CAREER SUMMARY:
Control Systems Design Specialist & Engineer with over 25 years of energy engineering experience, four years of civil engineering and five years of aerospace work. Over the last ten years, moved from home office work to field engineering work, and reclassified by Fluor from Design Specialist to Construction Engineer.
Between recent major field assignments, owned and operated a construction materials and light engineering company in West Java, Indonesia.
Construction Coordinator and Block Valve Engineer for the 45 block valve sites on an 1,100 kilometer crude pipeline in West Africa. Besides coordinating multiple construction contractors, and approving all aspects of construction at the widely spread remote valve sites, also verified and pre-commissioned the functionality of the control systems with the valve vendor reps.
On the previous assignment, managed I/E based (Instrument/Electrical) engineering/design packages, from conception through operations turnover in a maintenance and operations contract for a Minnesota refinery.
Most of my projects in Minnesota involved developing complex Process Control and Logics, and meanwhile, managing the other design disciplines involved on the project, such as process, piping, civil and mechanical. Developed the scope and budget documents, and during this design phase, assured the delivery and conformance of vendor materials and equipment, and verified the DCS/PLC reprogramming.
Before that assignment, I was involved in authoring and technical negotiations for a large I&E construction contract, including progress reporting, turnover procedures, and documentation content. Between the contract support activities, controlled project P & ID's (Piping & Instrument Flow Diagrams), instrumentation databases, and specified off line instruments.
Have been the Lead Designer on multiple hydrocarbon revamp projects. Early on, was the Lead Field Engineer on a pilot coal liquefaction project in West Virginia and more recently; at a large geothermal project in Indonesia. Have learned to speak simple Indonesian, and prefer to spend my off-time in that country.
When the energy sector was down in the mid 80's I was a Project Manager on several small civil projects involving land development, drainage and highway design. New to that field, one highlight was the hydrology calculation spreadsheet program I developed. Those old supervisors are still asking me to recreate that program on MS Excel, even 15 years after I left that field.
Prior to the bottoming of energy work, was the Control Systems Design Supervisor on two nuclear energy projects for the United States Department of Energy using high vacuum technology. The GCEP project was the largest that Fluor E&C has ever had, and my promotion to lead the design group was a big surprise to me in a company with hundreds of designers to choose from for that position. It turned out to be a seven year assignment. (US DOE Q Clearance)
Prior to my energy industry work, there were five years of experience in quality control in a jet engine overhaul facility.
Owned a computer store for several years, and have a high degree of P.C. experience and literacy. Ten years of AutoCAD experience.
SIGNIFICANT EXPERIENCE DETAILS:
CV BOJA JAYA – Parangkuda, West Java, Indonesia (05/02 to 09/04)
OWNER-DIRECTOR
This was a construction materials and light engineering firm that I created with an Indonesian partner. The firm managed to stay above water whenever I was there, but the corruption required in securing and performing every project was way beyond what I had envisioned. Whenever I was not in Indonesia, things got out of hand and I was forced to shut down the business. It was an interesting experience, but a costly one – I won't try that again!
We supplied materials such as rock, sand, steel, and even coconut tree logs (for a cofferdam), as well as labor for several small construction projects. I also supplied engineering services for small river crossing bridge and a potable water truck loading station.
FLUOR GLOBAL ENTERPRISES - Chad & Cameroon, West Africa (10/02 to 02/03)
CONSTRUCTION ENGINEER
Block Valve Engineer & Construction Coordinator
Chad-Cameroon Pipeline Project (Major $) COTCO CPMT Management Team
Project Office in Douala, Cameroon
This short-term assignment involved being responsible for the pipeline contractor's construction of the 45 pump stations and valve sites along the 1,100 kilometer length of this project. Aside from the pipeline construction contractor, there were also fiber optic, instrumentation, telecommunication, coatings and other subcontractors involved at each site. My job was to coordinate their activities, and commission the valves and controls for turnover to the client. This involved everything from the civil work to the control systems.
