To work as a Senior Planning/Scheduling Engineer or Planner/Scheduler (as suitable) and be involved in high-challenging tasks of Project Management such as establishment of Schedules including of its effective monitoring/update, controlling and reporting. Furthermore, to have an active role and be able to utilize my extensive planning experiences in different huge projects (Industrial, Oil and Gas, Buildings and Infrastructures) comprising of Design/Engineering, Procurement, Construction, Commissioning and Handover.
EXPERIENCE SUMMARY:
Sixteen (16) years of relevant work experience (domestic and abroad) in several huge projects comprising of Heavy Structural Steel and Process Piping Fabrication/ Erection, Ship Building/ Dry-docking/ Repairs, Bulk Plant Fuel Oil Storage Tanks, Combined Cycle Gas Power Plants, Natural Gas Plant - Onshore, Multi-billion barrels capacity of Underground Oil Storage Tanks (Concrete and Steel Lined) with complete system/ancillaries, High-rise buildings and other infrastructures, entailing various works phases and multi-disciplines from Design, Procurement, Construction/Installation, Commissioning and Handover.
Jan. 2005 – Present MIDMAC Contracting, Doha QatarPlanning, Estimating and Engineering Services (PEES) DepartmentSenior Planning EngineerPrepare Tender Schedule including Progress S-curves, Histogrammes and other relevant technical submissions in accordance with the Instructions to Tenderer, scope of work, BOQ, drawings, specifications, etc. Upon Project/Contract award, prepare detailed Project Construction Schedule complete with all resources (manhours, weightings, major materials) in accordance with the final contract and budget. The Project Construction Schedule including S-curves, Indicative Cash Flows, Manpower and Major Materials histogrammes are then submitted to Client for approval and subsequently handed over to Execution Team (Project Manager) for implementation – monitoring/update and control. Projects comprise of high rise/tower buildings (400+m high), airport roads/interchanges, world-class convention centre, science/technology transfer building/parks, Texas Engineering buildings, etc.
Dec. 2000 – Dec. 2004 ABV Rock Group KB, Kingdom of Saudi ArabiaSaudi Strategic Storage Plant Project (SSSP) – Multi-million barrels of Underground Oil Storage Tanks complete with all Electro-mechanical systems and ancillariesSenior Planning Engineer (Project Site and Project Head Office)Project Control Dept. - Planning Section Head; Overall Project Planning, Scheduling, Coordination, Progress Reporting (Engineering, Procurement, Construction, Installation and System Commissioning and Handover) including Quantity Surveys and Invoicing/ Payment Certificates all in accordance with the Project Control Departments/Project-wide procedures and manuals. Establishment, implementation and coordination/ follow-up of Integrated or Master Schedule including Detailed Schedules (lower levels) for various Production Disciplines and Subcontractors while ensuring that production targets are effectively attained. Provides management reports (i.e. progress S-Curves, narratives, Engineering Deliverables, manpower/major resources, long lead procurement/equipment, schedule look ahead /highlights, etc) being utilized both by our own Management and Client. Analyze production progress delays and accordingly recommend necessary corrective actions. Represents Planning Section in all meetings such as Progress, Schedule and production coordination both within our own Management and with the Client.
Project Head Office, special assignment (Sep. 2002 – Nov. 2003); Planning/scheduling and coordination of Multi-Discipline Detail Design/Engineering for our 2 Project Sites (Undertaken by Design Consultants - Foster Wheeler Corp. based in London and ABV AB based in Stockholm). The tasks include setting up and control of Detailed Design Schedule (FEED to Construction) and Progress Control System (Database) comprising thousands of Design Packages with respective Deliverables (Drawings, Datasheets, Documents and Specifications) and involving several works phases. These Schedules and Progress Reports form part of the respective Project Site's Integrated or Master Schedule.
Aug.2000–Dec. 2000 Foster Wheeler Philippines Inc.Malampaya Onshore Natural Gas Plant - Shell PhilippinesPlanning EngineerThe Plant processes the natural gas coming from an Offshore Platform via 500km underwater Pipeline and subsequently deliver the processed gas thru underground pipeline to newly Constructed two separate Power Plants with a combined capacity of 2700 MW (one of which stated below, which I also worked with).
Being on management/consultant team, had been responsible for several Subcontractors Planning/Scheduling, Coordination and Reporting. Subcontracts comprise of fabrication and erection of Structural Steel Supports/Pipe Racks, Piping for Process Trains, Tanks/Vessels and Flares Structure. Had been attending on periodical planning and coordination meetings with Subcontractors management team and tackle/resolve production problems, delays and other relevant issues as required. Check/finalize Subcontractors detailed schedules/programmes and progress reports prior to integration to main project schedule/progress.
