Exam Passed Year of passing Name of University / Board Remarks

Diploma in Mechanical Engg. 1970 Board of Technical Education Tamilnadu, India
Diploma in Tool Design 1975 Board of Technical Education Tamilnadu, India
CSWIP 3.2 - Sr. Welding Inspector May 2000 TWI London Valid up to April 2010
Level III in PT, MT, RT and VT Nov 1999 ASNT Valid up to NOV 2009
ISO9000:2000 Series Auditor/Lead Auditor 2008 LRQA

8. COMPUTER LITERACY Microsoft word, Excel, FoxPro, Access & WinPCS

9. BRIEF SUMMARY OF EXPERIENCE:
QA/QC/ CERTIFICATION / DOCUMENTATION /COMPLETION / TURNOVER

a. Preparation of Quality Plan, Inspection and Test Plan.

b. QA/QC on Equipment/Structural/Piping erection, Welding and Documentation.

c. Preparation of WPS and conducting PQR/WQT as per ASME Sec IX, API 1104 & IBR

d. Auditing and Surveillance as per Procedures.

e. Welding visual Inspection.

f. MT, PT, UT and Radiographic film Interpretation.

g. Preparation of test packs, Arrangements for Piping/Valves testing, Co-ordination and Inspection.

h. Stores incoming Material Inspection-Equipments, Valves, Pipe, Fittings, Insulation, etc.

i. Certification/Turnover - Organising and Managing Certification/Turnover Department activities
Verification of MRB, Inspection reports for Mechanical, Piping, Civil and E&I as per QCP, Documentation of Inspection reports, Preparation & Submission of Mechanical completion dossiers to cover Construction, ProComm and Commissioning Completion. Preparation of required Programmes, Reports and Status In FoxPro Database. Activities to satisfy ISO 9000 series requirement.

j. Co-ordination with Construction, QA/QC, Planning and Engineering departments.

k. Scanning and Final Handover of Original documents to the client.

l. Organising and Managing the Punch List Activities, Database files and Reports.

m. Equipment, Structural, Piping and Pipeline fabrication and erection.

n. Site co-ordination, progress monitoring & preparation of progress reports and Billing.

o. Computerisation involving data entry, preparation of database and reports.

- 2 –

10. DETAILS OF EXPERIENCE:

COMPANY / PROJECT / CLIENT / PERIOD / POSITION / EXPERIENCE

A. Teknica (U.K.) Ltd.
Mellitah Oil and Gas BV, Gas Division
HSEQ Corporate office, Tripoli, Libya - Sr. Certification Engineer

Nov 2008 – As of Date

Preparation of Procedures as per the requirement of Projects.
Review and Approval of Contractor and Sub-Contractor Procedures, Work Instructions and
Inspection & Test Plan.
Review and Revision of various Department Procedures.
Internal and External Auditing.
Ensure the required QA/QC requirements are fulfilled by the Projects and indicating the exact requirements
To satisfy Corporate/Project Procedures, ISO 9000 and International Standards.

QA/QC Co-ordination to Projects for Contractors and Sub-contractors activities

Review of Mechanical Completion Packages, MRB and Final Turnover Documents during the phase of Construction, Pre-commissioning and commissioning to ensure all these packages are arranged as per Project Procedures and as per the required Standards.

B. Consolidated Contractors Int'l Co., Abu Dhabi, UAE,
Habshan Gas Complex Expansion Project, GASCO
Sr. Certification / Turnover Engineer

April 2008 – Sept 2008

Organising Databases and Reports, Receiving Data from Client, Checking for the Correctness and Preparing Databases, Informing Missing Data to Client. Checking of Tags requirement and assigning tags as per Drawing for which tags not issued by Client. Assigning System No. for Tags as per System limit Drawings. Forecasting ITP requirements, Receiving ITPs, System Limit Drawings, As built Drawings, Punch Lists and Verification of completed inspection reports for All (Mechanical, Piping, Pipeline, Civil & E&I) Disciplines to check the completion as per specification and procedures.
Execution of All disciplines Inspection Reports Filing and arranges to locate for easy traceability.

Co-ordination with Construction, QA/QC, Pre-com and Commissioning Departments for the requirements to achieve Mechanical Completion and Commissioning as per Project Schedules.
Compiling of Specific and Generic inspection reports as per System to handover to client. Tracking of Progress, informing Status to Discipline Managers and Follow-up to achieve Mechanical Completion as per Schedules to Achieve Commissioning.

