Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #84717 next resume »»
CONTACT INFORMATION:
View contact information...

3 Date of birth 26.10.1961
4 Nationality: Italian
5 Civil Status: Married
6 Address

7 EDUCATION:
Institution Industrial Technical Institute Mechanical- Leonardo da Vinci Lanciano IT
Date 1975/1980
Degree or Diploma obtained Master inTechnical Mechanical

8 LANGUAGES SKILLS:
Languages Listening Reading Speaking Writing
Italian 5 5 5 5
English 4 4 4 4
Romanian 4 4 2 2
(acception: 1- lowest level of knownledge; 5 highest level)

9 USED PROGRAMS SOFTWARE
Microsoft Office Packet 5
Autodesk Autocad 2D 5
MC4 Clima Project 4
Microsoft Project 4
Adobe PDF Creator 5
Adobe Illustrator 4
Adobe Photoshop 4
Microsoft Internet Explorer 5
(acception: 1- lowest level of knownledge; 5 highest level)

10 PRESENT POSITION
PROJECT SITE MANAGEMENT HVAC - FIRE PROTECTION SYSTEMS - SANITARY - SPECIAL FITTINGS

11 YEARS WITHIN THE LAST FIRM
Since 04/08/2008 to 10/03/2009 S.C. EPSTEIN ROMANIA s.r.l.
12 COURSES OF SPECIALIZATION AND FORMATION APPLIED
Date: 1983/86 Application Master in the GEBERIT of Manno in Switzerland on the Planning and Execution of Fittingses of Unloading Waters in PEHD with system of weldings for electric fusion

Date: 1988 Application Master in the PIRAL P3 Planning and Execution of Behaviors Air in Panels in Aluminum with thermal isolation shaped

Date: 1990 Courses of specialization in the PRANDELLI S.p.A. for the use and the realization of Pipelines in PP Random

Date: 1995 Application Master near the DAIKIN Europe for Fittingses of Climatization Hetat Pump VRV Plus
Date: 1995 Courses for the Safety on Work Legislation 626

12 COURSES OF SPECIALIZATION AND FORMATION APPLIED
Date: 1999 Master in the AICCARR in respect to the evolution of the Fittingses of HVAC Evolution in the Hospital Field

Date: 2001 Courses for the Quality Control Management EN ISO 9002

Date: 2001 Course of specialization on the Management, Business Direction, Human Resources

Date: 2003 Courses for the Quality Control Management UNI EN ISO 9002 Vision 2000

13 LIST PROFESSIONAL EXPERIENCES
Date: 1981/88 I have developed qualified Worker duties and then specialized in a lot of Firms of the Sector you Install Hydraulic and of Heating in the civil and industrial sector

Date: 1989/90 I have developed duties of Holder of Firm and Technical Manager in the Sector of Install Hydraulic and of Heating in the civil and industrial sector

Date: 1990/99 I have developed duties of Holder of Firm and Technical Manager in the Sector of Install of HVAC, Climatization, Heating, Plumbing and Fireproof in the civil and industrial sector

Date: 2000/07 I have developed duties of General Manager, Project Manager, Manager of the Human Resources in the Sector Installs of HVAC, Climatization, Heating, Plumbing Sanitary and Fireproof in the sector great distribution, civilian and industrial

Date: 2008/09 I have worked in S.C. EPSTEIN ROMANIA s.r.l. as PROJECT SITE MANAGER for HVAC, FIRE PROTECTION SYSTEMS, INDUSTRIAL FITTINGSES.

