1) BSc (Hons)Civil Engineering (1981)University of Glasgow, Scotland, U.K.
2) Diploma Civil Engineering (1976) University Technology of Malaysia, K.L., Malaysia
WORK EXPERIENCE – GENERAL SUMMARY
* 6 years with Murphy Oil as Procurement Manager responsible for initiating, leading and managing of all contracts and procurement activities for exploration, drilling, project development and production operations for offshore oil & gas projects.
* 1½ months with Esso Malaysia as Contract Coordinator to draft and coordinate the development of a Tender Package for an offshore EPC contract for retrofit and host tie-in projects.
* 3½ years with Nippon Oil as Manager, Project Procurement, responsible for managing, leading and directing all procurement efforts for offshore Helang Field Gas Development Project.
* 1½ years with Penang Shipbuilding & Construction as General Manager responsible for the entire yard operation of the oil & gas division mainly involved in fabrication of offshore platforms.
* 12½ years with National Petroleum of Malaysia ("PETRONAS") served in various technical and management positions.
* 1½ years with Penang Municipal Council as Building Inspector involved in enforcement of the building by-laws.
* 1 year with Public Works Department in Malaysia as Technical Assistant (Civil) involved in the construction of the east - west highway project.
COMPUTER KNOWLEDGE
Proficient in all Microsoft applications.
DETAILS OF WORKING EXPERIENCE
1. May 1999 – June 2005
Procurement Manager
Murphy Sarawak / Sabah / Peninsular Malaysia Oil Co., Ltd.
* Formulated offshore contracts and procurement policies and procedures consistent with the requirements of company and the Production Sharing Contract with National Petroleum of Malaysia (PETRONAS) for implementation in Murphy to ensure full cost recovery.
* Initiate, lead and manage all efforts on contracts and procurement process and activities covering pre-award and post-award for geological, geophysical, drilling, project development and production operations for upstream oil and gas projects. Involved in the exploration and development projects for West Patricia (offshore Sarawak) and deepwater Kikeh (offshore Sabah). Key activities are similar to those described during my services in Nippon Oil.
* Providing contracts and procurement input for the Work Program & Budget, invoice verification, change management and other related technical and financial interfaces.
2. April 1999 – May 1999
Contract Coordinator
Design Engineering Division, Development Projects Department
Esso Production Malaysia Inc.
* Drafted a Tender Package for an offshore EPC long-term contract for retrofit and host tie-in projects. The contract includes the provision for engineering design, procurement, onshore prefabrication, offshore hook-up and commissioning.
3. November 1995 – March 1999
Manager, Project Procurement
Helang Field Development Project
Nippon Oil Exploration (Malaysia), Ltd.
* Managing, leading, directing and administering the procurement efforts, including pre-qualification, sourcing, enquiry, evaluation, negotiations, recommendation, ordering, expediting and receiving of engineered equipment, materials and services required for a major offshore gas processing facilities in an efficient and cost effective manner.
- Preparation of Tender Plan, ITB, Evaluation Reports and Award Recommendations.
- Preparation for logistics arrangement for material expediting, freight and receiving.
* Developing, establishing and implementing procurement procedures, standards and systems required for administering the procurement efforts.
* Liaison with Petronas/approving authorities and partners to obtain the necessary comments, endorsements and approvals of the procurement related activities.
- Petronas/partners presentation and approval of Tender Plan, Technical/Techno- Commercial Evaluation Reports and Award Recommendation Reports.
- Tax exemption from Customs/Treasury.
- Focal point for approval for all procurement-related matters with Petronas/government related bodies.
* Advising the company on Petronas/government procedures, rules and regulations in a Malaysian operating environment on procurement related activities.
- Petronas reporting on bi-weekly, quarterly and 6-monthly rolling plan.
- Report on local/foreign split and participation by contractors.
* Focal point on all project procurement matters and interfacing with engineering, including self-starting, control and coordinating all related activities.
4. April 1994- October 1995
General Manager
Penang Shipbuilding and Construction Sdn. Bhd.
