B.Sc. Industrial Engineering /Planning & Systems Analysis, Iran University of Science & Technology
(IUST) - (1994-1999)
B.S Thesis:
Managing Risk in Construction Projects.
KEY COMPETENCIES
* Direct and in the field experience with Integrity.
* Full Knowledge of the field and conscientious.
* Self motivated aiming for success.
* Organized detail, and analytically strong in meeting the professions requirements.
* Strong team player, and equally can work autonomously.
OBJECTIVE
* "To gain senior, high profiled positions within the Engineering and Construction Industry,
In the field of Projects Planning and Control. "
EMPLOYMENT HISTORY
June 2007 – Date IOEC (Iranian Offshore Eng. & Construction Co.)
Sept 2006 – May 2007 Kito Enterprises – UAE - Sharjah. (Mission On Behalf Of IOEC as a Planning Engineer)
Mar 2003 – Aug 2006 IOEC (Iranian Offshore Eng. & Construction Co.)
Sept 2000 – Feb 2003 Sepehr Industries Group
July 1999 – Aug 2000 Arash Manufacturing Company
Work Profile:
Overall, about 8 years professional experience in upstream planning & project control related industries Including more than 4 years in planning and project control in offshore oil/gas field development projects, and about 4 years in industrial production planning, manufacturing planning and factory design and development.
Professional Tasks:
* Establishment and manage effectively a planning and progress control system in order to support the Project Manager's decision.
* Making process and allow project manager to complete the project according to the internal baselines and in compliance with the contractual dates and requirements.
* Ensure any deviation from plan is promptly spotted and analyzed, final time impact is estimated and the effect of corrective actions taken is monitored.
* Create a schedule awareness atmosphere among all project participants. Administration of contracts during execution phase including management of Variation Orders and negotiations on claims and disputes.
* Assist the Project Manager to complete the project on time and within the approved budget; design and set-up the most suitable and effective control organization on the project to meet these objectives in compliance with the contract specifications.
* Support the Project Manager's decision-making process providing all information necessary for a rapid identification of any unfavorable trend or any potential problem in time to start immediate corrective actions. Create a schedule/cost awareness atmosphere among all project participants. Organize and maintain the best integration between scheduling and cost control functions ensuring that any activity is carefully planned and controlled in terms of time, budget and scope of work.
Professional Skills as a Planning and Project Control Engineer:
* During the initial phase after contract award:
Ensure the implementation of the Planning and Progress Control System; in particular: - Set-up type/ levels of schedules and the Progress Measurement System considering Project complexity, areas of risks, policy duration, in compliance with the Project Breakdown Structure, the internal standards and the Contract specifications and scope of work.
Establish the overall Project Breakdown Structure and relevant Coding System to meet all control requirements (Project Architecture, WBS, CBS, PBS, OBS, financing constraints etc).
Preparation of Contract Master Schedule and internal Control Budget and Cash Flow. - specify the project control requirements to Subcontractors and main packages Suppliers which to be included in the bid proposal documents in order to maintain a close control of progress, schedule and performance.
coordinate the implementation of all information and application systems required for the Job and prepare interface systems requirements as well (Administration, Procurement; Engineering, etc)
Interface with other Company Functions or Discipline Leaders/Supervisors to build up activities, assign milestones and constraints by issuing CPM/Pert time-scaled logic network using company standards or other factored ratios.
Liaise, consult and coordinate with all Supervisors & Managers to incorporate relevant information that will affect the implementation of the project schedule.
Prepare budget histograms, tables, curves, resources logs (Manpower, Materials, and Equipment) as reference baselines for the control during the various project execution phases.
Ensure that cost control and scheduling systems are compatible.
Ensures that the project's planning and scheduling requirements are properly and clearly communicated to those functionally responsible for executing the work.
Issue the Planning & Scheduling Procedure and the Progress Measurement Procedure.
* During the execution phase:
Ensures, the Planning and Progress Control System works effectively, progress status and completion forecast are soundly assessed and reported.
Monitor progress measurement is properly applied and information flow is correct and complete.
Revise promptly the Control Baselines with all agreed Changes.
Maintain updated all Schedules, collecting actual data, evaluating dates to completion and project delays by effective monitoring of actual progress and productivity compared with the scheduled baselines.
Maintaining records for all significant events relevant to contractual claims/obligations.
Compile productivity report, engineering deliverables production, delivery status of materials with extensive use of Company/Partner/Client IT systems & reports.
Ensure: - schedule baselines and Control Budget are promptly revised according variation orders agreed.
At site, monitor daily and report progress of erection, pre-commissioning and commissioning completion status.
Isolate any adverse trend and warn the Project Manager on time to take corrective actions.
Review monthly the forecasts to complete, any deviation from baselines and the effect of the corrective actions taken by Project Manager.
