Strengths:
- Possess excellent Team leading and management skills.
- Very good analytical and communication skills.
- Establish strong, productive and enjoyable working relationships
- Good attention to detail and good time management
- Sound knowledge and experience in Piping, fabrication, erection and commissioning.
- Excellent exposure in Project Planning, Resource Management, Estimation, Risk Management and Project Tracking with technical expertise in Primavera and Microsoft Project softwares.
Honors:
Academics Qualification: Bachelors in Mechanical Engineering – 1999 to 2002
Diploma in Mechanical Engineering – 1995 to 1998
Additional Certifications: ASNT Level -II (PT, MT & RI)
Software Knowledge: Primavera (P3, P3e and P6), Microsoft project 2003 &
2007, AutoCAD 2000 and Microsoft Office.
Work Experience
Company: Centamin Egypt Limited, Australia.
Designation: Senior Project Planner and Scheduler
Duration: December 2008 to till date
Client: Centamin Egypt Limited and Sukari Gold Mines.
Project: Sukari Gold Project, Pharaoh Gold Mine NL, Egypt (Turnkey Project)
Reference: Mr. Christopher McGoldrick, Project Manager.
Responsibilities:
* Preparation of entire EPC schedules from scratch after consulting drawings and contract documents.
* Assist Project manager in organizing, supervising and project construction activities to meet Project specifications and Master schedule.
* Develop Project schedule for cost effective manpower and machine utilization.
* Preparation of work breakdown structure and defining of resource, resource allocation and resource leveling.
* Perform Schedule analysis from progress measurement & productivity report, complete critical path analysis and prepare recovery plans to suit project milestones.
* Prepare Trend and forecast reports, Weekly and Monthly reports for Management.
* Chair weekly meeting schedule with the Executive Director, Project Manager, Construction Manager, Electrical and Instrumentation Manager, Project Controller, Commissioning Manager, Procurement & Expediting manager to explain project status and priorities at various work fronts.
* Vendor management focusing on coordination and monitoring of contracted tasks.
* Inventory management.
* Coordinate management, contractor and subcontractors, as applicable, to sort out and resolve schedule/claim related issues.
* Organize various Planning/Scheduling/Risk Analysis workshops with all the stakeholders during Construction, Work area definitions, Engineering Work Package development, Work face, Pre-commissioning and Start up planning.
* Managing a regular review process of contractor's, subsidiaries' deliverables (Monthly report/Program Update/Look Ahead, etc).
* Compare contractors monthly invoice claims with the actual percentage achieved in the schedule, in coordination with the respective Area Manager for approval.
* Review and approve vendor /contractor schedules.
* Allocate all the Equipments and machineries to jobs, on day to day basis according to the project schedule.
* Coordinate Dump & Heap Leach Construction activities.
* Coordinate Heavy structural steel erection and monitor progress.
* Coordinate Fabrication, Installation and Testing of Diesel, HFO and CIL Tanks.
* Prepare Master Schedule for Cummins & MAK Power Station and coordinate the construction activities with their priorities.
* Coordinate installation and erection of SAG & Ball Mills, Primary Crusher, Conveyors and Gold room equipments.
* Coordinate procurement, fabrication and erection of Carbon Steel, Stainless Steel and HDPE pipes, fittings, valves and Underground piping works.
* Tracking progress of up to 20,000 Weld joints on daily basis.
* Monitor Sea Water Intake, Pump Stations and RO Plant Construction Activities.
* Coordinate Overhead power line and Infrastructure Facility Construction Projects.
* Coordinate Installation of Gear boxes, Agitators, Carbon Safety Screens, Pumps, Apron Feeders, SAG Mill Feed Weightometer, Hydrostatic Bearing Lube System, Ball Mill Cyclone Cluster, Air compressors, Heat exchangers, Air blowers, Dust collector, Reagent processing areas (Cyanide, Flocculant, Lime, Caustic Soda, Hydrochloric Acid, Frother, Promoter A404, Xanthate Collector, Sulphuric Acid & Hydrogen Peroxide) etc.
* Develop, approve and track the Electrical, Instrumentation and Civil works schedule in coordination with Area Manager and Site Engineers.
* Coordination with document controller in maintaining accurate track record of drawings/ documents received from design office/ vendor and ensuring jobs meet specifications.
* Coordinate in preparation of check sheets for mechanical and practical completion packages for project completion.
* Coordinating with cost controller in critical stages, if any assistance required.
Company: Kempe Engineering LLC, Australia.
Designation: Project Planner and Scheduler
Duration: September 2007 to November 2008
Client: Bechtel, Australia.
Project: Hot Butt Cleaning and Hot Bath Processing Plant (Turnkey Project),
Sohar Aluminum Smelting Project, Sohar, Oman
Reference: Mr. Warren Key, Project Manager, Sohar, Oman
Responsibilities:
* Preparation of entire EPC schedules from scratch after consulting drawings and contract documents.
