Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #3554
next resume »»
CONTACT INFORMATION:
View contact information...
TYPICAL PLANNING/ESTIMATING/SCHEDULING RESPONSIBILITIES:
Reviewed drawings, specifications, and written statements of work (SOW) included in engineering and constrictor's bid packages. Downloaded cost estimate data via software Data Bridge into Primavera Project Planner (P3) or in some cases Microsoft Project. To create cost and resource loaded CPM project schedules. Confirmed detailed Statements of Work (SOW's) with overall project manager. Initiated the activity coding process to create database coding that included contractor work breakdown, cost breakdown and organization coding structures that would be used to create a preliminary project baseline and multiple critical path project schedules which was subsequently distributed to engineering, procurement staffs. Negotiated deliverable dates for all engineering and long lead-time procurement. Worked with this team to prepare and issue logistics, sub-contracting work packages schedules that supported client's fast track project schedule. Upon receipt of confirmed engineering and procurement deliverables schedules, revised project master schedule and subcontracted work schedules. After a pre-bid conference with prime and subcontractors, proposed overall master schedule that ensured the shortest project schedule and optimized overall project cash-flow. Continued to work with the client's team architectural and engineering and construction contractors to negotiate final project baseline. This process typically involves working scheduling issues with entire team, critiquing\analyzing logic, and in some cases creating new activities, and revised schedules that compressed and optimized P3 Schedule. Received contractors final cost-schedule proposals, updated and issued final overall P3 baseline turnaround schedule via a secure page on the World Wide Web that was accessible to entire project team. During the actual turnaround received and uploaded into P3, electronic files containing bi-weekly manpower cost and progress updates from all contractors. These sub-project actual updates were used to create a series of progress charts and reports. Within a few hours baseline to actual cost-schedule progress variance reports were issued to all via project website. Throughout T/A continued to monitor baseline milestones, man power levels and interdependencies between process unit subprojects, to identify the critical path. Worked with unit managers and contractors, to suggest alternatives that continued to ensure shortest possible shutdown duration. What the website created was near real-time centralized management of an overall project resource pool. This approach, in turn allowed plant and unit managers to quickly identify where current workloads were exceeding current capacity and thus a risk to overall plant schedule. In addition, this information was compared to prior historical work force management data, and used to model likely outcomes and provide decision support to adjust resource workloads. Throughout T/A continued to audit field installation, man-hour progress updates from all contractors. At overall 75% progress completion point: prepared and implemented daily testing, turnover and commissioning progress reports that incorporated critical path for overall plant startup...
PRIOR ACHIEVEMENTS
IRWIN INDUSTRIES, Long Beach, CA 8/2002 – 4/2003
Turnaround Estimator/Scheduler/Manager Multiple Shutdowns Less Than $3 million
Attended job walks, and reviewed drawings and specifications to verify completeness of package. Where appropriate requested additional bid information via RFI process. Solicited subcontractors for qualifications, capabilities, safety, insurance, bonding and other data. Prepared bid packages that solicited pricing from selected subcontractors. Prepared and submitted on-time overall project time and cost estimates for overall client proposal. Upon selection, created job start sheet, overall project cost budget, purchase orders, and subcontracts. Co-facilitated job kick-off, cost-schedule progress updates. Reviewed and finalized baseline schedule. Also reviewed and finalized client's payment schedule of values. Throughout the project obtained actual progress updates from field and job cost data from accounting and used this information to identify those schedule activities that were likely to miss their target dates or where job costs were likely to overrun. Next, determined appropriate recovery plan and helped implement when appropriate. Attended weekly site and client project status meetings. Ensured issues and RFI submittal logs were prepared, submitted, approved and documented. Where appropriate, prepared, submitted change orders to client. Negotiated approvals and notified accounting to prepare subcontract price adjustment. Also attended job close out meetings and final reviews of actual vs. estimated cost reports to obtain knowledge for future cost estimating and prepared project history and lessons learned files. Participated in the. implementation of Timberline Precision Estimating & Primavera Scheduling software packages.