Preparation of interim mechanical completion packs and final mechanical completion packs ensuring Construction and ProComm/Commissioning Completion.
Computerisation of data including preparation of Software/Programs in FoxPro for entry in Database, preparation of status / report as required. Punch list Tracking, Status and Preparation of required Reports.
Scanning and Turnover of Documents as per Project Procedures.

Cont…3

- 3 -

C. Chiyoda Corporation, Chiyoda Technip Joint Venture, - QGX II LNG Project, State of Qatar
Sr. Certification Engineer
Feb 2007 – Dec 2007

Turnover / Mechanical Completion Department
Execution of Activities:

Ensure the proper setup of Sub-Contractors certification Department with required resources.
Ensure Sub-Contractor's database for documentation is developed to meet the project Procedures requirements to track the progress and producing Reports for the required Details.
To check transfer of the required tags from Contractor's WinPCS system to Sub-contractors database and to ensure the forecast of the required Inspection and test reports, Data entry into Database for the required details and filing of the documents as per Project Procedure requirements.
Co-ordination between Sub-Contractors, CTJV Turnover Group and Client for all Certification issues in resolving day to day problems,

Organising Databases and Reports as required for assessing the Progress and Status of Systems for CTJV personals.

Arrange required reports to ensure components required for Systems are completed with the appropriate Inspection Reports to submit with Mechanical Completion Package.
Co-ordination with Sub-Contractors, CTJV Construction/QC/Commissioning & Turnover Departments to keep the target date of the Mechanical Completion.
Arrange to Issue the progress /outstanding Reports to ensure the System completion as required.
To ensure Sub-Contractors maintain outstanding items in Punch List Database incorporating required details and closing of the activities after completion. To produce required reports to track the punch list outstanding and completed.

To ensure Sub-Contractors maintain Specific and Generic inspections reports for easy traceability and as per project procedures.
Indicate the requirements for arranging and Turn over of Original Documents as per Project requirements with appropriate files & indexes and to ensure all the required Specific and Generic documents are included.
Assisting Turn Over Group for the Preparation of Mechanical Completion and Commissioning Dossiers, Scanning of the Documents and
Turn over of System Original Documents to Client as per schedules.

D. Global Petroprojects Services, Saipem, Sakhalin, Russia - Phase 2 Oil & Gas Pipeline Project

Sept 2005 – Jan 2007 Certification Engineer
QA/QC - Certification Dept.
Execution of activities:
Preparation of Main System / Sub-System Limit Drawings and components as per Project requirements.

Organising Databases and Reports, Receiving Data from Client, Checking for the Correctness and Preparing Databases, Informing Missing Data to Client. Forecast of required tags for Pipeline & AGI Activities. Assigning System No. For Identified Tags forecasting ITP requirements, Receiving Inspection and Test Reports, System Limit Drawings, As built Drawings, Punch Lists and Verification of completed inspection reports for all Disciplines and to check the completion as per specification and procedures.
Checking of sub-contractor's Pre-test, C&G and Final Test packs as per Project and Procedure requirements and to issue clearance for the activity.

Compiling of Western and Russian Documents as per System to handover to Client. Tracking of Progress, Preparation of CRR, informing Status to Spread/Discipline Managers and Follow-up to achieve Mechanical Completion as per Schedules to Achieve ProComm / Commissioning. Ensure outstanding activities are carried over to Punch, tracking of Punch List Status and Preparation of required Reports.
Preparation of interim mechanical completion packs and final mechanical completion packs ensuring Construction and ProComm/Commissioning Completion.
Coordinating the activities with All Pipeline Spreads and organising Main Database, to achieve final completion of the Project.
Scanning and Handing over the Documents as per Project Procedures.

Cont…4

- 4 -

E. Consolidated Contractors Int'l Co., Sultanate of Oman - Oman – Sohar Refinery Project

June 2005 – July 2005 Certification Engineer
Certification Department Activities (As indicated in Sl. No.K )

F. Consolidated Contractors Int'l Co., Sultanate of Oman - Oman – India Fertilizer Project

Oct 2004 – April 2005 Certification Engineer
Certification Department Activities (As indicated in Sl. No.K )

G. Consolidated Contractors Int'l Co., Aksai, Republic of Kazakhstan - Karachaganak Project

July 2001 - Sept 2004 Certification Supervisor

Certification Department Activities (As indicated in Sl. No.K and also executed the works as per the requirements of ROK Standards and Procedures. )

H. Consolidated Contractors Int'l Co., Abu Dhabi, UAE - Onshore Gas Development Project, Phase 2
Abu Dhabi National Oil Company

