Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #15635 next resume »»
CONTACT INFORMATION:
View contact information...

Qualifications for SENIOR PROJECT MANAGER

SUMMARY

Seasoned professional offers over 25 years of experience and a proven track record of success in project management, process/project engineering and technical service. Has held responsibility for the design and construction of refinery, natural gas, food, pharmaceutical, and other pilot/processing plants. An effective professional communicator capable of putting others at ease, negotiating, and solving problems. Offers both technical and hands-on field experience.

EDUCATION AND AFFILIATIONS

B.S., Chemical Engineering, University of Wisconsin

EIT, State of Wisconsin

American Institute of Chemical Engineers

Theta Tau Engineering Fraternity

MAJOR PROJECTS
Lube Oil Blending Plants * New Technology Pilot Plant * Mobile Pilot Plant * Refineries
Chemical Facilities * Intermediate Shampoo Grassroots Facility * Pharmaceutical Tank Farm

PROFESSIONAL HISTORY

Project Manager 2006-Present
Orbital Engineering Inc., Hammond, IN
Supervised and coordinated projects of up to $25M from the conceptual phase to the design phase as well as the installation of facilities dealing with refinery and chemical/petroleum product manufacturing at the BP-Amoco, Whiting, IN Refinery. Executed project management responsibilities such as Capital Value Process reviews, project schedule, cost control, client communication, interdisciplinary coordination and man-hours, preparation of BP phased project DSP/CVP Packages, with deliverables including Work Plans, project options, status reports, procurement and project drawings. Responsibilities included monitoring all project drawings (Process Flow Diagram (PFD), Piping and Instrumentation Diagrams (P&ID), General Arrangements (GA), Construction Drawings, etc.), HSSE and risk reviews, approval of Equipment Bid Evaluations, procurement assistance and preparation of Operating and Installation/Maintenance Manuals and performing of on-site Checkout, Startup and Training Services upon completion of the construction for Refinery Projects.

Environmental Mechanical/Project Engineer 2004-2006
McDonough Associates, Inc., Chicago, IL
Mechanical and Process design, specification and purchase of equipment and instrumentation for municipal waste-treatment and water treatment processes, government and various private industries. Developed PFD, P&ID's, General Arrangements, Heat/Material Balances, Hydraulic calculations and Utility Summaries. Developed Equipment, Instrumentation and Piping/fittings Specifications for each Project. Performed technical approvals on equipment for contractors and/or clients. Also environmental projects associated with new and existing underground storage tanks, including Federal, State and City regulations.

Project Manager/Process Engineer 1994-2003
FMC Blending & Transfer (formerly Mid-America Engineers Inc.), Chicago, IL
Supervised and coordinated projects of up to $25M from the conceptual phase to the design phase as well as the installation of facilities dealing with lube oil blending and chemical/petroleum specialty product
CURTIS J. COOPMANS PAGE 2 OF 3
(312) 587-0336 * cjcoopmans@aol.com

PROFESSIONAL HISTORY, CONTINUED

manufacturing. Executed project management responsibilities such as project schedule/cost control, client communication, interdisciplinary coordination and man-hours, preparation of Client Proposals, Work Plans, and final reports, monitoring all project drawings (Process Flow Diagram (PFD), Piping and Instrumentation Diagrams (P&ID), General Arrangements (GA), Construction Drawings, etc.), approval of Bid Evaluations and subsequent Purchasing of Equipment, preparation of Operating and Installation/Maintenance Manuals, and performing of on-site Checkout, Startup and Training Services upon completion of construction for Lube Oil Blending Facilities.

* Increased the profit margin of a $14M project from an originally estimated profit of $600K to $1.7M+, representing a 280% increase in profits.
* Prepared project proposals and sold multiple projects by making presentations to clients; brought in sales and revenues in excess of $100M over an eight-year span.

As process engineer, prepared PFD, P&ID, equipment layouts, and other documents for multimillion-dollar projects as well as performed heat/mass balance calculations and equipment-sizing calculations for equipment specifications; evaluated equipment vendor quotations and purchased the necessary equipment.

Manager of Project Group/Project Engineer 1993-1994
Jones and Attwood Inc., Libertyville, IL
Managed the project engineering department and coordinated all of the activities for in-house projects ranging up to $600K and encompassing the fabrication of waste treatment equipment, including the scheduling and assignment of projects, approval of equipment purchased, project cost monitoring, and other managerial responsibilities. Interacted with fabricators to determine their capabilities, shop availability, and the best equipment fabrication cost; reduced vessel fabrication costs by 8%. Coordinated the checkout and startup of new equipment.
* Analyzed feedback from contractors, clients, and district representatives on the performance of project personnel.
* As project engineer, prepared project approval submittals and coordinated with contractors to obtain engineer approval of the submittal interfaced fabrication and assembly of major equipment as well as purchased the buyout of equipment/instrumentation, specified controls, approved invoices, and monitored project schedule/cost.
* Improved the efficiency of a 10-person project engineering department 18% by streamlining the workload against individual ability and created a training program that increased overall group efficiency by an additional 2%.

