1982 – Bsc. Mechanical Engineering, Cairo University, Egypt.
2005 – In Preparation process of Master Thesis in Project Management Professional, in the University of the Pacific, USA.

CERTIFICATES & TRAINING:
July 2004 – Executive Management course of Project Managers (Dubai). Project Management Professional - PMP Certification, in the University of the Pacific, USA.
* September 2003 - Safety Award Certificate from CCC-Saipem Consortium for 11 Million M/Hours w/out LTI in Karachaganak Processing Complex Project, Kazakhstan
* Safety Award Certificate from CCC-Saipem Consortium for 10 Million M/Hours w/out LTI in Karachaganak Main Works Contract (KMWC), Kazakhstan
* CCC Seminars Attended 2001 / 2002 (Kazakhstan area KMWC Project)
- Communication
- Motivation.
- Leadership & Management.
- Empowerness.
- Negotiation.
- Labor Protection Law.

1998-2000 - Safety Award Certificate from Adnoc, Bechtel Technip Join Venture & CCC for outstanding safety performance of the OGDII Project in Habshan, UAE.

March 1998 - Safety Award Certificate from Fluor Daniel for Outstanding Project Engineer for achieving 7 Million M/Hours in Rabigh Power Plant Extension Stage IV Project, KSA

October 1997 - Safety Award Certificate from Fluor Daniel for Outstanding Project Engineer for achieving 5 Million M/Hours in Rabigh Power Plant Extension Stage IV Project, KSA

June 1996 – SGS ISO9002 International Auditor Training Course.

February 1993 – Training Course on Safety and Health Care.

March 1991 – Seminar on contracting and Contract Management, American University in Cairo, Egypt.

Languages: ARABIC (Mother Tongue), English (Fluent, Read & Writing) & Knowledge of Russian.

Computer Skills: Microsoft Windows Operating Systems, Microsoft Office, Primavera and
General use of the Internet and the WWW.

Technical Experience: 22 years experience in Oil & Gas construction Industry, Also
Engineering Skills experienced in chemical /Steam power generation Plants, Alloy
Construction Project. I have site & office experience as well as managerial leadership skills, natural decision making and organizational skills and communication skills with excellent presentation skills.
In addition to fine-tuned negotiating skills.

Familiar with various codes and standards (ASME, ANSI, API, ISO & GOST (Russian Standards))
Management & leadership abilities/supervisory skills field experience.

WORK EXPERIENCE
Nov. 1999 – Till Date
CCIC, Consolidated Contractors International Company

Project (June 2001 – till date): Karachaganak Main Works Contract. North West Kazakhstan
(KMWC). The scope of work comprises a Grossroot Gas Processing & Condensate Plant, an Oil & Condensate Processiong Plant with Gas Compression/Reinjunction Facilities & a Well Production Gathering System & Gas Reinjunction Trunkline & Flowline (approximately
300KMs) as well as an Oil Export Pipeline of approximately 600 KMs. The final Output of the plant will be 300,000 barrels/day pf oil & 883 Billion Cube feet of gas annually.

Period: July 2003 – till date (Handover Phase)
Employer: Karachaganak Development Project Phase II Main work Contract (KMWC)
CCC/Saipem Contract Value 1.1 Billion $.
Location: KAZAKHSTAN
Client: Karachaganak Petroleum Operating BV.
Position: Construction Manager.
Attached Project Organization Chart

Responsible: -Effective planning: people, schedule, resources and budget.
-Defining and refining contract terms with the clients and subcontractors.
-Monitor project planning and scheduling.
-Progress & performance monitoring for construction, precomissioning and commissioning phases of the project.
-Holding weekly and monthly meetings with different disciplines for site activities.
-Defining the scope of work for each subcontractor and discipline.
-Monitoring 3-weeks look-ahead schedule.
-Effective financial management.
-General Safety and Health Compliance according to international safety standards.
-Cross and inter-discipline co-ordination.
-Follow-up the change-order and site modifications with the contractors.
-Adhering to QA/QC codes & standards and contract specifications.
-Managing Construction Safety.
-Monitoring project resources (i.e. Manpower, Equipments, vendors& subcontractors), full-detailed planning for project mobilization/demobilization.
-Responsible for all Mechanical balance work completion:
- Technical Precomissioning, Commission Supporting team.
- Area work completion.
- Package completion.
- System handover.
- Member of Professional Acceptance Certificate (PAC) sign off team on 9 June, 2004:
Mr. Dick Parker KPDT Project Manager (British Gas).
Mr. Giovanni Ceradini KPO Commissioning Manager (AGIP).
Mr. Maurizio Pezzotti KPO Construction Manager (AGIP).
Mr. Camilio Ceresa CCC / Saipem Project Director (Saipem)
Mr. Ahmad Badawi Representative CCC/Saipem Main Contract
Consortium (Deputy Construction Manager)

