To serve humanity & to pursue an enhancing optimistic career demanding innovation and application of my technical and management skills to achieve professional excellence and prove my abilities in Oil, Gas, Petrochemical, Energy, and Infrastructure-Project Industries dedicatedly working towards the organization and individual benefits.
My key strengths comprises:
Veteran in managing/coordination of projects
Exceptional command on Project Management/Engineering
Commendable Project controls & logistics, management and project procurement.
Primavera Expertise & P3e for construction.
Databases (for dealing with Talisman, Artrims and Pyramid)
A confident and enthusiastic communicator.
High moral standards and personal integrity.
Management experience leading a technical and operation team.
Flexibility and endurance to success in a start-up environment.
High exposure towards SAP based applications(PMS-MMS SYSTEM)
Cross functional expertise, managing Multi-craftsman and various nationals
Excellence in presentation, communication & flawless interactive skills and have conducted audits & workshops.
Determinedly manage decisive resources to impact customer goals.
Troubleshooting composite problems to create a win-win engineering solutions
BRIEF JOB HISTORY
07 years professional experience at various levels primarily focused on Project Control, Project Management and Project Information System. Involved in various Projects like SAUDI ARAMCO, DOLPHIN ENERGY LIMITED-QATAR, QATAR GAS,TOTAL-PARCO (WOPP), SAIPEM NIGERIA LIMITED(ENI GROUP) in planning, scheduling, periodic monitoring & updating of project schedule, Resource Planning & Loading, WBS-OBS etc, Plotting S-Curves, Cash Flow curves, Cost Breakdown Structure, Manpower, Equipment histogram, Executive report to top management. Preparation of Progress reports. Project coordination with client, Sub contractors, vendors and suppliers. Ability to liaise with clients/contractors/ consultants advising the management with respect to Planning, Project Status, contract clauses and conditions
Keeping a close watch on critical activities which tend to delay the project, reporting the status of Critical Activities to the concerned department heads, suggesting possible remedial measures if requested by the management including altering of critical path, mobilization of additional manpower and equipment, shifting resources from non critical activities to critical activities which are occurring concurrently and having considerably high float etc.
EDUCATIONAL ATTAINMENT:
Bachelors In Mechanical Engineering CGPA 3.70 1ST DIV University of Engineering & Technology, MEHRAN-HYD-PAKISTAN
(Chartered with Higher Education Commission-HEC-Islamabad-Pk)
Bachelors in Science(Mathematics) CGPA 3.59 1ST DIV University of Sindh, Jamshoro-Hyderabad-Pakistan
Diploma in Mechanical Engineering 1ST DIV Sindh Board of technical Education-Karachi-Pakistan
Higher Secondary Education Examination (HSEE) A-GRADE Board of inter. & Sec. Education, PAKISTAN
Secondary /School Certificate Examination (SSCE) A1-GRADE Board of inter. & Sec. Education, PAKISTAN
CREDENTIALS:
Certified in Primavera Project Planner (P-3.1) from DESCON Project Management System (DPMS)
Certified in MS Project Planner-2003 from DESCON Project Management System (DPMS).
Certified in MS Office Suite Package from DESCON Project Management System (DPMS).
Certification in Construction, Technology & Engineering Management Training from DESCON World Head Quarter Lahore,
Certified in DESCON inland & multinational internal data base Project Control System- Process ®.
