SUMMARY:
Over 30+ years experience in the Petro-Chemical, and Power Generation Industries Worldwide. Expertise includes Construction, Start-Up, Operations and Maintenance of Oil Refineries, Chemical Plants, Combined Cycle, Gas, Oil and Coal Fired Power Generation Facilities. I have experience in both Greenfield and Brownfield Projects, and have used my Financial Management, Logistic and Life Support management skills in harsh environments. Leadership and getting the very best of Team and Equipment in difficult situations is one of my strong suits, making projects run more smoothly and come in on a timely manner. Supervisory / Management skills demonstrated on domestic and foreign multi-million dollar projects. Along with the skills listed above, I bring the experience of a Veteran with Military / Security Experience. I have training and expertise in handling Emergency Situations, Fire Suppression, the Handling of Hazardous Materials, and have recently held an interim Governmental D.O.D. Security Clearance. These strengths along with a strong working knowledge of procedural efficacies dealing with vendors, governmental entities and sub-contractors make me a "well rounded" and versatile asset to any project.

QUALIFICATIONS / EXPERIENCE

Project Manager
Project Manager / Iraq
Senior Sector Advisor / New Generation / Iraq
Owner's Rep
Construction Manager
Site Manager
Start-Up Manager
Lead Start-Up Engineer
Start-Up Engineer/ Puerto Rico
Supervisor Pre-Commission Cleaning / Africa / Puerto Rico
Chemical Plant Process Operator / 1st Class Millwright / Supervisor
Oil Refinery Operator and Operations Supervisor
Co-Gen Start-Up Engineer
Power Plant Operator and Operations Supervisor
Military Veteran / Security and Small Arms Instructor
Fire Suppression / Emergency Medical Technician

EXPERIENCE DETAIL:

CONSTRUCTION MANAGER 2-1-05 to Present
PKA Inc.
Pittsburg, PA

Mr. Barnett was responsible for the construction and oversight of the refurbishment of existing and out-dated Substations in and around the greater Pittsburgh, PA area. Mr. Barnett has been involved with all aspects of this construction endeavor from initial contract negotiations through final close-out of the completed refurbished Substations. Mr. Barnett was also involved with the "Green Field" construction of these Substations from cradle to grave as well. Responsibilities included, but not limited to, complete oversight of all crafts involved in this construction endeavor, tracking of equipment and supplies, long lead time equipment tracking, structural steel, underground as well as Trenwah duct bank installation. Mr. Barnett was also responsible for heavy equipment foundations, marshalling and interface cabinets, safety oversight for the Project on a day to day basis, and interfacing with and generating requisite reports to the Client.

PROJECT MANAGER
GE Power Recovery Project Manager 1-05 to 12-05
Contracted through Penpower to:
GE
Paulsboro, NJ

Mr. Barnett performed as the GE Power Recovery Project Manager for this Turbo-Expander Power Recovery Facility. As Project Manager, Mr. Barnett oversaw all phases of this new and innovative Project from Contract Negotiations to Final Completion. This Turbo-Expander Power Recovery Project produces 18MW of power utilizing waste heat and gas from an existing process.

PROJECT MANAGER
Baghdad Project Manager 6-04 - 11-04
Contracted through Penpower to:
GE
Baghdad, Iraq

Mr. Barnett performed as the Baghdad Project Manager in this joint venture supporting the Infrastructure Reconstruction Program for USAID in Iraq. Mr. Barnett's responsibilities included, but not limited to, implementation of an Assessment Program for nineteen (19) existing Power Facilities, Gas Turbine and Thermal, Project financial management, logistic and life support management, reports for the Client, recruitment and hiring of qualified personnel and all aspects of Security arrangements both in the field as well as in Baghdad. Day to day monitoring of the field assessment implementation of security safeguards as well as remote camp construction security to support the Project was of primary concern. Due to the ever changing security demands in Iraq, this issue was foremost in the vanguard of concerns for the Project. Due to the complexity of the Project, further details can be supplied as required.