Managing the yard operation of the Oil & Gas Division mainly involved in the fabrication of offshore platforms.
* Planned, organized, implemented and monitored all activities of the division.
* Established networking with client, vendors and government authorities.
* Involved in the diversification of company business.
* Initiated new tenders, inclusive of land-base projects.
* Formed strategic alliance with foreign companies to undertake EPCC and more complex tenders/projects.
Major Projects Involved
* Carigali's BAJT-F jackets and topsides
* SSB's MIDR-A topsides
* TOTAL's Bongkot Field HUC of Wellhead Platforms No.2, 4 & 6
* EPMI's Lawit-A riser jacket, topsides, vent boom, tripod and interconnecting bridge
* PGB's Segamat Compressor Station (tendered, but lost)
* Carigali's MCOT Fire Water System and Tank Bund Upgrade (tendered, but lost)
5. July 1993 – March 1994
Head of Maintenance, Sabah Operations
Production Operations Department, Petronas Carigali Sdn. Bhd
Undergone a training program formulated by SSB/SSPC to head the maintenance of the Samarang offshore platforms upon relinquishment of the field to Carigali. Worked very closely with SSB/SSPC's Head of Maintenance and spent most of the time offshore. Involved in the following key activities:-
- base operation
- logistic (materials, personnel, helicopter) arrangement
- offshore operation
- safety
6. November 1992 – June 1993
Project Services Manager
Projects Engineering Department, Petronas Carigali Sdn. Bhd
Managed, organized and directed all contracts, procurement and control activities in the department through the respective section and unit heads to provide timely and efficient services for the departmental oil and gas upstream development projects.
* Formulated sound contracting and procurement strategies and plans.
* Managed project schedules and projects reporting.
* Ensured timely completion of tender documents and tender committee papers.
* Secured appropriate approvals for contracting and procurement activities.
* Managed confidentiality of tender exercise.
* Directed bid clarifications, tender evaluations and bid negotiations.
* Presented contracting strategy and award recommendation papers to Petronas for approval.
* Administration of post-award activities that includes change orders administration and contracts closeout.
Major Contracts/Procurement Involved
* Offshore Installation Contract
* Hook-Up & Commissioning Contract
* Fabrication of BADP - E & G Jackets and Topsides.
* Manpower Services Contract
* Diving and ROV Services Contract
* Engineering Design Services Contract
* Purchase of Carigali's supplied long lead items such as compressors, generators, gas dehydration and glycol regeneration package, pressure vessels, pumps, special valves, structural steel materials, etc.
7. April 1992 – October 1992
Head of Contracts
Projects Engineering Department, Petronas Carigali Sdn. Bhd
Basically involved in hands-on and directing all contract activities covering pre-award to post-award activities. Projects involved as mentioned above.
8. October 1990 – March 1992
Resident Engineer / Senior Resident Engineer
Projects Engineering Department, Petronas Carigali Sdn. Bhd
Assigned to site to lead the supervision of the fabrication contracts for the following projects fabricated at SSE / MSE, Pasir Gudang, Johor:-
* Baronia BNG-B1 & B2 Gas Compression Modules
* Baram BAK-B1 Gas Compression Modules
* Baronia BNDP – I & J Jackets and Topsides
* Baram Remedial Works
Directed the activities of the site team in construction supervision and contract administration and ensured that the projects were completed as per the contractual requirements.
* Reviewed contractors' submission of their planning package comprising of planning philosophy and methodology including the review of CPN, barchart and progress measurement. Discussions were held with the contractors to develop the level 3 details rolled up to level 1, to be reported as an executive summary.
* Monitored contractors' progress and identified potential schedule/cost impacts.
* Provided on-site assistance to contractors to ensure smooth progress.
* Ensured quality of work within Carigali's specifications and adherence to safety requirements.
* Reviewed and verified invoices for work done, milestone claims and change orders.
* Reviewed and approved technical proposals from contractors (TBEs, STQs, etc).
* Liaised with third party contractors for all interfacing works.