Performance assessment and analyzing any deviation or unfavorable trend is timely spotted and reported to Project Manager or to any project team member responsible for decision making.
Review with Project Manager the risks/opportunities status.
Supports the Project Manager and the Contract Administrator during the contract changes/claims process providing the impact evaluation on costs and schedules
Issue all reports required by the Client and by internal procedures regularly (weekly & monthly Progress Reports internal or for the Client).
Promptly informed about all decisions or events impacting schedules and progress in order to timely reflect them in the time analysis. Also in addition Supports the Project Manager in all the most important meetings and participates to the coordination meetings (internal or with the Client whenever opportune).
Support the Project Manager for the preparation of the Project Close-out Report and send feed-back data to Project Control Department and Commercial Department.
Computer Skills:
Windows XP, MS Office (Word, Excel, PowerPoint), P3, P3e, MS Project.
Languages Skills:
Good command of English and Fluent Farsi.
Work History:
Iranian Offshore Eng. & Const. Co. (IOEC) – IRAN - Tehran June 2007 – Date
Planning and Project Control Engineer
* Planning and Project Control engineer in "Reshadat Renovation and Development pipe laying and cabling Project ", located in Persian Gulf and including 120 km 16",8" & 10" of export and infield offshore pipe lines including one line shore pulling. Responsible for: implementation of planning and project control system, preparation of project time schedule, budget estimation and cash flow, prepare WBS, attendance in internal meetings and clarification meetings with client and other relevant responsibilities.
* Cooperation with "South Pars Phase 9 & 10 - Tripods Installation – project", located in Persian Gulf as a planning and project control engineer (offshore/onshore).
* Cooperation in proposal documents preparation of South Pars Phase 22,23&24 entailing – 150 km 18",20",42" and 4.5" piggy back Offshore pipe lines, Jacket, Topside & Tripod Installation – ( prepare project overall time schedule and cost estimation tables).
* Cooperation in proposal documents preparation of "South Pars Phase I – 18" offshore pipe line – project" (prepare project overall time schedule and cost estimation tables).
Kito Enterprises - UAE - Sharjah. Sept 2006 – May2007
Planning and Project Control Engineer (Assigned from IOEC)
* Planning and Project Control Engineer for the South Pars Phases 9 & 10 project entailing 176 Km of 32" with 4" piggy-back pipelines including two lines shore pulling. Responsible for Prepare time schedule and updating, budget estimation and cost control, monitoring daily reports, prepare weekly, monthly reports, material controlling, pipes transportation monitoring, preparation of activities check list and attendance in daily meetings, going on board pipe layer barge and coordination and set up the reporting system and other relevant responsibilities.
Iranian Offshore Eng. & Const. Co. (IOEC) – IRAN - Tehran Mar 2003 – Aug 2006
Planning and Project Control Engineer
* Planning and Project Control engineer in "Salman Export pipe laying Project ", located in Persian Gulf and including 210 km of 30" export offshore pipe lines entailing tow lines shore pulling. Responsible for all tasks on board pipe layer and in site including: implementation of planning and project control system, preparation of project time schedule, budget estimation and cash flow, prepare WBS, material control, Issue all defined reports as per coordination procedure, attendance in internal meetings and clarification meetings with client and other relevant responsibilities.
* Planning and project control in "Paradip SPM & Crude oil 48 inch Pipe Line Project" including 20 km 48" pipe line and SPM installation located in Indian Ocean, Paradip area, as a site planning and project control on board pipe layer and responsible for preparing the reports ( DPR, material report, pipe transportation report, eventual reports), material control, attendance in daily meetings,….
* Cooperation in proposal documents preparation of South Pars Phase 8 entailing – 102 km of 32" with 4" piggy-back pipelines – (prepare project overall time schedule and cost estimation tables).
* Planning and project control engineer for Abouzar 1200 (DLV) main crane and stinger repairing project responsible for all related planning and project control tasks.
Sepehr Industries Group – IRAN - Tehran Sept 2000 – Feb 2003
Industrial and Planning Engineer Expert
* Planning and Project Control engineer in "Sepehrdocharkh company establishment Project ",located in Kashan region Responsible for: all data collection, feasibility study, Production Study, implementation of planning and project control system, preparation of WBS, preparation of project time schedule, budget estimation and cash flow, prepare WBS, attendance in internal meetings and clarification meetings with client and other relevant responsibilities.
* Cooperation with cost control and marketing department.
* Production and sale planning.
* Cooperation with QA department in ISO 9002 project.
Arash Manufacturing Company – IRAN - Tehran July 1999 – Aug 2000
(One of the SAP Co. Subcontractors)
Industrial and Planning Engineer Expert
* Responsible for production planning and all equipments and machinery planning and prepare all related procedures.
