Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #83654
next resume »»
CONTACT INFORMATION:
View contact information...
Scheduling experience:
Proposal scheduling, front end engineering scheduling, manpower control level scheduling, EPC scheduling, commission scheduling, tie-in scheduling, systems scheduling, shut-down/turnaround and work package planning.
Cost control experience:
CAPEX/OPEX studies, developing cost coding structures, development of project cash flows, development of deviation and change order procedures and forms, detailed estimating, development of staffing plans, construction and engineering auditing/progress reporting, quantity surveying as well as budget forecasting, gross margin and TIC reporting.
Contract experience:
Formation, negotiation, execution and administration of both Lump Sum and Cost Reimbursable contracts EPC and EPCM. Change management, claim dispute resolution, and familiarity of general contract language as well as Sarbanes-Oxley.
Expertise:
Refining, Petrochemical, Mining & Minerals – EPC & EPCM
Subsea - Controls, Flowlines and Risers Systems, Umbilicals
Offshore Platforms and Vessel – Maintenance, Upgrades and Shipyard Experience
Drilling - Semi Submersible Conversions and Upgrades
Expertise includes knowledge of vessel systems and equipment particularly related to drilling and propulsion packages (mud, cement, bulk, riser and VFD systems). This includes some design and construction experience as well as a fundamental understanding of ABS, DNV, API, ASME, ANSI and related industry regulations and standards.
Extensive RDBM and ERP System experience including: SAP, Oracle, Maximo, BST and SQL Server, Share Point. Expertise includes developing management report packages, project auditing and automated quantity based progress systems. Technical expertise includes reading isometrics, plan drawings, P&ID's and drawings designed by all disciplines.
Technical:
Primavera P6, P5, P3 3.1, MS Project, VBA, Visual Basic, MSSQL Server, Crystal Reports, SQL, Macromedia Flash, Visual Fox Pro, Access, HTML, ASP and MS Office. Working knowledge of: PLSQL, Developer 2000, Oracle Forms and Reports.
Education:
BS Ecology Management - Texas A&M University
Pursuing BS Mechanical Engineering - University of Houston
Engineering education includes: all levels of Calculus, Linear Algebra, Ordinary (1st and 2nd order linear) and Partial Diff. Equations, Physics – Mechanics, Vibrating Mechanical Systems.
Certifications:
Technology Courseware's Visual Basic Data Access Programming, ActiveX and COM Programming – 04/2001
Work Experience:
Bechtel International
BHP Billiton – Worsley Efficiency & Growth Project, Collie, WA Australia (11/2008 – Present)
Lead Contract Cost Engineer – Bechtel have been awarded the EPCM contract for an estimated capital investment of US $1.9 billion. The project is to lift capacity of the Worsley Alumina refinery from 3.5 million tonnes per annum (Mtpa) of alumina to 4.6 Mtpa (100 per cent capacity). This includes expanded mining operations, additional refinery capacity and upgraded port facilities.
As lead field contract cost engineer my duties are to develop and maintain an integrated cost, scheduling, and progress performance system for management review as well as contract administration and cost forecasting. This includes all major contracts and work packages which combined are in excess of $600 million.
CB&I
Rio Tinto Aluminum Ltd – Yarwun 2 Project, Gladstone, Qld. Australia (4/2008 – 11/2008)
Project Controls Manager – CB&I Australia have been awarded the engineering, procurement and construction of the Storage Tanks as well as fabrication, procurement and construction of the associated piping, steel and mechanical equipment. The total program cost is $1.8 Billion, of which, the CB&I portion is $145 MM. As project controls manager my duties were to develop a detailed integrated EPC schedule, cost control analysis and reporting tools, progress measurement system and monthly reports.
Clover Global Solutions (2007 – 2008)
Helix ESG – Q4000 DP Semi Conversion, Houston, TX (4/2007 – 4/2008)
Project Controls Manager – The Q4000 is a custom designed, dynamically positioned and constructed semi-submersible Multi Service Vessel. The project was to upgrade the vessel to a Mobile Offshore Drilling Unit. As project controls manager my duties were to develop a detailed integrated EPC schedule, cost control analysis and reporting tools, progress measurement system and monthly reports for the total project. TIC $120MM.