Period: June 2001 – July 2003 (Construction Phase)
Employer: Karachaganak Development Project Phase II Main work Contract (KMWC)
CCC/Saipem Contract Value 1.1 Billion $.
Location: KAZAKHSTAN
Client: Karachaganak Petroleum Operating BV.
Position: Project Engineer (acting Construction Manager).
Attached Project Organization Chart

Responsible: Responsible for completion work of total weight 41% of KPC Mechanical Work:
- Incoming Facility Area / Pipelines Launcher Receiving Area.
- Flare Area.
- Pipe Interconnecting Pipe Racks.
- Direct & co-ordinate site resources to ensure the all site requirements were covered within the limit of budget.
- Co-ordinate and support construction schedule to meet target plan.
- Review budget Man/hrs. for each activity.
- Follow project procedure & company policy.
- Updating monthly report to meet project schedule requirement.
- Preparing look-ahead schedule plan according to project resources.
- Review area completion date.
- July'03 till date responsible for all Mechanical work (KPC), Mechanical completion and final handover.
- General Safety and Health Compliance according to international safety standards.
- Adhering to QA/QC codes, standards and contract specifications.
- Managing Construction Safety.

Project (Nov. 99 – June 01): Onshore Gas Development Project (OGD II) – Phase II, Abu Dhabi – United Arab Emirates. The project involves the full construction of civil works, structure steel erection, piping works, product pipelines, mechanical works, electrical and instrumentation works, modification and revamping of OGD I, and pre-commissioning. It also includes the detailed engineering and construction of the necessary buildings.

Employer: CCIC, Consolidated Contractors International Company, Abu Dhabi.
Total Project Budget: 1.3 Billion $
CCIC Construction Budget 423 million $.

Location: Habshan, Abu Dhabi, UAE
Client: Abu Dhabi National Oil Company/Technip – Bechtel Joint Venture
Position: Project Engineer/Area Manager.
Responsible for: - Sulphur Recovery units 1100 Tons Piping work erection.
- Equipment 3270 Tons, Vessels/Drums/Stacks/Rotating Equipment Boiler. Etc.
- Direct & co-ordinate site resources to ensure the all site requirements were covered within the limit of budget.
- Co-ordinate and support construction schedule to meet target plan.
- Review budget Man/hrs. for each activity.
- Follow project procedure & company policy.
- Updating monthly report to meet project schedule requirement.
- Preparing look-ahead schedule plan according to project resources.
Review area completion date.
- Punch list completion / Pre-Commissioning & Commissioning Activities.
- Package Completion.
- System Handover.
- Area work completion.
- General Safety and Health Compliance according to international safety standards.
- Adhering to QA/QC codes, standards and contract specifications.
- Managing Construction Safety.

Project: Uthmaniya Gas Treating Facility Plan.
Period: July 1998 to Oct. 1999

Location: Saudi Arabia, Eastern Region, Uthmaniya, El-Hofouf.
Employer: M.S. Al-Suwaidi Est. for Contracting (Feb. 96 - Oct. – 99.
Saudi ARAMCO, Uthmaniya.
Client: Saudi Arabian Parson Ltd./Saudi Aramco.
Position: Senior Project Engineer.
Responsible for: Sulfur Recovery Unit (4 & 5) Piping (950 Ton).
- Khuff Gas Area 7,214 linear meter piping Work Erection (420 Ton)
- Installation, Vessels, Drums, Rotating Equipment's.
- Khuff Gas Area Major Shutdown Nov. 98.
- Review the monthly and overall progress with accordance to budget man-hour.