* Planning and project control in "Evaluation of SAP Co. subcontractors project " (with appliance of Sogedage 90 check lists) till final audits by the SAP Co. and award of A grade by them.
Collegiate Projects
* Process production study and line production continues timing in Sepehre Kashan Carpet. Co. (Time & Motion Study Project).
* Process production study, Man power and general machines computation and lay out design for production line of Volvo F12 cabin in Iran Kaveh. Co. (Factory Design Project).
* Transportation Study and improvement for Mazda 1600 cabin assembly line in Iran Vanet Co. (Transportation Planning Project).
* Planning and project control regarding Peugeot (405) assembly line in Iran Khodro Co. (Novitiate 1).
* Research and study on plastic injection molds in order to decrease production scrape in Pars Plastic Co. (Novitiate 2).
Interests
I am an open minded professional who likes to share his knowledge with others and to help them in doing the work. I like to spend my free time in practicing sport, I like playing Ping Pong and swimming, listen to music, and going to the mountains.
Training Courses:
* P3 & P3e.
* MS Project.
* Pert Master.
* Project Management Body of Knowledge.
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 551 to 600 of 2353)
Go to Search Parameters...
Brief Description
Over twenty-seven years of domestic and international experience with a broad range of pipeline, oil and gas, and associated facilities projects.
chronological resume last updated April 12, 2004
PMP,MBA with 20+ years experience in accounting management in multi locations and foreign country experience. Energetic, creative, self-starter with consistently demonstrated leadership, strong analytical and problem solving skills
20 yrs in Oil/Gas Operns, QC/QA, Inspn, Constn and HSE matters. Specialty in HSE Man't wrt Leading and setting up of HSE teams, training, Audits and compliance to standards. Interfaced on behalf of client with intern'l contractors e.g. Technip, Toyo, Kvearner and Bechtel.
31 years experience (10 years international)in project and contract management of large scale industrial projects in the oil & gas (onshore & offshore) alumina, petroleum, brewing, iron ore, nickel, gold and general mining industries.
I am a safety minded well versed toolpusher with 26 tears experience in the oilfield. I have worked on all sizes of land rigs in various parts of the world. I am currently looking for a similar position or even as a company man.
I am Mechanical Engineer with 18+ years of rich experience in the field of oil & gas industry.
HSE Officer with a background of over 19 years in handling safety, Health and Environment in large multi international Oil & Gas, Chemical and Construction Companies (industrial, power plant, petrochemical, marine facilities and heavy fabrication).
Mechanical / Electrical experience in Boilers, pumps, HVAC Systems, Compressors, steam systems and ancillary services, DHW skids, Chillers, Cooling Towers, Clean steam Boilers, Purified Water Systems, waste water, Low voltage Electrical Systems, Preventive Maintenance Systems.
I have earned 20+ certifications and growing. Is attached to my resume.
Meticulous finance professional, current Controller of Mining Operations with twenty-two continuous years of challenging professional experience in the areas of audit, banking, accounting, cost control, budget, financial management and controllership. Hands-on executive.
I have done Master from M.Sc. Chemistry. I worked in Shell Pakistan Ltd. as a Q.C.Analyst.
WORKING AS ASSISTANT MANAGER - PRODUCTION / SHIFT INCHARGE IN A LEADING PETROCHEMICAL COMPANY AT IMPORT, STORAGE & HANDLING TERMINAL
Senior Instrumentation & Control System Engineer in Oil & Gas; PMC, FEED and Detailed Design experience
Tender Preparation & Evaluation, Raising RFP’s, Preparing prequalification document including involvement in preparation of execution strategy, Defining scope of work, preparation of Commercial clarification, Raising commercial deviations etc. Project Monitoring: Continuous monitoring of Projects
25 years Experience Materials & Logistics, Base Manager, UK, West Africa, Middle East
Contracts, Services Manager, Wellhead Maintenace, Integrity Engineer, Senior Well Engineer
I am a petrochemical engineer with over 25 years of operation and technical service experience in ethylene plants.
Drilling Engineer, Supervisor, Superintendent
Free!
English - Russian speaking drilling engineer, Project Advisor. Oil and Gas Project management, Offshore drilling engineering, Drilling and EPC contracts, Bid evaluation, Oil and gas tender blocks evaluation and acquisition, JV and international experience,
IT leader with solid accomplishments working for global industries for the last 20 years. Value delivered in Brazil, Argentina, United States, Canada, Uruguay, Puerto Rico, Colombia and Germany. Focus on IT ROI, management, planning and operational excellence.
MBA Project Manager experienced in managing both infrastructure and application development projects.