Date: 2009 I am Administrator of my Firm S.C. NEW LIVING CONSULTING S.R.L., who has activities in the CONSULTANT & SITE MANAGEMENT for HVAC, FIREPROFF SYSTEMS,

14 QUANTITY OF HUMAN RESOURCES THAT I HAVE MANAGED
Date: 1978/88 from a minimum of 2 to a maximum of 5 among technical personnel and workers

Date: 1989/90 from a minimum of 2 to a maximum of 5 among technical personnel and of workers

Date: 1990/99 from a minimum of 10 to a maximum of 25 among technical personnel and workers

Date: 2000/09 from a minimum of 30 to a maximum of 60 among technical personnel and workers

15 MOST IMPORTANT CONTRACTS MANAGED AS GENERAL MANAGER AND TECHNICAL MANAGER

Date: 2008 - 2009
Location: Plojesti (PRAHOVA)
Company: S.A. CAMERON Manufacturing Echipments Black Oil (s.m. 10.000 plus office s.m. 2000)
Position: General Site Manager & Site Manager of the Sub Contractors for S.C. EPSTEIN Romania S.R.L.
Description Fittingses of HVAC Block Office and Manufactured Area
Thermal Central installation Cooling/Heating and Distribution fluid power for Heater Units and ATH
Installation systems of extraction air in the shops
Installation systems of HVAC in the Block Office, installation systems of extraction and Immission air manufacturing area, Distribution of Air Presured, Emulsified water, Gas Safety fittingses Fireproof with systems Sprinkler and to Hydrants and with Reserve and pressurization water

Date: 2006 - 2007
Location: L'Aquila (Abruzzo Italy)
Company: LeClerc - Conad Adriatico - Shopping Center L'AQUILONE s.m. 25.000 Parking s.m. 35.000
Position: General Manager, Project Manager, Manager of the Human Resources
Description Fittingses of HVAC Shopping Center and Supermarket
Thermal Central installation Cooling/Heating and Distribution fluid power kW 2.250,00
Installation systems of extraction air in the shops
Installation systems of climatization in the shoppin Center Meters Cubes of Air 270.000
Installation systems of extraction and immission air zone sale and zone workmanship Safety fittingses Fireproof with systems Dampness Sprinkler and to Dry further to Hydrants and with Reserve and pressurization water Liters 250.000

15 MOST IMPORTANT CONTRACTS MANAGED AS GENERAL MANAGER AND TECHNICAL MANAGER
Date: 2006 - 2007
Location: Isernia (Molise Italy)
Company: LeClerc - Conad Adriatico - Shopping Center PLAZA s.m. 9.000 Parking s.m. 4.500
Position: General Manager, Project Manager, Manager of the Human Resources
Description Fittingses of HVAC Shopping Center and Supermarket
Thermal Central installation Cooling/Heating and Distribution fluid power kW 1.100,00
Installation systems of extraction air in the shops
Installation systems of climatization in the shoppin Center Meters Cubes of Air 95.000
Installation systems of extraction and immission air zone sale and zone workmanship Safety fittingses Fireproof with systems Dampness Sprinkler and to Dry further to Hydrants and with Reserve and pressurization water Liters 50.000

Date: 2004 - 2005
Location: San Salvo CH (Abruzzo Italy)
Company: LeClerc - Conad Adriatico - Logistic Warehouse s.m. 38.000 Park s.m. 20.000
Position: General Manager, Project Manager, Manager of the Human Resources
Description Fittingses of HVAC Offices and Warehouse
Thermal Central installation Cooling/Heating and Distribution fluid power kW 130,00
Installation systems of extraction air in the Offices
Installation systems of climatization in the Offices Meters Cubes of Air 15.000
Installation systems of extraction and immission air zone deposit and zone workmanship Safety fittingses Fireproof with systems Dampness Sprinkler and to Dry further to Hydrants and with Reserve and pressurization water Liters 150.000

Date: 2003 - 2004
Location: Lanciano CH (Abruzzo Italy)
Company: LeClerc - Conad Adriatico - Shopping Center LANCIANO s.m. 15.000 Parking s.m. 15.000
Position: General Manager, Project Manager, Manager of the Human Resources
Description Fittingses of HVAC Shopping Center and Supermarket
Thermal Central installation Cooling/Heating and Distribution fluid power kW 1.900,00
Installation systems of extraction air in the shops
Installation systems of climatization in the shoppin Center Meters Cubes of Air 150.000
Installation systems of extraction and immission air zone sale and zone workmanship Safety fittingses Fireproof with systems Dampness Sprinkler and to Dry further to Hydrants and with Reserve and pressurization water Liters 150.000