GENUITY (FORMERLY BBN Internetworking) - Irving, Texas 1998 - 2002
Principal Planner/Scheduler
Managed 90 telecom projects with cross-functional teams of up to ninety personnel each. Set project goals and facilitated project-wide communications. Employed extensive knowledge of Primavera Project Planner (P3) and SAP R/3 to achieve overall program goals
Extracted of materials, engineering and equipment from P3 to prepare work packages. Planned and scheduled workflow for engineering, procurement and construction. Conferred with engineering and procurement supervisors to update them on status of assigned projects. Expedited operations that delayed critical path as well as overall baseline schedule.
Primary responsibility for coordinating proper regulatory permits; scheduling personnel from eight different engineering disciplines, coordinating procurement of over 100 different types of material, and coordinating overall project logistics for all facility construction, and electronics installation technicians work, while maintaining key vendor relationships.
Quickly gained respect and cooperation of team members in planning, engineering, implementation and operations by actively building professional relationships and demonstrating dedication to assisting personnel with problems and resources to complete work on time.
FLUOR-DANIEL, INC. - Irvine, CA 1993 - 1997
Principal Turnaround Planner/Controller
Responsibilities included: utilizing Primavera Project Planner (P3) to create 4,000 activity cost and resource loaded turnaround schedules. Creating and Implementing Baseline Schedules and Updating Construction Schedules. Responsibilities included maintaining and monitoring program and project level CPM schedules, developing and implementing weekly Earned Value Analysis with forecast. Post project supported client's delay analysis and client's subcontract claim settlement efforts.
Other responsibilities included: Integrated System Planning/Scheduling and Coordination; Sub-Contract Management; configuration Management; Contract Change Management; Manpower Requirements Analysis; Cost and Schedule Variances Analysis; Establishment and Coordination of Project Priorities and Coordination/Resolution of Technical Issues..
Create and maintained EPC P3 Baseline Schedule for a 200 MW, 2 unit Combined Cycle Gas Turbine Cogeneration facility.
Created 7,000+ activity bid schedule for shutdown and replacement of microwave backhaul transceivers and new antennas on over 750 cellular towers as well as equipment in 3 switching centers.
C.F. BRAUN & COMPANY - Alhambra, CA (a.k.a. Kellogg Brown & Root) 1991 - 1993
Senior Construction Manager
Created & maintained an outage schedule for the installation of a TDC 3000 digital control system of an existing refinery.
Assembled, mentored and led several construction planning teams for a world-class chemical process engineering and process plant construction firms effort to prepare bid statements of work, execution strategies, bid package schedules as well as overall programs baseline engineering, procurement, logistics, and construct schedules for $6 billion Ras Tanura Upgrade Project in Saudi Arabia
Recruited, trained and supervised a project control team of 10 responsible for managing 2,000 craftsmen on the SABIC/Shell USA projects in Saudi Arabia in Saudi Arabia.
Met the challenge of planning and directing construction logistics within an unfamiliar culture and business environment by independently studying the country and its history.
Prepared labor forecasts, project staffing and construction work schedules and oversaw international contractor screening and selection in accordance with subcontracting execution plan.
BRAGG COMPANIES - Paramount, CA 1989 - 1991
P3 Consultant.
Responsible for assessing industrial client business needs and developing critical path schedules that incorporated best practices. Examples include: development of standardized work break down coding structures; creating and publishing Engineering and Construction deliverables schedules; built successful relationships with owners and clients vendors and suppliers; successfully maintained communication lines for constant customer feed back. Ultimately benchmarked all scheduling work processes to leave behind a trained staff operated professional work processes
Implemented P3 and G2 estimating Software Applications in conjunction with Richardson WinRACE (Aspen. Technologies) Industrial Construction Pricing Database.
Created a professionally trained estimating and scheduling team that was successfully able to promote and offer high tech estimating and scheduling services to firm's client base. Impact was that my client was able to offer technical services to firm's client base that firm's competitors could not provide.
VECO, INC. - Anchorage, AK 1986 - 1989
District Director
Developed and managed multiple small capital project schedules for ARCO, BP, Mobil-Exxon, Shell and Chevron.
