utilized in my career.
First
1
2
3
4
5
6
7
8
9
10
11
12
[ 13 ]
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Next
Last
Seach Parameters
Change search parameters...
INDUSTRIES:
Mining;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com