10+ years of Project Management and Project Controls experience in Foster Wheeler Singapore, Mott MacDonald, UAE, Samsung Engineering Co ltd, Seoul & Engineers India limited, India along with MRP implementation in a Telecom Equipment Company.

Started as a Planning Engineer & Project Coordinator, executed Projects covering Oil & Gas (Upstream & Downstream), Refineries, Aromatics, Non Ferrous Metallurgy, Pipelines, Petrochemicals, and Utilities/ off sites,

Currently working as Project Control Engineer in Foster Wheeler Parsons (FWP) for Singapore Parallel Project (SPT) of EXXONMOBIL in Singapore.

Worked as Senior Project Control & Proposals Engineer in Mott MacDonald, Abudhabi for all Offshore & Onshore Projects.

Worked as Manager- Planning (Construction Division) in Samsung Engineering Co ltd, Seoul for Gas Separation Plant (GSP) in Thailand & Gas Separation Plant in China (EPC Projects & EPC Proposals)

Worked for Engineers India Limited from 1997 to 2004 for FEED, PMC & EPC projects in the Oil/Gas, Petrochemicals, Cross Country Pipelines & Non-ferrous Metallurgy Projects.

Implemented MRP module in a Telecom Equipment manufacturing company.

Responsibilities & Accountabilities include:
* Work Break Down Structure, (WBS), Risk Break Down Structure, Overall Project Schedule & resource-based functional Schedules, Resource Estimate
* Planning Procedures & Progress Measurement System.
* Project Coordination Procedures & Quality Plans.
* Cost Estimates for Construction Scope of Works.
* Project Planning, Scheduling, Monitoring & Reporting.
* Proposals for Offshore/ Onshore Oil & Gas Projects.
* Identifying Process & Non-Process Turnover procedures & Schedules.
* Developing/ Assisting in Project implementation strategies.
* Supporting all disciplines in execution of the Project.
* Engineering Billing Schedule based on Drawings/Document flow, Supply-billing schedule based on item/equipment delivery schedules & Construction Billing Schedule based on Quantities and raising Invoices based on progress of the work.
* Providing top management with regular updates of project status.
* Analyze project requirements and prepare a Project Master Schedule which integrates strategies and constraints for all project phases.
* Participate/Support in all Pre-project functions related to preparation of FEED & award of EPC packages.
* Conducting "What-if" analysis at regular intervals for time & Cost management.
* Carry out Risk simulation exercises using Monte Carlo simulation principles (Pertmaster & Crystal ball) for Schedule & Cost risk impacts.
* Consolidating Best practices/standards and lessons from various projects across for building up a standard database.
* Prepare regular periodic reports (Board, Project levels etc) along with presentations.
* Preparation of Cash Flow analysis, Material status report, and Analyze potential & imminent delays and develop action plan for eliminating delays.
* Schedule inputs to Feasibility studies, Cost & Economic studies.
* Resource allocation& optimization exercises.
* Assist in developing detailed rigging plan.
* Monitor & control all cost elements on each activity of work, which includes preparation of claims to clients & payments to suppliers & sub-contractors.
* Change Order analysis by keeping track of extra & additional efforts required during project execution & Budget analysis, Preparation of Contract documents.
* Ensuring timely engineering inputs & supply of Equipment & materials to site for completion of the job without time/cost overruns.
* Planning & Scheduling of Tie-ins & Hook up with existing plant/equipment and scheduling shut down of the plant in consultation with the operations group. Preparation of Shutdown, Erection & commissioning schedules.

Experience on Project Implementation under various modes as FEED, Design, Detailed Engineering, EPCM (Engineering, Procurement, and Construction Supervision & Project Management), LSTK (Lump Sum Turnkey) & PMC mode of Projects in varied fields.
Also carried out Third Party Project Management Services & monitored multiple projects.

Undergone one month training in Cost Engineering essentials including exposure to Cost estimation of Equipment, Piping items & Electrical/Instrumentation materials.

Extensively utilized Primavera Project Planner (P3 3.1 & P3 5.0), MS Projects, Sure Track along with Pert master, Crystal Ball in Planning, Scheduling & Monitoring of Projects throughout the Project Life Cycle including resource loading of activities, S-Curves, Manpower Histograms.