Provided guidance and assistance to the VP of Constructions superintendents, an estimator and project control manager. Worked closely with this team to prepare CPM schedules for cost reimbursable proposals and lump sum bid packages that lead to successful contract closures totalling over $15 million within a six-month period for ARCO, UNOCAL, Exxon-Mobil & Chevron.
C.F. BRAUN & COMPANY - Alhambra, CA 1973 - 1985
Scheduler to Project Controls Manager
Earned fast track promotion through several increasingly responsible positions beginning with Construction Supervisor to direct overall sales and marketing efforts to nine Western US states, the entire Pacific Rim and East Asia regions. Served as Principal Planner/Scheduler or Construction Project Controls Manager to clients such as US Department of Energy, US Department of Defense, ARCO and Exxon.
Successfully handled major projects including ARCO's 20,000 barrel/day Fluid Feed Hydrotreater, West Sak, Lisburn and Kuparuk oil field flow lines on the Alaskan North Slope and US DoE classified engineering projects for Richland and Rocky Flats operations.
EDUCATION:
CLAREMONT GRADUATE SCHOOL - Claremont, CA
MBA in Accounting & Finance
UNIVERSITY OF WASHINGTON - Seattle, WA
Bachelor of Science, Construction Management
SPECIALIZED PROFESSIONAL TRAINING/CERTIFICATIONS
Project Management Institute, Project Management Professional (PMP) Certification #52330
Association of International Constructors - Certified Professional Constructor
Currently enrolled in AACE professional certification program via distance learning course offered by University of Iowa.
SOFTWARE SKILLS & EXPERTISE
Certified: Windows Professional (Access, Excel, Word, PowerPoint, Publisher, Outlook, and MS Project) expert level user.
Scheduling Software experience: Over 12 years of hands on experience utilizing Primavera's P-3 software including implementation & trained of others and several P3 add-ons including: Earned Value Pack; Webster; PEAK (P3 to SAP Data Exchange) and Impress SAP to P3 data bridge.
Estimating software used to accurately define typical turnaround task costs include: ICARUS 2000, QuickPen Piping, WinEst, and Timberline in conjunction with Richardson's (Aspen Technology) WinRace Database for Process Plant Cost Pricing and Standard Man-hour Estimating Standards for Process Plant Construction as well as CMAA, NECA and other Construction Estimating Unit-Man-hour Standards; SAP R/3 Ver. 4.6B Client Server Project Management, Maintenance Management, and Logistics Management modules.
Designed and help implement Prolog Project-Point Collaborative Website for contractor document management, data exchange, drawing & submittal review/approval, and overall contractor control work processes.
Over 15 years experience reading and interpreting the following types of engineering drawings for turnaround task cost and task duration estimating and scheduling purposes: Process Control/Instrumentation Control: P&ID, loop function drawings; Security: CCTV, Microwave Motion & Infrared Heat, Smoke, and Sound Detector Drawings & Specifications; Refinery Fire Detection/Prevention Drawings; Mechanical: Vessel Fabrication, Ladder & Platform and Equipment Setting or Orientation Drawings; Electrical: one-line diagrams, equipment location, riser and raceway & conduit drawings; Piping: Orthographic and isometric drawings, piping line lists, installation and testing specifications; Structural: Structural Steel design, fabrication, and piece marked erection drawings; Civil Structural Steel & Concrete drawings; Civil: Underground piping, and electrical conduit drawings.
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 151 to 200 of 2275)
Go to Search Parameters...
Brief Description
An experienced Training & Development Manager used to setting up training projects for classroom, workshop and competency based models within the O&G inductries.
Over 20 years experience with major oil companies in europe and South America in multiple exploration, production and business development projects.
I offer a broad range of upstream petroleum business skills and leadership experience covering exploration/development planning and LNG project execution, subsurface and production facilities planning, economic analysis, strategic planning, commercial/legal negotiations and corporate communications.
Senior Project Manager, International Industrial Multi-Disciplinary &Muli-Cultural Projects
Negotiations, planning, economics in international joint venture gas and midstream projects for past 14+ years. Started career as reservoir engineer with Exxon.
14 year experience in international/ multicultural mid- and large scale oil & gas projects in polar areas of Russian Federation in both Contractor’s and Client’s role. Working to Russian and Western standards. Planning, cost, controls and certification for construction and commissioning.
