CONTACT INFORMATION:
View contact information...
Post Applied : Instrument Engineer
12.5 Years Experience in Instrumentation Including Oversees
Qualification : B.E.Degree
Proficiency in Compute : MS OFFICE
Languages Known : English, Hindi, Malayalam, Hindi
Career Profile
S l Company Post Held Project Duration
1. LG E&C/N.S.H.C Manager (Instr) QGPC Expn.Project , June 2000 to 002
Qatarr, Doha,Qatar
2. Airmech Sr Engineer(Instr.) DUBAL Expn ,Dubai May1999 to Aug'99
3. LG Construction Instr.Engineer Saudi Aramco Project 1997 To 1999
Abquiq,K.S.A
4 Travancore Rayons Instr.Engineer Travancore Rayons , 1990 to 1997
India
5. Keltron Controls, Instr.Engr Mettur Thermal Power 1989 to 1990
Plant , Cochin - India
Professional Highlights
*Able to handle the Project Independently *Installation of all Type of Field Instruments*
Loop Checking* Site Design *F&G System *Pre Commissioning Activities
*Preparation of all documents *Knowledge of different standard *QC Activities
*Knowledge of HSE *Site Modification *Erection of DCS (TDC3000, Fischer Provox,
Hitachi, Controle Bailey)* Awareness of PLC *Procurement* Bidding *Planning* Cabling*
Conduiting*Tubing *Good Knowledge of Analyzer System *Experienced in Senior levels
*Good Leadership quality *Good interpersonal relationship
Saudi Aramco, Qatar Petroleum, Dubai Aluminium, Petrochemical, Power PLant Experience
PROJECT DETAILS.
A. Qatar Petrolium Co.(QGPC) Expansion Project. Measied, Doha, Qatar
Post Held: Manager (Instrumentation)
Project: Expansion of Existing facility (Condensate Refinery, FCC, Tank Farm, Sulpher Unit,
(Utilities etc.) of Qatar Petroleum(QGPC).Installation of New Instrumentation system(Honeywell
TDC 3000. Shutdown activities of Existing facilities
Duties: All type of construction activities by leading a team. Erection and Commissioning of
all type of Field Instruments used in Oil Refinery. Erection of DCS ( HONEYWELL TDC 3000)
Site modification. Pre commissioning activities, Loop Checking .Shutdown work of Existing
Facilities. Fire and Gas Detection System Erection and Commissioning. PLC AB-Contol logix
B. Dubai Aluminium Company Expansion Project, Dubai U.A.E
Project: Expansion of Dubai Aluminum Company
Post Held: Senior Engineer (Instrumentation)
Duties: Construction works of the Expansion Project
C. Saudi Aramco's Shaybah Downstream Project, Abqaiq, K.S.A
Project: Upgrading the existing plant by constructing new plants. Total Instrumentation of
the new project using Fischer Rosemount Provox DCS System.
Post Held :Instrument Engineer
Duties: Construction activities of the project includes erection, commissioning of Field
Instruments, (All type of Transmitters, MOV, CV, Analyzer system etc.) Site modification,
Shop drawing, Cable routing. Loop Checking.Cable tray work .conduiting, preparation of
documents, Erection of DCS System( Fischer Rosemount Provox),PLC
D. Travancore Rayons Ltd, Perumbavoor, Kerala, India
Project: This is one of the Pioneers in the Rayon Industry. Installation ,Maintenance and
revamping of the new Instrumentation System by replacing the existing one
Post Held :Instrument Engineer
Duties: Erection , Commissioning, Maintenance of Field Instruments like Transmitters,
Control valves, Converters etc. (Foxbro, Bells, Rosemount, Yokogowa, Masonilin etc..),
Cabling, Maintenance of Electo Pneumatic Instruments, Boiler Instrumentation
E. Mettur Thermal Power Plant
Project: Construction of new Thermal Power Plant 840 MW
Post Held: Engineer Trainee/Instrument Engineer
Duties: Installation of instrumentation system for the Power Plant 4 x 210MW.Cabling, Cable tray,
Cable routing, Tubing, Erection of the DCS( Controle Baily (France),
Hitachi HIDIC V90/25,Japan) ,PLC ( GEC -ALSTOM)
View contact information... |