Stress Subsea, Inc. (2005 – 2007)
BHP - Neptune, Houston, TX (10/2005 - 9/2007)
Project Control Team Lead – The project included the construction, installation and operation of a stand-alone platform and the associated seven well subsea system. The facility was estimated to have a gross nameplate daily capacity of 50,000 barrels of oil and 50 million cubic feet of gas. Our role on this project included system engineering, subsea integrity management and interface management. This included creation of plans and procedures for subsea testing, installation and interface of topsides facilities. My duties involved gathering information from various contractors and delivering a subsea total project schedule, progress curves as well as cost analysis reporting for the subsea tress and controls. TIC $400MM (BHP Cost).
BHP Billiton - Genghis Khan Subsea Integrity Management System, Houston, TX (11/2006 - 9/2007)
Technical Manager – BHP Billiton, with co-ventures Hess Corporation and Repsol YPF, purchased the Genghis Khan oil and gas development from Anadarko Petroleum Corporation in December of 2006. My role was to design and develop an Integrity Management System capable of processing the large volume of data and information that was handed over for the Genghis Kahn reservoir, well and topside facilities.
ExxonMobil - Cal-OSHA Piping Integrity Management, Houston, TX (4/2007- 9/2007)
Project Manager – Phase I was verification of line list, P&ID and corrosion circuit data. Phase II was to develop an electronic system to match this data. Phase III included preparation of data to be uploaded to an in house database. As project manager my responsibilities were to oversee all work for this project as well as submit formal schedules and reports to the client.
ExxonMobil - Risk Assessment Validation, Houston, TX (4/2006 - 7/2006)
Technical Manager – The scope of this project was to gather process information, construction and fabrication data on critical pressure vessels (PV) for project records, ASME U1-A forms, P&IDs and similar sources at various gas plants. I was assigned as a technical manager responsible for the development, testing and maintenance of a program to streamline the reporting of process data, as built information, inspection reports, and equipment degradation documents (EDD) data. The end product was capable of producing reports to determine the HSE risk associated with having each critical PV removed from service due to failure or other causes.
Project Information Management System (PIMS), Houston, TX (11/2005 - 9/2007)
Project Manager – PIMS is a scalable Internet based relational database with extensive document management capability. It provides storage, retrieval, filling, security, archival, retention and distribution of company and project documents. I was responsible for the design, development and deployment of this system. It was built on SQL Server and using ASP.
NetPropeller, Inc. (2001-2005)
BDO Seidman - Reduced Paper Office (RPO) Project, Houston, TX
Operations Manager/Project Manager – Primary project responsibilities were project reporting, testing and system implementation. Secondarily I was responsible for client relations, business development and operation for the company.
S&B Engineers and Constructors (1999 - 2001, 2005)
BP - Clear Skies Program, Texas City, TX (2005)
Project Cost Lead – Our services included front end and detailed engineering as well as procurement and construction services to improve the compliance of federal regulations at the BP Texas City Refinery and several Chemical Plants. As lead cost I was responsible for all cost duties for this program in excess of $30MM TIC. This included overall TIC reporting, cash flow projection, progress measurement, change order management and quantity trending for the project.
Enterprise Products - WTFII Expansion Project, Mont Belvieu, TX (2005)
Project Controls Specialist – Services included front end engineering, detailed design as well as procurement and construction management. The scope of work was to increase the fractionator feed capacity to 60 KBPD with feed dehydration. The TIC exceeded $45MM. I was responsible for setup and reporting of progress measurement and change management.
Equistar Chemicals - Plant Expansion, Bayport, TX (2000-2001)
Project Controls Manager – Services included engineering, procurement and construction services for a plant expansion. This was a small capital lump sum project estimated $ 5MM. As project controls manager I developed and maintained the project schedule, cost analysis and reporting.
Shell Chemical Company - Phenol 3 Project, Deer Park, TX (1999-2000)
Project Controls Specialist – The Company performed detailed engineering, procurement and construction services for both OSBL and ISBL for a new nominal 500MM lb/yr Phenol Plant. The project was estimated at $175MM. My responsibilities were to develop and maintain all field auditing throughout the duration of the project. I was also responsible for developing an interface reporting program for SAP and a legacy cost system to integrate client code of accounts on future projects.