Seeking assignments in Business Development in Energy Sector ( OIL & GAS / POWER) with a growth oriented organisation.
Petroleum/Oil/Gas - Economics and Technical Management - Chem Eng - 30 yrs exp.
A western educated finance professional with 23 years of accounting, strategic cost analysis, corporate finance, listing, valuations, banking, project finance and execution, supply chain, restructuring, turnaround, strategy, business development and board experience with world class multinationals.
An Oil and Gas Professional with expertise in International Operations Management, Assessment of Technical Data, and Long-term Business/Budget Planning. Managed international operations, PSC and construction contract negotiations, liaise with foreign governments and, field exploration/development.
HAVING 23+ YEARS OF SERVICE ,INCLUDES 20YEARS IN INDIAN AIR FORCE AND PRESENTLY ENGAGED WITH PRIMUSTELECOMMUNICATION INDIA LTD
Engineer with MBA and possessing over twenty-two years of experience in Electrical/Instrument Maintenance and Project works in refining and petrochemical industries. Capabilities of shouldering Maintenance Manager's responsibilities, during the latter's absence.
QHSE Manager, EOD/UXO consultant, height safety specialist, International experience and dedicated professional.
Project management and development experience in international energy and infrastructure projects. Extensive oil and gas experience in EPIC projects, including onshore and offshore structures, pipelines, subsea and floating production systems. South America, GOM, West Africa and SEA experience.
Free!
Experienced in managing Quality and HSE activities of multinational Petroleum refining and marketing companies including TOTAL & SHELL and successfully developed quality and HSE standards and procedures and rolled out global initiatives at the corporate level. Experience in leading cross functional
20 years experience in the Instrument & Controls through to Information Management arena
a challenging and responsible position in Purchasing, Procurement & Supply Chain Management utilizing experience gained in Domestic operations and multinational Projects.
I offer over twenty-five years of Sales and Sales Management experience, as well as domestic and international Marketing. Through out my career I have demonstrated the ability to provide companies with professional and high volume producing sales teams as well as building strong customer relations.
Multiple Industrial Construction Projects involving new Fossil Power Generation, and Petrochemical Process facilities; Routine seasonal turnaround or shutdown schedules for oil and gas production, oil refining, fossil gas & coal fired power generation plants; Environmental – Remediation projects;
Master in Metallurgical Engineering. Experience in manufacturing management, operations, quality assurance, and production; and in managing and implementation of ISO 9002 certification. Fluent in Spanish and English.
Over 25 Years of Oil Industry Experience in Purchasing, Contracts Administration and Materials Control.
25 yrs in Commercial and Project Mgt in the Oil & Gas industry. Had P&L responsibility on major projects in Europe/Africa, Caspian, Middle East, SE Asia & Russia. Also wide experience in contracts/negotiations, BD, international JVs, M&As, due diligence and in the start-up of new companies.
CAREER FOCUS - Add value to the global society by using the very latest technology to manage a business toward continuous improvement and long term solutions
Petroleum Eng, MBA Tulane U., Advncd Mngmnt Prgrm 26 yrs, Petroleos de Venezuela, Shell Holland Business Developmnt, Performance Evaluations, Costs , Budget , Planning, Gas Business Teamwrk, Chnge Mngmnt, Leadership, Negotiation skills, Adaptation to geographic and cultural environments.
A chemical and facilities eng. with 24 years in major field developments, including water injection, gas compression, treating and LPG extraction, and project management, very strong experience Managing Oil and Gas Production Assets ,as an Asset Manger, as a Chief Operations Officer .
Experienced team manager in the domains of E & P technology, information and data management. These skills are uniquely combined with business development, sales and consultancy management delivery experience.
Professional with 12 years of international experience in several sales, marketing and business development managerial roles in European and Latin American markets. Trilingual, with Executive Master in Sales Management and Marketing and Bachelor of Science in Business Administration.
Seasoned result–driven leader adept at utilizing experiences and managerial skills to maximize market share, profits and client satisfaction. Accomplished international business manager. Able to quickly identify and assess situations with a perspective that allows strategic insights.
