Go to Job Seeker's Center »»
Misco Jobs
Employer's Center
  • » Employer’s home
  • » Feedback
  • » Help
  • » Search Resumes
  • » Post Jobs
  • » Edit/Delete Jobs
  • » Resumes by E-mail
  • » Log In
  • » Register as Employer
  • » Lost Password
  • » Contacts
  • » Job Seeker’s Center



  • licensing
  • drilling
  • electrical
  • mechanical
  • training
  • health
  • siting
  • mining
  • management
  • experience
  • geologist
  • process
  • energy
  • business
  • design
  • equipment
  • environmental
  • development
  • safety
  • engineering
  • construction
  • maintenance
  • operations
  • learning
  • exploration

Qualify E&I Site Supervisor, QA/QC Inspector, Project Coordinator, Pro…

« previous resume next resume »
Information:

Posted: 23 Oct 2009
Brief description: Qualify E&I Site Supervisor, QA/QC Inspector, Project Coordinator, Project/Electrical Engineer and as well as Construction Manager. Excellent Documentation Skill for Project Management.

Resume description:

Oil and Gas „P Construction „P Operation Industry

Career Successes & Distinctions

Seek “better ways to manage the change and complexity that are perennial features of fast-moving, demanding, project-oriented business environments”.

Executive Summary

Senior-level executive experienced in multi-level engineering disciplines through accelerated working experiences from electronics through automotive operation industry. Develop a great knowledge in maintenance service oriented trading industry. Recently, identify strategic opportunities in Engineering, Procurement, Construction and Commissioning (EPCC) for oil and gas operation management.

Professional Experience


Employment


Kejuruteraan Wangemas (m) Sdn Bhd

EPCC STATUS COMPANY FOR ELECTRICAL AND INSTRUMENTATION 2007 TO Sept. 2009

(iso 9001:2000 Status Company)


DESIGNATION: Project Management Team as qualify E&I Site Supervisor, Electrical & Project Engineer, Project Coordinator and experienced Construction Manager. (Technical and Commercial Issue).

Performance Milestones:

Project Management

  • Planning and scheduling
  • Responsible for Construction Documentation for Pre-Job/ Kick Off Meeting for Revision
  • Total Site Coordination for Provision of Manpower Supply, Tools, Equipments and Machinery at Site.
  • Contract management (Commercial)
  • Revise Project Contract Value For Certificate of Payment
  • Issue Variation of Order as not per detail Engineering Design.
  • Request Approval for Certificate of Completion for Original Scope of Work.
  • Controlling
  • QA/QC Activities for RFI, NCR and Punch List Activities.
  • Basic Design and Engineering, Detail Engineering and Collaboration.
  • Red Line Mark-up Drawing

Construction Management

  • Site Planning and Scheduling
  • Site Management and Execution
  • Interface with Engineering, Planning and Procurement as well as other disciplines
  • Fleet Equipments and Tool Management
  • Pre-Commissioning & Commissioning, Startup and Handover

Situation
To accelerate myself to a maximum as a qualify Project Management Team (PMT) in Oil and Gas Industry.

Impact & Analysis
Chances to lead this following project* as currently delay or put on hold by clients: Updated as September 2009.
  • Brunei Methanol Plant Expansion Project.-Successful bidding for E&I work. Mobilization period uncertain.
  • Project by P. T Rekayasa Engineering & Construction JV with Mitsubishi Heavy Industries (MHI)
This project was unable to proceed as Project Contract Value was unacceptable.
  • PFKSB - Construction & Operation of Ammonia/Urea Plant in Gurun.- Plant De-bottlenecking Project
  • Successful bidding for E&I work but Mobilization period is uncertain.
This project was unable to proceed as Project Contract Value was unacceptable.
Project by P. T Rekayasa Engineering & Construction JV with Mitsubishi Heavy Industries (MHI)
  • Incinerator Project for Pulau Langkawi and Pulau Pangkor- No latest update.
  • Project Management Team for Australia E&I Project — Gorgon Project, Barrow Island LNG Plant.
  • Updated by September 2009 — Proceed 2 months in UK for Engineering Studies and 1 year at Australia project Site.-IN PROGRESS
  • Safe Astoria, Norwegian FSO Oil Rig -Rejuvenating Project.-Closed as Project Value was under Budget.
  • Note: * Project cost above RM1 Million minimum-Details undisclosed to protect Company interest.