The technology on this project was simple, but the logistics in this dangerous and primitive part of the world were very difficult. It was my first experience in the upstream portion of the petroleum/energy industry, and a very valuable, albeit short term, experience.
General Responsibilities:
* Overall responsibility for all valve stations, control valves and pig launchers/receivers.
* Schedule & coordinate construction contractors' activities at valve sites.
* Monitor progress, completion, and acceptability of all work at valve sites.
* Report work progress and compliance for incremental payments to contractors.
* Monitor and witness vendor reps acceptance testing of valves and equipment.
* Precommission valve sites for turn-over to Operations.
* Coordinate my activities with, and support o Overall Project Managers (Africa & U.S.)
o Overall Engineering Manager o Overall Construction Manager o Contracts Manager o Project Controls Manager o Security Manager o Project Administrative Manager o Site Construction Superintendents
FLUOR GLOBAL SERVICES - Pine Bend, Minnesota (03/00 to 10/01)
I/E DESIGN LEAD & COMMISSIONING ENGINEER
Refinery M&O Contract ($100K/yr) Koch Petroleum
Pine Bend Refinery Pine Bend, Minnesota
Duties at this petroleum refinery included project conceptual feasibility, detailed design and checking of I/E engineering packages before being issued for construction. Conducted the project planning meetings incorporating Engineering, Construction, Operations, Maintenance, HSE, Programming, Procurement and Management early in the design phase, at the 70% design phase, and prior to construction package issue.
Duties also included planning and verifying all schedules for equipment, materials, crafts, and operational shutdown, coordinating the schedules with discipline-department planners. Lead the construction/shutdown coordination meetings prior to shutdown. Once a package was issued for construction, and scheduled, I would take the role of Commissioning Engineer, managing client and construction resources through project turnover. Prior to turnover, had developed process operation procedures after developing the logics, and implementing them with the PLC/DCS programmers. Along with the programmers, conducted operations training for shutdown and start-up.
Following project completion, managed the document closeout. Operated as Project Engineer on medium and small packages (under 1000 manhours), and Lead Designer on larger projects. We primarily used AUTOCAD 14, Microsoft Office, and client proprietary relational database software at this site.
FLUOR DANIEL – Irvine, California (12/97 to 11/99)
INSTRUMENT ENGINEER
Refinery Upgrade Project (Major $) Irving Oil
Crude and RFCCU Units Saint John, New Brunswick, Canada
(5/98 – 11/99)
On loan to Engineering, specified off-line instruments, and managed the instrument databases and P & ID modifications. Also wrote and negotiated E&I construction contracts, and developed system turnover philosophy during several site trips.
Supervisor – Mark Murphy – Aliso Viejo, Ca, (mark.murphy@fluor.com)
DESIGN SPECIALIST
Yanpet (Major $) Yanbu al Bahr, Saudi Arabia
(11/97 – 5/98)
Detailed design of Control Systems design in polymers processing plant. (Fill-in assignment) Used PDS for instrumentation design locations, and wrote instrumentation installation specifications.
FLUOR DANIEL-IKPT (1996 to 1997)
FIELD ENGINEER
Salak Geothermal Project (Major $) Unocal
(12/96 - 11/97) Gunung Salak, W. Java, Indonesia, S. E. Asia
This project was a major expansion of an existing geothermal electric power facility atop an Indonesian mountain. Lead Control Systems Field Engineer for process and mechanical instrumentation. Continued to manage and maintain instrument databases. Often got my hands dirty when local contractors didn't know how to install or modify instrumentation. PLC & DCS installation was by others. Most of my subordinate Engineers & Designers, and all construction crews were Indonesian locals. I learned Bahasa Indonesia to more effectively manage the construction phase. Difficult assignment, the detailed engineering package produced in Jakarta was inadequate, and local construction contractors were inexperienced. Was able to stay barely ahead of design errors and construction contractors' inexperience, but managed to turn over project to client ahead of schedule, and under budget.
