CONTACT INFORMATION:
View contact information...
EDUCATIONAL AND PROFESSIONAL AFFILIATIONS
* 3 year Diploma in ELECTRICAL ENGINEERING (1990 ~ 93) - From State Board of Technical Education Kerala, India.
* Computer knowledge:
* Completed the AutoCAD Level- I & ll training program from AutoDesk training centre, Cochin, Kerala, India.
* M.S. Office, Micro Station, Smart Plant Review (PDS support), Chamlite and Philips Lighting Design & Calculation software.
SUMMARY OF EXPERIENCE
10 Years gulf experience in Design Electrical and Instrumentation Drawings & Documents for Onshore and Offshore Oil & Gas projects, Petrochemical projects and having the experience in preparation of following engineering drawings and documents.
ELECTRICAL:
* Design Single Diagrams for HV & LV Switch Board, DB, UPS Unit etc.,
* Design Metering, Protection & Control Schematic Diagrams, Trouble shooting & Interconnection Diagrams etc…
* Preparation of Calculation notes for Indoor Lighting (in Philips software), Outdoor Lighting (in Chamlite software), Cable sizing etc...
* Sizing / Selection of Power Cables, Control Cables, Breakers, Fuse Unit, CT/VT, Cable Ladder / Trays, Cable Trench, Cable Glands, MCT Frame & Modules etc…
* Preparation of Load Balance, Cable Schedule, JB Schedule, Equipment Schedule, MCT Schedule and Bulk Material Take-Off.
* Design and preparation of Substation Equipment Layout, Cable Routing Layout, Earthing System Layout, Lighting System layout, Lighting Circuit Booklets etc…
* Preparation of Electrical Installation Standard for Power, Earthing and Lighting.
INSTRUMENTATION:
* Design and prepare control room layout, instrument location layout, and instrument cable routing layout.
* Design and prepare Instrument Loop Diagrams, JB and Marshalling cabinet Wiring Diagrams.
* Design and prepare Instrument Process & Pneumatic Hook-up Drawings and Instrument Installation and Mounting Details.
* Instrument schedule, Instrument Cable schedule and Instrument Material Take-Off.
GENERAL:
* Conduct site visit and collect informations required for tie-in projects with existing facility and expansion projects.
* Check other discipline drawings, review vendor documents etc…
* Attend meetings with contractor and provide design clarifications during construction of projects and provide the technical support for all project execution.
* Prepare sketches and coordinate with draughtsman to decide Cable routing, Location of push button, lighting, finalising Substation Equipment Layout etc…
* Prepare Bulk Material Take-Off for EPC tender proposals.
* Preparation of As-Built mark-ups from site.
EMPLOYMENT RECORD
3 Since 19th Nov. 2002
M/s ZADCO, Abu Dhabi, UAE (On Contract base with Pan Emirates Eng. Ltd).ELECTRICAL & INSTRUMENTATION DESIGNER
3 21st Oct. 2000 ~ 18th Nov. 2002
M/s TECHNIP-COFLEXIP, Abu Dhabi, UAE (On Contract base with Pan Emirates Eng. Ltd)Sr. ELECTRICAL DESIGNER
Projects Involved with:q Soroosh Nowrooz Integrated Development Project for SHELL & NIOC, Iran (EPIC JV with NPCC)q Al Khalij Northern Area Field Development (FEED) for TOTAL FINA ELF, Qatarq Asab & Shah Facilities Upgrade Project for ADCO, Abu Dhabiq Asab Plant Modification Project for ADCO, Abu Dhabiq Masaied Additional LPG Tanks Project (FEED) for QGPC, Qatarq Train-I & II ESD Upgrade Project (FEED) for ADGAS, Abu Dhabiq Sahil Water Injection Enhancement Project for ADCO, Abu Dhabiq IDD EL Shargi Field Development Project for Occidental Petroleum of Qatar ltd.
3 4th April 2000 ~ 3rd Oct. 2000
M/s ABU DHABI COMPANY FOR ONSHORE OIL OPERATIONS (ADCO), Abu Dhabi, UAE (On Contract base with Pan Emirates Eng. Ltd., Abu Dhabi).ELECTRICAL & INSTRUMENTATION DESIGNER
3 20th Oct. 1999 ~ 3rd April 2000
M/s ENOC PROCESSING COMPANY (EPCL), Jabel Ali, Dubai (On Contract base with Technip, Abu Dhabi).ELECTRICAL & INSTRUMENTATION DESIGNER
Projects Involved withq Condensate Processing Plant Offsite Improvement Project.q Effluent Treating Plant Expansion Project.
3 25th April 1998 ~ 11th Aug.1999
M/s ABU DHABI MARINE OPERATING COMPANY (ADMA-OPCO), Abu Dhabi, UAE (On Contract base with Pan Emirates Eng. Ltd).ELECTRICAL & INSTRUMENTATION DESIGNER
Projects Involved withq Modernisation of Das Island Control System (Modics 'A') Project.q Updating of Electrical Drawings for Umm Shaif Super Complex – (Prepare mark-up drawings of HV & LV switchboard, Power distribution boards etc…)
3 30th Dec. 1997 ~ 23rd April 1998
M/s TECHNIP, Abu Dhabi, UAE (On Contract base with Pan Emirates Eng. Ltd.)INSTRUMENTATION & ELECTRICAL DRAUGHTSMAN (On Micro Station 95)
Project Involved withq ADNOC's Ruwais Sulphur Handling Plant Expansion -Phase II
3 01st May 1995 ~ 20th Dec. 1997
M/s BK GULF (Balfor Kilpatric Inc.), Dubai, U.A.E., M/s POWER TRANSMISSION GULF, Abu Dhabi, U.A.E.ELECTRO-MECHANICAL DESIGN DRAUGHTSMAN
¤ Exposure My Task was preparation of Electrical and Mechanical detailed Design / Engineering shop drawings in AutoCAD.
3 29th May 1994 ~ 30th April 1995
M/s KHALFAN GENERAL CONTRACTING, Abu Dhabi, U.A.E.Trainee ELECTRICAL ENGINEER
* Languages Known: English, Hindi, Arabic and Malayalam (Mother tongue)
View contact information... |