Mar.1999– Aug. 2000 Daelim Philippines Inc. (Raytheon Ebasco Ltd US - Management Consultant)KEILCO 1200MW Combined Cycle Power Plant - Ilijan, Batangas City, PhilippinesPlanning EngineerOverall project planning/scheduling, implementation/coordination, progress reporting (S-Curves, histogrammes, narratives, resources' analysis, etc.), major materials/equipment planning, etc. Update, control and implement the detailed production schedule and ensuring the completion of agreed milestones and specific targets. Attending on Planning and Coordination meetings within our own Management and Client.
Sep. 1992 – Aug. 1998 ABV Rock Group KB, Kingdom of Saudi ArabiaSaudi Strategic Storage Plant Project (SSSP) – Multi-million barrels of Underground Oil Storage Tanks complete with all Electro-mechanical systems and ancillariesSenior Planning Engineer – Steel Works and Installation Department
Initially as Planning Engineer/Estimator for Steel Works Department and responsible for detailed planning, scheduling, quantity surveys/estimates and budgeting works comprising prefabrication, painting and erection of huge underground Storage Tanks steel lining, tunnel roof/wall/floor mounted structural steel modules/supports/racks for mechanical/electrical installations. Had been responsible in preparation of Management Reports such as production schedules, progress, man-hour, equipment and materials procurement status.
Promoted as a Planning Technical Supervisor (Deputy Planning Section Head) and being the one directly responsible for supervision, training and support of Planning Engineers and Quantity Surveyors. I have also established Database system used for progress monitoring, materials planning/controlling, manpower, documentation and other management reporting.
Further promoted to Senior Planning Engineer (Section Head) and responsible for the Department's overall Production Planning/Scheduling and Coordination. Had been attending in Management meetings and participated in decision-making particularly concerning production efficiency, budgets/costs and proper resources' utilization. Concurrently, assigned as Design Coordinator for follow-up of Design Changes, Site queries, Non-Conformances, Clarification Requests and other technical matters relevant to Civil and Structural Steel Construction.Special accomplishment includes setup/development and implementation computerized Progress Updating/reporting Database, which has also linked to updating of Primavera Project Schedules.
Aug. 1989 – Sep. 1992 Phil. National Oil Company (PNOC) Dockyard & Eng'g. CorporationSan Miguel, Bauan, Batangas, PhilippinesPlanning & Control Engineer – Production Planning & Control DepartmentInitially, had worked as Structural Engineer (3 mos.) to supervise the prefabrication/erection of misc. steel structures, platforms and supports (for U.S. John Brown Engineering Project – 10 units Power Plant and Fuel Barges).On my 4th month, had been transferred to Planning Department, trained and designated as Planning & Control Engineer. Had been responsible for the overall planning/scheduling, estimates, and budgets of any assigned projects and controlling of same. Projects comprise of ship building/dry docking and repairs, prefabrication/erection of fuel oil storage tanks and LPG pressurized vessels, structural steel supports/platforms and other similar structures. Some of the vital tasks involved were establishment and monitoring of progress, budget, cost, resources histograms/ S-curves, analyzing time schedule and progress delays as well as the productivity. Had been assigned as Project Engineer for special projects (off sites) involving erection of pressurized vessels, steam pipelines and construction of service buildings for power plant project. Had been attending in pre-bid conferences and prepared tender/package proposal (estimates, time schedules, histograms, key resources, etc) for prospective projects.
Jan. 1989 – Aug. 1989 Atlantic Gulf & Pacific Co. of Manila (AG&P)Batangas Marine & Fabrication Yard (BMFY)San Roque, Bauan, Batangas, PhilippinesCadet Engineer/TraineeCadet Engineer/Trainee for three (3) months (both Lectures and On the Job Training), concerning various Standard Procedures for Steel Construction such as Prefabrication, Assembly/fit-up, Surface Preparation/Painting and Erection. Having been completed the extensive training, had worked as Assistant Shop engineer doing the detailed materials take off, layouts, fit up checks, etc., which are all processes related to heavy structural steel and piping fabrication. Performed basic welding and QC inspection, production checking and prepared daily production reports.
1989 – 1992, 1998 - 2000 Private PracticeBatangas City, PhilippinesCivil Engineer/ConsultantWhile working locally in the Philippines, had been preparing structural design for vertical RC building (residential/commercial), technical specifications and doing construction supervision/ inspections as well as being the Project Owners' representative/consultant.