Current Project Status: For Fiscal Year 2009
A).Preparation for Kuantan Compressor Station TT4 Upgrade Project for 3 units Solar Gas Turbines
  • Preparation for Project Documentation such as MOS, JSA, QAQC activities and others.
  • Review Engineering Technical issue such as Cable schedule and Route, Ladder / Tray Installation and Fabrication, Scaffolding Erection and Provision of Manpower, Tools, Equipments and Machinery at site.
  • Review Construction Drawing for AFC (Approved for Construction).
  • This Project was Under Quoted by Client therefore KWE (M) Sdn Bhd was unable to proceed.

B).Preparation for Gorgon Project, Barrow Island LNG Plant.
  • Design 40 ft. cabin for site operation and Instrument calibration-Complete
  • Preparation for E&I Engineering Design — In Progress
  • Detail scope of work:
  • Safety Instrumented System-ESD System & TMR (Triple Modular Redundant).
  • Electronic & Pneumatic Transmitters — Yokagawa
  • Design, fabrication and testing requirements for
  • Uninterruptible Power Supply (UPS) systems consisting of constant-voltage rectifier/charger, rechargeable storage batteries, static inverter, transfer switch, bypass transformer, and associated accessories.

  • To define the minimum requirements for the supply, design, manufacturing, testing, inspection, and installation of instrument cables for the Gorgon Project, Barrow Island LNG Plant. All instrument cables shall be designed and supplied in accordance with project philosophy.

  • To defines the minimum requirements for the installation of Instrumentation on the Gorgon Project, Barrow Island LNG Plant. The equipment covered includes:
  • a) Measurement and Control Equipment b) Safeguarding Equipment c) Fire and Gas Detection and Alarm Devices

  • This specification covers the technical aspects of the design, manufacture, testing, and inspection of stationary prefabricated Field Equipment Rooms (FERs) required for installation on the Gorgon Project, Barrow Island LNG Plant. FERs are to be installed outdoors and shall house a variety of instrumentation equipment and electronic controlsystems. The major control system equipment to be installed in the FERs is covered in separate individual specifications.

C).Kualiti Alam Malaysia (GLC Status Company under UEM)
  • Coordinating three weeks shutdown activities for Instrument Calibration and Updating P&ID drawing from August 3rd until August 17th 2009.-Completed

D).Preparation for ITB submission for E&I scope of work St Joseph Re-Development Project under Sarawak
Shell Berhad and Sabah Shell Petroleum Co. Ltd.
Scope of Work includes Hook-up and Installation, Fabrications Work and Pre-Com. Activities
  • Client: Sabah Shell Petroleum Company Limited
  • Fabricator: Brooke Dockyard & Engineering Works corporation
  • Project: St. Joseph Re-Development Project
  • A major Integrated Instrumentation and Electrical and Pre-commissioning Vendor (MIEV) for Engineering, Procurement, Fabrication, Pre-Commissioning, Ship loose of St. Joseph Re-development Project-(SJQ-A Topside & SJQ-A Bridge)-In Progress

DETAILS OF WORK EXCECUTED IN INSTRUMENTATION FIELD OF CONSTRUCTION IN OIL AND GAS, PETROCHEMICAL PLANTS, GATHERING STATIONS, INCINERATION AND FERTILIZER PLANT AND TOP SIDE PROJECTS (onshore / offshore).

