Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #33993
next resume »»
CONTACT INFORMATION:
View contact information...
POSITION APPLIED FOR:
1ST Choice: Construction Manager/Superintendent
2nd Choice: Project / Construction Engineer
3rd Choice: Sr. Pipeline/Piping Engineer
SUMMARY OF WORK EXPERIENCE:
More than 21 years of combine technical work experience in fabrication, construction, erection & installation on both offshore and onshore. Inclusive are mechanical equipment, piping / pipeline, structural steel, civil & architectural. Work related such as construction coordinator, project management, consultant, engineering & supervision work project related to oil & gas, offshore facilities, petrochemical plant, refineries, power plant, pulp & paper mill, industrial building & major facilities. Organization and balancing of contractor manpower, equipment, material resources in liaison with the client or owner. Plan, execute and control work activities in accordance with approved drawings, work procedure & specification required by the project. Such as: API, ANSI / ASME, BS, JS & AWS.
EXPERIENCES:
15 November 2003 – 11 July 2005
EMC Construction
Sta. Rita / San Lorenzo 1, 500MW CCGT Maintenance
Philippines
Construction Manager
By having multi-discipline skill I have experienced to lead construction team.
Controlling of construction progress to be ahead of the project schedule and prepared constructions procedures.
Overhead management for staff assignment to various project, and for hiring & firing of construction staff.
Attending managers meeting & coordinating to each department and client regarding construction, maintenance including QHSE for our people.
01 December 2002 – 31 October 2003
Tripatra-Gulf Consortium
PGN Gas Transmission and Distribution Project
28" dia. Pipeline from Indonesia to Singapore
Offshore – 276 km & Onshore – 207 km
Indonesia to Singapore
Construction Coordinator
Project Management and Consultant for the Panaran and Pemping Station.
Responsible for ensuring all of the construction activities are in accordance with the approved procedures and project standard.
Ensuring that various department are fully briefed for each daily activities.
Do & prepare punch list, site memo & give verbal instruction for piping, mechanical, structural and civil works to be coordinated & to expedite to be finished by Contractors such as: HYUNDAI, NACAP / THIESS, NPCC, BOSKALIS & PUNJLLOYD as per given schedule by PGN / PMC.
15 August 2001 – 30 October 2002
Halliburton (Kellog Brown & Root)
ESSO, Exxon Mobil, Petronas & Chevron
Chad – Cameroon Development Project 30"
& 18" dia. 1, 070 km. or 663 miles pipeline from
Chad to Cameroon, Central Africa.
Kome, Chad, Central Africa
Construction Manager (TCN/FILIPINO)
Construct facilities, fabrication & installation of process piping, pipelines, wellhead flow lines, piping hook up & dress up connections.
Meeting with Esso & Exxon Mobil for various reports and project schedule for the additional work to be given to KBR Halliburton.
The project is to develop the oil fields in Chad (US$ 1.5 billion) & construct a 1,070 km. pipeline to offshore oil loading facilities going to Cameroon Atlantic coast (US$ 2.2 billion) and World Bank is the financier.
23 January 2001 – 31 July 2001
Ballast Nedam International
First Gas Philippines
San Lorenzo 500 MW Power Plant
CCGT Project
Philippines
Structural Superintendent
Establish with subcontractors and maintain effective work teams to complete their assigned tasks on time meeting defined budget of quality requirements.
Review of the specification, drawings, technical instruction, TO, Quality System document (Work Methods) during work preparation stages.
11 April 2000 – 07 January 2001
EMC Construction
First Gas Philippines
San Lorenzo 1, 000 MW Power Plant, CCGT Project, Philippines
Construction Manager
Implementing & formalized project plan schedule which includes site monitoring.
Check and monitor the progress & maintain against plan.
Conduct the daily coordination meeting considering the work priority in terms of overall project schedule & look for the security of my people that takes priority.
16 March 1998 – 28 March 2000
Klockner / ROH Joint Operation
PT. Tanjung Enim Listari
Musi Pulp & Paper Mill Project
(Pipeline and Processing Plant)
Sumatra Selatan, Indonesia
General Superintendent (Consultant / Advisor)
In charge for the monitoring of the daily distribution of our people and responsible for the acceptance of the CWSI (Civil Work Site Instructions) follow up & expedite the erection of structural steel.