Project (Nov.96 – May 98): Rabigh Steam Power Plant Ext. Phase IV (combined Cycle), KSA

Period: July 1997 to May 1998
Client: General Electric Ltd. / Flour Daniel Arabia Ltd.
Position: Senior Project Engineer.
Responsible: Assembling Four Heat Recovery Steam Generators (HRSG).
- One Steam Turbine Generator – 170MW & Steam Condenser Package.
- Installation of Tanks / Drums & Vessels
- Installation of Packages Equipment skid mounted, Pumps & Process Equipment's.
- Installation of Heavy wall Steam Piping at STG Area, Cooling Water Piping & Utility Piping.
- Structural Steel: boiler Structure, Pipe Racks, Turbine Building.
- Insulation and cladding work of HRSG Stack and Boiler to Meet Proj. Schedule & Target Modules, Insulation & Cladding of Equipment & Piping.
- Review the monthly and overall progress with accordance to budget man-hour.
- System Completion and handover.

Period: November 1996 to July 1997
Project: Rabigh Steam Power Plant Ext. Phase III (Simple Cycle) Rabigh, KSA

Client: General Electric Ltd. / Flour Daniel Arabia Ltd.
Position: Project Engineer.
Responsible for: Mechanical Erection /Alignment of Four Combustion Gas Turbine Generator total 300MW & Miscellaneous process Equipment's all installation of Packages Equipment skid mounted pumps.
- Piping Works.
- Responsible for Weekly / Monthly report on job erection.
- Preparing look-ahead erection schedule to meet project plan.
- Review the monthly and overall progress with accordance to budget man-hour.

Period: February 1996 to Nov. 1996
Project: Sabayek Gulf Ferro Alloys Plant, Jubail, Saudi Arabia.

Client: Sabek, Maphar Company.
Position: Furnace / Product Handling Area Project Engineer.
Responsible for: Responsible in Mechanical erection, Installation and Alignment of 4 units
Submerge furnace-6000 ton. Total furnace 1 (FEM) 2000 Tons equipment's.
- Furnace (2) FESI (SEMN).
- Furnace (3) FESI (SEMI).
- Furnace (4) SEMI
- Raw Material Handling System.
- Gas Cleaning System.
- Dedusting Area.
- Furnace Cooling System etc.
- All Piping (Water-Air) cooling System.

Employer: Petroleum Project & Technical Consultation (Petrojet) Co. Cairo, Egypt.
Period: June 1994 to January 1996
Project: Amereya LPG Recovery Plant (Alexandria City North Egypt)
Client: Egyptian General Petroleum Co., E.G.P.C. / ENPPI Co.
Position: Senior Project Engineer (Area Manager)
Responsible for 1) Installation of 3 towers 17-22 Meter height of total weight 283 ton 12
pressure vessels drums, equipment skid mounted, pumps, compressor.
2) Installation of 1900 ton pipe rack and support.
3) Fabrication & Erection 675 ton Pipes of different Alloys & sizes.
4) Erection of 2 Spherical Tanks 1050m3 each.
5) To produce 367 ton per day.
6) 11.6 Million cubic meter Fuel Gas.
7) All equipment's of Total Weight 1920 Ton.
8) Installation of 12 Pressure Vessels 206 ton Weight.

Period: January 1993 to May 1994
Project: ABU QIR Field Relocation.
Client: WEPCO
Position: Deputy Construction Manager
Responsible for: All Mechanical work of Jetty Piles Steel Decks, Rubble mounted work sheet piles pipe support and piping.

Period: Nov. 1991 to Dec. 1992
Project: Extension of NPC Refinery. (Suez Gulf Region).
Client: NASR Petroleum Co. / Snam Progetti Co. (Italian)
Position: Mechanical Proj. Engineer
Responsible for: Extension of NPC Refinery.
- Fabrication & Installation of Crude Oil Distillation unit 2.5 million ton/year.
- Fabrication & Installation of Vapour Recovery unit 5.5 million ton a year

Period: October 1990 to 1991.
Project: Gas Gathering process and condensate recovering plant.
Client: Nile Delta Region – Petrobel Co. / ENPPI Co.
Position: Project Engineer.
Responsible for: Installation Construction Equipment Vessels skids, filters, column heaters, Underground piping.

Period: September 1989 to September 1990
Project: Abu Qir Ammonium Nitrate Fertilizer plant (North Egypt).
Client: UHDE Co. German Nationality.
Position: Project Eng. Construction Equipment / Piping / St. Structure.
Responsible for: Erection Ammonia Production Unit, Capacity 1000 ton/day.
- Nitric Acid Unit, Capacity 1800 ton/day.
- Ammonium Nitrate Unit, Capacity 2300 ton/day.