Date: 2003 -2004
Location: Lanciano CH (Abruzzo Italy)
Company: Deposit Mechanical Trains Railroad "SANGRITANA" Toto S.p.A.
Position: General Manager, Project Manager, Manager of the Human Resources
Description Fittingses of HVAC Offices
Thermal Central installation Cooling/Heating and Distribution fluid power kW 800,00
Installation system of Heating for Deposit with Strips ceiling radians
Installation systems of climatization in the Offices Meters Cubes of Air 15.000
Installation systems of extraction and immission air Offices Safety fittingses Fireproof with systems Dampness Hydrants and with Reserve and pressurization water Liters 50.000

Date: 2003 - 2004
Location: Campiglione di Fermo AP (Marche Italy)
Company: Magazzini Gabrielli S.p.A. - Shopping Center IL GIRASOLE s.m. 16.500 Parking s.m. 16.500
Position: General Manager, Project Manager, Manager of the Human Resources
Description Fittingses of HVAC Shopping Center and Supermarket
Thermal Central installation Cooling/Heating and Distribution fluid power kW 2.000,00
Installation systems of climatization in the shoppin Center Meters Cubes of Air 175.000
Safety fittingses Fireproof with systems Dampness Sprinkler and to Dry further to Hydrants and with Reserve and pressurization water Liters 150.000

16 MOST IMPORTANT CONTRACTS MANAGED AS GENERAL MANAGER AND TECHNICAL MANAGER

Date: 2001 - 2002
Location: Ascoli Piceno (Marche Italy)
Company: Magazzini Gabrielli S.p.A. - Shopping Center AL BATTENTE s.m. 24.000 Parking s.m. 24.000
Position: General Manager, Project Manager, Manager of the Human Resources
Description Fittingses of HVAC Shopping Center and Supermarket
Thermal Central installation Cooling/Heating and Distribution fluid power kW 2.100,00
Installation systems of extraction air in the shops
Installation systems of climatization in the shoppin Center Meters Cubes of Air 250.000
Installation systems of extraction and immission air zone sale and zone workmanship Safety fittingses Fireproof with systems Dampness Sprinkler and to Dry further to Hydrants and with Reserve and pressurization water Liters 230.000

Date: 2000 - 2001 - 2002
Location: ROMA (Lazio Italy)
Company: Firm Regional Development and Agricultural Increase of the Lazio
Position: General Manager, Project Manager, Manager of the Human Resources
Description Systems of Climatization with VRV DAIKIN PLUS2 With Refrigerant GAS To direct expansion and HEAT PUMP power kW 600,00

Date: 2000 - 2001 - 2002
Location: Pescara (Abruzzo Italy)
Company: Sporting center "LE NAIADI" COSVIM S.C.a.R.L. New Swimming Pool
Position: General Manager, Project Manager, Manager of the Human Resources
Description Fittingses of HVAC New Swimming Pools Center
Thermal Central installation Cooling/Heating and Distribution fluid power kW 3.900,00
Installation systems of extraction air in New Swimming Pools
Installation systems of climatization in the New Swimming Pools Meters Cubes of Air 80.000
Installation systems of extraction and immission air zone New Swimming Pools Safety fittingses Fireproof with systems Dampness to Hydrants and with Reserve and pressurization water Liters 150.000

Date: 2001 - 2002
Location: Lanciano CH (Abruzzo Italy)
Company: Natinal Associates of Hospitals - ANCONA (Italy)
Position: General Manager, Project Manager, Manager of the Human Resources
Description Fittingses of HVAC (VAV System) New Departments
Thermal Central installation Cooling/Heating and Distribution fluid power kW 2.800,00
Cogenerations with Electric Power kW 2.800,00 & Production of Steam & Hot Water for HVAC
Installation systems hvaof extraction and immission air zone sale and zone workmanship Safety fittingses Fireproof with systems Dampness Sprinkler and to Dry further to Hydrants and with Reserve and pressurization water Liters 75.000