Experience as Site Supervisor:
  • Job includes scheduling and monitoring manpower installation work at site as per standards, ITPS, project specs, Coordinate QA/QC activities such as Inspection in Hazardous(zone-0,1,2) & Safe areas included detailed inspection of all EEX Certified equipment Inspection of certified equipments for plants project work, Review field quality control procedure, making punch list, reports for inspection work involved as per their procedure & specification for inspection of material, instruments, inspection of installation & Insulation Test for E&I Cable. Above and Under Ground cable laying activities, correct Cable glanding procedure. Installation of cable Ladder & Tray, Field Junction Box Installation, Telemetry interface cabinets, Witness Calibration and Installation of Field Instrument and Local Indicator Equipments.
  • Familiarization with the job specification and review all documentations associated with Electrical & Instrumentation including Inspection & Test Plans (ITP), Procedures, Method Statements and JSA, Vendor Documentation and Maintenance and Operations Manuals for Hook-up and Installation, Pre-commissioning and Commissioning Work.
  • Control company budget in term of procurement and manpower mobilization.

Experience as QA/QC, Project Engineer/Coordinator and Construction Manager:
  • Final Inspection of Field Instrument Hook-up and Installation.
  • Final Inspection of Electrical & Instrumentation cable installation routes for above and under ground laying.
  • Final Inspection of Field Instrument Calibration, Cable Glanding and Termination work.
  • Periodic inspection of cabinet / station / instrument / connection and termination, glanding, earthing system and neatness, penetration sealing and instrument / tubing / cable identification
  • Checking of installation practices and quality of installation, alignment, level and orientation
  • Pre-run checking and punch-listing of equipment, system and component shortfalls
  • Monitor the subcontractor during testing activities to ensure compliance with the agreed testing procedures.
  • Witness pressure / leak / integrity testing of instrumentation tubing prior to testing
  • Circuit testing preparation and witness pre-commissioning work, power-up activities, Functional test and signal checks.
  • Perform inspection of all equipment during equipment pre-commissioning / commissioning
  • Prepare and review test documentation, submit results to Client and End User for Approval and Verification.
  • Close out the management changes made through NCR's Site Instructions & Engineering queries appropriately.
  • Control Overall site activities and Report direct to Project Manager and Board of Director.
  • Resolve Commercial Issue for Mobilization and Demobilization and Supply materials, tools and machineries and as per contract value and as per service contract.

Reason to Leave:
Searching for a best suitable company for me to retire if was possible. The Mobilization Package for new upcoming project is still unclear with my previous employee and sounded not very interesting.

Megapadu Sdn Bhd

CONSTRUCTION FOR WATER AND GAS PIPE LINE: HDPE & MDPE 2006 TO 2006

(iso 9002:2000 Status Company)


DESIGNATION: Engineer to Operation Manager

Performance Milestones:

Facility & Plant Operation

  • Space Management
  • Maintenance Operation & Asset
  • Service, Sales & Marketing
  • Service Operation.

Procurement & Material Management

  • Expediting & Tracking/Quality Inspection

Business Support

  • Customer Management
  • Workforce Deployment
  • Situation
To improve products acceptance in replacing other alternate solution such as MS and Ductile Iron for water pipe line and residential gas pipe line industry. To collaborate with state control water network and to support business division target.

Impact & Analysis
To lead manufacturing, QA/QC and Engineering Department (Internal and Site Operation) in order to achieve RM20 million sales with compressed up 15 employees only including the management site.

Promaxus Sdn Bhd & Trep Sdn Bhd

(Target Resources Sdn Bhd subsidiary company)
OPERATION INDUSTRY IN AUTOMOTIVE 2005 TO 2005

(iso Status Company)


DESIGNATION: Plant Manager

Performance Milestones:

Facility & Plant Operation

  • Space Management
  • Maintenance Operation & Asset

Design & Engineering

  • Detail Engineering

Fabrication & Assembly

  • Planning
  • Execution & Quality Assurance.
  • Situation
Facing highly competitive labor markets, company needs way to attract labor, retain employees and preserve organizational knowledge despite a shifting workforce. Companies need a better way to maximize the productivity of their people as well as to maintain operation and asset to peak performance with zero downtime (if possible).