SENIOR SECTOR ADVISOR NEW GENERATION / IRAQ 10/03 – 06/04
Contracted through IRG to:
USAID Baghdad, Iraq
Baghdad, Iraq

Mr. Barnett performed as the Senior Advisor for New Generation under the USAID Iraq Infrastructure Reconstruction Program. Mr. Barnett's responsibilities included frequent direct interaction with the Minister of Electricity of Iraq in identifying new generation power projects, viable sites for new generation and the fuel type and quantity required for the new generation. Mr. Barnett oversaw the project management and financial disbursement of more than 1 billion in contracts for USAID to its implementing partners. Mr. Barnett oversaw, interfaced with and advised Bechtel, USAID Prime Contractor, to facilitate the completion of new generation projects. Mr. Barnett worked closely with the Coalition Provisional Authority on the viability of the projects identified as well as security, transportation and sourcing and delivery routing of major equipment and camp locations as well as related logistics. Mr. Barnett was the source for information on restructuring the power distribution grid in Iraq, as well as the proposed rebuilding of the natural gas development and delivery infrastructure for Iraq's generation assets. Mr. Barnett worked closely with the USAID Contracting Officers identifying issues and recommending solutions for the electric sector. Mr. Barnett was supported by and worked closely with the United States Army Corps of Engineers on the quality assurance and control for new generation as well as other technical facets of the electrical sector in Iraq.

OWNER'S REP / MECHANICAL CONSTRUCTION / START-UP 3/03 – 6/03
Contracted to NGS
Greenport Power Project
Greenport, NY 11944

Mr. Barnett performed as the Owner's Rep and was responsible for the completion of construction and initial start-up and commissioning of 1 (one) Pratt&Whitney FT-8 Swift Pac with Water Injection and Evaporative Coolers. This FT-8 Swift Pac is one of the first of Pratt&Whitney's new Turbine design to be installed and go commercial. The Pratt&Whitney turbines operate on Citech software in conjunction with Woodward Controls. Mr. Barnett was also tasked with the BOP configuration and integration into the Start-Up and Commissioning of the SCR with Ammonia injection for the control of NOX and CO. This was in accordance with New York regulations. Responsibilities also included generating field engineering changes, the compilation of Start-Up Packages, all BOP Flushing of Equipment, operator training, procedure writing, CEMS training and Demin-Water training and developing a Site Lock-Out / Tag Out Procedure.

SITE MANAGER / CONSTRUCTION MANAGER 5/02 – 3/03
COMMISSIONING / START-UP
Contracted Through: Defined Source Cooperative, Inc to:
PRENCO Svcs. (Division of Alstom Power)/PEPCO
Construction / Commissioning Management Alliance Program
La Paloma Combined Cycle Site (HRSG Commissioning Oversight)
NIH (National Institutes Of Health) Bethesda, MD
NIH Combined Cycle Project (Greenfield Oversight)

Mr. Barnett performed as part of an ongoing Alliance Program. Serving as Site Manager, he reported directly to the Site Project Manager. Duties included scheduling, managing site budget, site engineering, overseeing and providing direction for all disciplined Superintendents and associated sub-contractors, client interface, vendor interface, coordination with home office project management team including engineering, as well as all administrative reporting. Scope of work included HRSG installation and commissioning oversight and construction completion, commissioning oversight and complete system integration related to the existing NIH Central Boiler House of a Greenfield gas turbine combined cycle 23 MW facility at the NIH Campus in Bethesda, Maryland.
Mr. Barnett was tasked with the demolition of an existing incineration facility and the construction of a new building including all drainage, sewer, concrete, duct banks, roofing, electrical, instrumentation and HVAC installations to house a Alstom GT 10 23MW Combustion Turbine with Co-Generation for the production of 150# saturated steam to augment heating for the NIH Campus. Mr. Barnett worked closely with the PEPCO Project Manager in the completion of this facility.

START-UP MANAGER 1/02 – 5/02
Contracted Through PIC to:
Burns & Roe
Foothills Project
Catlettsburg, KY 41129

Facility consists of 2 (Two) Westinghouse 501-FD's, Combustion turbines, with evaporative coolers with Fogging Systems, Hot SCR with Ammonia injection operating on Tele-Perm (TXP) DCS. Responsibilities included but not limited to: Overseeing completion of construction, initial start-up and commissioning of all plant equipment, performing BOP configuration, overseeing I/O point checkouts, complete integration of all systems to the existing Riverside Power Plant, compiling Start-Up Packages, creating Daily Run Schedules (including MW output & gas usage). The Start-Up responsibilities of the Foothills Power Project were completed one month ahead of schedule.