* Assisting the Project manager in organizing, supervising and project construction activities to meet project specifications and schedules
* Preparation of Project schedule to meet available resources and cost.
* Preparation of work breakdown structure
* Defining of resource, resource allocation and resource leveling.
* Applying flexible and in flexible constrains to the respective activities.
* Tracking of project.
* Identification of problem areas, formulation of action/contingency plans to achieve project timelines
* Perform risk analysis to highlight critical path items.
* Preparing, regular updating & distribution of Progress Reports (Monthly, Weekly, Daily and S- Curve, histograms) etc to Client / Management
* Preparation of monthly invoices
* Allocation of Equipments and machineries to jobs, in day today basis according to the project schedule.
* Preparation of monthly invoices
* Coordination of shipping materials with expeditor in order to avoid critical path in project schedule.
* Coordination in fabrication and erection of Hot Butt Cleaning and Hot Bath Processing Plants steel structures, machineries and equipments.
* Coordination in procurement, fabrication and installation of pneumatic, compressed air, fire water and hydraulic piping.
* Coordination in installation of pan conveyor, Butt cleaning machine, Rod brushing machine, crust bin load unload station, Bucket elevators, Mill, cooling tower, Silos, vibrating feeders and power & free conveyor unit.
* Coordination with mechanical and practical completion packages for project completion.
* Authorizing field construction schedule to ensure good workmanship, safety and meet project timelines.
* Coordination with Electrical, Instrumentation and Civil works with the respective site engineers.
* Inventory management.
* Coordination with document controller in maintaining accurate track record of drawings/ documents received from design office/ vendor and ensuring jobs have met the specifications
* Vendor management focusing, coordination and monitoring of contracted tasks.
Company: Jobby Engineers Private Limited
Designation: Planning Engineer - Projects
Duration: September 2006 to August 2007
Project: Nuclear Demonstration Desalination Plant (NDDP), Bhabha Atomic Research Center (BARC), Kalpakkam, India
Reference: Mr. Dagore, Project Manager, BARC, Kalpakkam, India
Responsibilities:
* Organizing and supervising project construction activities for Multi Stage Flushing Modules.
* Monitoring and managing Project schedule.
* Preparation of work breakdown structure
* Defining of resource, resource allocation and resource leveling.
* Applying flexible and in flexible constrains to the respective activities.
* Tracking of project.
* Perform dependency analysis and work on contingency planning to achieve project timelines
* Perform risk analysis to highlight critical path items.
* Authorizing field construction schedule to ensure good workmanship, safety and meet project timelines.
* Supervising fabrication and erection of Multi stage flushing Modules.
* Resource management ensuring effective capacity planning and deployment of people
* Inventory management.
* Inspection and certification of jobs on day to day basis.
* Vendor management focusing coordination and monitoring of contracted tasks.
Company: M/s Rudhra creators and contractors.
Designation: Planning Engineer
Duration: December 2005 to August 2006
Project: Bharatiya Nabhikiya Vidyut Nigam Limited. (BHAVINI),
500 MW Prototype Fast Breeder Reactor (PFBR), Kalpakkam, India.
Reference: Mr. A. Ananth, Project Engineer, Planning, BHAVINI, Kalpakkam.
Responsibilities:
* Assisting the Project Manager in organizing and supervising of project construction activities to meet project specifications and schedules.
* Monitoring and managing Project schedule.
* Preparation of work breakdown structure
* Defining of resource, resource allocation and resource leveling.
* Applying flexible and in flexible constrains to the respective activities.
* Tracking of project.
* Perform dependency analysis and work on contingency planning to achieve project timelines
* Perform risk analysis to high light critical path items
* Authorizing field construction schedule to ensure good workmanship, safety and meet project timelines.
* Maintaining accurate track record of drawings/documents received from design office/vendor and ensuring jobs have met the specifications.
Company: RMEC Projects Ltd., Pune.
Designation: Planning Engineer
Duration: June 2002 to December 2005
Project: Fast Reactor Fuel Reprocessing Plant (FRFRP)
Indira Gandhi Center for Atomic Research (IGCAR), Kalpakkam, India
Reference: Mr. M. Dhananjayakumar, Scientific Officer 'E', FRFRP, IGCAR.
Responsibilities:
* Assisting the Project manager in organizing, supervising and project construction activities to meet project specifications and schedules.
* Authorizing field construction schedule to ensure good workmanship, safety and meet project timelines.
* Inspecting the works performed by the contractor and certifying work measurements according to the terms and conditions of contract.
* Monitoring and managing Project schedule.
* Tracking of project.
* Perform dependency analysis and work on contingency planning to achieve project timelines.