Impact & Analysis
To create a baseline budgets and schedule based on accurate estimates and easily manage downstream variations in definition, scope, cost and other indirect concerns.

Tribune Industry Sdn Bhd

MAINTENANCE SERVICE ORIENTED TRADING INDUSTRY 2002 TO 2005

DESIGNATION: Managing Director

Performance Milestones:

Enterprise Management

  • Strategic Enterprise Management
  • Management Accounting
  • Financial Accounting
  • Corporate Governance
  • Financial Supply Chain Management
  • Business Analytics
  • Situation
To gain a maximum returns on personal investments and create a future philanthropy. I formed a private company.

Impact & Analysis
Grew my original part-time expertise to a fully concentrate core business without any formal financial back-up.
Venture my experience in non-dominance market expertise which is highly competitive especially in term of pricing from procurement to material management. I have been a self-starter, and leveraged my experience in maintenance to develop company business target.

Raya Plastik Industri Sdn Bhd

OPERATION INDUSTRY IN AUTOMOTIVE 1995 TO 2002

(iso Status Company)


DESIGNATION: Plant Maintenance Manager 2000 TO 2002
DESIGNATION: Project Engineer 1995 TO 2000

Hicom Freightmate (m) Sdn Bhd

OPERATION INDUSTRY IN STEEL FABRICATION 1993 TO 1995

(iso Status Company)

DESIGNATION: Design Project Engineer

Nitto Denko Electronics (m) Sdn Bhd

OPERATION INDUSTRY IN PCB EPOXY MATERIAL 1993 TO 1995

(iso Status Company)

DESIGNATION: Mechanical Engineer

Performance Milestones:

Facility & Plant Operation

  • Space Management
  • Facility Lease out / in
  • Maintenance Operation & Asset

Procurement & Material Management

  • Request for Quotation & Awarding
  • Subcontracting & Purchase Order

Design & Engineering

  • Detail Engineering

Situation
Seize aftermarket opportunities with optimum facilities operation-through business models that provide services during the entire life cycle of the facility.

Impact & Analysis
Implementation of TPM system in daily facilities management in order to achieve a zero facilities downtime in returned.
Focusing and integration with others, indirectly products acceptance, costing and productivity will improve tremendously.

Educational & Professional Development


No Descriptions / Subject Skill Level Year of experience
1 Learning Skill and Understanding either new or refresh subject Very Fast > 10 years
2 Electrical Skill and Knowledge — 11kV Advance > 10 years
3 Maintenance Management Skill Advance > 5 years
4 Manpower Management Advance > 5 years
5 AutoCAD design capabilities Intermediate > 10 years
6 Instrumentation knowledge Intermediate > 10 years
7 Microsoft Office illiterate Advance > 10 years
8 Mechanical maintenance knowledge for Hydraulic, Compressed air and Cooling system for equipments selection and Piping design. Advance > 10 years
9 Motivation and Analytical skill Advance > 10 years
10 Communication Skill Advance > 10 years
11 Procurement knowledge-Material sourcing and negotiation skill Advance > 5 years
12 Civil Engineering Intermediate > 10 years
13 ISO Documentation Intermediate > 10 years
10 Working Experiences at a Managerial level Advance > 5 years

Note: Skill level is classified as bellow except item no. 1:
Beginner — Surface understanding only
Intermediate — Be able to explain and to demonstrate the skill with certain reference needed.
Advance — Be able to explain and to demonstrate the skill with less or without certain reference needed.