START-UP MANAGER 9/01-1/02
Contracted through PIC to:
Cal Peak Energy
Border LLC Site
San Diego, CA 92154

Mr. Barnett was responsible for the completion of construction and initial start-up and commissioning of 1 (one) Pratt&Whitney FT-8 Twin Pac DLN w/Evaporative Coolers. The Pratt&Whitney turbines operated on Citech software in conjunction with Woodward Controls. Mr. Barnett was also tasked with the BOP configuration and integration into the Start-Up and commissioning of the SCR with Ammonia injection for the control of NOX and CO in accordance with California regulations. Responsibilities also included the compilation of Start-Up Packages, nomination of daily natural gas usage, operator training, procedure writing, CEMS training and Demin-Water training and developing a Site Lock-Out / Tag-Out Procedure.

SITE MANAGER 2/01-8/01
Contracted through PIC to:
Ameren Energy
Columbia, MO 65202

Mr. Barnett was responsible for the complete installation of 4 (four) GE Frame 6B combustion turbines and Alstom generators in a simple cycle configuration. Included in the scope of work were all civil, mechanical, concrete, structural, electrical, and instrumentation work related to this Installation. He also performed all pertinent BOP work as well as overseeing the engineering and construction of a new 16" Natural Gas Pipe-Line to serve this facility. This project was completed on schedule.

LEAD START-UP ENGINEER 10/00-2/01
Contracted through Universal Energy to:
Duke Fluor-Daniel
McClain Energy Facility
New Castle, OK 73065

Mr. Barnett supervised the completion of construction and initial start-up and commissioning of all equipment associated with this Duke Energy power producing facility. Major equipment included but not limited to 2 (two) 7FA G.E. gas turbines with hydrogen-cooled generators, 2 (two) ABB Triple-Heat steam producing HRSG's, totaling 500 MW. The GE gas turbines operated on the Mark VI software and controls. Ancillary equipment included but not limited to: The flushing of the closed-loop cooling system, HRSG degrease, Compressed Air Blows, Auxiliary Boiler boil-out, and Steam Blows.

LEAD START-UP ENGINEER 05/00-9/00
Contracted by PIC to:
Dayton Power & Light
Greenville, OH

Supervised completion of construction and implemented the initial start-up & commissioning of all equipment associated with this Dayton Power & Light energy producing facility. Major equipment includes but not limited to 4 (four) Pratt&Whitney FT8 Twin-Pac Gas Turbines w/Evaporative Coolers and Water-Injection. Pratt&Whitnry FT8 Turbines operated on Citech software in conjunction with Woodward Controls. Responsibilities also included operator training, procedure writing, CEMS training and Demin Water training.

LEAD START-UP ENGINEER 3/00-5/00
Contracted through PIC to:
G.E. Lee Station CP & L
Goldsboro, NC

Supervised completion of construction and initial start-up and commissioning of all equipment associated with this Carolina Power & Light energy producing facility. Major equipment including but not limited to: 4 (four) 7FA G.E. gas turbines with hydrogen-cooled generators, totaling 720 MW. G.E. gas turbines operated on the Mark VI software & controls. Ancillary equipment includes but not limited to: The flushing of closed-loop cooling systems, fuel oil systems, & water injection skids. Responsibilities also included: CP&L operator equipment, walkdowns, and training.