EDUCATION/HONORS
1983 – 1988 Batangas State University (formerly Pablo Borbon Mem. Inst. of Tech. - PBMIT)Bachelor of Science in Civil Engineering(Full Institute/Academic Scholar, winner for numerous College Academic competitions and ranked 4th for Outstanding Graduates)Board Placer in Civil Engineering Licensure Examination of Nov. 1988 (Lic. No. 0056568)1991–1992 Batangas State University (formerly Pablo Borbon Mem. Inst. of Tech. - PBMIT)Masters in Business Management (completed 16 units; subjects comprising of: Organization and Management Theory, Quantitative Approaches to Project Management, Financial Management, Production Planning and Controlling, Management Information System – MIS and Decision Making)
SPECIAL SKILLS/PROFESSIONAL TRAINING (Local and Abroad)
- Strong experience and proven success in Project Planning/Scheduling, Controlling and Coordination.
- Expert and hands-on experience in computerized Planning/Scheduling software such as Primavera Project Planner v3.1, Microsoft Project, as well as MS Access Databases facilities, being used for progress reporting/controlling and data processing (export/import data to/from Planning/Scheduling programs).
- Great technical and managerial skills in the field of Project Planning/Scheduling. Has the capability to train and support both Planning and Production Staff.
- Had attended the following professional trainings and seminars:- Production Planning, Scheduling and Controlling- Bar Charts and PERT CPM Techniques and application- Introduction to ABV Rock Group Quality Control Systems- Introduction and Implementation of ISO 9000 series- Budgeting and Cost Controlling- Effective Supervision- Employees Performance Evaluation- Artemis/Planet 7000- Primavera Project Planner (Basic and Advanced)- Several Civil Engineering Technical Seminars (sponsored by Phil. Institute of Civil Engineers)- Soil Engineering/ Improvements
References
Available upon request
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 1351 to 1400 of 2515)
Go to Search Parameters...
Brief Description
Civil Engineer, board topnotcher and full Academic/University scholar. Expert and hands-on experience in Primavera P3.
Experienced EPC Project Executive with proven results through leadership and technical aptitude.
I have been working in the Petro-Chemical Busines for 25 +years( construction and maintenance.) I 've been a Supervisor, Superintendent & Project Manager. Heavy expirence in Piping ,Fabrication, Rigging, I have with all disciplines.I have worked in the U.S. and abroad.
Master sailing on tankers looking for shore based job
Comprehensive international leadership in Environmental, Health, Safety and Sustainability. Extensive experience in Asia with top multinational firms. Excellent cross-cultural skills in Indonesia, Singapore, Malaysia, Thailand, Philippines and China. Speaks Bahasa Indonesia conversationally.
Planning, Scheduling and Cost Control Engineer
Detailed structural design and engineering, feasibility studies, project / contracts management, plant and building trouble stooting, QA / QC, contracts, project estimation, preparation and review of specifications,
Proficiency in using Primavera (P3), Primavera Enterprise, Expedition, Suretrak, Microsoft Project, Access, Excel And Other Related Software.
Mechanical commissioning Engineer. HNC & ONC Mechanical Engineering. Experienced Project Manager,Supervisor and Technical Engineer.
I am Chartered Accountant and working with Al Khafji Joint Operations (Saudi Aramco Gulf Operations and Kuwait Gulf Oil Company) as Financial Analyst
Control & Instrument Commissioning / Maintenance Engineer 01.10.2006
Electrical Design Engineer with 15 years of experience with MNC in India, Japan & Middle East for Oil and Gas, Petrochemical, Chemical, Power.
BE (Chemical) + MBA Experience in Sales & Marketing especially in International Trade related to Process & Oil & Gas Industry.
18 years of experience in the field of Inspection, QA/QC, Quality Audits, Design, Procurement, Construction, Project Management in a wide range of activities for Chemical Processing Plants to Oil and Gas Plants Piping, Static and Rotating Equipments, Storage Tanks, Pressure Vessels, Structures and
Qualified as an approved electrician and later occupied positions as Electrical Superintendent, Electrical Supervisor, Senior Quality Control Engineer, Senior Electrical Inspector, Construction Specialist and Site Manager on Commercial, Light & Heavy Industrial, Petrochemical, British Gas Systems
A competent professional with around 11 years of experience in the areas of Information, Physical security, ability to design, execute, implement and impart training on security systems. Possess consultative orientation and ability to deliver a broad range of innovative and value-added services. Abi
Free!
I have 16 years post qualification experience as a Project Engineer, project Controls engineer, Cost Engineer, Planning and Scheduling engineer. I have worked both on opeerator's team and contractor side. My experience spanned through deepwater projects in oil and gas industry, EPC projects etc
I have extensive experience in multiple levels of construction projects including roles as supplier, installer, managing contractor, and owner’s representative, allowing me the ability to interface with all levels of a project.