Structural steel support for mechanical & piping erection or installation.
Prepare as built drawing for piping field run (small & large bore).
Attending meeting with PT. TEL Client (weekly & monthly)
Drawing to be issued to our sub contractors (John Holland, Ballast Nedam, Thiess Engineering and Truba Jurong).
20 May 1997 - 27 February 1998
Kiewit Holt International
California Energy & Halliburton
Pipeline 750 km – 28" dia. pipeline
80 MW Geothermal Power Plant
(Deing, Patuha & Bali)
Central Java, Indonesia
General Superintendent
Night shift general superintendent of wellhead pad & pipeline works for gathering system.
Supervised 200 Indonesian crafts of multi-discipline in all areas separated about more than 10 km each.
The work consisted of activities such as civil, structural and pipelines construction, modification and installation of equipment tanks, pressure vessels etc. expedite the works in all areas to meet with deadlines, and to achieve high work output so that all areas were carried out satisfactory.
21 November 1996 – 30 April 1997
Commonwealth Asia Pacific Ltd. Pte.
Pt.Kiani Kertas
Bleached Kraft Pulp & Paper Mill Project
(Pipeline and Processing Plant)
Kalimantan Timur, Indonesia
Chief Piping Engineer & Inspector
Site checking, to identify the problem that causes the low productivity ratio deficiency on piping installation.
Prepare memo FWO, EWO, or site instruction to be closely coordinated to Beloit Corporation for site adjustment, modification, revision, deletion, or as built drawings.
Involved in inspection, line checking, punch listing and testing of pipe spools.
Responsible for progress update report, pump alignment release notice and documentation.
05 January 1995 – 13 October 1996
Japanese Gas Corporation
Bakrie Kasei Corporation (PTA & CTA Project)
Bakrie Diafoil I-F Project (Plastic)
PT. ASC Project (Asahimas Subentara Chemicals)
Merak & Anyer Indonesia
General Superintendent
Chief of Steel Structures & Civil works on CTA & PTA Projects.
General Superintendent for Industrial Building in Indonesian Film Project.
14 October 1993 – 30 November 1994
PT. NISCONI/TOYO ENGINEERING
PT. Chandra Asri Petrochemical Complex Project
(Biggest ethylene plant in the World)
Cilegon – Indonesia
Piping Design Engineer
In charge of coordination closely with TOYO Engineering Designers for the changes of the drawings based from revision made by TEC.
Site modification etc.
Responsible for the computation of dia – inch cutting length of pipe and material take off.
Site checking to identify the problem that causes the low productivity ratio deficiency on piping installation.
Do the daily and monthly progress report to forecast the anticipated problems for smooth execution.
Lead the daily schedule meeting with the attendance of all concerned contractors for area wise.
Schedule the coordination and discussion of piping prefabrication and material verification etc.
04 March 1991 – 30 September 1993
Euro Mechanical & Electrical Contractors Co.
LNG Plant, Sulphur Plant, ADMA OPCO, D & D Plant Project
ADGAS Pipeline
Das Island, Abu-Dhabi
United Arab Emirates
Project Engineer
Supervision and check the dimensional control items and if fabricated within the contract specification tolerances.
Supervision on welded joint numbers if in accordance with the standard specification and that if satisfies the stipulated requirements.
Inspection and check of D & D project. (Dehydration/Desalting Plant).
Demothballing and re-commissioning works which consists of heat exchangers, valves, pipelines works, fire heaters plus the installation and hydro testing.
Support shall conform to the codes and standard, such as ASME, API, ASTM & AWS collect data from P & I D drawing etc. Involved in data captured and inputting via terminal to the teroman computerized maintenance system.
27 February 1990 – 02 March 1991
JAC Construction
Batangas, Philippines
Caltex Refinery, LMG Chemicals, & Industrial Buildings
Philippines
Construction Manager
Coordinating and attend meeting with the client which regards to the daily progress report & status of structural, piping electrical, civil and mechanical projects as a construction manager.