Overall, about 8 years professional experience in upstream planning & project control related industries Including more than 4 years in planning and project control in offshore oil/gas field development projects, and about 4 years in industrial production planning, manufacturing planning and factory
Have a positive attitude, good sense of humour, pro-active and not afraid to take initiative and make independent decisions where required. Core competencies: excellent communication skills, planning and organization, detail oriented and self-motivated.
Reliability, maintainability & logistics, welding inspector, Mechanical engineer
Certification as a machinist, supervisor, Engineer, & licensed teacher + 25 years in 16 countries. machine service centers (GE, Sulzer), supervise overseas workshops (Badak LNG), start-up & commissioning, chemical plants field supervisor (Dow, Mobay) trouble shooter (Brown & Root, GE),
29 years experience in Quantity Surveying, Commercial and Contracts Management in the oil & gas, nuclear and petrochemical industries. Experience in all aspects of pre-contract engineering and post-contract administration under various contracting strategies and formats.
I’m interested in a Marketing Communications Director position. With over thirty years of experience, I can bring a high level of creativity as well as the ability to initiate and take small or large projects / events from concept to execution while managing all stages of the development.
I have over twenty years experience in procuring, coordinating and delivering all logistical equipment needed for drilling, construction and production for oil/gas and natural gas operations. Extensive experience in J.I.B. Exceptional ability in the skill of negotiating
Under balanced Drilling, UB Drilling, Air Drilling, OHSE Management, Operations Manager Drilling Consultant, Tool pusher
Result oriented Chemical Engineering Professional with a Post graduation in Management offering extensive experience of over 14 years in the Commercial and Government Market place. A broad experience base, with a proven record of success in Industrial projects
Drilling Fluids Cementing Logistics Marketing Management
14 years experience in Electrical Controls/Instrumentation field. PLC programming, Variable frequency drives, AutoCad, Electrical Codes, Industrial networks ProfiBus, DH+, DeviceNet
A Chemical Engineer with outstanding professional experience of more than 30 years in the manufacturing / Projects/Process engineering and HSE management in Petrochemical / Chemical/Fertilizer plants /Offsite and terminal complex.
13 yrs AWS CWI QA & QC inspection & management, industrial construction in major plant expansions & combined cycle power plants.
Started as Drilling Engineer. Project management expertise. Contract document prep & specs. Procurement of products/services/consultancy ,management of contractors/suppliers. Responsible for commercial, logistical, technical performance of jobs. Tendering, contract negotiations. Budgets up to £10m.
I am at present a Tool Pusher in Chad. IWCF Surface BOP Stack ; Current through 3/06 H2S Alive Certificate, Saudi Arabia Exxon Leadership Safety Training Workshop Eddie Bauer Problem Solving Certificate S.C.R. Rosehill Prodico Certificate
I am interested in domestic or international employment in the oil and gas industry. Please see resume for an interview of my qualifications.
Objective: To obtain a management or Business Development position with a Service Company in the Oil Industry that will allow me to implement my engineering and management knowledge in Completions and Production
22 years of experience in the oil field trucks, cranes, forklifts, loaders, pickup's, passenger cars.
Safety Manager Seeking Position
Supervisory/Management position in a corporation promoting quality, team effort and excellent customer/worker relations. 20+ years supervising labourers, welders, & fitters on many different jobs and locations. Oil, Gas, Petroleum, & Pipelines. Many trips to Iraq in the 80's
Expediting Manager with 40 plus intermediate and senior Expeditor's with experience ranging from 250M - 5.6B Oil & Gas Projects.
Strategic Planning Business Development Project and Business Valuation
Twenty nine years of engineering management experience for which 24 years in the oil, gas and shipping industry -EPC projects which includes: Project management, conceptual, feasibility studies, FEED and detailed design engineering, procurement, planning, organizing, QA /QC, construction.
IT Consultant with experience in Plant Design, 3D Modeling, P&ID, Instrumentation, Piping Spool, IT Management, GIS and Photogrammetry,
I have BSc. in Mechanical Engineering, MSc. in Mechanical Vibration of Rotating and MSc. in design of gas turbines. I have >20years of experience with Engineering and Operating Companies in O&G and Petrochemical fields as Senior Mechanical Engineer in Egypt Enppi and in Qatar QP Offshore and QVC
MBA from National University of Singapore Business School. Worked for 4 years with India's leading Global Fortune 500 company in the Oil and Gas Sector
Exceptional Office Manager, Microsoft , Maximo, JDedwards, typing 80 wpm and ten key by touch
fpso, subsea, structural, naval, project management, marine, risk management
1
2
3
4
5
6
7
8
9
10
11
[ 12 ]
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
Seach Parameters
Change search parameters...
CATEGORIES:
Management;
INDUSTRIES:
Petroleum/Oil/Gas;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2008 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com