Motivated Landman with a proven track record in leasing and title research
Experienced Engineer (Quality Assurance, 6 Sigma, Design V&V and Leadership)
NEBOSH Health & Safety General Certificate
Mechanical and Production Engineer with 20 years of mechanical design, project engineering and management experience in England, Chile, Argentina, Peru, Cuba, Canada, USA and Australia, fully bilingual in English and Spanish.
Well versed in contracts formation and administration, project management, claims mitigation and resolution, contract negotiation, subcontractor mangement, quality assurance on major projects thoughout the world. Results-oriented, with an ability to see any assignment to successful completion.
Mechanical maintenance equipment of all types
Degrees in Electronics and Instrumentation.Highly detail oriented, and organized. Good planner, a self-starter with ability to meet deadlines, and personable. International experience in & gas and other industries.
JIB
Senior Planning Engineer, > 15 years experience in upstream oil&gas projects, construction.
To secure a senior level position responsible in Project Management, Engineering, Procurement and Construction aspects of heavy industrial petrochemical, chemical and power plant projects.
I have expertise in general operations, contract administration, budgeting and human resources, among others. I have years of experience working with the public, business owners, managers and government officials. In addition, I have on-the-ground experience in public works, drilling and pipelines.
Dynamic, hands-on international oilfield operations Finance & Administration Manager
In-House/Field Landman/DOA/Lease Analyst/ROW Agent/Acquisitions-Divestitures
Detail and task-oriented Mechanical Engineering professional with an exemplary background in automotive and manufacturing industries. More than 10 years of experience with a track record of propelling technology to optimize performance and profitability. Creative and innovative in conceiving and de
Project Manager/Manufacturing Manager/Site Safety
Senior Project Manager, Quality Manager, International experience
I hold a Master Degree in Civil Eng. – Canadian Equivalent and possess 17 years of professional experience in Project/Construction Managt, Design and Manfg of Structural Steel and Pre-Eng. Buildings. Regstd PE in Canada on August 05.
8 years of experience in telecommunications including 5 as Head project manager and contract maintenance. 1 year of experience in industrial maintenance at Air Liquide as coordinator of maintenance.
A professional providing Leadership & Support for his team to achieve organizational goals. My primary expertise as an operations engineer at a world class Ammonia – Urea Complex is further boosted by multi-disciplinary accomplishments in fields of HSE & six sigma
DEGREED MECHANICAL ENGINEER - QUALITY ASSURANCE – DESIGN – SERVICE – TECHNICAL SALES
ETAP Power System, PLC, NEC, ANSI, IEEE, NEMA, IEC, electrical testing & commissioning, Over twenty (20) years of hands-on experience focusing on High Voltage (HV) and Low Voltage (LV) Power Distribution System, project management, electrical engineering design, project coordination and supervision
An experience individual with excellent knowledge of Freight handling / Exports Management with the objective of achieving organizational goals and making it a strong profit center, seeks an opportunity in managerial capacity.
Bachelor of Electronics Engineering ,14+ yrs of experience in designing and commissioning complex programmable logic controller (PLC) based control Systems for Process and Machine automation.drawing tools like AUTOCAD, ORCAD.,SCADA Packages like Intellution-Fix32, Ellipse,
A qualified and internationally experienced Mechanical Engineering professional graduated from Kirikkale University (Kirikkale/TURKEY) with a Bachelour of Science Degree in Mechanical Engineering in June 1997 followed by a Master of Science Degree in Mechanical Engineering from Texas A&M University
Free!
Telecom and electronic engineer, specializing in RF, with over twenty years worldwide experience.
HR Management, Project Management, Consultant
Having worked on projects across Canada and in Mexico, I have a diverse background in Health, Safety and Environmental issues which includes everything from full HSE Management System creation to managing all field work, investigations, HSE Compliance, training, environmental management, etc.
More then 20 years in the hydrocarbon industry working on Offshore platforms, FPSO’s & Onshore gas & oil installations. Strengths within commissioning start ups, operations, team building, Team development and a high level of safety awareness.
Electrical Engineer with over 21 years' varied experience in Projects- contracts, engineering, construction, project management with EPC-MNC, Large Process/Chemical and Electricity Utility companies
I am a Piping / Pipeline Construction Manager or Superintendent in the Oil and Gas Sectors, I have a wide and varied experience of overseas Projects, with expeience of Construction, Maintenenance and Production work on and offshore.
Degree of Bachelor of Computer and Communication Engineering, and computer literate in windows and microsoft.
Leadership, Technical, Organizational, and Computer Skills.
First
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
[ 28 ]
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Next
Last
Seach Parameters
Change search parameters...
CATEGORIES:
Management;
INDUSTRIES:
Petroleum/Oil/Gas;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com