Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #13832 next resume »»
CONTACT INFORMATION:
View contact information...

BRIEF OVERVIEW
* Strong experience in the arena of Engineering,installation,re-vamping,commissioning and maintenance of DCS/SCADA/PLC systems for clients in India and abroad
* Effectively managed assignments to deliver timely results
* Involved with all stages of the project, and ensured quality of work at all levels
* Knowledge of and exposure to various systems, tools and technologies
* Proven contract management abilities with strong communication and interpersonal skills
* Involved with After sales services Activities

PROFESSIONAL EXPERIENCE

Tata Honeywell Ltd. Jan. 2000 - Present
Dy. Manager - Systems
Sr. Engineer

Work Profile:
* Undertaking the engineering, re-vamping, commissioning & maintenance of Honeywell DCS/PLC/SCADA at client site as well as at our works.
* Handling the Annual Maintenance Contract and Customer Service related functions
* Attending to system breakdown and preventive maintenance calls
* Complete execution from Project engineeing to execution of new project and third party interface with Syatem.
* Complete Execution from Inquiry to execution of Add-On and re-vamping projects.
* Managing the migration of systems to higher versions
* Checking for system performance with respect to loading and overruns

Torrent Gujarat Bio-Tech Ltd.
Executive - Projects (Systems) Jan. 1995 - Jan. 2000

Work Profile:
* Undertaken system installation and point configuration assignments as per P&I diagrams
* Handled Loop checking from field to DCS screen
* Installed field equipments, and carried out failure analysis and calibration
* Undertaken logic checking as per interlocks.
* Planned and implemented Preventive maintenance schedules for Field instruments, Siemens PLC and Honeywell DCS.
* Annual budjet preparation and USFDA prodedures.
* Process optimization and efficiency improvement implementation in DCS.

EDUCATION
L D Engineering College 1994
B. E. - Instrumentation and Control

COMPUTER KNOWLEDGE
* Proficient with the use of Windows, MS Office and the Internet
* Configuration, engineering, application programming, commissioning and maintenance of Honeywell TDC-3000 DCS, Experion Quick-Builder and PLANTSCAPE systems
* Engineering, software programming and maintenance of Triconix,FSC PLCs

STRENGTHS
* Knowledge of and exposure to a wide variety of systems, tools and technologies
* Strong skills at contract and project management
* Easily adaptable to changing work cultures and environs
* Strong leadership skills with an ability to build, develop and lead result-oriented teams
* Excellent communication, presentation and interpersonal skills
* Release migration, Add-on, HM initialization
* Re-vamp job execution in minimum time.

LANGUAGES KNOWN: English, Hindi and Gujarati

PROJECTS HANDLED
Tata Honeywell Ltd. Jan. 2000 - Present

Client: Petroleum Development of Oman (PDO)
Location: SAIH-Rawl Gas Gathering Unit, Oman

Description and responsibilities:
* Deputed as engineering-In-Charge to Handled complete engineering, Logic implementation and Coordinated with consultant and customer for complete Honeywell TPS system which incorporates 4 US, 2 GUS Stations, 3 APMs, 2 HPMs and 2 FSC (TUV Approved PLC) with QMR Processor
* Implemented Control Language (CL) programming for Oil and Gas well gathering
* Undertaken control algorithm and complex control loop development
* Managed the commissioning of the entire system
* Implemented and modified Trip and Shutdown schemes for Oil and Gas process in FSC PLC
* Installed GUS software - TPSDDE, file transfer, GUS Display Builder etc.
* Handled the I/O Point Building in FSC PLC as well as in SMM
* Handled the I/O Point Building and soft Tags like RP,RC,Logics in HPM

Client: Cairns Energy India Ltd., Surat, India

Description and responsibilities:
* Deputed as PLC & third-party communication expert to Implemented the communication of FSC -FSC system at onshore and offshore through RF link,Allen Breadly PLC with Honeywell PLANTSCAPE system
* Implemented communication of FSC system and Honeywell SCADA System PLANTSCAPE
* Developed logics for fire and safety, and for compressors and turbine
* Developed an interface between turbine and FSC
* Developed an interface between turbine and PlantScape
* Implemented and modified trip and shutdown schemes for the Process in FSC PLC as required for plant performance operation