Presiding the daily coordination meeting, weekly, and monthly.
Conduct actual field monitoring and prepared working drawings for Caltex Refinery and LMG Chemicals.
Prepare inspection report, estimating and others.
Attend the weekly Managers meeting etc.
22 February 1989 – 23 February 1990
Mohammad Al-Mojil Est. & EEI
Riyadh Petromin Refinery
Yanbu Petrochemical Plant
Glycol & Ethylene Plant
Riyadh, Yanbu, Dammam, Abquik, etc.
Kingdom of Saudi Arabia
Structural & Piping Engineer
Expose in process and utility line.
Being familiar with the use of codes and standards.
Do the daily accomplishment report, documentation, crane utilization report, estimating & material take off.
Supervision of maintenance work such as dismantling and cleaning of heat exchanger's construction of pipe supports such as dummy leg support, vessel pipe guide, floor support, anchor support, etc.
05 January 1988 – 24 December 1988
A.G. & P. Co. (Atlantic Gulf & Pacific Co.)
ONGC Project of India
(Oil & Natural Gas Commission Complex Project)
Philippines
Piping / Pipeline Inspector & Engineer
One year experienced on site and fabrication yard as Piping Engineer.
Conform to the drawings and standard, specifications the prefabrication, Inspection, installation & erection of pipe spools.
Being familiarized with drawings and different specification to be coordinated with supervisors and fitter foreman for some difficulties in structural and piping works
Preparing drawings for offshore facilities, piping for the as built, revision and tie-installation. Assures that the fit up of structural members, pipe supports and pipe spools shall conform to the approve drawings by the A.G.& P. standards.
02 October 1985 – 28 December 1987
EEI & Braun Transworld Corporation
Kuwait National Petroleum Company
Refinery Modernization Project
(Up grading Pipeline and Processing Plant)
Mina Ahmadi & Mina Abdulla
Shuaiba, Kuwait
Piping & Structural Engineer
Supervised 142 to 172 people as a Piping and Structural Engineer.
I do the S.E.R. (Site Engineering Request) daily crane utilization report for 45 to 150 tons cranes, inspection for acceptance.
Tracking and expediting of pipe spools and structural steel materials.
Materials take off from the drawing's including pipe field support for process line and utility line.
At site I do the S.E.R., sketch and draft' the structural obstruction which are commonly causes the problem for the completion of the installation of piping at unit 148 C-utility 148 process from area A, B, C,D,E,F & G other unit and area, In-charge for Level 1 up to Level 4 (Both for Piping & Structural).
25 May 1984 – 20 September 1985
JAC Construction
Caltex Batangas Refinery, LMG Chemicals
Philippines
Project Engineer
Coordinates with superintendent and fitter supervisor or foreman for some rectification to be followed before welding and fitting.
Prepares inspection for Caltex Refinery and LMG Chemicals Expansion.
Conduct actual field visual inspection survey for the preparation of working drawing for Caltex Modification and LMG Expansion.
I visit the job site to see the progress of the project and assist in tracking and expediting of materials, necessary for the said project.
Study and identify problems that causes the low productivity ratio deficiency of steel erected and familiar to interpret blue print of isometric, orthographic drawings, basic rigging, spool computation, material take off, estimating etc. which is necessary for the said project.
TRAINING AND SEMINARS ATTENDED:
1.Health Awareness Training Program
Kellog Brown & Root / N'Djamena, T'Chad Africa
2.Project Development Management
Philippine International Multi – Purpose Cooperative of Overseas Workers / Riyadh, Kingdom of Saudi Arabia
3.Countryside Entrepreneurship Development Program
Department of Trade and Industry / Lipa City, Batangas Branch, Philippines
4.ADMA – OPCO LNG & Desalination Project (Dehydration & Desalting Plant)
Das Island, Abu – Dhabi, United Arab Emirates
Safety Training, Operating of Breathing Apparatus & First Aid Course, Sponsored by Abu Dhabi Marine Operating Company
JOB SKILLS: OTHER SKILLS:
Construction Manager Computer Literate:
Project Engineer MS-Word
Construction Engineer E-mailing
Construction Coordinator
Piping / Pipeline Engineer or Superintendent Driving
Structural or Civil Engineer
Inspector (Piping, Structural & Civil)
Quantity Survey Engineer (Estimator)
General Superintendent
Project Coordinator
EDUCATIONAL ATTAINMENT:
University: University of Batangas (Philippines)
(Formerly Western Philippine College)
1979 -1984 (GRADUATED)
B.S. Civil Engineering
College: P.B.M.I.T.