* Perform risk analysis to high light critical path items.
* Supervision of fabrication, erection and commissioning of Cell piping and Equipments.
* Managing and facilitating contractors with proper work fronts after analyzing requirements and availability of materials
* Coordinating with Vendor supervisors for monitoring the jobs performed by contractors.
* Preparation of Pneumatic test packs for client approval.
* Maintaining accurate track record of drawings/ documents received from design office/ vendor and ensuring jobs have met the specifications.
Company: Spic Jel Engineering Construction Ltd, Chennai.
Designation: Junior Engineer
Duration: June 1998 to November 1999
Project: Chennai Petroleum Corporation Ltd. (CPCL), Expansion Plant III, Manali, Chennai, India.
Responsibilities:
* Supervision of pre-fabrication, fabrication and erection of structures, piping and equipments
* Ensuring work carried out is as per project specifications and approved procedures.
* Dimensional inspection of fabricated spools as per specifications.
* Checking of erected lines as per GAD and P&ID standards.
* Assist in the field engineering works such as field revision of isometric drawing.
* To ensure that all site activities are performed in environmentally safe and responsible manner.
* Responsible for the Productivity and has to solve the problems occurring and reporting to Engineer.
* Verify the availability and adequacy of the material and drawing.
* Fabrication, Erection and Testing of different sizes of tanks and associated structural steel platform.
* Coordinate Marking, fixing and welding of connected nozzles.
* Fabrication, erection and testing of associated piping.
* NDT Inspection co ordination.
* Preparation of hydro test, pneumatic and vacuum test packs for approval from client.
* Preparation of progressive bills.
* Preparation of final documents after completion of project and reconciliation of client supplied materials.
Personal Details:
Date of Birth: August 27, 1978.
Sex: Male
Marital status: Single
Nationality: India
Languages known: English, Hindi, Tamil, Telugu
Driving License: Indian and Oman
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 1751 to 1800 of 2515)
Go to Search Parameters...
Brief Description
Telecommunications Engineer, with Bsc. In Telecommunications and Electronics, present occupation on Telecommunications Network Resource Management, Planning & Design Telecommunication Circuits Serving Electrical Networks. Consultant Engineer: Alarabi Engineering Consultants.
Senior Electrical Engineer with over 20 years of manufacturing, industrial, chemical, and power plant field experience.
Secure a challenging engineering position where my team player attributes, experience, and communication skills can be utilized in obtaining personal career goals and those of the employer
Experienced human resources generalist and administration manager in fast paced harsh and hostile environments. 30 years proven experience in Oceania, South East Asia, Central Asia and Middle East.
Integrated Buidling Systems Manager, Project Manager, IT Manager, CMMS
Rotating Equipment Engineer with 9 yr Experience
Well qualified Tunnelling professional with broad experience in several technical key areas like microtunneling,dewatering,piling and CCTV sewerage inspection includes management,administration and team building skills in Project Management, troubleshooting, execution in Infrastructure industry.
I am hard working and dependable Software Engineering graduate with the ability to work well both independently and in a team. i have 3 year international experience in Mud Logging. OIL AND GAS, i can work anytime anywhere to serve my ability for company and i am sure i am the rite person to deserve
13 Years with Onshore & Off shore, OIL & GAS refinery & Shutdown .
Civil Engineering graduate with over 16yrs of experience in Civil Works (12yrs in Middle East) with a versatile potential to utilize & develop the vast experience gathered in the field of pipelines & infrastructures, dedicated to contribute the best efforts for growth of the company.
Over 15 years of engineering and project management experience in commercial and industrial construction. Demonstrated ability to manage a diverse array of projects, including hospitals, stadiums, FAA airport projects, casinos, biopharmaceutical, and semiconductor facilities.
Strategic thinking Executive leading environmental, health and safety area. Recognized for assessing environmental, health and safety protocol, formulating and implementing highly effective policies, procedures and training to meet compliance, minimize injuries & reduce worker’s compensation claims.
Highly skilled engineering and construction management professional.
As Geosciences Engineer, 13 years of experience. Exploration and Production mines
Good interpersonal and communication skills, Counseling and persuasive ability,Good quality report writing and typing speed, Public speaking and presentation capacity, Proficient use of spreadsheet software and Microsoft Office suite such as MS-Word, MS-Power point, MS-Access and MS-Excel,
Experienced Mechanical supervisor with over thirty years spent employed in the middle east.
Safety Supervisor , HSE Supervisor for all oil/gas, Pipeline, Offshore Construction, civil Construction
16 years Safety Construction, Developer of Behavior Safety Assurance Formula, Bs Occupational Safety and Health
General Accountant/Financial Reporting
More than 10 years of rich, in-depth, varied experiences in the field of Project Quality Assurance / Quality Control, Project coordination, execution, Testing and Pre-commissioning of diverse E & I and CP system activities in Refineries, Oil & Gas Plant (Onshore & Offshore), Fertilizers Plant, etc.