Certified In Construction Technology, Management & Planning (CTMP)
Certified in "DESCON Progress Monitoring System" (DPMS), Material Management System (MMS),
Certified In Document Control System (DCS)
Certification of Competency in HSES Management Supervision & Leadership Program
JGC Middle East FZE Ras Laffan Industrial City- Qatar. This Includes:
Supervision & Leadership
Management in HSES
General Safety
Security control & Monitoring
Environmental Control & Monitoring
Occupational Health
Behavioral Safety
Safe work Method Statement / JSA
Certification of Incident Investigation & Reporting Program
JGC Middle East FZE Ras Laffan Industrial City- Qatar
Saudi Arabian Oil Company (SAUDI ARAMCO) 250 MBCD AXL CRUDE EXP. RES'L COMPLEX-SHAYBAH- KSA
* Certified in PMS-PCS from Saudi Arabian Oil Company (SAUDI ARAMCO)
* Health Safety Environment & Management System-HSE & MS
SAIPEM CONTRACTING NIGERIA LTD-ENI GROUP (TOTAL)
Project Monitoring System –PMS (Certification Program)
SEMINARS:
People Observing work for Employee Risk Reduction - Power 2
JGC Middle East FZE ON Dolphin Energy Ltd Gas Compression Facilities Project, Ras Laffan Qatar
Integrated Commissioning And Progress System (ICAPS)
JGC Middle East FZE ON Dolphin Energy Ltd Gas Compression Facilities Project, Ras Laffan Qatar
Integrated Management System (IMS)
* Awareness of ISO 9001:2000 QMS (Quality Management System)
* Awareness of ISO 14001 (Environmental Management System)
* Awareness of OHSAS 18001 (Occupational Health & Safety Management System)
* Awareness of IMS (Integrated Management System)
INFORMATION TECHNOLOGY SKILLS
Operating Mode Windows & MS Office Tools
* CMMS Applications.
* Microsoft Office Suite Package 2007/-Windows XP/ VISTA Technology Accelerated.
* Preparation of spread sheets in Microsoft Excel for project key performance indicators (KPI)
* SAP PMS-MMS
PROFESSIONAL MEMBERSHIP / AFFILIATION
* Member Pakistan Engineering Council - PEC No. Mech-18400
* Member Institute of Engineers Pakistan-IEP-9056
CODE AWARNESS
* AWS
* ASTM
* ASME Section –VI ~ XI
* API- 5L – 1104 - 658
* AWWA
* SAUDI ARAMCO STANDARDS
* BS
* CMAA (Construction Management Association of America)
CAREER SUMMARY
* Preparation of Project Schedule for all disciplines like Civil, Mechanical, Electrical & Instrumentation Activities with performed task & milestones.
* Plan and extract weekly / monthly look a head schedules updates, analysis & progress reports for construction projects.
* Preparation of detailed periodical progress reports for client & internal review as requested by the management including 'S'-Curve, Cash Flow Curve etc.
* Detail working schedule for the arrival of equipment loading for the erection of planned equipment.
* Implement all the pre-activities of project based on process units regarding Which Includes Installation of Steel Structure for Main Pipe Rack, Sub Pipe Rack, Equipment Supporting Structure, and Plate Forms & Access Ways. Installation of Rotary and Stationary Equipment, Erection of SS, CS and GRP Piping and Painting Works.
* Consumables and material budget definition & preparation with their procurement plan.
* Allocate resources to activities using distribution curves to accurately reflect how the work is performed.
* Analyze changes between versions of schedules with Claim Digger to understand the progress that has taken place in the update period.
* Integrate schedules from engineering, architects, subcontractors and owners to create a master program schedule.
* Easily create fully customizable graphics including Gantt charts, Activity Network Diagrams, Timescale Logic Diagrams and Histograms. Scheduling overall construction activities as per time phase update day by day allocated /up linked with their target plan.
* Communicate status to general contractors, subcontractors, owners and other project team members via customizable industry standard reports.
* Coordinate labor, material, equipment and subcontractors to ensure on-schedule, on-budget completion.
* Allocating resources in the scheduling and resource analysis producing reports from P3 (Export to Pyramid).
* Create unlimited "what-if" scenarios to explore alternatives.
* Break activities down into smaller weighted steps and track the completion of the steps to determine the activity percent complete.
* Document risks and calculate risk exposure values and impacts on the project's schedule, costs, and durations.