Fluor Corporation (1995-1999)
Montell Polyolefins - E-Line Upgrade Project, Bayport, TX (1998-1999)
Project Controls Specialist – The project scope included uprating existing polypropylene polymerization facilities, extrusion of flake and blending and loading of pellets in a new rail car facility. We provided engineering, procurement, construction and contract management. More than 800,000 direct field labor work hours were expending in 9 months. The project TIC exceeded $73MM. This project included a 30-day shutdown/turnaround. I managed all progress and audit duties, which included the development of all progress budgets for shutdown and pre-shutdown activities, quantity reporting, construction progress reports and cost/scheduling interfaces.
Mobil Corp./Saudi Arabian Basic Industries Corp. -Yanpet Expansion Project (YEP), Yanbu, Saudi Arabia (1997-1998)
Project Controls Specialist – The YEP complex is designed into 4 major units: Ethylene, Ethylene Glycol, Polypropylene and Polyethylene. It was a designed partnership where I was assigned to the Utilities and Offsites providing the utility systems essential for each unit. The total project value exceeded $2 Billion. I was assigned as a project scheduler, which included planning and execution of overseas construction projects.
Amoco Chemical - PX-1 Restart, Decatur, AL (1995-1997)
Project Controls Specialist – This project included all engineering, procurement and construction activities to expand the paraxylene unit. Phase I, which included the outage portion of the project, was successfully completed ahead of schedule and under budget. I was assigned to develop and maintain engineering and construction manpower plans as well as overall project progress using earned value basis. In addition my responsibilities included quantity surveying, system completion planning, tie-in planning and turnaround scheduling.
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 1451 to 1500 of 2515)
Go to Search Parameters...
Brief Description
30 years experience in the industry and a seasoned expat, last position held was the turnover coordinator for the Washington Group in Northern Alberta, Canada. Also spent 4 years in Baku, Azerbaijan as the senior electrical commissioning eng.
Free!
Offshore Maintenance Experience
Procurement/ purchasing engineer/Manager
I am an electromechanical engineer and I have experience in power plant and oil refinery
Senior Construction Manager
Wimax Engineer-Alcatel Lucent, ZTE
Lead Auditor in ISO 9001, 14001 and 18001 by IRCA
Experienced procurement professional skilled in managing material and equipment needs for $6-8 million dollar construction projects, controlling inventory, overseeing operation of distribution centres, and maintaining and scheduling a fleet of construction vehicles.
With a Petroleum Engineering degree and more than 12 years experience in E&P industry
Senior Project Site Manager HVAC - FIRE PEOTECTION - PLUMBING - SPECIAL FITTINGS
Technical Author, Trainer, Project Manager
I am an engineering specialist having more than 19 years of experience, graduated from M.I.T, the most reputed Institute in India for Instrumentation. At present I am working as the Associate General Manager (Projects) for one of the leading Zinc producer in the world.
Field professional skilled in management, operations, maintenance, safety. Seeking an international and/or domestic leadership assignment with a company who may challenge my abilities and use my versatile background and experience.
Process/Operations Engineer, with four years of Refinery (FCC) experience.
Broad experience of oilfield infrastructure, water,sewage treatment , gas turbine stations, oil pipelines, rig sites, industrial building, housing, earthworks, rail & general civil, mechanical & electrical works in UK, Africa & Asia. Project and Site Management in a variety of challenging locations
Engineering/Project Manager skilled in organizational/project management/business development. Highly skilled in client relations/development. Diverse experience in environmental consulting/nuclear power/regulatory compliance/facilities/systems engineering/infrastructure projects.
manager
Aviation expert with 21 years in the maintenace arena. Track record of increasing productivity, improving quality while reducing cost and meeting customer needs. Skilled in scheduling, supervising &evaluating over 50 personnel. Successful in developing & executing operational policies and procedures
Experience of more than 11 years in the sector of Oil and Gas , Petrochemical , Ship Building, High Rise buildings and expertise on planning and scheduling with prima vera soft ware , keeping track of records with prima vera expedition , involved in tender level programming as well as master level
Planning, project engineering/management of Petrochemical/Oil and Gas plants with around 28 years experience with design and engineering consultants, EPC contracting companies and oil producing companies. Associated with planning and control of projects with international companies like Shell etc.
I have PG Diploma in Petroleum Exploration and Masters Degree in Computer Science with 3+ year Oil and Software industry Exp.
In well services Egypt co (Sperry sun drilling services),I was working as Directional survey engineer(magnetic single shot and magnetic multi shot).