CURRENT JOB APPLICATION IN PROGRESS: as updated by the end of August 2009
No Designation Company Activities Level Remark
1 Construction Manager Consultant Recruitment Company Appointed by Client, for Shell Gumusut-Kakap or Dry -Dock Project. under MMHE Sdn. Bhd. Management Waiting for Contract Employment.
2 Project Manager Sukiada Engineeering Sdn Bhd.
Fire Protection System for Oil and Gas. Management Final canditate Status: Unknown
3 PMT as Electrical Engineer Toyo Engineering and Construction Sdn. Bhd. Management Under consideration
4 Maintenance Manager Kemaman Bitumen Company Sdn Bhd Management Under consideration
5 Eng. Manager Assunta Hospital Petaling Jaya Management Under Consd.
6 Open Designation Shapadu Energy & Engineering Sdn Bhd Management waiting
7 Open Designation Sapura Crest Management Unknown
  1. Const. Spdnt. Technip-New Caledonia Management Waiting
  2. Note: Above application for reference purpose to indicate my strength in market demands.

Educational Background:

Qualification: Degree, Bachelor of Science in Industrial Engineering

College attended: Lamar University Beaumont Texas U. S.A

Years Graduated: August 15th, 1992.

Members: BEM (Board of Engineer Malaysia)

Personal Target: Registered Ir. Engineer by the 2009 or 2010
Scope: Construction Management

Nationality: Malaysian

Availability: October 2009

Mobilization period: 24 Hrs

Career Highlight.

In summary my job descriptions and supporting career developments:

At this moment, I 'm looking for is a position that mostly related to Site Project Management or equivalent too. Currently my career basically has been in Oil and Gas Construction activities specialty in Electrical and Instrumentation works as an experience E&I Construction Site Supervisor, QA/QC Inspector, Electrical / Project Engineer, Project Coordinator and as well as a Construction Manager.

In term of Project Management, my specialty is more on calculating of tendering work and ITB submission for a new project. I have full experience in total site coordination in term of provision of manpower, tools, equipments and machineries supply. Interface and coordinating with others disciplines also have been contributing a lot in my working experiences.

More than that, I'm also having excellent in skill of preparation and construction / project documentations overall. Good interpersonal skill interacting with client and main contractors during the mobilization period.

In my career development, my excellent specialties have been a lot in construction and project documentations and of course its will relevant automatically to ISO procedures. Furthermore I'm also have developed myself a lot in construction / project site coordination and have been in HSE committee in previous projects.(something that I have to involved directly).

Something that my previous company appreciated the most at site coordination is my interaction with the client, vendor and main contractor (technical and commercial issue). Other than that, my expertise in E&I cable laying activities is considered to be among the best, with 50,000 km (minimum) in length for above and underground cutting and laying route with 99% error so far. It's ranged from MCC room, Turbine skid, metering skid, and field instruments, FGS, CCTV and others.

As I have been involved myself in multi discipline engineering background, then these experiences so far have help me a lot to adapt with it quickly. Furthermore, I have been joining previous company by invitational and only few by applications.

My mobilization can be arranged as soon as required because currently I'm not working since this second week of October 2009.

Contact information:

« previous resume next resume »