Client: Indian Oil Corporation Ltd. - LPG Mounded Bullet plant
Description and responsibilities:
* Deputed as Site-in-charge to Handled the installation of the complete Honeywell Failsafe Controller System with Plant Scape
* Commissioned the FSC and SCADA system, and implemented I/O in FSC PLC and SCADA
* Put in place and modified Trip and Shutdown schemes for the process in FSC PLC
* Involved with field instruments loop checking with the SCADA system
* SCADA system Operation and system Graphics development
* SCADA system Point building, third party communication likes Bentley vibration system.

Client: Gas Authority of India Ltd. - LPG Recovery Plant
Description and responsibilities:
* Deputed as Engineering/Site-in-charge to Handled the engineering,installation and commissioning of the entire Honeywell TPS System having a configuration of 4 GUS Station, 3 High Performance Manager (HPM), 1 TUV approved Fail Safe Control (FSC) PLC, with Flashed RAM Integrated with Safety Manager Module (SMM)
* Implemented Critical Process Control Loops of chemical plant, tuned them for optimization with Rapid Tune software
* Implemented and modified GUS Graphics as required by the Operations Department
* Undertaken implementation of Control Language (CL) programming for the control algorithm and complex control loop development
* Implemented third party devices, interfacing with TPS System through Modbus Standard Serial Interface for Allen-Bradley PLC Systems, Bentley Systems, GC and Flow Computer.
* Put in place and modified Trip and Shutdown schemes for the process in FSC PLC as required for plant performance operation
* Involved with field instruments loop checking with the DCS system.
* Implanted GUS Software - TPSDDE, file transfer, GUS display builder etc.
* Handled implementation of GUS ART software and MASIBUS Sequence of Events (SOE)
* Built I/O Point in FSC PLC as well as in SMM
* Modification in HPM I/O Points

Client: GNFC
Description and responsibilities:

* Deputed as Engineering /site-in-charge for safety shut-down TUV approve FSC PLC, Logic implementation and commissioning for Ammonia and Methanol plants
* Handled the commissioning of the entire system.
* Established communication between FSC and Yogogawa system, and FSC and Foxboro system as a third party interface
* Implemented and modified trip and shutdown schemes for the Process in FSC PLC as required for plant performance operation

Client: Grasim (Nagda) Chemical Plant
Description and responsibilities:
* Deputed as Engineering/Site-in-charge for the plant re-vamping operations.
* Converted the Honeywell-Yamataka A-MC System to Honeywell TPS system
* Carried out complete logic study, undertaken implementation check, and installation
* Removed existing hardware and install new hardware in it's place
* Carried out on-line release upgradation from 435.2 to 6xx.xx Honeywell TPS system.
* New graphics developed for TPS system operation.
* Successfully completed the job in just four days
* Client: GACL - CA Plant
Description and responsibilities:
* Deputed as Engineering-in-charge for the plant re-vamping operations.
* Converted the Honeywell-Yamataka A-MC System to Honeywell TPS system
* Carried out complete logic study, undertaken implementation check, and installation
* Removed existing hardware to install new hardware in it's place
* Carried out on-line release upgradation from 435.2 to 6xx.xx Honeywell TPS system.
* New graphics developed for TPS system operation.
* Successfully completed the job in just 50 hrs.

Client: IPCL, CA Plant
Description and responsibilities:
* Deputed as engineering-In-Charge to Handled complete engineering of Add-on HPM and LM, Release migration.
* Carried out on-line Release upgradation from 435.2 to 6xx.xx Honeywell TPS system.
* Up gradation from APMs to HPMs
* Installed on-line new HPMs add-on, and added an online I/O rack in APM
* Involved with field instruments loop checking with the DCS system.