Date: 2000
Location: Lanciano CH (Abruzzo Italy)
Company: Firm Sanitary Local department of " Neurology and Oncology"
Position: General Manager, Project Manager, Manager of the Human Resources
Description Systems of HVAC (VAV System), Therapeutic Gas, Plumbing power kW 300,00

Date: 2000
Location: Pescara (Abruzzo Italy)
Company: Firm Sanitary Local department of " Cardiology Department of Intensive Therapy"
Position: General Manager, Project Manager, Manager of the Human Resources
Description HVAC (VAV System) Local of hospitalization for intensive therapy and Operating Room with System to Course of varying air power kW 250.000,00

View contact information...
«« previous resume next resume »»
Search Results (Resumes 1451 to 1500 of 2547)Go to Search Parameters...
Brief Description
Drilling Supervisor - 17 years Drilling Experience - 7 years International Experience - Safe and Efficient
I am seeking a position in your esteemed organization, Hawk Petroleum Inc. for Sales, Marketing, Trading of Petroleum Products in South East Asia (Indi)
Experience of leading a group of students at college level, volunteering and organizing various events at school and college level. Experience of working on rig.
I am flexible, reliable, company oriented, team player. I am fluent in French as well as English and I have learn Spanish.
I began working in the oil and gas industry in 1993 at the age of 17. Since then I have worked very hard to continually improve my knowledge and abilities, and have recently been promoted to Production Foreman at the age of 31. All of my experience has been in offshore California.
M.Sc Energy Economics and B.Sc Petroleum Engineering. Currently working as a Petroleum Economist, have a cumulation of 7 years in the Oil and Gas industry, 3 years + in the Upstream sector and 4 years in the Downstream Sector. Strong spreadsheet skills and intermediate level PEEP user.
Oil and gas lawyer with in-house experience
Highly experienced project professional with broad engineering, maintenance and construction experience. Competitive by nature with a consistent focus on the “Bigger Picture”. Outstanding track record and highly adept at managing high-criticality maintenance and construction projects.
Experienced telecommunications professional with key achievements, knowledge and abilities in the area of information technology, applications development and business systems.
My Q-HSE management experience spans more than 20 years and includes a broad spectrum from that of worker, public safety officer and emergency responder to educator, consultant and civilian contractor to both construction and general industry clients, including 21 months in Afghanistan.
Well Engineer with 21 years oilfield experience, 6 years of which Well Engineering with Major Operator, 18 months as consultant Night DSV. Well Engineering Office experience in Well Design, Well Abandonments and interventions.
HSSE Management System Coordinator / Sales / International Buyer
A holder of Barchelor Degree in Sociology with experience of seven years in human resources and administrative practices working for various multicultural small and big cooporate firms.
RPL Certified* Landman with an MBA and background in Project Management
Bachelors Degree in Mechnaical Engg. Profesional Certification as Chief Engineer on board Motor Ships. Thirty Eight (38) years of Marine & Offshore (Oil & Gas )Engineering projects
GIS Analyst and Mapping Specialist, Geotechnician, Landman
Living Quarters, offshore accommodation, modular buildings, upgrades, conversions, new builds
30 years experience in the industry and a seasoned expat, last position held was the turnover coordinator for the Washington Group in Northern Alberta, Canada. Also spent 4 years in Baku, Azerbaijan as the senior electrical commissioning eng.
Procurement/ purchasing engineer/Manager
I am an electromechanical engineer and I have experience in power plant and oil refinery
Senior Construction Manager
Wimax Engineer-Alcatel Lucent, ZTE
Lead Auditor in ISO 9001, 14001 and 18001 by IRCA
Experienced procurement professional skilled in managing material and equipment needs for $6-8 million dollar construction projects, controlling inventory, overseeing operation of distribution centres, and maintaining and scheduling a fleet of construction vehicles.
With a Petroleum Engineering degree and more than 12 years experience in E&P industry
Senior Project Site Manager HVAC - FIRE PEOTECTION - PLUMBING - SPECIAL FITTINGS
Technical Author, Trainer, Project Manager
I am an engineering specialist having more than 19 years of experience, graduated from M.I.T, the most reputed Institute in India for Instrumentation. At present I am working as the Associate General Manager (Projects) for one of the leading Zinc producer in the world.