May 1999 - April 2001 Certification Supervisor
Certification Department Activities (As indicated in Sl. No. K )

I. Dodsal Private Ltd., Muscat - Gas Pipeline Project, Petroleum Development of Oman

FEB 1999 - APR 1999 Sr. QA/QC Inspector
Duplex Stainless Steel Piping/Pipeline Fabrication,Erection,Welding Inspection,PT,UT and QA/QC activities

J. Consolidated Contractors Int'l Co., Doha, Qatar - Khatiyah Degassing Plant and pipeline.
Pressure Water Injection project
Ras Laffan LNG Project,
Qatar General Petroleum Corp.
Ras Laffan LNG Company

Jan 1997 - Oct 1998 Sr. QA/QC Inspector

QC Dept. - Welding Procedure preparation, Conducting PQR, Qualification of Welders, welding visual Inspection, Piping spool dimensional checking, MT, PT, Radiographic film interpretation and co-ordination, PWHT / Pressure test co- ordination and inspection, preparation of Pressure Test Packs, Material Inspection, QA/QC on equipment, structural/ piping fabrication & erection and preparation of Project
Dossiers.

K. Consolidated Contractors Int'l Co., Abu Dhabi, UAE - Onshore Gas Development Project, Phase 1
Abu Dhabi National Oil Company
Nov. 1993 -July 1996 Certification Supervisor
Certification Dept. Activities: Organising Databases and Reports, Receiving Data from Client, Checking for the Correctness and Preparing Databases, Informing Missing Data to Client-Assigning System No. for Tags as per System limit Drawings. Forecasting ITP requirements, Receiving ITPs, System Limit Drawings, As built Drawings, Punch Lists and Verification of completed inspection reports for All (Mechanical, Piping, Pipeline, Civil & E&I) Disciplines to check the completion as per specification and procedures. Compiling of inspection reports as per System to handover to client. Tracking of Progress, informing Status to Discipline Managers and Follow-up to achieve Mechanical Completion as per Schedules to Achieve Commissioning.
Preparation of interim mechanical completion packs and final mechanical completion packs ensuring Construction and ProComm/Commissioning Completion.
Computerisation of data including preparation of Software/Programs in FoxPro for entry in Database, preparation of status / report as required. Punch list Tracking, Status and Preparation of required Reports.
Scanning and Handing over the Documents as per Project Procedures.

L. Consolidated Contractors Co, Dhahran, K.S.A - Gas & Oil Separation Plant, Saudi Aramco Project
Jan 1992 - Sept 1993 QA/QC Inspector
QA/QC inspection on structural fabrication / erection, equipment erection & CS/SS/RTR piping fabrication and erection. Inspection of internal and external coating/painting for vessels and piping. Preparation of Procedures, progress, planning schedules and Turnover of Original documentation to Client.

Cont…5

- 5 -

M. AICAM Engg. Pvt. Ltd., Madras, India. Nuclear Power Project, Oil Natural Gas Project, Offshore Project
Aug 1990 - Dec 1991 Deputy QA/QC Manager
Fabrication, Welding, NDT and QA/QC of Nuclear components, Pressure vessels and tanks. Planning, estimation, fabrication, welding, erection and QA/QC for Jacket.
N. Foster Wheeler - SNC, Canada, Zia Fertiliser Co. Ltd. Bangladesh (129 TPH Process Boiler)
Nov 1989 - July 1990 Mechanical site Engineer
Planning, erection of structurals and stack. Fabrication & erection of LP & HP piping, welding, NDT, Insulation & painting. Preparations of field run piping drawings/As-built drawings and QA/QC.
O. GEC Power Engg. Services, New Delhi, India - GEC TGIL, UK, Balco Captive Power Plant (68MWx 4)
Ennore Thermal Power Plant (110MW)
Malaysia National Elect. Board(210MW)
July 1986 - Nov 1989 Deputy Manager
Erection of equipments and piping. QA/QC on erection, testing, welding, NDT, store and documentation. MT, PT, UT and Radiographic film interpretation. Computerisation to maintain drawing, welding/NDE status and other documentation. Maintenance of pumps, boiler and other piping systems, Insulation and painting.
P. Vijay Engg. & Trading Co., Bangalore, India - Tamilnadu Newsprint Plant,
Tamilnadu Ind'l Explosives Plant
Mettur Thermal Power Plant-210MW
Sept 1983 - June 1986 Resident Engineer
Erection of recovery boiler, erection of all types of equipment and piping. Welding/NDT, QA/QC, Planning, Estimation, Procurement, store, accounts etc. associated with site.
Q. Mukund Iron & Steel Works, Bombay, India - Reactor Research Centre, Kalpakkam, India
June 1982 - Sept 1983 Piping Engineer
Fabrication & erection of Nuclear piping and testing. Welding/NDT, Quality Control and inspection.
R. Madras Atomic Power Project, Dept. of Atomic Energy, India - Madras Atomic Power Station-235MW
May 1974 - Apr 1982 Senior Supervisor
Erection of all types of equipments, HP & LP piping, Planning, Estimation, Inspection, Procurement, Control of sub-contractor, Billing, Preparation of as-built sketches and commissioning of the systems.
S. Tamilnadu Transport Dept. Madras, India - Workshop
Nov 1972 - Apr 1974 Chargeman
Vehicle maintenance, planning, estimation, procurement, Inspection & workshop activities
T. Pallavan Transport Corporation, Madras, India - Workshop
Jan 1972 - Nov 1972 Engg. Apprentice
Vehicle maintenance, planning, estimation, procurement & inspection
U. Vel Engineering Works, Madas, India - Workshop
June 1970 - Jan 1972 Engineer
Procurement and inspection of automobile parts