Conceptualized, Codified & periodically updated a resource based Project Schedule of > 14000 activities, right from Residual Basic Engineering, through Engineering, Procurement, Construction & Commissioning.
This included revision of the schedule half way through the Project.
All the schedules were prepared in Primavera and reports, progress were obtained using P3. Additionally the schedule was updated periodically & fortnightly work plan for all disciplines were issued.
Adept in handling data to & from Primavera (P3 5.0), Intelligent use of Primavera Data through Macros in Excel thus minimizing efforts at data gathering level.. Use of Visual FoxPro for preparing programs for entering data into primavera.

Trained Project & planning personnel about the concepts & usage of Primavera as a planning & scheduling and analysis tool.

Was part of the team, which studied & prepared detailed report, on Resiting of Utilities/Offsites for Refinery Expansion Project (From 6.0 MMTPA to 12.0 MMTPA) and PxPTA Project of Indian Oil Corporation Limited, Panipat, India.
This resulted in savings of approx $ 60 Million by consolidating various utilities like Cooling Tower/Tank ages; Flare System & power plant executed catering to both Refinery Expansion & Petrochemical Projects.

QUALIFICATIONS

POST GRADUATION DEGREE: M.TECH (INDUSTRIAL) 1996 – 8.75 CGPA
INDIAN INSTITUTE OF TECHNOLOGY, DELHI, INDIA

GRADUATION DEGREE: B.E (MECHANICAL) 1994 – 76 %
JABALPUR UNIVERSITY, INDIA

CERTIFICATES/ TRAININGS

Advanced Training in Primavera Project Planner (40 hrs).
Windows NT Administrator (40 hrs)
Cost Engineering Essentials (40 hrs)
HSE Training (24 hrs)
Quality Engineering Safety (QES Training)
ISO 9001/14001 fundamentals.

COMPANIES/ PROJECTS

Foster Wheeler Asia Pacific PTE, Singapore May 2006 onwards

* SOP Naphtha Tank age Project as a part of Singapore Parallel Train (SPT) Project (EXXONMOBIL)
o Planning, Scheduling & Monitoring of the EPC phase of the project including reporting, developing System-wise Construction & Commissioning schedules, preparation of Piping, Electrical & Instrumentation Tie-ins. Maintaining & monitoring Piping Bulk material status & its requirement.
o Identifying detailed scope of work for Process & Non-process systems and Developing System-wise Project Turnover Plans for smooth handover including appropriate windows for Tie-ins.

Mott MacDonald, Abudhabi, UAE, July 2005 till May'2006

* Umm Shaif Oil & Water Injection Pipeline Replacement Project- Select Stage project for Abudhabi Marine Operating Company (ADMA), UAE
o Scope includes Optimization of Sub-sea Pipeline Network to sustain 265,000 BPD production involving rerouting of Pipelines, Top sides Modification & addition of New Collection Towers. Responsibilities include Planning & monitoring the Study Project and preparation of Construction schedule for 25 year Replacement Plan.
* ESD Reliability Study for Abudhabi Marine Operating Company (ADMA), UAE. Responsibilities include Planning & monitoring of the Project.
* Engineering Services for Segregation of Inshore Flares at Das Island for ADMA in Abudhabi, UAE. Responsibities include Planning & Monitoring of the Project and Cost Estimate of Construction package including Free issue items (2.5 Million USD)
* Engineering Services for Wash Water System & Produced Water Re-Injection system for Abudhabi Company for Onshore Operations (ADCO), UAE. Responsibilities include Planning & monitoring of the Engineering Project
* Engineering Services for Installation of MEG Regeneration Unit for MARGHAM, Dubai. Responsibilities include Planning, monitoring & execution of the Project
* ZADCO Full FEED Development Project (PMC Services including evaluation of FEED Bids).
* Abudhabi Company for Onshore Operations (ADCO). Gas Lift Project. Cost Estimate of Construction Package including Free issue items (~ 13 Million USD).
* Proposal of EPCM Services for 28 kms of SubSea Pipeline, Top Sides of 6 nos Platforms along with Launcher/ Receiver facilities for Zakum Oil Development Company (ZADCO), UAE. Planning of all stages of Project including Man-hours for Engineering Stage & Manpower Histogram of Construction Stage.- 34 Months
* Proposal of a 30 Month Project (EPCM Execution) consisting of Terminals, Pipelines & Storages for Abudhabi National Oil Company (ADNOC) Planning of all Stages including Engineering Man-hours & Construction Histogram ~ 30 Months.