LEAD START-UP ENGINEER / CONROL ROOM SUPERVISOR 8/99-2/00
Contracted through PIC to:
Central Wayne Energy Recovery Facility
Dearborn Heights, MI

Supervised completion of construction and initial start-up and commissioning of all equipment associated with this Municipal Solid Waste (MSW) to energy facility. Major equipment included 3 (three) D.B. Riley Municipal Solid Waste combustors with a total steam flow of 245 KPPH. Each boiler was fitted with 1-Ignition Burner, 1-Auxiliary Burner, and Detroit Stoker Reciprocating Grates. Power was generated by a 25 MW Ansaldo and Bentley Nevada Turbine Supervisory Instrumentation. Emissions Control System included an Altec CEMS, Fueltec Urea Injection, Chemco Lime Slurry, Wheelabrator SDA and Fabric Filter and PAC Carbon Injection. The Plant Control System consisted of the Bailey INFI 90 with Bailey Symphony Conductor VMS-Series 43 CRTS. Other areas of responsibility included Bailey INFI 90 DCS – On the Job Training of control room operators.

START-UP ENGINEER 5/99-8/99
Contracted through PIC to:
Enron / Eco Electrica
Penuelas Power Plant
Penuelas, Puerto Rico

Responsible for the completion of construction, initial start-up and performance testing of 2 (two) Westinghouse 501-F combustion turbines and 1 (one) Toshiba steam turbine, using Westinghouse DCS controls. This is a Co-Gen facility combined 507 MW.

PROJECT SUPERVISOR 12/98-5/99
Site Management Services International Inc.
Houston, Texas / Penuelas, Puerto Rico / Ghana, Africa

Responsible for Pre-Commission cleaning of Petro-Chemical and Power Generation facilities worldwide. Projects include Steam-Blows, HRSG De-Greasing, HRSG Chemical Cleaning, Turbo-Flushes and Oil Flushes of Steam as well as Combustion Gas Turbines. Overseas assignments include Ghana, Africa and Puerto Rico.

PLANT OPERATOR / OPERATIONS SUPERVISOR 6/84-12/98
Rohm and Haas Texas Inc.
Deer Park, Texas

Responsible for the safe, efficient daily operation and maintenance of various Chemical Processes. Prepared daily and monthly production reports, safety (lock-out, tag-out) clearances, hot-work permits, confined-space entry permits and coordinated maintenance activities to insure maximum unit production. Mr. Barnett also oversaw several pipe-line additions for this facility. Developed extensive computer skills. I entered and completed the Rohm and Haas Course for Millwrights and graduated and worked as a 1st Class Millwright and Millwright Foreman on rotating equipment of all sorts. I was a member of the Rohm and Haas Fire Brigade my entire tenure and as such am very familiar with Haz-Mat situations and procedures.

SHIFT SUPERVISOR AND START-UP ENGINEER 1/84-6/84
Houston Light and Power
Houston, Texas

Responsible for shift personnel in starting up and operation of a 650 MW coal-fired boiler and water treatment.

PLANT OPERATOR / OPERATIONS SUPERVISOR 11/77-1/84
Charter International Oil Company
Houston, Texas

Operated several processes within the Charter Refinery Organization such as the Crude Oil, Cat-Cracker, Platformer, Udex, etc. The Crude Oil Unit utilized Sour Crude and as such was processed through a De-Salter. Worked my way up to Operations Supervisor where my duties included but not limited to: Total shutdown and refurbishment of Heat Exchangers, Process Vessels, Heaters, Fin Fans, Underground Piping, Pipe-Lines, Headers and Piping, Boilers and associated equipment. Scheduled all work to be accomplished and managed the manpower to complete the turnaround as well as securing all documentation required. Supervised and commissioned the addition of the Solvent De-Asphalting Unit for Charter Oil. Worked with and issued Engineering changes to facilitate the existing Processes for Charter Oil. I was a member of the Charter Oil Fire Brigade my entire tenure and as such am very familiar with Haz-Mat situations and procedures.

U S AIR FORCE 10/75-10/85
Worldwide

Completed the Basic Training Course at Lackland Air Force Base in San Antonio, Texas. Additional training in Air Police, Combat and Advanced Combat Training, Air Base Combat Defense Training as well as Search and Rescue Training. Graduated as one of two Honor Graduates from my Basic Training Platoon. I was assigned to a Strategic Air Command Base (SAC) in Abilene, Texas where I held a Top Secret Military Security Clearance. After separation from Active Service, I joined the Air National Guard and served at Ellington Air Force Base in Houston, Texas from 1977 to 1985. During my tenure in the Air Guard I completed the training for Marksmanship Instructor for the Air Force and was the NCOIC or Non-Commissioned Officer in Charge of the Marksmanship Unit on the Ellington Air Force Base. I received extensive First-Aid training as well as completing the Non-commissioned Officers Course for the Air Force.