Supervisor – Mark Murphy (see above)
DESIGN SPECIALIST
Salak Geothermal Project (Major $) Unocal
(01/96 – 12/96) Jakarta, Indonesia, S. E. Asia
Control Systems adviser to IKPT (Indonesian Engineering partner) in Jakarta during the detailed design phase of the above the project, while managing and maintaining the project instrument databases. Also functioned as the IKPT liaison with California and English speaking contractors for all IKPT disciplines. Contractually, I was forbidden by project management from involvement in the actual detailed design work, and was limited to answering conceptual questions from the local engineering firm.
Supervisor – Mark Murphy (see above)
FLUOR DANIEL (1991 to 1996)
DESIGN SPECIALIST
Salak Geothermal Project (Major $) Unocal
(10/95 – 01/96) West Java, Indonesia, S. E. Asia
This was the front-end portion of the above contract, done in California. Developed the P & ID's (Autocad) from blank paper (screens) to the final issue. Established and issued control systems standards, typical installation details & computer generated loop diagram graphic forms.
Yucca Mountain Project (Major $) U.S. Department Of Energy
CRMWS - M&O
(03/95 – 10-95) Las Vegas, Nevada, North America
Design support for the procurement, fabrication, installation and documentation of the site characterization Data Acquisition System for the U.S. mined geologic nuclear waste disposal project. This project required US DOE security clearance, and numerous government project-training classes. The assignment was short-lived as funding was temporarily withdrawn in a political battle in the U.S. Congress.
Continuous Catalyst Regeneration & LSFO Chevron
(1993 - 1995) El Segundo, California, North America
This was an upgrade of a catalyst unit to provide continuous catalyst regeneration. I was the unit lead designer, and besides the normal scope of work, innovated several highly lauded construction interface tools to smooth out the required plant shutdowns. The client and contractors were very pleased with the unsolicited initiative and extra effort that facilitated minimal shutdown time, and very smooth contractor & operations interface. My demonstrated detailed understanding of construction processes and sequences alerted Fluor management to my value in construction roles.
Shell Tabangao Asset Renewal (Major $) Shell International
Petroleum MIJ.B.V.
(1992 - 1993) The Hague, Netherlands, Western Europe
Control Systems Design - Area Lead for 25 new process units in this STAR Petroleum Expansion project. Led a crew of about 20 designers in the detailed design packages, and also did all of the analyzer and nuclear instrumentation design myself. Fluor was in the habit of using me for all complex instrumentation design, based a lot on my superior depth of knowledge in physics, chemistry, material properties and construction techniques.
Arco Clean Diesel (Major $) Arco Petroleum Products Company
(1991 - 1992) Carson, California, North America
Control Systems design of a new processing unit and revamp of existing facilities to meet new California and E.P.A. requirements. On this project, was the Lead Designer, and performed all of the instrumentation design functions, from P&ID development, design specifications, location plans, installation details, loop diagrams, instrument index database, vendor submittal checks and interdisciplinary coordination.
9.2 Expansion ($20M – tiny for Fluor) Intel
(1991) New Mexico, North America
Control Systems Design of an expansion project to increase production of computer processing chips. This was an interim position, and my scope was primarily to logically develop the physical layout of the process facility.
ASSOCIATED ENGINEERS (1989 - 1991)
PROJECT MANAGER Rancho Cucamonga, California
Managed several small (max $500K) land development and highway improvement projects working with private sector clients and governmental agencies, including design check of state route 5-55 interchange bridges in Santa Ana, California. Other projects included apartment complex and subdivision layout and grading, golf course drainage design, and also configured and managed all of the small offices' computers and AutoCAD configurations. Also guest lectured on small engineering office computer configuration and application at Riverside City College.
ASL CONSULTING ENGINEERS (1987 - 1989)
SENIOR DESIGNER Rancho Cucamonga, California
New to Civil Engineering, I quickly became to office go-to guy for complex problem solving. As the Civil Engineering designer of a 1400-Acre land development (housing) project, my focus was on drainage/flood control (hydrology) and street design. Also designed several small dams in the hills above the large subdivision, and did the complete flood control drainage system. Other skills quickly learned were earthwork and legal descriptions. This is where I co-developed a highly productive spreadsheet hydrology program, based on California hydrology standards. The program was very complex, but saved hundreds or thousands of design hours, providing instant "what if" results for the hundreds of complex calculations needed in each revision in a large drainage system. After leaving that company, they were unable to migrate the program to later versions of spreadsheet programs. The old bosses, still friends, beg once a year or so for me to recreate the program in Excel, but that would take at least two months of my free time.