Samsung Engineering Co Ltd, South Korea, 2004 to June'2005 (EPC Projects)
* Gas Separation Plant-1 at Songkhala in Thailand of TTM (Trans Thai) consisting of CO2 removal & Gas separation facilities (EPCC Contract, Value: 180 Million USD)
o Responsibities include review of Construction schedule, monitoring of Construction activities on a weekly basis. This included quantity-wise monitoring (RCC, Structural Steel, Piping, Cabling, Equipment erection etc), analyzing delays, and recommend corrective/accelerated actions. The analysis & reports were generated using Primavera & the system was developed using macros & Import-export facilities of Primavera.
* Gas Separation& production facilities at Shanghai in China of SHIPIG (Licensor ;Air Liquede) consisting of CO & H2 separation & production facilities. (EPCC Contract, Value: 120 Million USD)
o Responsibilities include preparation of Detailed Construction Schedule including loading of Quantities & Manpower requirement along with Heavy Lift erection schedule. Monitoring of the Construction schedule, delay analysis & suggesting recovery Plans.
* Construction Schedule PP/PDH Project of Advanced Polypropylene Co., Ltd, Saudi Arabia.
* Proposal Schedule for MG-III Project in Malaysia. Responsibilities include preparation of Construction Schedule, Construction Manpower requirements,

Engineers India Limited, India, 1997-2004

* Para-xylene-I & II projects at Panipat in India of Indian Oil Corporation Limited, India, EPCC Contract (200 Million USD, 300,000 Engineering Manhours)
comprising of Naphtha Hydrotreater, Catalyst Platforming & Reforming, Sulfolane, Benzene Toulene Fractionation, Xylene Fractionation, Isomerisation, Tatoray & Paraxylene recovery units with UOP as Licensor.

o Responsible for preparation of Overall Project Schedule, Functional schedules, progress measurement system, weekly plans & reports. Close monitoring of day-to-day activities & highlighting slippages/ backlogs & ensuring timely action. Organizing Fortnightly review meetings for expediting work at Head Office.
Follow-up with Vendors & closely monitoring Critical & Long Delivery Items/ Equipments and alerting management of possible slippages in advance.
Coordinating between various engineering disciplines & ensuring timely inputs.
Preparation of Milestone based billing schedule for raising invoices accordingly.
Preparation of Resource/Cash Flow curves.
Preparation of Scheme for erection of a 523 MT Xylene Column.
Doing a sensitivity analysis on total cost of the project by resource-cost leveling & analyzing the impact & then preparing the schedule accordingly.

* PTA Project + Utilities & Offsite at Panipat in India of Indian Oil Corporation Limited (270 million USD) comprising of a PTA plant & Utilities including Cooling Towers, Effluent Treatment Plant, Tank ages & Flare systems.
PMC Services for PTA plant being executed by L&T.
EPCM services for utilities & Offsites.

o As a PMC Planning Engineer, Review of EPC project schedules (Overall & Detailed), review of Drawings/ documents register, Progress Measurement System & Weight ages, Weekly & Monthly review of Project Progress.
o As an EPCM planning engineer, responsible for preparation of Overall Project Schedule, Functional schedules, Monthly & Weekly Progress reports along with periodic Management & Client presentations.

* Gas Cracker & LLDPE Unit at Pata in India of Gail (India) Ltd, (150 million USD)
(Production of 0.16 MMTPA of LLDPE)

o EPCM mode of Project execution
Preparation of Overall & Detailed Project Schedule involving three different completion durations.