Petroleum/Oil/Gas resumes »
Management

Resumes: 551 — 600 of 1928

Posted   Description
10 Jan 2010 I have knowledge and experience working with computers, Proficient with all Microsoft programs, and other office equipment. Excellent customer and communications skills. Qualified and Certified in Occupational Safety, Health and Environmental Management (OSHA).
09 Jan 2010 I ’m a seasoned professional looking for actively applying my experience and technical background as ASSET MANAGEMENT, MAINTENANCE AND RELIABILITY LEADER for designing, manufacturing, maintaining and disposing assets, exceeding the expected performance and minimizing the impact to the environment
08 Jan 2010 I am having handson experience in the purchasing, inventory, warehouse management, material cataloguing & spir review startegies
06 Jan 2010 Pro-active and results oriented with broad experience in all aspects of Accounting & Financial Management. Demonstrated hands on management style in the development and implementation of strategic plans to ensure company growth. Solid planning & Organizational skills
06 Jan 2010 Subject: Lead Project Development Engineer.
31 Dec 2009 A Mechanical Engineering Graduate with more than14 years of Experience in QA/QC function for Oil & Gas Projects(Onshore & Offshore), Pipeline and Tank construction,
15 Dec 2009 Seeking for position of Procurement manager in a prominent Company with a performance driven team-based culture.
14 Dec 2009 I would like to inform you that, I am seeking for a position within your organization for Field Construction Superintendent position or allied. I am a Civil Engineer with 10 years of experience with several international companies in the world's major EPC and PMT Oil&Gas projects.
09 Dec 2009 sales, marketing, business development, general management. technical/commerical, negotiation skills, presentation
06 Dec 2009 A highly qualified and respected Petroleum Engineer and Geologist having over 26 year ’s
05 Dec 2009 AUT CSWIP Level II, CSWIP 3.2.2, BGAS Gr 2, AWS-CWI, Level II in RT, UT, MPT & PT
05 Dec 2009 More than twenty nine of excellent experience in seismic data acquisition, data processing, Interpretation, VSP analysis, Logs analysis, AVO analysis, attributes analysis and seismic inversion. Well to seismic correlation and prospect generation. QC Supervisor Geophysicist and also Senior Observer
03 Dec 2009 More than 19 years oil and gas exploration experience, with 11 years as rig manager. I Communicate well with all levels of management, contractors and team members. Utilize total quality and safety management principles to operate successfully.
03 Dec 2009 A Mechanical Engineering Graduate with more than14 years of Experience in QA/QC function for Oil & Gas Projects(Onshore & Offshore), Pipeline and Tank construction,
03 Dec 2009 Commissioning / piping engineer, BSc, 15 years experience Approved to work in Canada, US, Europe and Singapore
02 Dec 2009 Have been working as Petroleum Engineer since 19 yerasin crudeoil and natural gas exploration and production projects onnshore and offshore. Worked as drilling, well completion and production supervisor and manager in different projects. Strong technical background and analytical approach.
02 Dec 2009 Multi-Skill, Multi-Talented and Highly Innovative Well Engineer with 19+ years of experience in all terrain (Land, Swamp, Shallow Water and Deepwater) of Well Engineering Operations
25 Nov 2009 Environmental/EHS Engineer
25 Nov 2009 15 years of experience in Engineering Projects & Maintenance, design engineering, construction and commissioning of instrumentation in petrochemical and chemical industries
25 Nov 2009 Offshore Installation Manager (OIM) with Production and Instrument/Electrical background. Shell UK trained with experience in UK, Australia, Singapore, New Zealand, Malaysia, Thailand. 7 years FPSO experience in Australia and Thailand. UK National, Australian Citizen. Willing to relocate.
22 Nov 2009 10 Years experience in Petrophysics and general petroleum engineering with B. Sc., Mechanical Engineering and MBA. I ’m looking forward to obtain a challenging and rewarding position as Business Coordinator, Planning Coordinator, Petrophysicist or Petroleum Engineer with a forward moving company.
19 Nov 2009 Possess 5 year s experience in Administrator Buyer and Planner. In depth practical knowledge management skill in logistic or admin. Mature with strong work ethic towards team support or report dateline. Proficient in both spoken and written English and Bahasa Malaysia and advantage 1 native language
16 Nov 2009 Sales and Office Administration for Steel Manufacturing Firm
15 Nov 2009 Drilling Financial Controller responsible for all drilling expenditures