I am a self-motivated dynamic project management professional with fourteen years of experience and having an extraordinary sense of responsibility for the profession. I graduated in Civil Engineering with MBA in FMCG and have continued to acquire education, skills and experience related to differen
To utilize my medical and insurance career experience management position.
Planning, scheduling and control activities in projects “EPC”. Responsible for advance and cost management in: the budget, planning, execution and construction stages
A Sr. exploration Geologist, with extensive experience( 25 years) in oil and gas exploration: G&G and geochemical studies, play assessment, prospect identification and generation, team leader, project management, research of new exploration opportunities, JV , Bid round Data rooms ,etc.
Corporate Engineering Executive strong in asset and integrity management, technology leadership, business planning, management controls and economics. Degree qualified in engineering, metallurgy and materials with a Sloan MSc in Management from London Business School.
Project Manager looking for Offshore rotational position. 20 yrs experience Oil/Gas from Ground Up. Objective supported by: INTERNATIONAL PM MBA Ceng INSTRUMENTATION AND CONTROL HNC PROCESS CONTROL CONSTRUCTION SUPERVISION COMMISSIONING / AUDITING FISCAL MEASUREMENT SYSTEMS ENGLISH / SPANISH
Senior Project Manager/Director with extensive diverse experience in Offshore and Power. Proven proficiency in multi-functional, multi-location, international/domestic projects up to $6 Billion value for companies and Joint Ventures. Doubled profits in Peru, although sales prices halved.
Seeking domestic or international HES manager position in progressive oil & gas company. Results oriented business leader combines excellent management and technical qualifications with demonstrated achievement in delivering multi-million dollar projects.
• Ability to achieve goals with or without direct supervision. Extremely ethical and honest. . 20+ successful years in sales, marketing and operations management. . Strong team player with exceptional ability to get along with others. Highly motivated.
A position where I can contribute in a 1) Governmental Affairs [Federal, State, & Local land access issues, DC Lobbying, etc.], 2) Mergers & Acquisitions, 3) Rocky Mountain Exploration, or 4) ERP asset management function.
For the past 5 years, Project Manager for technical databases, data management, and GIS solutions for Oil companies in Indonesia. Nearly 20 years of Oil and Gas experience using and supporting technical applications for oil companies and software vendors including Landmark, Geoquest, and Paradigm.
Exec with management, commercial and tech experience with a Fortune 100 multinational seeks mgmt position. Degrees in law and engr and a proven record in supply chain mgmt and planning and econ. Negotiated jv agreements and contracts for sale and purchase of goods and services.
Result oriented senior manager with over 20 years international. Strong problem solver. Broad management experience in operations, business development, strategic planning, negotiation and project management. Strong cross-cultural and multilingual skills. Masters in engineering and MBA.
More than 25 years of management experience encompassing international operations, development and project management. A professional adept in all aspects of petroleum industry. Excellent communication skills highlighted by successful negotiations, presentations, and written documentation.
OBJECTIVE: Management in technology-based organization. • Twenty-five plus years of experience, domestic/international, operations, sales, marketing, including over twenty years of management. Track record of integrity and success.
Chemical engineer with extensive experience in oil & gas, industry and contracting fields. Worked in the Arab Gulf region and Lebanon.
SUMMARY OF QUALIFICATIONS Twenty five years domestic and international experience in Prime Contracts and Subcontracts Management & Administration and Pricing involving all aspects of the procurement cycle.
Geologist with 20 years experience in minerals exploration & oil and gas industries.
MBA marketing and Electrical Engineer
To seek a challenging, technical opportunity as a management staff in petroleum engineering where I can utilize my managerial, professional experiences and research skills in the field of oil & gas reservoir management.
Seeking an entry position in Management Consulting. Can leverage diverse skills in Engineering, Management and Business. Interests in productivity/process improvement and culture change management.
Energy industry economist and manager with broad experience in both the private and public sectors covering exploration & production, refining & marketing, transportation, utilities, public policy and regulation.
1
2
3
[ 4 ]
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
Seach Parameters
Change search parameters...
CATEGORIES:
Management;
INDUSTRIES:
Petroleum/Oil/Gas;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2008 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com