* Integrated PxPTA Project at Panipat in India of Indian Oil Corporation Limited
(Production of 0.56 MMTPA of PTA and 0.36 MMTPA of Para-Xylene) FEED Phase
Plant comprising of PTA, Paraxylene units, Utilities/Offsites & 56 MW Power Plant.

o Planning, Scheduling of FEED phase (including development of Infrastructure works.). Preparation of Overall Project Schedule, Progress measurement systems, Planning procedures & Functional schedules.
o Preparation of Milestones based Billing schedules & raising invoices accordingly. Weekly & Monthly Progress reports o Coordination between Licensor / Discipline engineers for development of FEED Package for Paraxylene Unit (Licensor: UOP) and PTA Unit (Licensor: DuPont).
o Preparation & Compilation of 5 nos EPCC Scope of Works, discussions with Vendors & finalization of Techno-Commercial recommendations.

* Aluminum Smelter Expansion Project at Angul in India of National Aluminum Company Limited, India
(From 0.23 MMTPA to 0.345 MMTPA) with Aluminium Pechiney, France as Licensor o EPCM mode of Project execution
Responsible for execution of Alumina Handling system, Pot Shells & Pot Superstructures, 220 KV Conversion Sub station and Pot Control & Regulation system. Approval of billing schedules. Preparation of Contract agreement.

* Utkal Alumina Refinery Project (Indian Aluminium Company Limited, India)

o Detailed Feasibility Reports.
Responsible for preparation of Overall & Detailed Project Schedule.

* Gasoline Production Facilities, Dubai (ISO OCTANE Company, Dubai)
1.5 MMTPA Gasoline Production facilities consisting of Hydrotreater, Reformer, LPG unit, Isomerisation, Fractionation, Pipelines up to Jetty, Utility & Offsites.

o EPM mode of Project execution
Responsible for preparation of Overall Project Schedule, Detailed schedules, monthly progress reports. Keeping a track of Change orders & assisting Project Managers in raising Change orders with complete back up. Coordinating between various engineering disciplines for smooth & unhindered flow of work. Alerting management of the slippages & formulating action plan to keep the project in schedule.

* Alumina Refinery Expansion Project at Damanjodi in India of National Aluminium Company Limited, India
(From 0.8 MMTPA to 1.575 MMTPA, 832,000 Manhours) with Aluminum Pechiney, France as Licensor. Comprising of Ball Mills, Grinding, Precipitation, Filtration, Evaporation & Calcination units along with associated facilities.

o EPCM mode of Project execution
Prepared Overall Project Schedule (Master Schedule) consisting of 3 sub projects, Functional Schedules & Work Break down structures.
Revised Overall Project Schedule & Functional Schedules mid stage during Project execution keeping end date as same.
Prepared Shutdown, Erection & Commissioning Schedules for erection of Interstage coolers on 32 nos Precipitation Tanks during annual Shut-down of Tanks.
Prepared Overall Construction Schedule in Primavera based including resource loading based on quantities.
Integrated Package Contractor's schedule with Master schedule for better monitoring of the entire job.
Prepared job specific & general reports from Primavera using Matrix Reports & Report writer.

* In addition to the specific jobs mentioned above prepared proposal schedules, man-hours requirement &Manpower projection for the following:
o Qatar Petroleum.
o Kuwait Petroleum Instrument Modernization Project.
o PARS refinery, Iran o ADCO Refinery Project, Abu Dhabi o Assam Gas cracker Project. India

Indian Institute of Technology, Delhi, India o Developed MRP system for a Telecom Equipment manufacturer in India in FoxPro. Was a team member in a Consultancy project, the services provided included design of Sampling systems, Optimization of work sequence & implementation of Total Quality Management.

Samriddhi Agro Agency, Jabalpur, India, 1994-1995
(Agency involved in assembly & marketing of Aluminium Pipes for Sprinkler System)

o Coordination between Manufacturer of Pipes & Couplers, supervision of coupler assembly operations, Stores Management, Marketing & Distribution of products in the State of Madhya Pradesh.