Project Manager/Lead Process Engineer 1990-1993
Wheelabrator Corp., Schaumburg, IL
Directed process design, the specification and purchasing of equipment, and instrumentation based upon licensed ARI sulfur removal Environmental processes. Generated PFD, P&ID'S, General Arrangement layouts, heat/material balances, equipment/instrument specifications, and utility summaries. Performed process modeling, developed equipment/instrumentation indexes, piping specifications for each project as well as purchased equipment, instrumentation, piping and fittings. Wrote startup manuals.
* Coordinated the installation of equipment and the instrumentation on prefabricated steel skids.
* Project manager duties included meeting with clients, coordinating activities between discipline groups, project schedule development, tracking activities, man-hour/capital expenditures, and added oversight; projects ranged up to$5M.
* Built a New Technology Pilot Plant, coordinated the process development, design, and construction/startup, of a new Soil Decontamination Process (SOIL *EX) pilot plant.

CURTIS J. COOPMANS PAGE 3 OF 3
(312) 587-0336 * cjcoopmans@aol.com

PROFESSIONAL HISTORY, CONTINUED

Lead Process Engineer/Project Manager/Project Engineer 1986-1990
K & W Design/Construction, Burr Ridge, IL
As a lead process engineer/project manager/project engineer, contributed to major projects as needed. For the Chemical Facility project, revamped and modernized a small existing latex as well as oversaw client goals, making suggestions and implanting those concepts. Developed PFD, P&ID, equipment and instrumentation lists, control concepts, and project schedules.
* Reviewed line sizes and utility requirements for new latex formulations; included the revamping of select existing equipment and specifications as well as the selection and coordination of the installation of new equipment/instrumentation.
* Further activity included meting with clients, tracking project schedule, coordinating manpower and all budget/purchasing activities, and supervising construction.
* Performed corresponding and specific responsibilities for a Mobile Pilot Plant project, Intermediate Shampoo Grassroots Facility, a Pharmaceutical Tank Farm project and. Developed Pharmaceutical Utilities-Water For Injection (WFI), Clean Steam, Process Steam and glycol/water chilling/heating.

Prior to 1986: Staff Plant Engineer/Project Engineer, Amoco Production Company; Technical Service Engineer, Northern Petrochemical Company; Technical Service Engineer/Development Engineer, Universal Oil Products