Contracts Manager
Civil Engineer with Project Control experience and knowledge of Primavera (P3)
Senior Contract Engineer Trilingual English/French/Spanish Oil and Gas industry, experience in Africa, South America, Europe. Working for a major international engineering company. Mainly contract formulation and admin. but also project and construction management, cost control and planning.
Chemical engineer with 3 years of experience in the fields of R&D, pilot plant, process design, basic & detailed engg., project management & procurement in chemical, bulk drug & pharma industries
Florida P. E. No. 54962 & Texas P. E. No. 29648; Degree: Bachelor of Science in Civil Engineering - University of Texas, El Paso; Graduate Studies: 12 Hours-Civil / Ocean Engineering - University of Houston; Languages: Fluent in English and Spanish; Beginning French and Arabic
Project maintenance manager/planner/trainer
9 years of extensive experience in Project Management, Planning and Execution involving fabrication, erection & commissioning of Piping & Equipments in Nuclear Facilities, Petrochemicals, Aluminum Smelter and Gold Mine Projects.
Project Manager, Telecommunication, Civil Engineer, Project Coordinator, Project Engineer, Supervisor
B.Tech-Mechanical Engineering, CSWIP-3.2 Senior Welding Inspector and LEAD Auditor-ISO 9000 having a 16 years experince in various levels in EPC projects ion Oil.GAS, Petrochemicals,Refinery and Pipeline in India, UAE,Nigeria, Saudi Arabia and Qatar.
HR/Recruiting/Client Relationship Expert
Management/Business Development of Engineering/Consulting Services
Graduated Mechanical Enginner with Extensive Experience in Europe, Australia and Africa in Power generation, Oil Exploration, Mining Industry
Auto Cad R-12-14, Auto Cad 2000, Uni Graphics 15.1 and 16, Solid Edge (Not in practice now), Power Builder 6.5 and 7.0 (Not in practice now), Java. C++, HTML 3.x, Javascript 1.x, Sybase System 10/11 (Not in practice now), MS SQL 6.0, Oracle 7 and 9i, Oracle SQL*, PL/SQL, Microsoft Access, Fox-Pro 2.
Extensive Experience in the industry!!
Over 10 year experience globally, CEE, Europe in general management, logistics, transportation and supply chain - excellence in strategy, costs optimization, business development, operational excellence, change management and restructuring
Dynamic supply chain specialist with over 15 years’ combined experience across a wide range of activities (project management, commodity purchasing, services and contracting procurement, inventory control). Extensive expertise supported by top Canadian (C.P.P) and USA (C.P.M.) professional designati
. I am having vast experience (22 Years) in an integrated industry in construction, Projects & Maintenance and in Diverse fields. I am also suitably qualified (BE (M), ME (PROD), DIP. IN MGMT, PGDIT) for taking up any challenging assignment with a rewarding career anywhere in the Globe using the mos
Strategic Planning • Program Management • Budget Analysis • Client/Employee Relations • Estimating
After having the highest level of exposure in Project Planning for the past Eight years in one of the fastest growing companies in Dubai. I am looking for a challenging and creative position that will set new standards in Project Planning. And to obtain a challenging position.
Ex Radio-Officer in The Merchant Navy...experienced in Marine HR Management
Communicator, negotiator, manager, natural leader
IT PROJECT MANAGEMENT
Total 11 years of experience for Instrumentation and control related design and detail engineering activities for Petrochemical refineries, Ammonia Fertilizers, Cross country Pipelines, Offshore and onshore gas processing facilities and power projects.
Graduate + Diploma in Materials Management, 12 Years exp., working as Purchaser in a Global Leading EPC Company in Qatar
Safety/Env (HSE) post sought (Will also accept Quality related positions) Reliable/Flexible/Language proficient - Willing to work worldwide, available from June 2009
After completing my Degree in Mechanical Engineering, I have worked in Diagnostician company providing NDT services on pipelines across Russia. Later I joined GAZPROM’s Subsidiary “Stroytransgaz” in Syria where 36”x319km Gas Pipeline Construction Project gave me a solid background in many QC aspects
Logistics Manager, Rig Manager, Materials Manager
A position with a construction company which requires skills in field engineering, cost controlling, planning, scheduling, and estimating
Working on projects for various E&P Companies and Contractors
A Credit Analyst and an Administrative Officer for more than 2 years, experienced in Accounts Receivable Management and other Administrative works.
First
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
[ 36 ]
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Next
Last
Seach Parameters
Change search parameters...
CATEGORIES:
Management;
INDUSTRIES:
Petroleum/Oil/Gas;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com