Softwares/ Hardwares o Windows XP
o MS Office incl MS Access o MS Projects, Sure Track.
o Primavera & P3e (5.0)
o Pert master o Crystal Ball o Oracle (Basic)

Reference
Will be provided

PERSONAL DETAILS

NAME: Padharthi Sriniwas Dattatreya

DATE OF BIRTH: 01-01-1973

NATIONALITY: Indian

MARITAL STATUS: Married

PASSPORT NUMBER: E4862249 (Valid up to 19.11.2011)

CURRENT SALARY: Upon request

SALARY EXPECTED: Negotiable

AVAILABILITY: 6 Weeks

View contact information...
«« previous resume next resume »»
Search Results (Resumes 551 to 600 of 2520)Go to Search Parameters...
Brief Description
QA/QC Professional Manager Construction/Operations
Fifteen years of experience in Construction in the Middle & Far East on large-scale multi-disciplinary infrastructure projects. Worked with BECHTEL in liberated Kuwait in the early 90s in the rehabilitation & expansion of Gathering Centers, Drilling Locations, Tank-farms and Flow-lines.
Fifteen years experience in corporate finance and advisory to local and international oil & gas companies, half of which has been in the CIS Extensive due diligence experience Fluent Russian, conversational Spanish
Mechanical Engineer with 14 years experience in Oil and Gas Project Management
Seasoned executive with twenty years of experience in specialty chemicals and engineered materials. Proven track record in sales and marketing, ventures, contract negotiation, international business, profit and loss, and product development/launch at senior and general management levels.
MAINTENNACE PLANNING / MAINTENANCE /PROJECT/CONSTRUCTION
Looking for Planning related positions. Presently in Qatar for the Pearl GTL Project under PMC Project Controls as Senior Scheduler/Planner. Also providing supports to the CSU Planning Team.
Business Development, Waste Management, General Manager,Drilling and Completion fluids
A talented multi-lingual business professional with more than 10 years expertise in domestic/international business, market, and product development increasing market share by 30% and sales by 20%
10+ years of Project Management and Project Controls experience in Foster Wheeler Singapore, Mott MacDonald, UAE, Samsung Engineering Co ltd, Seoul & Engineers India limited, India along with MRP implementation in a Telecom Equipment Company.
All descriptions of skillsand experiences are listed in resume. I am available to begin work immediately.
I am a certified welding inspector CSWIp-3.1 and ASNT level-2 (RT,UT,MT)
I am having more than 18 years of experience as of now. I am a result-oriented professional with innovative ideas and great communicating skills. Following are highlights of my Experience
In House Landman/DOA/LA/TA
Marine & Offshore Mariner with broad shore management, command and offshore experience. An onshore fleet manager & offshore project mariner, superintendent and consultant. A commercially orientated, team builder and leader who enjoys overcoming challenges and achieving goals.
crane inspector, technician, project manager, special projects coordinator
World Class HSE professional with over 20 years experience within the oil and gas arena. Outstanding change / process management knowledge coupled with highly capable influencing skills.
Sr. Drilling & Completion Consultant
GIS Specialist
I am a Mechanical Engineer with over 20 years of oilfield experience in Drilling, Well Intervention, Cementing and downhole tools
Thirty years experience on Semi-submersables/ Jack-ups/ Tenders/ Barges/ DP & Ships
Please accept this as my application for the OIM position within your organization. Experience as Master on foreign-going tankers Master on afra- and suezmaxes. Most recently, for last 3 years, I've been with MODEC Int. as Offshore Installation Manager on one of the most advanced FSO
Chartered with analytical abilities and strenght in finance
Graduate engineer having exp. more than 7 yrs in industrial pumps & valves
An energetic professional with over 10 years experience in Land Administration. Self starter with strong interpersonal skills and exceptional attention to details. My experience has taught me how to organize, prioritize and multitask time effectively, especially when dealing with change.
Cost Engineer for 11 years. Has adequate experience in a multitask discipline as planning, project management and supervision, quantity survey. Proficient in SAP and microsoft software applications. Team player, diligent and hard working.
I am currently seeking a new assignment as my present project with Shell Houston on the construction /Integration/commissioning of topsides for the FPSO BONGA has recently come to an end in Nigeria. I was the QA Lead supporting and auditing on/offshore construction activities and based in Lagos.