View contact information...
«« previous resume next resume »»
Search Results (Resumes 2201 to 2250 of 6543)Go to Search Parameters...
Brief Description
I am presently employed with Black&Veatch, a US based reputed company doing mainly Oil &Gas and EPC projects mainly in power plants.
Process engineer with two years of experience in the feild of basic enginnering, front end engineering design and precommissioning and commissioning of process plants.
Provide day to day on-site supervision of drilling operations to ensure operations are performed in accordance with the Drilling Program in a safe cost-effective manner.I m responsible for Health and Safety procedures being continuously enforced
Development, maintenance and utilization of the full field reservoir simulator
I am an enthusiastic and professional Marine Engineer / Plan Maintenance System Engineer, working with AMOS and RAST Programs. I am quick to grasp new ideas and concepts, and to develop innovative and creative solutions to problems.
Total Exp. 2 years. Exploration, Drilling, Workover - offshore and onshore wells. Estimating cost of oprn., coordinating with service providers, supervising drilling operations.
PLC programming, installation and commissioning of motor drives/ process controller and instruments and have expertise in board-level repair of electronics controls and PC board.
•Leadership Quality,•Loyalty with the assigned responsibility,•Decision making •Desire to produce better results than previousability,
project and process engineering, erection and commissioing, trouble shooting, apicodes , hazop and iso.
Drilling supervision and engineering, well control instructor, rig commessioning
Reservoir Engineer, B. Tech (Petroleum Engineering), 11+ years in reservoir simulation studies, development planning, performance review, well equipped with most of analytical aspects
Mechanical/Piping Engineer with 13 years experience in offshore industry looking for new challenge. Good communication, organisation skills. Team player. Good knowledge of piping and mechanical codes and standards, Caesar II, PV Elite, CodeCalc.
10 years experience in the oilfield Drilling and well services both on offshore and land rigs. Field Engineer experience performing installation and trouble shooting of drilling equipment.
SOECOR Reservoir Engineer. Offshore oil well geophysical log analysis Schlumberger), testing and evaluation. On site project work in conjunction with engineers and geologists. Geohydrological investigations in South West Africa (Namibia).Geophysical investigations.
Senior Piping Designer-Office & Field.Multi-industrial background: Experience in Food & Pharmaceutical, Petrochemical, Power (Nuclear & Fossil), Semiconductor (Clean Room) & Steelmaking as well as working for Consulting Engineers & Piping Contractors.
TRAINING OF DRILING LANGUGES SKILLS FRENCH. ARABIC. ENGLISH AND LETARATE OF COMPUTER WORD AND EXEL AND IERNET
Welding Inspector
Credential 9 years functional experience in Oil & Gas Engineering construction project and nine years in explosive department of Govt. of India.
I am a post graduate process engineer with over three years of experience in Oil and Gas and Petrochemicals. I have worked for FEED as well as detailed engineering in EPC and consultancy environment. I am familiar with process simulation as well as design softwares such as HYSYS, HTFS, FLARENET.
Master in Industrial Engineering (With 3.86/4 CGPAand BE in Mechanical engineering(With Honours) with adequate knowledge of computer including (MS Ooffice, autocad 200) and good communication skills.
Project Management
Project Engineer :Responsible for execution of assigned projects from proposal to detail design completion.Responsible for ensuring that the package for submittal to the client meets all client requirements.
Specialist In DCS, P LC, SCADA, Turbines, Control & Instrumentation
22 yrs of experience in Govt of India, engineering consultancy firm (An ISO 9001 Company) and has wide exposure from basic engg to detailed engg of multi disciplinary mega projects related to Water and Environmental engineering, Infrastructure, Heavy Industry, Oil & Gas, Urba
SENIOR PIPELINE ENGINEER- OFFSHORE- SEVEN YEARS OF PROFESSIONAL EXPERIENCE IN DESIGN RELATED TO ALL ASPECTS OF CONCEPTUAL, BASIC AND DETAILED ENGINEERING OF SUB-SEA AND ONSHORE PIPELINES IN OIL & GAS INDUSTRIES BASED ON DNV RULES, BS 8010, ASME B 31.4. B 31.8 AND B 31.3 CODES.
Senior Piping Designer PDS
Refinery operator, panel operator, start-up all units in oil industry, 20 years in refinery industry.
Rig mechanic, mechanic supervisor, motorman, diesel mechanic
Offshore Survey - Client Representative, Project Surveyor, Party Chief, Engineer
Mechanical Maintenance Engineer/contract and Procurement Engineer
Worked for several drilling companies, service and maintenance organizations during my career. Managed large numbers of personnel in most of these companies. Known for effective time and cost saving procedures. Excellent safety record, proficient in human relation skills, self-starter, task orientat
QA/QC Engineer with more than 16 years in engineering & construction, from medium to large projects. exposed to oil & gas projects, onshore projects, industrial and building projects.
Quality engineer in offshore and onshore fields
Senior Instrument / Control & Automation Engineer for all phases of project execution (FEED, detailed design, procurement, construction supervision, commissioning assistance, handover to operation). 12 yrs offshore & onshore E&P oil & gas exp. (FFB, DCS, IPS, PLC, F&G, BN, Remote I/O, AS-i Bus)
ESSAR OIL LTD- FCCU (May 2005 to May 2008)
Electronics & Mechanical Engineering with QA/QC certification
18 years in field operations, management, production engineering, gas processing. tight formations, CBM and shales.
B.Eng(Petroleum Engineering);Diploma(Object-oriented/Scientific programming);Experience in Cementing, Stimulation(CT/N2 jobs),Completions fluids/Wellbore clean-out tools
Production & Quality professional with five years of experience in chemical & petrochemical plants, working with multicultural people in a team environment.
Petroluem Engineering
Electrical Engineer
Mechanical / Static / Pressure Vessel Engineer (~5 Years Oil & Gas Experience)
Worked both as technician and engineer in the field of Instrumentations, Analyzer and Control Systems
Wide range of well operations activities and also Onshore Support for Well Operations programmes / campaigns. Liaise directly with customers on and offshore ensuring that all activities, programmes and completions, etc. carried out meet the required safety and reporting standard
2yrs experiences as a Process Engineer, 2yrs and seven months experience as a Research Engineer and one year experience as a Laboratory/Chemistry instructor
I am having masters degree in instrumentation and 2 years of experience in Automation industry in which I did Develpoment, execution & commisioning of automation projects using SCADA (InTouch, Citect), PLC (Allen Bradley, Omron, Siemens) and different types of controllers and communication devices.
qualiy inspection
Instrumentation Engineer with 5+ yrs experience in Automation industry and Power Plant Industry.
Sub : Application for the post of materials engineer/materials controller/ logistics co-ordinator in materials department.
Bachelor degree in Electrical-Electronic Engineering. Had been working as metering engineer since 2003. leading the validation team for gas and liquid metering validation and also servicing.calibrating and validating all flowmeters,turbine meters and PD meters at workshop.
First   1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   [ 45 ]   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
CATEGORIES: Engineering/Technicians;
INDUSTRIES: Petroleum/Oil/Gas;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2008 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com