HOUSTON FIRE DEPARTMENT 10/69-10/75
Houston, Texas

Completed the Houston Fire Department Training Course and graduated as a Pipe and Ladderman. I served as a Pipe and Ladderman in Fire Suppression for 2 years and then completed the training involved to serve as an Emergency Medical Technician (EMT). My tenure with the Houston Fire Department taught me to deal with stressful and life threatening situations in a calm and thorough manner while maintaining control over the situation.

------------

View contact information...
«« previous resume next resume »»
Search Results (Resumes 1101 to 1150 of 2547)Go to Search Parameters...
Brief Description
Experienced cost controller
Experienced oil/gas/mining/heavy civil project manager. Currently PMT Construction Manager on $8.5 billion dollar project.
B.S. Mechanical Engineer. Member of Mechanical Engineer’s Chamber / TURKEY; Qualifications : Bachelor of Science in Mechanical Engineering (University of Anadolu / TURKEY 1980-1984) , Certified Welding Inspector ( CSWIP 3.1, Cert No: 37291, E
I am working in oil, gas and offshore projects and plants from 14 yrs in india, middle east and europe for multinationals for erection, commissioing and projects.
AM Fabrication Engineer with CSWIP W/I 3.1,European Welding Inspection Practitioner, International Welding Inspector with ASNT level II in MPT,DPT,RFI,UTG having around seven years of experience in ndt/inspection of Oil&Gas Installations both Onshore/offshore.
Recent MBA graduate from Le Moyne College, Syracuse, NY and has a 4 years of experience as a civil engineer. Wants to have a career change working at petroleum/oil/gas industry and willing to relocate and travel.
A business-savvy finance professional with thorough knowledge in Financial Management. Experience in oil and gas accounting and refinery economics. Substantial knowledge in derivative instruments and accounting for options and futures. Expertise in design of profit projection simulation models.
Onshore/Offshore Medic,very experienced medical doctor with long years of medical service
I am presently in MNC around Mumbai as an Junior Safety Officer. I have 8+years relevant experience in Industries like Pharma, Perfumery, Speciality Chemicals, Mettalogical and Fiber Glass. My job profile is to provide scheduled Training to companys employees (300 in No.)
Mechanical Engineer with experience in Contracts Administration; General Services Coordination; Procurement - Warehouse; QA Coordination, in Oil Industry.
Develop technical specification, guidelines, procedures, etc. that are practical to be applied as Company's standards in order to control the expected quality, performance and efficiencies. Resolve technical and quality issues pertaining equipment performance & problem.
Manager of Projects; Operations manager for OSV,DSV AHTS etc. Construction manager;Workshop manager
35 YEARS ELECTRICAL ENGINEER/HV/PLC
Bachelor of Engineering with over 27 years experience in Process Automation & Control industry.
Precom & Com Specialist - System Completion - Instrument & System
Professional Engineer with extensive international experience in chemical/environmental engineering and Construction Management. Very proficient in Project Mangement tools. Doctorate degree in Chemeical Engineering and pursuing PMP certification.
Skills: Critical thinking, active listening, negotiation, persuasion. Qualifications: Product /Proyect /Marketing Manager
15 years Domestic and International Management experience. B.Sc. Mining Engineering.
My fourteen years of experience have provided me with a broad range of relevant skills and I am confident that those would be successfully utilized in a new office manager position.
An experienced Manager with Expertise in the Establishment of Various Client and Industry Specific Databases with an emphasis on Staff Training, Security, Storage, Sorting, Manipulation, Distribution and Archiving of information and data for a diverse variety of clients. Experience gained in infor
Emergency Officer with the experience of 10 years in safety and emergency management .
SAP, Project Management
I am an experienced Structural Engineer with expertise in the analysis and design of both onshore and offshore facilities. I have excellent proficiency in the use of SACS software for the analysis and design of offshore structures. I have a Bachelor of Technology Degree in Civil Engineering.
Mechanical Engineering (Rolls-Royce U.K. Limited). Canadian Inter-provincial certification in Industrial Mechanical Maintenance. Extensive experience in Maintenance and Maintenance Planning.