FLUOR ADVANCED TECHNOLOGY (1979 - 1986)
DESIGN SUPERVISOR
Hanford Waste Vitrification Plant U.S. Department of Energy
(1986) Richland, Washington, North America
Design of nuclear waste handling - Control Systems. This project was temporarily dropped, but before it was, my scope was front-end conceptual design development.
Gas Centrifuge Enrichment Project U.S. Department of Energy
(1979 - 1986) Portsmouth, Ohio, North America
This project was the largest Fluor has ever had, and peaked at 500 engineers and designers in the California office. Involving the design of a nuclear fuel processing facility, I lead a group of 30 designers over the seven year duration of Fluor's involvement. This was a big move up from the previous assignment as a Principal Designer. Many older, and much more experienced Design Supervisors were bypassed for this assignment.
I got this assignment because of my dedication to detail, but also my knowledge of advanced Physics and Fluid Mechanics. I was able to effectively challenge, and revise the opinions of some of the nation's top deep vacuum technology PhD's on the implementation of Deep Vacuum processing.
Aside from my supervision duties, and as a pioneering computer store owner, I introduced the use of desktop computer use to Fluor, by bringing in one of my own to do my complex control level scheduling and progress reporting. Also put on several seminars on computer use, and pioneered the introduction of desktops with upper management.
Not satisfied with supervision and administrative functions, I took on the most complex design work, and especially all process analyzer installations. Was installed as Chairman of Fluor's Analyzer Committee.
Another role taken on was Chair of Fluor's Safety Committee.
FLUOR ENGINEERS, INC.
PRINCIPAL DESIGNER
Saudi Pectin (Major $) Saudi Pectin
(1978 - 1979) Saudi Arabia, Middle East
Large grass roots refinery design - control systems design. Typical duties as a designer included:
SENIOR DESIGNER
(Field Engineer)
Coal Liquefaction Pilot Plant ERDA - FE
(1977 - 1978) Cresap, West Virginia, North America
Conversion of existing plant to process coal into liquid petrochem products, in my first field assignment, was designated as the functional field engineer.
DESIGNER
SASOL II (Major $) SASOL
(1976 - 1977) South Africa, Southern Africa
Coal Gasification plant - control systems design. My personal favorite highlight was the "Perspective View" manual drafting assignment of the control room. Being the only designer trained to also do vanishing point perspective drafting, it was an enjoyable change from the routine tasks.
Caustic Chlorine Plant PPG
(1975 - 1976) Lake Charles, Louisiana, North America
Control Systems Design
Oxo-Alcohol Plant Oxochem
(1974 - 1975) Penuelas, Puerto Rico, Caribbean
Aeromatics plant revamp - Control Systems Design.
CHAFFEY COLLEGE, ALTA LOMA, CALIFORNIA, (1971 - 1974)
TUTOR/PEER COUNSELOR
Tutored Math, Physics, Chemistry, English, Drafting and U.S. History, primarily for minority students. Counseled curriculum and light personal problems.
KMART, MONTCLAIR, CALIFORNIA (1971)
ASSISTANT MANAGER/CAMERA DEPARTMENT
Camera Sales (Fun job, pathetic salary)
GENERAL ELECTRIC, ONTARIO, CALIFORNIA (1966 - 1970)
INSPECTOR
Los Angeles Aircraft Operations - Jet engine overhaul penetrant and dimensional inspection. This job provided a sound background in QA theory and practice, and also a good knowledge of various welding procedures, machine shop design and practice, cleaning and coatings, besides the obviously highly technical inspection techniques for high stress engine parts.