Client: IPCL, VCM Plant
Description and responsibilities:
* Carried out on-line release upgradation from 435.2 to 6xx.xx Honeywell TPS system.
* Up gradation from APMs to HPMs
* Installed on-line new HPMs and LM add-on,
* Involved with field instruments loop checking with the DCS system.
* Implementation of ESVT - EST

Client: Tata Chemicals Ltd. - MUW #03 Plant
Description and responsibilities:
* Deputed as site-in-charge for handled the installation and commissioning of the complete Honeywell TPS System, which comprised of a configuration of 4 GUS Station, 2 High Performance Manager (HPM) and one 620-35 PLC on LMM
* Implemented Critical Process Control Loops of chemical plant, tuned them for optimization
* Implemented and modified GUS Graphics as required by the Operations Department
* Undertaken implementation of Control Language (CL) programming for the control algorithm and complex control loop development
* Put in place and modified Trip and Shutdown schemes for the process in 620-35 PLC as required for plant performance operation
* Implemented the Sequential Motor Start/ Stop Logic
* Involved with field instruments loop checking with the DCS system

CERTIFICATES
* Bronze certificate for FSC Implementation
* Bronze certificate for GUS Implementation
* Bronze certificate for HPM Implementation
* Bronze certificate for PHD Implementation
* Bronze certificate for Experion Controller Implementation
* Negotiation Skills Training & Certificate from TATA MANAGEMENT TRAINING CENTER