9. July 1990 – September 1990
Construction Supervisor (Offshore)
Projects Engineering Department, Petronas Carigali Sdn. Bhd
Assigned to the offshore installation barge for the supervision of the installation of Dulang A and B jackets, topsides, living quarters and pipelines at Terengganu offshore location.
Ensured that the installations of the facilities were carried out by the offshore installation contractor (Malmac/McDermott) in accordance with the contractual requirements and met Carigali's offshore programme.
10. April 1989 – June 1990
Quality Assurance Engineer & Safety Coordinator
Projects Engineering Department, Petronas Carigali Sdn. Bhd
Assigned to the site team as Quality Assurance Engineer cum Safety Coordinator for the fabrication of Dulang A and B jackets at Sime Sembawang Engineering fabrication yard, Pasir Gudang, Johor.
* Planned / directed the activities of Carigali's quality assurance team of inspectors.
* Reviewed and appraised WPS, WPQT, WQT, Mill Certificates, QA Manual, QC Procedures, Safety Plan and Programme, etc.
* Coordinated surveillance and appraised contractor's construction activities and ensured quality conformance to engineering drawings, specifications and appropriate standards and codes, and good engineering practice.
* Reviewed and approved final documentation for the project.
11. July 1988 – March 1989
Senior Contracts Administrator
Projects Engineering Department, Petronas Carigali Sdn. Bhd
Administered and controlled all contracting activities up to award of the oil & gas offshore fabrication contracts of Dulang A and B facilities.
* Prepared pre-qualification and tender documents.
* Clarified with bidders pertaining to tender.
* Prepared contractual correspondences.
* Evaluated bidders technical and commercial proposals.
* Negotiated and finalized tender prior to award.
* Prepared award recommendation reports.
* Prepared final contract document.
* Prepared final award letter.
* Administration of change orders and contracts closeout.
12. February 1988 – June 1988
Senior Project Officer
Engineering Department, Petronas Dagangan Sdn. Bhd
Drafted and finalized the tender document for the land reclamation works for PDSB's depot project in Tawau, Sabah. Also managed to closeout outstanding land lease matters of PDSB's aviation depots.
13. January 1986 – January 1988
Site Manager
Projects Department, Petronas Property Management
Assigned to site as Site Manager to lead the construction supervision of civil and building works for Rantau Petronas development projects in Kerteh, Terengganu for the following facilities: Drainage System, Highway Overhead Bridge, Surau, Major Renovation to Golf Pavilion, Major Renovation to International School, Residential Houses.
* Directed the site team in construction supervision.
* Ensured progress of works and cost within contract requirements.
* Ensured quality and safety adherence of construction activities.
* Reviewed and verified contractors technical proposals, progress claims and variation orders.
* Liaised directly with the local authorities to obtain the necessary approvals and Certificate of Fitness.
Prior to assignment to site, managed and coordinated various project consultants engaged on the project and ensured efficient and prompt services were provided by the consultants.
* Reviewed project designs, tender documentation, tender evaluation reports and award recommendations proposed by the consultants and made recommendations to Petronas Management for approval.
* Drafted Professional Services Agreement and negotiated on professional fees for the consultants.
14. September 1981 – December 1985
Resident Engineer
Projects department, Petronas Property Management
Assigned to site as Resident Engineer to lead the construction supervision for the civil and building works for Pasir Gudang Housing Project, Batu Rakit Technical Training Centre and Bangi Management Training Centre.
Performed routine inspection and supervision to ensure contractors performance as per the contractual requirements.
15. September 1978 – August 1981
Studied at University of Glasgow, Scotland, U.K
Obtained a BSc (2nd Class Hons) Civil Engineering Degree.
16. January 1977 - August 1978
Building Inspector
Building Department, Penang Municipal Council
Conducted enforcement in accordance with the local building by-law in Penang.
* Initiated notices and summonses to owners of illegal / unauthorized buildings and extensions.
* Reviewed applications for new buildings and extensions and made the necessary comments and recommendations.
* Reviewed applications for Certificate of Fitness and made the necessary comments and recommendations.