Professional in Quality and HSE
Thirty Eight years in Material Handling, Purchasing, Logistics, Expediting and Management with a record of Reliability and Progressive Advancement. I have handled the entire Purchasing Process for as many as twenty projects at any given time involving m
Commercial Manager with over 7 years experience in the UK & Internationally. Additional qualification (M.Sc) in Oil & Gas Engineering. Strong skills in organisation and leadership.; economic analysis, financial modelling and project management. Strong relationship management and sales skills
I am a GRADUATE MECHANICAL & CERTIFIED COST ENGINEER possessing 20 years of diversified experience in Petrochemicals, Refining, Chemical, Fertilizer, Oil & Gas with various multinational companies in Pakistan, Bahrain & Saudi Arabia in the fields of Project control, Cost & Contract Management, Plant
Administration , Accounting and Human Resource experience
Construction manager/Chief field engineer with HND Mechancial engineering and Member Institute of Mechanical Engineers. 18 years of construction management experience at all levels.
Young Reservoir Engineer with 4+ years of experience. Areas of expertise include: PTA, reservoir simulation, waterflood management, sand management, naturally fractured reservoirs, calssical RE methods, etc.
Broad-based experience covering a full spectrum of health safety and environmental services, including, Environment and Earth Resource management, and experience in administration and consulting. Knowledge of environmental tools: life cycle analysis, environmental impact assessment and HSE
Around 2 years of experience in HR activities with expertise in Human Resource, Personnel Management, Public-Client Relations, Administration, Customer Service and ability to deal with Multicultural People.
Key Qualifications: Engineer with skills in site management, project management, project sales, business development, oil&gas/marine control application implementation
PIPE DESIGNER, More than twenty-five years experience in Technical drafting, piping and equipment hands on field work in the Chemical Manufacturing environment.
Logistics and Supply Chain Management, Well, organized, Good Communications, P/L and Budgets, Remote Site setup and management, Warehousing, Maintenance, Procurement and subcontracts, Transportation, Multi-cultural environments, Management of multi-locations.
PhD chemical engineering, 15 years experience as operations and academic teaching
I would like to find an opportunity in an auditing field. I think i can be qualified to fill this position. I participated in ACCA to increase experience and to expand knowledge. Finally i believe that self development and self initiative are the basis to move forward.
I am a new graduate of Mining Engineering from Nottingham University this summer. I am seeking employment in the mining or petroleum sector, and am willing to consider anything that will challenge me or give me a solid skill base.
Offshore Field Engineer Pipeline Electrical Automation Mechanical
I have been in the oil and gas industries for 13 years doing project coordinations and managing maintenance of equipments
Camp Catering & Facilities Management, Remote Sites(Catering Degree, Hygiene Diploma, HACCP Training Cert)
Well versed in preparation & analysis of financial reports, implementation of policy & procedure & internal control
To achieve professional excellence, self development, advancement and improvement while enjoying job satisfaction and achieving cooperate goals EDUCATION University of Benin, Benin. B.ed. Adult Education.
IT SKILLS
I am an Instrumentation & Control Engineer by Profession. Review of my credentials will confirm that I have 15 years of experience in instrumentation, operations, maintenance & design.
Desalination Plant Maintenance/Inspection, Materials Testing, Technical Evaluation,Troubleshooting, Supervisory/Managerial Skills
Project Controls Specialist, Project Services Manager, Project Controls Manager, Cost Control Manager
Over 20 years experience as Project / Construction Manager on overseas assignments. Extensive experience in pipe design, fabrication and inspection of refineries, LNG plants, chemical plants, power plants, pipelines and mining facilities. After college, started a career as a craft pipe fitter in Hou
14 years of diversified project management and controls experience (EPC) in the oil and gas industry (up and down stream). Assignments include: Project Manager, Project Controls Manager, Lead Scheduler, and Lead Cost.
Civil engineer with six years experience in the oil & gas Industry. 1 1/2 years as buyer and 4 1/2 years as control projects Eng (planner, estimator, cost control, contracts administrator)
Seeking a responsible and challenging growth oriented position in the field of electrical engineering with emphasis on high voltage out-door substations including its preliminary design, selection of transformers, switchgears and other materials
First
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
[ 30 ]
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Next
Last
Seach Parameters
Change search parameters...
CATEGORIES:
Management;
INDUSTRIES:
Petroleum/Oil/Gas;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com