View contact information...
«« previous resume next resume »»
Search Results (Resumes 1151 to 1200 of 2546)Go to Search Parameters...
Brief Description
Accomplished technical and managerial career qualified by 24 years of measurable achievements in the construction and mining industries. Highly skilled in identifying, evaluating and negotiating joint venture and other international business opportunities with government officials, the private sect
HSEQ manager, management system development, auditing, safety case development
Very good experience in the mechanical maintenance of various oil fields, gas companies and refineries. Familiar with day to day maintenance planning, shutdown planning , CMMS and IPP syatems.Familiar with Primavera P3-e, MS Project, SAP-R3, MAXIMO&TEROMAN. Budget preparation&cost control
More than 11 years of professional experience in structural basic & detail engineering of Refineries, oil field developments, process and worked extensively in (PDMS11.6.SP.4, PDS7.2, X-steel, Auto Cad R2004.
Petroleum Engineer
I am a very detail and task orientated person. When I set out to accomplish something, nothing stands in my way until it is 100% complete. I am competent in delegating duties and tasks, and I follow up on other's progress.
I am a graduate with Chemistry in 1st class having 24 years experience as a Chemist/ Senior Lab Technician in Petroleum Refinery (Takreer, ADNOC) (10 Years), Natural Gas Plants(5 years) (in Malaysia and DUGAS), Petrochemical Plants (5 Years) (MTBE & Pentaerythritol) and 3 years in Pesticid
Project engineering/managment
A solid operations/manufacturing/sales/marketing/quality control/administration background within large and small firms with responsibility to orchestrate numerous M&A and turnarounds of trouble companies and divisions. A complimentary proven risk management background within Middle Office and Tra
Mechanical?Electrical Engineer,Steel Expert,Steel Plant operation Incharge Marketing & Sales Incharge ,QMS,EMS.OHSAS Regd Lead Auditor,MBA9Business Admin.Professional Doctorate in Environmental Management.,Handled Projects as well as Maintenance,Director,European Quality Body,Managing Directoer Asia
Joint Venture Accountant for four oil and gas companies
Senior Mechanical / Piping Engineer
25+ years experience as Operations Manager in the Resources and Oil & Gas Sectors. Formal qualifications in Engineering and Business.
Experienced Contracts Manager professional with CLA credential, MBA (December 2009) and proven track record with more than 15 years of business expertise in financial analysis, logistics, engineering, FAR knowledge, strong legal background, and project management.
Free ! YOUNG POTENTIAL in FINANCE & ADMINISTRATION
Science major with sales negotiation experience
To utilize my acquired background in the field of Electrical Engineering as well as my higher education in Engineering Management and to perform quality work in a professional career related to my technical skills
Material standardization, Formatted/structured coding & cataloguing, SPIR review, Inventory value optimization, maintenance engg data management(Equipment master, spec),maintenance Bill of material, MRP.SAP,Oracle financials,MESC,CMT,E-SPIR,EMA-3000,PACER-D,Teroman.12 years exp in Oil/Gas Industry.
Management, Logtics, Cost Control, Sales
I have US and overseas QA/QC project supervisory experience in the construction, petroleum, mining, and aerospace industries. I am a CWI, Level II in MT, UT, PT and RT film interpretation. Past project duties and responsibilities have included review of purchase orders and exceptions,
I have more than fifteen years of progressive professional experience and have matured from a background in material / inventory control, coordination, and warehousing techniques for oil and gas maintenance, construction and manufacturing industries.
Over 18 years of extensive experience Maintaining a Safe Work Culture, Budgeting, Strategic planning, Policy Development/Implementation, Finance/Leasing, Fleet Maintenance/Management
Experienced Supply Chain Manager
Engineer / Supervisor Oil Industry upstream production, maintenance & construction. Large field oil production supervision, light & heavy crude oil, well ops & monitoring. Tank farm & ppln construction. Budgeting & Contracting Eng
Free! Offshore Maintenance Experience
Provides support of ongoing onshore operations through the application of engineering to daily operation problems. Optimizing and de-bottlenecking production surface facilities.