Period: July 1989 to September 1989
Project: East Ziet Bay Gas Facilities Project (60 Million Cubic feet/day)
Client: ESSO INK CO.
Position: Mechanical Project Engineer, Process Area.
Responsible for: Gas Gathering Sweetening and handling area.

Period: Oct. 1987 to July 1988
Project: Abu Sannan Gas Condensate Recovery Plant.
Client: EGPC / ENPPI CO.
Position: Mechanical Site Engineer.

Period: April 1986 to Oct. 1987
Project: At Assiout Refinery Project (3 Million Ton Crude Oil/Year).
Client: ASORBIC/BECHTEL CORPORATION (650 Million $).
Position: Mech. Site Engineer.
Responsible for:
1) Erection of Equipment's in Process Area & Utility Area
2) Erection of all attached piping to Equipment's & Underground Piping.

Period: January 1985 to April 1986
Project: At LPG Project, Ziet Bay Red Sea Region.
Client: SUEZ Gulf Co. – BECHTEL
Position: Mech. Site Engineer.
Responsible for: Equipment Installation.

Period: February 1984 to December 1984
Responsible for: Responsible for piping Fabrication at Main Fabrication Shop.

View contact information...
«« previous resume next resume »»
Search Results (Resumes 751 to 800 of 2282)Go to Search Parameters...
Brief Description
25 years experience in Planning/Project/Detailed Engineering of Oil and Gas Plants, Petroleum Refineries and Petrochemical Plants
Window 98, Millennium, XP, Word, Excel, Access, PowerPoint, Microsoft Project, Adobe Acrobat, Package for Artificial Rising (Flow System, Pipe Phase, Pcpump, Rod Star, Nabla, Perry,DIM, Asad) , Financiers Software, Administration Software, Statistical Software, etc,
Senior Estimator Available to work in Indonesia, Malaysia, Nigeria, Kazakhastan, Thailand
I try to get better conditions and get better live with my skills and competency
To obtain a full-time Landman position, that will utilize my education in the oil and gas industry.
Team Leader Shift Supervisor, Trainer: Operation at Refinery Processing Plants, Remote Oil & Gas Production Field and High Pressure Systems at NGL Processing Facilities LPG Plant including Petroleum & Petrochemical Utilities. Professional member MInstLM & MCMI UK, MBA Prod. Ops. Management, BSc, BA
NEBOSH- International General Certificate in Occupational Health and Safety(United Kingdom) Abu Dhabi
Versatile IT Project Manager with > 15 yrs experience in the IT and Upstream Petroleum Industry implementing IT solutions (including software, hardware, firmware);evaluating and recommending solution options, supervising solution implementation, and QA. Able to deliver Projects on time and on budget
Planning & Control Engineer
Procurement/Supply Chain/Materials Management
Thirteen years of experience in quality and safety management roles of oil and gas industry, project management of Tension Leg Platform (TLP), semi-submersible floating production, FPSOs, and involved as an engineering project manager for designing various mechanical equipment systems for re
Working In the Oil and Gas Drilling Industry Since 1986 Looking for a company that wants its employers to look after it !!
2.2 Years of EXP on Primavera, MS-Project, Pro/E wildfire 2.0 and AutoCAD
Over 28 years in the oil and gas industry.
Construction Manager with 22-years experience in Mechanical Construction discipline for Industrial Projects (Oil & Gas, Refineries, Petrochemical Project and Power Plant Projects).
I hold a BSc in Engineering and have extensive experience in procurement and contracts activities in the upstream oil and gas projects. I seek an employment in the Middle East region as Senior Procurement /Contracts Engineer.
Engineering manager, Planning, Contracts and administration. Production engineering a specialty.
Project Engineer working in Project Management Team for an EPC company on 4 separate newbuilding Drillship projects with extensive experience in Engineering Coordination activities between various disciplines, assuring the quality, the consistency and the timely execution of the activities
BSc in Petroluem Engineering; 2 x Modules MSc in PE; PMP (Project Mgmt. Professional) by PMI.
Project Engineer
Purchaser, Warehouse Manager, Estimator
I have an excellent amount of experience in the Personnel/HR management 12 years (1996 – present). My current position is HUMAN RESOURCES MANAGER /ADVISOR, Abu Dhabi.
•Over 15 years of Project Management experience. •DCS- Delta-V , Foxboro I/A system and YOKOGAWA . •PLCs- Gould Modicon, Askawa, August , HIMA etc. •Foundation Field Bus •Analytical sys.Design and Engineering - Physical Property Analysers, NIR •Field Inst. Engineering. •System commissioning.
I have worked for over 10 years for Schlumberger Oilfield Services. My career with Schlumberger has involved mostly hard rock stimulation, some coal bed methane stimulation, coiled tubing and cementing. I have been involved in the design, execution and management of these areas.