* Leverage best practices by using your templates and completed projects to build new projects.
* Perform earned value analysis by using past performance to predict a more accurate cost to completion.
* Review Contractor's/Sub contractors Progress reports for accuracy of progress measurement by different progress monitoring techniques/software's.
* Prepare and compile Monthly Progress report for submission to the senior Management.
* Work with the Company Business Manager and Project Control Manager for day-to-day project control activities like preparation of manpower forecasts, various reports and presentations to the Management.
* Technical Queries related with the running activities/ field queries and field Trouble Report with the help of execution.
* Preparation of Method Statements and Working Procedures for all the activities for Execution.
* Preparation of Safe Work Method Statements and Job Safety Analysis for all the execution activities.
* Preparation of Risk Assessment for all the hazardous activities.
* Monitor overall Progress of the Project with Key Performance Indicators -KPI.
* Prepare baseline Pre-EPC / EPC schedules as part of the bid documents for upcoming projects.
* Identify all critical paths within a project by using float path analysis.
* Coordination with engineering team to expedite the job.
PROFESSONAL EXPERIENCE
Employer: SAIPEM S.A, SAIPEM CONTRACTING NIGERIA LIMITED-(ENI GROUP) (www.saipem.eni.it)
Global Petro Projects Services (GPS)-Zurich Switzerland (www.gpsag.ch)
Duration: Sep-2007 to up to date
Project: East Area Projects for Gas Wellhead Platforms fabrication and installation for (offshore Brown & Green Field)
Client: Mobil Producing Nigeria Limited-MPNL
EXXON-MOBIL DEVELOPMENT COMPANY (EMDC)
Position: Planning & Scheduling Engineer/ Planner
Project Description:
Engineering (Shop Drawings & As Built Drawings), Fabrication, Mechanical Completion and Load Out, Sea Fastening of
Wellhead Platform (Unam D), Wellhead Platform (Iyak B), Losse Materials (Phase A and C) and all Piping and Electrical Supports.
Onshore Fabrication of gas well head offshore platform for Brownfield and Greenfield and offshore installation, complete Engineering procurement & construction of EPC Project with Mechanical, Electrical and Instrumentation works-
Exxon Mobil Development Company-EMDC (Houston-) as the Main client-Will Bros as a Designing consultant (Middle East, Europe & Africa) Worth-(13,266 M US$)
Employer: OLYAN DESCON INDUSTRAIL ENGINEERING COMPANY LIMITED-JUBAIL-KSA (www.descon.com.pk)
Duration: Oct, 03-2006 to Sep-20, 2007
Project: Saudi Aramco Residential Complex Expansion for GOSP
(Shaybah-Eastern Province-EP), Saudi Arabia-KSA
Client: Saudi Arabian Oil Company-(SAUDI ARAMCO)-SHAYBAH-KSA-(EP)
Position: Planning/Scheduling Engineer
Project Description:
Project-01
04-Residential Complex Expansion Buildings similar to existing one with 03-Stories and 200 rooms having the area of 66,000sqm with recreational facilities. Civil, Mechanical, Electrical, Instrumentation, HVAC, Firefighting works for Residential complex.
Project-02
Saudi Aramco Temporary Residential Camp for Gas Operating Separation Plant Staff-Shaybah-EP-KSA
SAUDI ARAMCO is the main client. Design review of concept design by SNC LAVALIN and SAUD consultant. Worth (176Million US$ )
Achievements:
Technical Bids prepared, submitted and contracts won in year 2007 for SAUDI ARAMCO Ext. facilities Residential complex worth 138 Million SR.
Cost Breakdown / Invoice for the whole project approved by Saudi Aramco for Shaybah Resid'l Complex Exp. Project.
Level III and IV Schedule for based on master schedule for Shaybah Resid'l complex Exp. Project approved by Saudi Aramco.
Manpower Histogram / S-curve with utilization of resources approved by Saudi Aramco.