* Represented the Municipality in mentioning of building cases in court.
17. April 1976 – December 1976
Technical Assistant (Civil)
East – West Highway Project, Public Works Department, Malaysia
Based at Base Camp, Grik, Perak involved in the construction of the highway project.
* Supervised the earthworks and blasting works carried out by contractors at site.
* Ensured safety in the operations.
* Conducted soil test in the laboratory to ascertain proper compaction has been achieved.
18. 1972 – 1976 - Studied at University of Technology of Malaysia, K.L. Obtained a Civil Engineering Diploma.
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 751 to 800 of 2287)
Go to Search Parameters...
Brief Description
Geosteering, Exploration, Development, Wellsite
25 years experience in Planning/Project/Detailed Engineering of Oil and Gas Plants, Petroleum Refineries and Petrochemical Plants
Window 98, Millennium, XP, Word, Excel, Access, PowerPoint, Microsoft Project, Adobe Acrobat, Package for Artificial Rising (Flow System, Pipe Phase, Pcpump, Rod Star, Nabla, Perry,DIM, Asad) , Financiers Software, Administration Software, Statistical Software, etc,
Senior Estimator Available to work in Indonesia, Malaysia, Nigeria, Kazakhastan, Thailand
I try to get better conditions and get better live with my skills and competency
To obtain a full-time Landman position, that will utilize my education in the oil and gas industry.
Team Leader Shift Supervisor, Trainer: Operation at Refinery Processing Plants, Remote Oil & Gas Production Field and High Pressure Systems at NGL Processing Facilities LPG Plant including Petroleum & Petrochemical Utilities. Professional member MInstLM & MCMI UK, MBA Prod. Ops. Management, BSc, BA
NEBOSH- International General Certificate in Occupational Health and Safety(United Kingdom) Abu Dhabi
Versatile IT Project Manager with > 15 yrs experience in the IT and Upstream Petroleum Industry implementing IT solutions (including software, hardware, firmware);evaluating and recommending solution options, supervising solution implementation, and QA. Able to deliver Projects on time and on budget
Planning & Control Engineer
Procurement/Supply Chain/Materials Management
Thirteen years of experience in quality and safety management roles of oil and gas industry, project management of Tension Leg Platform (TLP), semi-submersible floating production, FPSOs, and involved as an engineering project manager for designing various mechanical equipment systems for re
Working In the Oil and Gas Drilling Industry Since 1986 Looking for a company that wants its employers to look after it !!
2.2 Years of EXP on Primavera, MS-Project, Pro/E wildfire 2.0 and AutoCAD
Over 28 years in the oil and gas industry.
Construction Manager with 22-years experience in Mechanical Construction discipline for Industrial Projects (Oil & Gas, Refineries, Petrochemical Project and Power Plant Projects).
I hold a BSc in Engineering and have extensive experience in procurement and contracts activities in the upstream oil and gas projects. I seek an employment in the Middle East region as Senior Procurement /Contracts Engineer.
Engineering manager, Planning, Contracts and administration. Production engineering a specialty.
Project Engineer working in Project Management Team for an EPC company on 4 separate newbuilding Drillship projects with extensive experience in Engineering Coordination activities between various disciplines, assuring the quality, the consistency and the timely execution of the activities
BSc in Petroluem Engineering; 2 x Modules MSc in PE; PMP (Project Mgmt. Professional) by PMI.
Project Engineer
Purchaser, Warehouse Manager, Estimator
I have an excellent amount of experience in the Personnel/HR management 12 years (1996 – present). My current position is HUMAN RESOURCES MANAGER /ADVISOR, Abu Dhabi.
•Over 15 years of Project Management experience. •DCS- Delta-V , Foxboro I/A system and YOKOGAWA . •PLCs- Gould Modicon, Askawa, August , HIMA etc. •Foundation Field Bus •Analytical sys.Design and Engineering - Physical Property Analysers, NIR •Field Inst. Engineering. •System commissioning.