1977 – 1979
Technical Electricity
High School: Saint Theresa's Academy
1973 – 1977 (Graduated)
Elementary: Bauan West Elementary School
1967 – 1973 (Graduated)
PERSONAL DATA:
Upon request
Language Spoken & Written: English / Tagalog / Malay / Bahasa Indonesia
CERTIFICATES & REFERENCE: (Upon Request)
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 1901 to 1950 of 2551)
Go to Search Parameters...
Brief Description
40 years in the land surveying profession, 30 years as a Licensed Land Surveyor, Multi-state Licenses
Telecommunications Professional Engineer with strong analysis capability, deep knowledge on telecommunications networks and telecom business processes. Outstanding operating, managing and administrative skills. Proficient usage of office utilities and advanced expertise with excel macros.
Facilities Management, Procurement Specialist, Proficient in MicroSoft Office Suite
International Trade such as Import & Export Business, Offers, Sales Promotion, Market Research, Different Business Reports / Information's, Estimations and Future Business Plans beside some Administrative Work etc
Almost twelve (12) years of experience as a Lead Document Handler with Solid Professional involvement in the Document Management System of Various Major Projects on JGC Philippines, Inc., namely Oil Wharf Expansion Project in Caltex Batangas, BAPCO Kero Merox PJ, K2U ,one of the
A Senior Financial, Systems and Accounting Manager with significant experience in the development, creation and management of accounting and reporting systems gained both internationally and domestically. Have worked in the United States and the United Kingdom for Citibank, Xerox, Yale, Louis Dreyf
Marine Engineer from Greece, Languages: Arabic, English, Greek, Italian. Experience = 16 Y. Eni Oil Co. Ltd.1/6/ 1999. Title Senior Plant technician, skills: Microsoft word, excel, Amos, Internet
Information / Documentation Data Manager; Hiring and training of internal /external staff vendors for collaboration software system. Updating collaboration systems. Design Title blocks / numbering system. Work contractual assignment (projects) start of life cycle to finish of Handover to Client
Mechanical engineer (4 yrs degree) with appx 15 yrs exp in Contract & Project management. LOOKING FOR CHANGE IN MIDDLE-EAST, CANADA OR INDIA (AVAILABLE FOR IMMEDIATE START)
During my university and professional work, I acquired a solid experience in the field of the program coordination, the logistics and the financial management.
Procurement Manager with an acadimic engineering (civil) background, and in-depth Knowledge of key Telecom commercial elements and pricing structures of telecom suppliers’ contracts, and technical knowledge of Telecom goods and services (GSM Networks)
Project Engineer experienced in report writing, proposal prep, health and safety audits, process hazard analysis, budget maintenance, field crew management, client relations and preparation of P&IDs
Seeking a position as an Exploration Geologist/ Mining Geologist/Resource Geologist, utilising my past professional experience and educational background
Graduating senior from Texas Tech University with a Business degree in Energy Commerce
I'm a certified SAP SD consultant with a domain of 2 years in marketing.
By having multi-discipline skill; I have 21years of combine technical work experience in Project Management/ Consultant/ Coordinator/ Advisor/ Engineering/ Fabrication/ Construction/ Erection/ Installation & Maintenance work on both offshore & onshore.
I have worked in management positions for over 15 years in both the construction and manufacturing industries. I have had up to 120 employees under my supervision at any given time. HR, production, purchasing, documentation and inventory all under my supervision. Workflow and quality #1 priority.