Recovery Plan / Schedule for construction more than 1700 multi discipline activities approved by Saudi Aramco.
Employer: Descon Engineering Qatar LLC-Doha-Qatar (www.descon.com.pk)
Duration: January, 03-2005 to August 2006
Project: Dolphin Energy Ltd-DEL, Installation of New Onshore Gas Plant Compression Facilities
Client/Contractor: Dolphin Energy Limited-DEL / Japan Gas Company, Yokohama, Japan -JGC MEFZE-Qatar
Position: Planning & Scheduling Engineer
Project Description:
Dolphin Energy Limited (DEL)-Ras Laffan Industrial city Qatar-Installation of New Onshore Gas Plant compression facilities spread over 2000M having Civil, Mechanical, Electrical & instrumentation works with heavy Equipment Erection and installation. Descon have Civil, Mechanical and Painting works MC3 for DEL. Japan Gas Company-Yokohama-JAPAN JGC ME FZE as the Main contractor. Size: (12,50,000 M2) Worth(US$ 3.5 Billion)
Employer: Descon Engineering Qatar LLC-Doha-Qatar (www.descon.com.pk)
Project: (Annual shut down-LTA Free-35 MILLION MANHOURS)
Duration: April-2005 to May-2005
Client: Qatar Liquified Gas Company -RLIC QATAR
Contractor: Chiyoda Technip Joint Venture (CTJV)
Position: Planner/Scheduler
Employer: China Petroleum Engineering & Construction Group-CPECC (www.cnpc.com.cn)
Duration: Oct 2003-Dec 2004
Client: TOTAL PARCO Oil Refinery Company-Multan-Pakistan
Project: White Oil Pipeline Project (WOPP) (865 Kilometers Cross-country Pipeline)
Position: Planner/Scheduler
Project description:
EPC-Engineering, Procurement, Construction, Fabrication, Erection, Laying & commissioning of 865 km, 26"  Cross country pipeline having capacity of 12 million tons / year for White Oil Pipeline Project-WOPP with Mechanical, Electrical, and Instrumentation works with 04 Pumping/Boosting oil terminal stations –Project Total Cost Worth (480M US$).
Achievements:
Approved base line and master schedule based on 4700 activities for TOTAL PARCO WOPP Project.
Implementation of quality management system as per Project Quality Plan-PQP.
Employer: TECHNO Engineering & Petroleum Services (Pvt) Limited. (www.tech-engg.com.pk)
Duration: March 2002 to Sep 2003
Client: TOTAL Petroleum Oil Refinery Company –PARCO-Multan-Pakistan
Project: White Oil Pipeline Project. WOPP (865 Kilometers Cross-country Pipeline)
Position: Asst. Engineer QA/QC
Project Description:
Manufacturing of Helical seam spiral welded steel pipe for pipe lines & Line pipes as per API-5L and 3-Layer Polyethylene coating as per DIN 36850 Standard for cross country pipe line for Total-PARCO Oil Refinery- Multan- Pakistan
Responsibilities / Tasks:
* Manage all the activities regarding welding processes, procedures and Non-destructive Testing (NDT)
* Manage all testing and inspection as per specified standard for pipe fabrication.
* Check and manage all the activities regarding manufacturing & inspection of High Pressure Steel Line Pipe
According to Specified Codes.
* Implement the Quality Management System (QMS) as per PDCA Cycle.
* Coordination regarding Material Management System (MMS).
* Initiated Project management division in the company.
Achievements:
Implementation & Co-ordination of ISO-2000-QMS (Quality Management System)
Personal Details:
Citizen Ship: PAKISTAN
Date of Birth: September, 20-1979
Linguistic skills
English, Hindi, Arabic, Urdu
Additional Information
STRENGTHS / Behavioral Competencies (Planning & time management, customer focus, influencing skills etc)
Flexible & Adaptable
Target Oriented
Strong Leadership
Excellent Team Work
Self starter
Excellent Interpersonal Relationship (PR)
Punctual
Proficient in communication
Confident
Loyal
Hobbies
Badminton, music, indoor games, net surfing, tourism
Reference: Reference will be furnished upon request / stage
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 1801 to 1850 of 2311)
Go to Search Parameters...