REFERENCES
Available on request

View contact information...
«« previous resume next resume »»
Search Results (Resumes 1801 to 1850 of 6558)Go to Search Parameters...
Brief Description
An Electrical Engineer with over 12 years of hands-on experience in Maintenance of Assets and Utilities in a Gas based Petrochemical plant and Integrated Steel Plant with Rich Managerial and technical capabilities in Installation/Commissioning and Upkeep of Electrical Equipments.
AWS, CSWIP 3.1 AND ASNT LEVEL II IN RT,UT,MPI & DPI
Pipe stress engineer with eight years experience.Software Caesar II.
8 + years Oil & Gas field experience in Instrumentation and Control engineering. Lastly Worked as Assistant Resident Engineer for Tyco Fire & Security, UAE
11years experience in the field Mechanical Maintenance of Machine shop and Foundry
Gas turbine, Boiler, Water treatment, Oil and gas operator
Condition monitoring Engineer with 7 years experience in oil and gas industry
I have been involved with many projects throughout these regions, from Heavy Construction, Platform Installation and Inspection IRM programs.Also I have more than 3 years experience in NDT/Welding Inspector in various project. I just recently pass my Subsea Insp. Controller CSWIP 3.4U(TWI-UK).
Piping, mechanical, stress analysis, nuclear
KNPC & KOC approved planning engineer for EPC projects,Involved in Planning and coordination for the KNPC GRTA- 2006 shutdownInvolved in Planning of Major Shutdown for KOC -GC 27
An experienced metocean engineer/hydrographic surveyor/GIS technician/coastal engineer seeking suitable positions in related fields
Welding and NDT Supervisor, Lifting Equipment Inspector
Subsea Pipeline & Riser Installation engineering with Offpipe or Orcina Software(Orca Lay, Orca Flex
Computer :
My expertise includes strong hands-on technical skills with ECLIPSE and MBAL software applications. I am highly skilled in EOS fluid characterization, well test analysis, reservoir modelling, manage mature reservoirs, well monitoring
Welding Superintendent: SSCL. DME (3years welding), WI (QA/QC) 1992, Safety Training qualified and 21 Years Experience (QA/QC Welding Engineer-01 Year; Welding Supervisor--12 Years; Welding Educator-04 Years; Welding Instructor-02 Years) in working with ASME, AWS, API standard in EPC Industries
Ten (10) years of accumulated experience in construction engineering, project planning using Primavera P3 ver. 3.1 for more than six (6) years, and project management. Last seven (9) years with Saudi Arabian Oil Company (Saudi Aramco), Saudi Electricity Co. - Eastern Region Branch (SEC-ERB) and Saud
cartographer - gis
Internationally experienced and trained professional in Instrumentation and Control Systems. Experienced in the design, control philosophy, MMI/HMI generation, implementation, start-up, commissioning, and operation of DCS, SCADA, and PLC.
Occupational Health And Safety Professional, Post Graduate Cert. In OHS&E Management
Technically accomplished & competent professional with over 9+ years’ rich experience on Refinery Inspection department Activities, starting from Refinery construction stage to pre-commissioning and Normal operation. Currently working as Assistant Manager (Inspection) with NRL
Having total 11 years experience out of which 10 years in Oil & Gas and Shipbuilding Industry as an Cost Estimator, Cost Control Engineer, Tender Coordinator and HSEQA Adviser in the leading FPSO/FSO Company, Shipbuilding/ship repair and conversion yard.
Chemical Engineer. Main experience as chemical treatment and corrosion engineer in Oil&Gas facilities (gas, steam and water injection plants, tank farms). Engineering and field experience. Oilfield chemicals selection and testing. Process optimization. Control and Instrumentation experience.
Wellsite geologist, wireline corelation, mapping, pressure detection, hands on well control advisor, well design, rheology and hydraulics solutions.
Experience in Safety / Loss Prevention Engineering and Risk Assessment Studies
B.E. Mechanical Engineer, Middle Management Maintenance Executive. Demonstrated willingness and ability to quickly acquire new expertise, solving problems related with Rotating Equipment reliability and performance. Looking for challenging opportunity and career advancement.
Senior Piping Designer CADD
Mechanical / Piping Engineer
Working in all fields of civil qc civl & qs civil is maincan work as project manager for oil &gas field &bulding construction
Im graduated of bachelor of science in civil engineering, I have 14 years experience in Drafting/Design for structural steel, FPSO pressure vessel and piping layout thru P&ID. I have background in qaulity inspection for dimensional and visual, also Im NDT-LEVEL II Inspector (DPT).
I am Civil/Structure Engineer with almost 10 years experience in oil&gas, petrochemical, cement, powerplant and mining industries.
Instrumentation Engineer With 10 Years Experience In Managing Engineering,Re-vamping,Installation, Commissioning And Maintenance Of HONEYWELL DCS/SCADA Systems
Project Control Manager/ Lead Planning Engineer - Oil & Gas.
I have worked extensively with various simulation packages viz. MoReS, Eclipse, VIP, MORE etc, I have over 8 years experience as a Petroleum Engineer, specializing in reservoir engineering.
I worked in automation and process consulting companies for six years.
Industrial Engineer with experience as maintenance instrument technician and plant engineer in process plants. Higher Knowledge in Instrumentation and Control, such as transmitters, field sensors, analyzers, solid handling instrumentation, control valves, special application devices
I am Mechanical Engineer having 14 years of working experience in Maintenance of Petrochemical and Fertilizers Plants. Good knowledge of SAP, MS OFFICE.
I am an Electrical Engineer from Colorado School of Mines. I have worked for two major oil companies. I have worked on several areas of energy industry as an Electrical Engineer.
I am working as a QA/QC Engineer in Oman.I am expecting a challenging job to prove my potential.
Bachelors and Master's in Geophysics with almost 3 years in Oil & Gas Industry
Wellsite Geologist – Operation Geologist, geology department representative at rig site for drilling activity of: development, delineation, and exploration wells with over pressure risk. Familiar with deltaic system, mainly in gas field.
I am a petrochemical engineer with over 25 years of operation and technical service experience in ethylene plants.
Six years experience in Project Controls and Project/Programme Management (including three years experience in EPC/PMC projects). Focused mainly on planning & scheduling & project risk management.
Supply Chain Management & Well Optimization Coordinator
Cathodic protection engineer with 7 years exp. with every aspect of C.P,Well versed with NACE and other Interntional and Industry specific stds
Pipeline engineer and Stress analyst (CAESAR II)
Worked as Rotating Equipment Engineer for various types of rotating equipments for refineries, petrochemical and nickel-mining plants in compliance with the project specifications, clients’ requirements and international codes and standards. Field engineering works during construction stage related
I am Junior Piping Designer with PDMS skill
My experience include but not are not limited to ensuring and maintaining healthy, incident and injury-free environment, as well as implementing the company’s safety policies and procedures.
Hse speciality
First   1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   [ 37 ]   38   39   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
CATEGORIES: Engineering/Technicians;
INDUSTRIES: Petroleum/Oil/Gas;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2008 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com