Construction / mining / environmental
Troubleshoot equipment an identify need for new equipment and/or modification’s to existing equipment, optimizing throughput and minimize equipment downtime.
Area of expertise includes: Office Management, Project/Staff Management, Training and Development, Budget Management, Procurement Management, Planning and Execution Skills, Secretaria/Confidential Services, Document Management, Coordination/liason, Team Building & Team Management, Logistics and Tran
Rotational Equipment, Power Infrastructure E&I, O&M, & International ISO Quality and Safety Systems
I have implemented and maintained 7 ISO 9000:2000 Quality Management Systems for several leading companies.
I am an experienced Wireline Supervisor with cased/open hole experience.
A high qualified mechanical engineer, Looking for challenging and rewarding career. My major Industry experience has been with a CAT Dealership in KSA; however my Sales & technical skills give me versatility within any Business which seeks excellence in product support functions.
Expediting Supervisor, Oil and Gas, Marine, Petro Chem
I am an Environmental and Chemical Engineer, working in an oil and gas sector as an EIA specialist at Kuwait
I am a Canadian, "Hands-on", Project Manager/Superintendent interested in International work again. My extensive experience is in Heavy/Civil and Oil & Gas Pipeline Construction. I have a reputation for completing on-time, safe and cost-effective projects in various climates and nationalities.
Providing technical review and recommendation for peers. Knowledge in Project Managemant, HYSYS. Training in ISO 9001:2000, OHSAS, ISO 14001:2004
Barge Master, Barge Superintendent, Rig Mover, Marine Coordinator, CSR, Operations Manager 24 years experience in offshore Construction and Drilling
If you are looking for a dedicated, hardworking, honest, dependable employee who can think “Out Side the Box”, see further into the future than the end of his nose and is a dedicated team player - your search may be over.
Vast Experience in Document Control, Administration, Human Resourses and IT
Constrol System Engineer /Automation Engineer
Hands-on engineering and construction individual with extensive experience in all stages of the industry, project & site support, field & maintenance engineering, technical expertise and interpersonal skills in order to function within a multi-discipline team or operate within a stand-alone environm
Licensed professional civil engineer. Have worked mostly in construction as either an owner or an owner's representative. Enjoy doing field work and would like to work in a foreign country.
HR, Payroll, Operations
Professional Engineer, MBA, offshore oil & gas, Quality management, 11 years
MIT educated program manager/engineer seeks full-time employment in engineering, financial modeling/investing, or engineering management involving optimization, system identification, simulation, graphical user interface design/implementation, and/or control system design/analysis.
Systems Engineer - Project Planning & Control Specialist. Oil & Gas / HVAC / Construction
Project Manager (Electrical, Alarm Applications, Construction,Safety)
Civil engineer with 7 years experience.
Mechanical CAD Design Product and Tooling Development Engineeer
Long term experienced : wanted , Painting Inspector , Paint Superintendent or Technical Sales
Extensive experience in Engineering, Scheduling, Cost Control and Quality Assurance in Power Generation, Bio-technology and Manufacturing industries.
I have been trained and have experience integrating the spectrum of the logistics processes within the operational, acquisition, and wholesale environments. The major logistics processes include distribution, materiel management and contingency operations. Duties included directing and managing dis
Sr. Planner, Scheduler, Risk Management using Monte Carlo Simulation
Hands-on skill in Allen Bradley PLC, SLC, Panel Builder 32, RS logix, Frequency Drives,HMI software, SCADA-DCS, Industrial Mechanics and in Broadcast Transmitter.
15-years of experience as Document Controller for vendor & design documentation in gas and oil industry.
Experienced electrical sales, buyer, customer service,contract negotiations,job bidder
Land surveyor with over 30 years experience
I am having more than 3 years in Oil & Gas Refinery Field Constructions & I am worked as Materials Engineer, Engineering Coordinator, Planning Engineer & Now i am working as a Planning Engineer in GPS, Oman.
First
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
[ 39 ]
40
41
42
43
44
45
46
47
48
49
50
Next
Last
Seach Parameters
Change search parameters...
CATEGORIES:
Management;
INDUSTRIES:
Petroleum/Oil/Gas;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com