10 Nov 2009 Experience in Project Management and Marine Construction
09 Nov 2009 Supply Chain and Procurement Management
03 Nov 2009 An accomplished and result-driven Management Executive with multi-faceted marketing experience. Exceptional communicator with demonstrated success interacting with people at all levels.
28 Oct 2009 Power Plant Chemist: An extremely talented Power Plant chemist with huge background in operating and maintaining Water Treatment plant. boiler water treatment, Cooling water treatment, steam and water analysis, lube & fuel oil analysis, coal analysis, Effluent Treatments.
23 Oct 2009 Qualify E&I Site Supervisor, QA/QC Inspector, Project Coordinator, Project/Electrical Engineer and as well as Construction Manager. Excellent Documentation Skill for Project Management.
12 Oct 2009 Master of Science Civ. Eng. — Contracts/Subcontracts Progress Monitoring, Management & Administration; Pre-Award & Post-Award Contracts Activities; Contracts Commercial & Financial Matters, Invoicing, Change Orders, Claims; ITT, Biding, Evaluation Reports, Recommendations,
09 Oct 2009 9 years of rich work experience in Project Controls, Planning & Scheduling functions in the field of Oil & Gas, Petrochemical/Chemical Plants.
09 Oct 2009 Well Test and C&WI services, i. e., Coiled tubing, acidizing, sand control, wireline, Fracturing, cementing, well testing, slickline, e-line, perforation programs, down hole plugs, x-mas tree change outs, and other.
06 Oct 2009 complete mechanical design & detail engineering of pressure vessels, heat exchangers, columns, reactors, jacketed vessels, refractory lined equipments, storage tanks, silos/bins & structural skids etc.
05 Oct 2009 An Engineer with an extensive 23-year Architectural and Structural experience with Offshore Living Quarters and other blast rated modules and buildings for the Petrochemical, Nuclear and Pharmaceutical industries
05 Oct 2009 ISO 9000, ISO 14001, OHSAS 18001, ISO/TS 16949, TQM, SAP R3, FOURTH SHIFT, SPC
20 Sep 2009 Experienced Managment support as commercial manager, contract administration
17 Sep 2009 BE Mechanical /Entry level fresher
14 Sep 2009 Senior registered Professional Engineer with over thirty years of experience in management, drilling and production engineering, planning and operations.
10 Sep 2009 Strategy development & implementation; Project management; Team leadership; Standardisation & cost reductions; ITIL; Quality Management — ISO 9001; Customer Relationship Management; Programming methodologies; Engineering applications; Excellent communication/negotiation
28 Jul 2012 25+ yrs progressive exp. as a Sr. Supervisory Planning/Scheduling & Project Control Engr/Mngr with Risk/Contracts Exp, Int’l w/Utilities, EPC Firms/Consultants, Turnkey OEMs and Constructors within the Energy Sector. P3 Ver.3.1, Primavera P6, P7, Pertmaster, Claim Digger, MS Office, Acrobat
24 Aug 2009 Project Manager — FEED - EPC - PMC - Oil/Gas
19 Aug 2009 Project management
14 Aug 2009 Wellsite drilling supervisor all phases of drilling
14 Aug 2009 Thirty Eight years in Material Handling, Purchasing, Logistics, Expediting and Management with a record of Reliability and Progressive Advancement. I have handled the entire Purchasing Process for as many as twenty projects at any given time involving m
13 Aug 2009 Total Experience of Eighteen, encompassing as a professional experience in Project engineering for Major Construction Projects in the Middle East & India.
11 Aug 2009 12 Years of experience in the Project Management, Planning, Controlling, Production and Material Management
07 Aug 2009 PETROLEUM GEOLOGIST with experience in exploration, development, acquisitions, divestitures, and operations. Experienced in clastic, carbonate and salt environments. Available to travel for either permanent or contract work.
05 Aug 2009 Cost Engineer for 11 years. Has adequate experience in a multitask discipline as planning, project management and supervision, quantity survey. Proficient in SAP and microsoft software applications. Team player, diligent and hard working.
30 Jan 2012 Chartered Accountant, U. K Citizen, Multi-Lingual 4 Languages incl. French, Mining Experience in French and English Speaking Africa
01 Aug 2009 Thirty (30) years of engineering and safety management experience, 26 years of which were in the oil, gas and shipping industry and EPC projects that include the ff.: Project and HSE management, conceptual, feasibility and risk studies, basic and detailed design, safety and procurement.
«
»
1 ... 8 9 10 11 12 13 14 15 ... 39
 

Advanced Search Parameters (Click here to show/hide search parameters form)

Experience:
Categories/Regions:
Selection:
of the words


Copyright © 1999 — 2011 Misco Jobs. All rights reserved. Contacts: support@miscojobs.com.