Free! Oil & Gas Finance, Commercial Manager. 30+ years industry and 20+ years international experience.
Over thirty years engineering, construction, remediation, operations, start-up, and manufacturing experience includes: project management; project planning, sched¬uling and analysis; cost engineering; cost, schedule, and earned value analysis and reporting; WBS, OBS development; EAC, SPSPI and CPI
Radiation Safety Officer, Certified Health Physicist, Environmental Manager
QA/QC Manager, Vendor Surveillance, Inspection Supervisor, Construction Supervisor
Engineer /PGDBM 17 Years Experience in SCADA, PLC, Automation in INDIA, France, Gulf, Middle East
I am a graduate Mechanical Engineer having16 years Design experience with oil refineries and reputed Engineering consultancies. I am well experienced in all piping design activities including stress analysis.
QA/QC, CERTIFICATION, TURNOVER
19 years of experience as a Camp / Accommodation-Facilities Management (Staff Welfare Operation and Maintenance) in Oil & Gas, EPCC, Company (Road & Bridge, Electro-Mechanical Contractor.
Career Objective
Twenty five years experience in ten manufacturing sites with four integrated major and three independent oil companies. Responsibilities include Unit Operator through Refinery Manager, and span operations, maintenance and technical departments. Steady promotion and career growth.
I' ve worked as Cementing Job Supervisor for three year. Work with people and equipment, job calculations, job organization, logistic. Now I work as Cementing Lead Supervisor. Provide support for cementing crews, contact to customer, spares ordering, equipment usage control, personnel work control
16 years in Engineering, Procurement and Construction projects associated with cost control, planning and scheduling fields. Project categories includes petrochemical, gas and oil refining, power, and industrial, buildings, roads and a sports complex. Conversant with project cost control s
Senior Project Coordination/Management Engineer-Oil Gas Petrochemical Energy & Infrastructure
An MBA Finance with strong knowledge of Hedge Accounting and Derivatives valuations and experience with a Big 4 and Financial Software company.
Experienced and innovative operation & maintenance engineer with technical leadership in commissioning & operation and maintenance activities, quality achievement, reliability, efficiency, customer service and cost reduction goals. High level of management skills with outstanding leadership
Objectives To pursue a career in a progressive organization that provides opportunities for career growth and professional development and also in order to groom the overall personality.
MBA(HR), Bachelor of Engineering (Mechanical); Skills: Computer - Ms Access, MS Office, working knowledge of SAP. Soft Skills - Training Need identification, Organising Training, Trainer, Communication, Presentation, Negotiation Skills.
Twenty+ years of Materials and Procurement Management experience including supervision and management of warehouse contractors, material control, procurement activities including vendor sourcing, requisitioning, procurement and expediting, warehousing including receiving and issuing.
Offshore Installation Manager with 25 years experience in the Oli and Gas industry
Deepwater Completions Consultant
Demonstrated expertise in the life cycle of software development. Proven success track in managing people, resources and processes within a worldwide organization while effectively building internal and external relationships. Have a credible track record in resolving customer-related issues
Has the experience and skills required to manage, supervise, handle and monitor all job related aspects of Safety, Health and Environmental protection. Capable and knowledgeable in the process, development and application of different Safety measures that are vital in Offshore & Marine Safety,
In last fifteen years, I gathered varied experience in a medium to large organization which encouraged me to take more responsibilities. You may find my experience suitable for the position in the Electrical Engineering discipline from Project, Operation and Maintenance function. Working in Reliance
Experienced New Technology Key Account Manager
First   1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   [ 24 ]   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
CATEGORIES: Management;
INDUSTRIES: Petroleum/Oil/Gas;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com