I am responsible for all instrumentation, maintenance modification, and repairs for plant machinery and furnace maintenance. I have strong supervisory experience in a petrochemical plant. My experience also includes extensive electrical/HVAC knowledge.
A self confident, motivated and energetic person, able to cope with rapid change in corporate culture, strong technical analysis, management and computer skill, able to work under pressure, willing to learn.
Engineer, 10 Years experienced, Construction management of industrial projects
Over 15 years experience of Project Management and Specialist Engineering on numerous project task forces in the oil refining and gas processing industry.
More than 15 years of Oilfield experience and Drilling Services with Schlumberger. worked in many countries in different positions starting from Engineer Trainee to Staff Engineer, Rig Manager, Operations Manager and now (SDS) QHSE Manager worldwide.
Fully experienced manager/agent within the water/utilities industry
Management of QA (Quality Assurance), Planning, Scheduling & Project Control
With high motivation, I apply my skills in both a “hands on” and supervisory manner, certifying that Client Specifications and Standards are followed and implemented by Contractors and Sub-Contractors.
Experiences involved working with various Premier Construction groups like Indian Oil Corporation Limited, Engineers India Limited, Gas Authority of India Limited, Bharat Petroleum Corporation Limited, Petronet, ILF & Partner LLC, Oman Gas Company, BOTAS
Ø Seeking a challenging position to utilize my education and experience in the field of Pipeline engineering profession. Ø To work in challenging environment and contribute the growth of the organization, to work professionally, honestly and for the prosperity of organization.
A keen team player with more than 15 years experience in Project Document Management, solid background in IT support, accounts, project administration, Project co-ordinator, quality control co-ordination and project analysis. Expert in Documentum.
A qualified Chartered Accountant and Company Secretary with 25 years experience in accounts, finance, banking, treasury, costing and budgeting, procurement, insurance, materials management, import clearing logistics, contract management / negotiation and general administration. Indus
Demonstrated skill in management and supervisory functions Experience developing contracts, proposals and customer presentations Ability to anticipate issues, proactively prevent or resolve problems Proficient in MS Office
40 years, Production, Workover, Drilling Supervision, Land and Offshore
Information Technology Vicepresident / Manager / Director / Project Manager
Over 25 years of progressively responsible experience in environmental program management, marketing, managing and performing site characterization studies, feasibility studies, remedial alternative development and implementation for numerous oil and gas sector projects in the US and internationally
Briefly I offer services pertaining to quantity surveying both as a PQS and Contractors Qs. That includes for duties such as Preparation of contract documents, Preparation of Bills of Quantities, Bid Administration, Cost Estimating, Cost Planning, Procurement, Measurements, valuations and Claims.QUA
Have a strong :Managerial and technical skill, leadership skill, agent of change, interpersonal and intrapersonal skill, Communication skill, Good motivator, Familiar with API and ASME Codes Standards, Familiar with P&ID, Familiar with ITP, Familiar with Rotary and Static Equipments, Installing Rota
Seasoned professional sourcing, procurment Manager with 19+ yrs experiences with Fortune 10 company and others in Middle East and South East Asia.
B.Com (India), ACA (India), Grad CWA (India), M.S.Finance (Canada)
Oil Field Co-ordinator, Microsoft Programms, Mangement
I am seeking the position of Field Service/Customer & Technical Support/Sales Engineer/Supervisor/Coordinator.
ENGINEER with experience in PROJECT MANAGEMENT Russian, English and French fluent. Pipeline coordinator in Moscow, Russia.
HSE Manger
Working as Petroleum Engineer since 17 years. Engineer, Supervisor and Manager roles in drilling, wellcompletion, production and workover operations in oil and gas E& P .
17 Years exp DRILLING & COMPLETION ENGINEER / SUPERINTENDENT
1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   [ 16 ]   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46  
Seach Parameters

Change search parameters...
CATEGORIES: Management;
INDUSTRIES: Petroleum/Oil/Gas;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2008 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com