EXPERIENCE:
6/2008 - 3/2009 Belcan Corp. - Chesterfield, Mo.
Planner/Scheduler - ConocoPhillips - Wood River, Ill.
Generated P3 schedules for progress tracking of the Revamp & Restart portion of the CORE Expansion Project. Issue bi-weekly progress reports, curves and material status to construction coordinators. Assist in progress of overall integrated project schedule.
6/2007 – 4/2008 Accurate Turnaround Management – Gretna, La.
Planner/Scheduler – Valero Refinery – Memphis, TN.
Plan and schedule refinery AFE projects using P3 software. Assist in assembly of bid packages and coordinate contractor. Assist in plant turnaround planning, generating work orders, material requisition and track in SAP.
12/2006 – 6/1/07 Headway Corp.
Scheduler – DP&L (Wagner Industrial Electric) – Aberdeen, OH.
Inherited existing electrical schedule for multi-million dollar Air Quality Control
Project located at two power plants. Track progress, generate weekly
Look-a-head and progress curves. Develop new schedules as needed.
6/2006 – 11/2006 High Bridge Assoc., Norcross, GA.
Planner/Scheduler – Valero Refinery, Delaware City, DE.
Jacobs Engineering CO Boiler Cutover Project which includes the installation of two FD Fans, followed by a boiler shutdown. Generated P3 CPM schedule for both phases of the project. Coordinate between contractors to progress and track schedule. Generate daily 3 day look-a-heads, resource load reports and progress curves.
12/2004 – 5/2006 Universal Services, New Orleans, LA.
Planner/Scheduler – Hovensa Refinery, St. Croix, V.I.
Assemble detailed P3 schedule from Operation scope for their Fired, Waste Heat Boiler and Gas Turbine Turnarounds. Enter Notification, Work Orders and order material in clients SAP system. Generate cost estimates, daily Schedules and track progress. Coordinate all sub-contractor work related to each turnaround.
08/2002 – 04/2004 Accurate Turnaround Management, Gretna, LA.
Scheduler/Cost Tracker – Premcor Refinery, Lima, OH
Track Turnaround cost for $43M project using refineries CMMS (Maximo),
CTS input and clients accounting figures. Generating daily cost curves by unit.
Input and track T/A FCO's to completion.
Scheduler – RMF/Nooter – Toledo, OH
Assemble P3 Mechanical Turnaround schedule for bid submittal. Resource load and define critical path.
Scheduler –Ashland/Marathon Refinery – Cattlesburg, KY
Worked with Electrical Contractor estimators to build P3 schedules. Issue
Weekly schedules and progress to establish overall performance ratings by
Job package. Issue progress reports and histograms.
03/2002 – 07/2002 CDI Engineering, Baton Rouge, LA.
Scheduler – Wyeth Pharmaceutical, Marietta, PA.
Assemble engineering and construction P3 schedules for upcoming $10M
HVAC modifications and upgrade to existing buildings. Track and update during all phases.
03/2000 – 01/2002 Jacobs Engineering, Baton Rouge, LA.
Planner/Scheduler – Conoco Refinery, Lake Charles, LA.
Assemble P3 schedules from civil, structural, and mechanical sub-contractors to track and update all phases of the project.
Planner/Scheduler – B.P. Chemical, Lima, OH.
Generate P3 schedule for $13M Area/Ammonia Turnaround. Assemble
Turnaround work packages by work order number, to include inspection reports,
Marked P&ID and scope necessary to perform the job.
Planner/Scheduler – Motiva Refinery, Gramercy, LA.
Monitor and evaluate the current maintenance planning department using Maximo
CMMS system to suggest improvements to Jacobs Regional and Plant Managers.
Scheduler – Genetics Institute, Andover, MA.
Assist Senior Scheduler in developing the Master Construction Schedule for new
Building prior to client's deadline date.
Planner/Scheduler – Agrium Chemical, Soda Springs, ID
Develop P3 schedule for upcoming outage. Gather Operation scope and
Engineering changes to estimate. Track progress and labor cost to generate daily
Reports to site Manager.