Brief Description
Dedicated Cost Engineering Professional with exceptional project corresponding skills, multinational work experience and extensive abilities in Cost estimation, Quantity surveying, Claim analysis, Tendering, Contract administration, Cost monitoring/reporting, Schedule monitoring, Bid management, Bud
Company Dispatcher,service Coordinator,Administrative Exp.
Project Manager
Majoring in Business Management, I have extensive knowledge of Transportation and Fleet Budget Management, Canadian and U.S. Customs Requirements, Broker Clearance Procedures and International Shipping Requirements for Consolidated and Bonded Freight
Civil engineer (Cost control)
AutoCAD, ProE, Primavera
Process chemist with a strong bias towards continual improvment, New product development and Managment systems. Main skill is communication
Storage cavern, salt cavern, solution mining, cavern leaching process, computer modeling, cavern development, leaching modeling, WinUbro, sonar, salt deposit, underground storage, hydrocarbon underground storage, leaching, salt
Electrician-Industrial
I have over 30 years of experience in the electrical industry, primarily in the industrial sector, and in a supervisory capacity.
Experienced maintenance scheduler planner with CMMS background and project management experience
I have solid experience in International procurement management gained by working with multinational Blue chip Engineering Procurement and Construction Company JGC-Corporation Japan on various oil and gas, refinery, petrochemical projects. Currently I am working as Acting Procurement Manager / Lead
Experienced Regional Manager (Russia, CIS, Eastern Europe), liaison between the US and overseas sides of operation.
12 plus years of diversified project management and controls experience (EPC) oil and gas (upstream and downstream) industry. Assignments have ranged from Project Mgr, Project Controls Mgr, Lead Scheduler, Lead Cost and other project controls positions from large cap to small maintenance projects
Geologist. Has good theoretical knowledge (PhD candidate in sedimentology, MSc in petroleum geology) and practical experience of geology (3 years in mud logging). Practical understanding of the oil and gas exploration industry. Computer literate (StratWork, OpenWork, ZMAP, SeisWork)
Senior Welding Inspector CSWIP 3.2 Senior + Rad Interpretation
25 years of gas plant construction, commissioning, startup and operations. Also gas treating and transmission experience. 3 years in Syria, 1.5 years offshore Dubai.
Master Electrician with 26 yrs experience in the construction field
Primavera Expertise & P3e for construction,Integrated support with SAP Module (PMS-MMS SYSTEM),Databases (for dealing with Talisman, Artrims and Pyramid),MS Office Suite Package,Bachelors In Mechanical Engineering CGPA 3.70,1ST DIV, University of Engineering & Technology, MEHRAN-HYD-PAKISTAN (Chart
10 yrs R&D Lab experience - incl. Instrument analysis & troubleshooting, Inventory & ordering, supervisory role with students
I prefer to work in a friendly environment and look forward to learn new knowledge & skills. Keen to learn and excel in job field to become a knowledgeable and experienced.
A skilled and dedicated Administrative Assistant with more than 15 years’ experience in the oil & gas industry; coordinating, planning and supporting daily operational and administrative function. Able to provide comprehensive support for senior and middle management.