Leading team of process engineers for oil and gas process engineering work (Conceptual, FEED, Basic and Detail, etc)
EXPERIENCED PETROLEUM ENGINEER and PMP (PROJECT MANAGER), DEEP OFFSHORE, DRILLING, COMPLETIONS, SUBSEA EQUIPMENT AND CONNECTORS
A proactive, versatile and committed Executive Manager with extensive experience spanning throughout the world and accustomed to project and people management, coordinating resources effectively to achieve targets often within stringent deadlines. A skilled problem-solver
24 years cross cultural experience in Materials Management, Project Procurement, Contract Management, Global Sourcing, Vendor Development, Logistics.Hands on experience in overseeing overall functions of materials management entailing Vendor Development, Sourcing, Imports, Procurement, Logistics.
HSE Officer with a background of over 19 years in handling safety, Health and Environment in large multi international Oil & Gas, Chemical and Construction Companies (industrial, power plant, petrochemical, marine facilities and heavy fabrication).
B.Sc. (Chemistry)+PGDM (Marketing, International Business) with more than 4 years of experience in Fortune Companies Like Pfizer, Nestle and bp-Castrol with Sales and Marketing Departments. Currently heading Motor Cycle Division of Castrol in State MP of India. Expert in Sales, Marketing, BTL Ads.
project coordination, Scheduling and Analysis, project documentation management skills using Microsoft Word, MS-Project, Power point, Access, Excel, Outlook, Visio and Enterprise P3e, Risk Identification and Management Capabilities, IT Training and UAT expertise, Budget Control/Tracking
20 years supply chain management in the oil and gas sector. Ability to train others in all warehousing and logistics.
Dynamic, result-oriented professional with over fourteen years multi-disciplined experience, including international assignments. Expertise in upstream and downstream crude oil, natural gas and LNG activities both locally and internationally.
The person who’s looking for an excellence in profession, growth in career with in Material Management ,Project Management and Supply Chain Fiels an organization offering a responsible position whereby my academia and work experience can best be resulted.
B.Sc. public Admin.; Professional Certificate in Corporate managerial Admin. Experience. Over 19 yrs with an oil giant multinational out of which 11 yrs have been at the supervisor positions
Project Controls, Cost and Planning
Marine Operation Manager, Marine Superintendent , DSV Operation Manager
A licensed cook for nine years and have numerous years of management experience
I have been in the oilfield industry since 1996, working my way up from a Pipeyard Hand to Construction Supervisor. I then switched careers to become an HSSE Advisor. My work in the real world has allowed me to excel in this field by sharing the knowledge I have learned with my fellow workers.
A very experienced (29 yrs) individual in all aspects of Logistics Management, Supply Base Management, Cargo Delievry and Major Projects support. High HSE awareness and excellent leadership skills. Worked in Drilling and Production environment throughout carreer. In employment with Major Oil Company
Self-motivated executive, MBA, experienced in Plant start ups, manufacturing, Operations, Quality Systems Implementation, Lean manufacturing implementation & Training. Green Belt Certified and Auditor Certified.
Resume 2009 Technical purchasing support for Louisiana manufacturing facility for fabricated and machined parts.
Quality Assurance/Quality Control, IRCA Registered Lead Auditor with over 20 years of experience
My skills and experience include: • Technical planning and analysis • Business development and investor relations • Business process management • Risks analysis and management
Experienced Safety Professional works for more than 12 years in the field of Oil and Gas, Power and Desalination Plant, Refining and Petrochemical Plant, Module Fabrication, Turn-Around, and Upgrading. Mostly in Middle East Region includes Off Shore EPC Project in Iraq. Capable to maintain the site
Innovative Professional with 26 years of progressive experience in engineering design, maintenance planning and management, including 16 years in the Oil/Gas industry.
Scheduler / Planner / Planning Engineer - 13.5 years overseas experience in Refinery, Petrochemical, Keen in Planning, Scheduling and monitoring of all EPC and Maintenance activities, well versed in Primavera (P3 & P6), MS-Project, CMMS Database.
First   1   2   3   4   5   6   7   8   9   10   11   [ 12 ]   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
CATEGORIES: Management;
INDUSTRIES: Petroleum/Oil/Gas;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com