International Project Manager
Experience includes Cost Engineering, Electrical/Instrumentation Estimating, Construction Electrical Engineering and proprietary software support. Duties include reporting of various kinds, forecasting, change management, staffing plans, cash flows and more.
Project Management/Engineering/Construction, with over 25 years of professional experience in EPC projects, in Management, Engineering and Construction in oil and gas field, infrastructures, site development, roads, airstrips and buildings, Proven Project Management skills with post responsibility
Project Management in Chemical turnkey consultatnts, Master degree in Chemical Plant Design from REC Karnataka, India with Distinction.
7 years of experience in SalesMarketing-Oil industry. Highly self-motivated and results driven. Excellent communication and inter-personal skills. Ability to present advanced technical material. Experience in WellTesting interpretation soft (Kappa, Sch) and in Economic Evaluation applic. (GeoQuest).
I have thirteen years of experience in the petrochemical, food and cement manufacturing industry. I was responsible for the reliability, maintenance, engineering and management process improvements of fourteen manufacturing plants through out the United States of America and Egypt.
I prefer a work much affiliated in my capability like supervising people, handling clerical work and other business related jobs that will enhance my skills. I am also interested in jobs related to oil drilling.
IIT Chemical Engr with 23 yrs exp in Sales & Marketing of Downstream Petroleum & Petrochemical Products in Fortune-500 Oil & Gas Company
I am lead piping engineer ,supervised 6 engineer ,6 autocad drafter and 7 PDMS staff.I am familiar with all international stds related to oil&gas ,petroleum and power plant.
17 years of legal work experience as DA, Chief Judge, Legal Advisor and part time professor
HSE Manager in major energy, power generation, oil and gas sectors covering technical and commercial requirements. With professional experience in directing and mananing health, safety and the environment protection & sustainability development aspects as per OSHA framwork and guidelines. Strong abi
Good understanding of Accounting Principle,Excellent problem solving skill and leadership qualities,Good knowledge of Accounting Package , Microsoft Word and Excel.
Drilling Safety Manager/ Operational Safety Trainer Land Based Drilling
18 Years including 10 years in oil & Gas - Construction experienced Safety Specialist , having Mechanical engineering Degree from Bangalore University and Diploma in Industrial Safety From RLI Chennai, India & OSHA 30 Hours Trained - Key skills : Construction Safety Mangement, Auditing, Trainer
I have degree in Business Administration with Customer Service, Administration and IT Skills. I worked in gas distribution and transmission compnay for more than 10 years. Presently I am working as Admin Manager s in Phones4u UK. I started as Store Admin in August 2005 but got promoted afterwards.
Senior Primavera 6.2 Planner / Scheduler or Management Skills
MBA-FINANCE AND MECHANICAL ENGINEER WITH 2 YEARS EXP IN CHEMICAL INDUSTRY AND 1 YEAR IN BANKING INDUSTRY
Highly skilled graduate Project Manager/Civil Engineer and Project Controls Lead with more than 25 years related domestic and international experience in project and construction management.
Well Intervention, Well Services, Field Well Completion,
NDT Resume
PLANNING/SCHEDULING ENGINEER & BACHELOR OF ENGINEERING (CIVIL)
Drilling & completion fluids engineering senior engineer and management
HSE Specialist
Project HVAC Engineer / Management - HVAC – Onshore Offshore and FPSO Estimating - Mechanical Product Development - Business Development -Engineering & Design (Weight control). - Land Surveying - Contracts Engineer/Administration - Cost Engineer
A multi-skilled mechanical/piping, Construction Superintendent/manager, QA/QC Engineer, with over 20 years international experience in the oil, gas, petro-chemical and power generation industries
It is with great interest that I am forwarding my resume for your consideration. My record of academic achievements and professional career history, demonstrates attributes that make me a valuable employee.
First   1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   [ 23 ]   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
CATEGORIES: Management;
INDUSTRIES: Petroleum/Oil/Gas;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com