7+ Years of Experience in Directional Drilling & Pipeline Projects
1. Specialized in Occupational Health, Safety & Environmental Management System in Industrial Establishments & Enterprises; in Health Care Facilities and Biotechnology & Pharmaceutical Companies; 2. Expert in Risk Management & Loss Prevention and 3. Talented Trainer in Occupational Safety & Health
Industrial Electronics + Journeyman Licensed Technician coupled with 20+ years sales
I am a qualified and experienced Fire Safety person with more than 23 years of oil and gas experience. Worked in middle east, far east and in Africa. Can command and handle Fire Safety depatment of any set up
Experienced Construction Project Management Engineer
As a Project/Contract Mgr, my background is in Construction. I have worked with Owners/Clients, Architects, & Engineers. I am experienced in continuous improvement in construction, process, & people mgmt. I'm experienced in business & project mgmt in small, large, & mega const. projects.
I am very interested in finding a position in your organization where I can best use my skills and further improve my knowledge. My education, along with my professional experience, my passion for learning and the knowledge of the latest technology, makes me an excellent candidate.
IT Professional seeking to apply talents toward a new challenge. Possess a unique combination of analytical & communication skills that have contributed to my effectiveness in client relationship building, needs assessments, contractual negotiations & technical project management.
Having an experience of more than 10 years in the field of project system design & execution
Project and Operations Management experience. Banking Sector Technical Support, Field Services. Customer Service. and IT experience.
Highly motivated and results-oriented professional with exceptional leadership and communication skills.
I am a Chemical Engr from REC Surathkal (one of India’s top 10 Engg. Colleges) and have almost 9 yrs of exp in techno-commercial management of Proposals & Projects, in multi-sectored industries (including O&G, petroleum, water, Engg. Consultancy & pipeline coating).
Twenty nine years experience in Project Management, Quality Control, Quality Assurance, Engineering, Technical Research and Development, Auditing, Vender Surveillance, Metallurgy, Welding, and Inspection.
Qualified Quantity Surveyor with experienced in Cost Planning, Estimating, Budget Control and Monitoring in building, construction and semicoductor industries.
Dynamic professional with BS in Mechanical Engineering from UCI seeking a challenging career in the oil refinery and/or power industries where technical and engineering leadership and direction are sought to execute projects from the developmental process to a finished state
construction/process plant cost estimator, certified project scheduling, projects control
I have gained in excess of twenty five years experience in the construction petrochemical industry which includes offshore and onshore oil & gas projects for such companies as Shell, Arco, McDermott, Hyundai, ConocoPhillips, Premier Oil, Saipem, Unocal and Statoil
Dual Post Graduate Mechanical Engineer with 10 years of experience
Management -Technical Skills: Catia,Solidworks-Mechanical Desktop-AutoCAD-FEA-Carrier-MasterCAM-Microsoft Office(Word,Excel,Powerpoint)-Windows(98,XP,Vista)
All elements of safety implementation and instruction
Environmental, Occupational Health and Safety Engineer
Over 16 years of installation and troubleshooting experience within the instrumentation field in various chemical plants. Also have four years of process chemical operating, troubleshooting, and making recommendations for plant safety, quality and quantity of plant production.
Experience in ISO 9001, ISO 17025, ISO 17799 , Good Laboratory Practices(GLP) systems. The ISO 17025 and GLP are mainly focussed on testing and clinical laboraories. Almost 7 years of experience in Qulaity Management Systems as well as and System Administration activities.
BSc degree major in computer science; currently enrolled in CAPPA level 2; strong communication and analytical skills; self-motivated and positive attitude; efficient team player.
Human Resource, Employee Relations, Recruitment, Corporate Social Responsibility, Social Audit
General manager of Services Company / QHSE and Management systems Oil and Gas sectors
Free!
I am able to effectively perform set tasks, successfully fulfil the task objectives and meet their dead-lines. I report information to the necessary authorities by means of written and/or verbal reports which are reliable and accurate.
Wide experience as HSE Coordinator as well as Safety Manager on several construction projects in live plants and heavy construction sites.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
[ 37 ]
38
39
40
41
42
43
44
45
46
47
Seach Parameters
Change search parameters...
CATEGORIES:
Management;
INDUSTRIES:
Petroleum/Oil/Gas;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2008 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com