I have worked for over 10 years for Schlumberger Oilfield Services. My career with Schlumberger has involved mostly hard rock stimulation, some coal bed methane stimulation, coiled tubing and cementing. I have been involved in the design, execution and management of these areas.
I am responsible for all instrumentation, maintenance modification, and repairs for plant machinery and furnace maintenance. I have strong supervisory experience in a petrochemical plant. My experience also includes extensive electrical/HVAC knowledge.
A self confident, motivated and energetic person, able to cope with rapid change in corporate culture, strong technical analysis, management and computer skill, able to work under pressure, willing to learn.
Engineer, 10 Years experienced, Construction management of industrial projects
Over 15 years experience of Project Management and Specialist Engineering on numerous project task forces in the oil refining and gas processing industry.
More than 15 years of Oilfield experience and Drilling Services with Schlumberger. worked in many countries in different positions starting from Engineer Trainee to Staff Engineer, Rig Manager, Operations Manager and now (SDS) QHSE Manager worldwide.
Fully experienced manager/agent within the water/utilities industry
Management of QA (Quality Assurance), Planning, Scheduling & Project Control
With high motivation, I apply my skills in both a “hands on” and supervisory manner, certifying that Client Specifications and Standards are followed and implemented by Contractors and Sub-Contractors.
Experiences involved working with various Premier Construction groups like Indian Oil Corporation Limited, Engineers India Limited, Gas Authority of India Limited, Bharat Petroleum Corporation Limited, Petronet, ILF & Partner LLC, Oman Gas Company, BOTAS
Ø Seeking a challenging position to utilize my education and experience in the field of Pipeline engineering profession. Ø To work in challenging environment and contribute the growth of the organization, to work professionally, honestly and for the prosperity of organization.
A keen team player with more than 15 years experience in Project Document Management, solid background in IT support, accounts, project administration, Project co-ordinator, quality control co-ordination and project analysis. Expert in Documentum.
A qualified Chartered Accountant and Company Secretary with 25 years experience in accounts, finance, banking, treasury, costing and budgeting, procurement, insurance, materials management, import clearing logistics, contract management / negotiation and general administration. Indus
Demonstrated skill in management and supervisory functions Experience developing contracts, proposals and customer presentations Ability to anticipate issues, proactively prevent or resolve problems Proficient in MS Office
40 years, Production, Workover, Drilling Supervision, Land and Offshore
Information Technology Vicepresident / Manager / Director / Project Manager
Over 25 years of progressively responsible experience in environmental program management, marketing, managing and performing site characterization studies, feasibility studies, remedial alternative development and implementation for numerous oil and gas sector projects in the US and internationally
Briefly I offer services pertaining to quantity surveying both as a PQS and Contractors Qs. That includes for duties such as Preparation of contract documents, Preparation of Bills of Quantities, Bid Administration, Cost Estimating, Cost Planning, Procurement, Measurements, valuations and Claims.QUA
Have a strong :Managerial and technical skill, leadership skill, agent of change, interpersonal and intrapersonal skill, Communication skill, Good motivator, Familiar with API and ASME Codes Standards, Familiar with P&ID, Familiar with ITP, Familiar with Rotary and Static Equipments, Installing Rota
Seasoned professional sourcing, procurment Manager with 19+ yrs experiences with Fortune 10 company and others in Middle East and South East Asia.
B.Com (India), ACA (India), Grad CWA (India), M.S.Finance (Canada)
Oil Field Co-ordinator, Microsoft Programms, Mangement
I am seeking the position of Field Service/Customer & Technical Support/Sales Engineer/Supervisor/Coordinator.
ENGINEER with experience in PROJECT MANAGEMENT Russian, English and French fluent. Pipeline coordinator in Moscow, Russia.
HSE Manger
Working as Petroleum Engineer since 17 years. Engineer, Supervisor and Manager roles in drilling, wellcompletion, production and workover operations in oil and gas E& P .
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
[ 16 ]
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
Seach Parameters
Change search parameters...
CATEGORIES:
Management;
INDUSTRIES:
Petroleum/Oil/Gas;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2008 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com