UNITED STATES NAVY (1964 - 1966)
Seaman - BOSN Mate U.S.S. Pt. Defiance (LSD-31)
TRAINING:
* Four Years of College Credit, Engineering Technology; Calif. State Polytechnic University, Pomona. (3.6 GPA)
* AS degree in Physical Science at Chaffey College, Alta Loma Calif.
o Also completed 2-year drafting program as top student o President of Engineer's Club o Frequent Dean's List honors o Outstanding Engineering Student Award (one student per year honored)
o Minored in U.S. History
* Fluor Flow Diagram (P&ID) Course – Top Student - 1974
* Fluor Control Systems Design Course – Top Student - 1974
* Pasadena City College – Advanced Instrumentation Course - 1975
* Fluor Engineers Supervision Series - 1979
* Fluor Daniel Electrical Design Courses – 1991
* Numerous short courses and seminars in Instrumentation provided by vendors
* Guest lectured at UCR on P.C. use in small engineering offices
LANGUAGES
English – Fluent
Indonesian (very similar to Malay) – basic
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 1701 to 1750 of 2551)
Go to Search Parameters...
Brief Description
I believe my 4 years studying in Universiti Teknologi PETRONAS will be of great value should I join your company. Throughout the learning process, I was exposed to the task and responsibility in the field of technical and theoretical especially in mechanical field.
Progressively Responsible of a range of Purchasing/Warehousing Management, Organization & Administration positions with worldwide procurement (national & international); Contribution and Direct Involvement in all previous jobs with regards to purchasing of spare parts and materials required for all
24 years in oilfiled \ Safety Rep.\ EMT
Strategic thinker and forward, proficient at working with financial controls, experienced in QHSE, Operations audit, breath of Oilfield services and technical knowledge.
Logistics, Procurement and Materials Manager (Supply chain)
M-Tech (Aerospace) and B.Tech (Aerospace) , Specilization: Computational Fluid Dynamics
Experienced Design Engineer
A solid background in project controls, project coordination, project scheduling, and records management with over twelve years combined experience in these areas.
Procurement Manager with over 15years Multidisciplinary experience, providing Managerial, Engineering, Information Technology for onshore/offshore rigs and office operations in Procurement, Warehousing and Logistics.
I am a licensed Heavy duty mechanic trained and certified in Canada. I have extensive oil field/drilling experience. I am trained in Caterpillar natural gas compression products. I have extensive supervisory experience as well.
A project management and business development professional with extensive experience in bid management through to contractual completion. An impressive record in winning new business, and managing and completing projects on time and under budget.
Background includes the military, law enforcement, and international security management experience. Education includes a B.S. in Justice Studies, Master Safety Administrator (MSA) certification, and Emergency Medical Technician (EMT) certification.
I have a diverse environmental experience derived from both industrial and international development sectors, from the corporate level to the field level -- over a wide range of environmental aspects and capacities. Currently eager to return to engineering roots.
Contracts & Global Procurement Manager, Change Agent, Systems Initiation, Strategic Sourcing, Seasoned Negotiator, Proven Organizational & Team Leadership, Collaborative Mgmt. Style, Broad knowledge of OEMs & Suppliers, Contractor Oversight, Systems & Procedures, Middle East Mega-Project Experience.
An experienced security professional with 24 years of strong corporate security and law enforcement qualifications who has demonstrated a high level of success in a variety of significant and highly critical assignments in a fast paced environment. Also has an impressive track record of hands-on exp
I am a mining engineer and also has a masters degree in urban and regional planning.
Buyer/Planner Skilled in Inventory Management, Cost Reduction, Sourcing and Negotiation
I'm a construction evangelist with lot of ideas. I do planning & project controlling. Trained in using Primavera P3/ Enterprise, MS Project, Autocad, Softdesk, Matlab, Hypack, etc. Interested in Offshore Projects
Channel sales, Institutional sales, Oem sales, Business development, International sales
He has more than 25 years of experience; from his current work in hydrogeological and hydrochemical assessment, environmental monitoring, and capacity building. He has managed many projects as well as acted as team leader on various project components.