Field professional skilled in management, operations, maintenance, safety. Seeking an international and/or domestic leadership assignment with a company who may challenge my abilities and use my versatile background and experience.
Process/Operations Engineer, with four years of Refinery (FCC) experience.
Broad experience of oilfield infrastructure, water,sewage treatment , gas turbine stations, oil pipelines, rig sites, industrial building, housing, earthworks, rail & general civil, mechanical & electrical works in UK, Africa & Asia. Project and Site Management in a variety of challenging locations
Engineering/Project Manager skilled in organizational/project management/business development. Highly skilled in client relations/development. Diverse experience in environmental consulting/nuclear power/regulatory compliance/facilities/systems engineering/infrastructure projects.
manager
Aviation expert with 21 years in the maintenace arena. Track record of increasing productivity, improving quality while reducing cost and meeting customer needs. Skilled in scheduling, supervising &evaluating over 50 personnel. Successful in developing & executing operational policies and procedures
Experience of more than 11 years in the sector of Oil and Gas , Petrochemical , Ship Building, High Rise buildings and expertise on planning and scheduling with prima vera soft ware , keeping track of records with prima vera expedition , involved in tender level programming as well as master level
Planning, project engineering/management of Petrochemical/Oil and Gas plants with around 28 years experience with design and engineering consultants, EPC contracting companies and oil producing companies. Associated with planning and control of projects with international companies like Shell etc.
I have PG Diploma in Petroleum Exploration and Masters Degree in Computer Science with 3+ year Oil and Software industry Exp.
In well services Egypt co (Sperry sun drilling services),I was working as Directional survey engineer(magnetic single shot and magnetic multi shot).
Professional in Quality and HSE
Thirty Eight years in Material Handling, Purchasing, Logistics, Expediting and Management with a record of Reliability and Progressive Advancement. I have handled the entire Purchasing Process for as many as twenty projects at any given time involving m
Commercial Manager with over 7 years experience in the UK & Internationally. Additional qualification (M.Sc) in Oil & Gas Engineering. Strong skills in organisation and leadership.; economic analysis, financial modelling and project management. Strong relationship management and sales skills
I am a GRADUATE MECHANICAL & CERTIFIED COST ENGINEER possessing 20 years of diversified experience in Petrochemicals, Refining, Chemical, Fertilizer, Oil & Gas with various multinational companies in Pakistan, Bahrain & Saudi Arabia in the fields of Project control, Cost & Contract Management, Plant
Administration , Accounting and Human Resource experience
Construction manager/Chief field engineer with HND Mechancial engineering and Member Institute of Mechanical Engineers. 18 years of construction management experience at all levels.
Young Reservoir Engineer with 4+ years of experience. Areas of expertise include: PTA, reservoir simulation, waterflood management, sand management, naturally fractured reservoirs, calssical RE methods, etc.
Broad-based experience covering a full spectrum of health safety and environmental services, including, Environment and Earth Resource management, and experience in administration and consulting. Knowledge of environmental tools: life cycle analysis, environmental impact assessment and HSE
Around 2 years of experience in HR activities with expertise in Human Resource, Personnel Management, Public-Client Relations, Administration, Customer Service and ability to deal with Multicultural People.
Key Qualifications: Engineer with skills in site management, project management, project sales, business development, oil&gas/marine control application implementation
PIPE DESIGNER, More than twenty-five years experience in Technical drafting, piping and equipment hands on field work in the Chemical Manufacturing environment.
Logistics and Supply Chain Management, Well, organized, Good Communications, P/L and Budgets, Remote Site setup and management, Warehousing, Maintenance, Procurement and subcontracts, Transportation, Multi-cultural environments, Management of multi-locations.
First   1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   [ 30 ]   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
CATEGORIES: Management;
INDUSTRIES: Petroleum/Oil/Gas;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com