Scheduler –Exxon Refinery, Baton Rouge, LA
Track, record and estimate all extra work request during Ammonia Plant
Ammonia Plant Shutdown. Assist in updating P3 daily schedules and generate
New shift schedules.
Scheduler – Jacobs/PCS, Lakeland, FL.
Assemble construction Level II schedule using P3 for PCS Chemical Plant Expansion Project located in Aurora, N.C. Work with construction managers to develop schedule needs.
12/1999 – 02/2000 Accurate Turnaround Management, Gretna, LA.
Planner/Scheduler – Sunoco Refinery, Toledo, OH
Assemble P3 schedule for Amite Capital Project to work during upcoming
Turnaround. Receive ISO drawing, order material and implement into current
Master Turnaround schedules.
10/1999 – 11/1999 Turnaround Management, Houston, TX
Planner/Scheduler – Farmland Refinery, Coffeeville, KS.
Perform evaluation of existing planning department using Maximo CMMS
for daily maintenance planning. Setup dummy turnaround schedule for planners to practice for future outages.
11/1998 – 09/1999 Jacobs Engineering, Baton Rouge, LA.
Planner/Scheduler – Exxon Refinery, Baton Rouge, LA.
Plan, Schedule and track progress for demo and upgrade of existing plant
Wide pipe rack and piping. Assist client in establishing yearly budget.
07/1998 – 10/1998 Meitec Inc., New Orleans, LA
Planner/Scheduler – Texaco Offshore, Morgan City, LA.
Plan, estimate and schedule using Microsoft Project, modifications of existing
Electrical and instrumentation. Scope included running new conduit and supports,
Mounting new instruments and connections. Issue and track daily schedules to
Generate progress reports.
08/1997 – 06/1998 Brown & Root International, Houston, TX
Maintenance Planning Supervisor – JG Summit - Batangas City, Philippines
Responsible for setting up new maintenance planning department at new
Polyurethane/Polypropylene Plastic Plant. Create and implement Work Order procedures. Interview and hire department personal. Assist in setting up warehouse procedures and stock item for maintenance. Train personal to use Maximo CMMS program. Assist Maximo rep in setting up CMMS structure.
07/1996 – 08/1997 Brown & Root Industrial Services, Houston, TX
Maintenance Planner – Exxon/Mobile Refinery - Chalmette, LA.
Receive work orders from Operation, order stock and non-stock material,
Issues sub-contractor bids, scope and track work orders to completion.
06/1995 – 07/1996 Southeast Louisiana Contractors, Norco, LA.
Planner/Scheduler – Good Hope Refinery, Norco, LA.
Plan/schedule existing Crude Unit and Water Treatment Plant Upgrades.
Receive ISO's, order material and implement into existing schedules using
P3 Finest Hour.
04/1974 – 6/1995 Brown & Root Industrial Services, Houston, TX.
While working with Brown & Root I performed the following duties:
Outside Machinist – Troubleshoot and repair pumps, compressors, turbines,
Fin fans and conveyors. Rebuilt equipment spares, mechanical seals and test
Pressure relief valves.
Outside Machinist Supervisor – Responsible for the safety and supervision of
15 machinists, 2 lapping room techs. Issue daily job assignments, assist in troubleshooting equipment, perform daily/weekly safety meeting.
Maintenance/Project Planner – Gather Operation scope to develop Turnaround
Schedules. Track and progress to completion work on PSV's and equipment.
EDUCATION:
Belle Chasse High School, Belle Chasse, LA. – Graduation 1970
Job Related Training & Courses:
Millwright I 1974
Borg/Warner Seals 1976
Prager Gears 1978
Millwright II 1978
Supervision I 1980
Supervision II 1984
LSU Fire Training 1986
First Responders 1990
Hasmat/Haswoper 1990
Union Carbide Maint. 1996
Maximo CMMS 1996