I have experience in various phases of procurement, cost, and accounting within the construction management industry. I have been in procurement field as well as in project controls for more than four years with a successful project track record.
Sales and marketing management, Channel Business, Budget Administration
Software Developer .NET, Java SQL
Utilize management and organization skills acquired through previous positions in
Human Resource Profession
An Experienced HSE Supervisor having worked with many Multi national companies and being recognised by those companies for the excellent job done. The Clients include Exxon Mobil, Single bouy Moorings (SBM), Qatar Gas II, British Petroleum (BP), Anadarko, Saudi Aramco, ARCO Dubai, DPC, RAKGAS, etc.
Enthusiastic & Keen, Good Health, able to Read, Write and interpret intelligently, Skilled to Express ideas Persuasively Confident and Quick, Strong Interpersonal Skills, Ambitious to achieve Demanding Goals
3 years in Oil & Gas industry. Oil refinery plant supervisor.
I have an overall experience of 17 years out of which 11 years in Oil & Gas Development Projects. Presently I am working as Group Project Engineer in a Major British Exploration & Production Company in Edinburgh UK. Following are my current responsibilities:
I am a Mechanical Engineer in addition to PGDM (Marketing) with 2 years of experience to offer you. I am also a Diploma in Hardware Technology from C-DAC. Have worked for Direct Sales Team of Standard Chartered Bank, Bangalore and Godrej Automation and Robotics Ltd., Mumbai as Sr. Officer (Design).
Contracts Manager
BSc, 10 years field/management experience in pipeline integrity, pipeline inspection, direct assessment, risk models, project management, surveys, non destructive testing etc.
Quality, Safety, Health, Environment and Security Professional w/ 17+ years in International upstream and downstream O&G sectors
• Extensive experience managing Document Control deparments within Engineering, Construction and Petrochemical Industries.
Project Controls / Project Services / Business Management
Project Management / Production Control
Site Construction Manager Oil and gas Industry. Over 20 years experience. Process plants, facilities and pipelines.
A results-oriented Analyst combining hands on management consulting, project finance, market analysis and mining operations experience, I provide actionable advice for the key business decisions that enhance competitive positioning.
I have done my MBA and Diploma in information technology. I have worked in diffrent feilds
Instrumentation, Construction Engineer, Commissioning Engineer, Shutdown, Turnaround, I/E Lead, Designer, Design Specialist, Field Engineer, EPC, AutoCAD
Marine Engineering, Risk Assessment, Lloyds Surveyor, Project Management FPSO Projects worldwide
Extensive and progressively responsible hands-on management experience.
•Nebosh International certificate in Occupational Health and Safety , Membership Examaination of The Institution of Fire Engineers UK., Fire Officer course from National Fire Service College Nagpur India
Welding Engineer
BE,MBA graduage having 13+ years experience in Sales & Marketing of Engineering, Flow Control & Instrumentation Process Products
A proactive leader with extensive reliability centered maintenance management and hands-on experience in the repair, overhaul and troubleshooting of mobile equipment, initiate change and reengineering of quality improvement processes while maintaining a positive, safe and productive environment.
I am a Fire & Safety Engineer,Presently working as an ENGG. (F & S) [Fire Station Incharge] in a PETROCHEMICAL INDUSTRY with having an experience of 2yrs , Have done 4yrs Bachelor of Engineering in FIRE & SAFETY, Presently persuing P. G. Diploma in Industrial Safety.
With more than ten (10) years of extensive experience and knowledge in Pipe stress calculation and support design of oil & gas, petrochemical, refinery, chemical, LNG, LPG, onshore, nuclear power plant and subsea piping projects.
Security Manager
Over 20 Years experience in International and Domestic assignments in the Electrical and Instrumentation Fields. Assignments internation-ally have been in Project/Construction management, Supervision, QA/QC and commissioning. Project experience is diverse and in-cludes mining and extraction/ recov
First
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
[ 35 ]
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Next
Last
Seach Parameters
Change search parameters...
CATEGORIES:
Management;
INDUSTRIES:
Petroleum/Oil/Gas;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com