Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #1959
next resume »»
CONTACT INFORMATION:
View contact information...
CURRICULUM VITAE
DATE OF BIRTH: 9th Dec 1950
NATIONALITY: Australian (with Current Passport to 2006)
AVAILABILITY: Available on short notice.
EDUCATIONAL QUALIFICATIONS: Certificate in Civil Engineering
(Equivalent HNC – UK)
MARITAL STATUS: Married – no dependant children
SUMMARY OF RELEVANT POSITIONS HELD
July 2002 – Present Facilities Engineering Co-ordinator Exxon Mobil
July 2001 – July 2002 Drilling Facilities Project Engineer Transfield-Worley JV
Feb 2001 – July 2001 Construction Superintendent Halliburton
June 2000 – Feb 2001 Drilling Facilities Project Engineer Transfield-Worley JV
Jan 1998 – June 2000 Offshore Project Superintendent Halliburton
July 1997 – Jan 1998 Offshore Project Superintendent (Thailand) Brown & Root
July 1996 – June 1997 Construction Superintendent Brown & Root - AOC
Mar 1995 – Oct 1995 Project Field Piping Engineer United Construction
Jun 1987 – May 1994 Construction Supervisor Woodside
Dec 1985 – April 1987 Construction Supervisor (Norway) Kvaerner Brug AS
Sept 1985 – Dec 1985 Field Engineer (UK Sector North Sea) AOC
SUMMARY OF QUALIFICATIONS AND TRAINING
1975 Certificate in Civil Engineering Queensland Inst. of Technology
1985 Offshore Safety & Target Zero Training (3 Day Course) Shell Expro (UK)
1993 Life Support & First Aid Training (Intermediate) Woodside
1993 Job Safety Analysis (JSA) Course Woodside
1997 Project Development & Report Writing Brown & Root – AOC
1998 Job Hazard Analysis (JHA) Course Brown & Root – AOC
2001 HUET & Solas Course (Current to Dec 2003) Transfield - Worley
2002 Opportunity & Project Realisation Process (OPREP) 2 Day Transfield - Worley
2002 Safety & Industry Leaders Awareness Course (2 Days ) Exxon Mobil
July 02 - Present EXXON MOBIL (WANDOO PRODUCTION ALLIANCE)Facilities Engineering Co-ordinator (Mechanical)Responsible for operations and maintenance support for Wandoo Production Facilities responding to Offshore Production group requests for materials and equipment for day to day running of facility. Carried out site survey and prepared documentation for the replacement of Wandoo A Flowlines. Preparation of project workpacks including quality control (QC) documentation and test records. Completed Shutdown planning and implementation for full platform Shutdown.
July 01 – July 02 TRANSFIELD - WORLEY JOINT VENTURE (Perth)Drilling Facilities Project Engineer (Piping) Responsible for modifications to Drill Rigs on Woodside’s NRA & GWA Platforms to enable drilling of long reach and big bore wells. Brownfields project and involved identification and development of work scope, completion of high level estimates, liasing with vendors and subcontractors, development of Work Packs and site implementation of works.
Feb 01 – July 01 BROWN & ROOT ENERGY SERVICES (Perth)Construction & Maintenance Superintendent Installation of Thevenard Island Waterflood Facilities. Compiled Work Packs, procured materials and identified site personnel prior to moving to site to manage workscope including supervision of site trade personnel, planning and scheduling of work sequence, preparation of quality control (QC) documentation, assistance with plant commissioning and management of safety on site. Supervisor for Maintenance crew on Thevenard Island Facilities Site Workforce – 25 Personnel
June 00 – Feb 01 TRANSFIELD - WORLEY JOINT VENTURE (Perth)Drilling Facilities Project Engineer. Preparation of workpacks and implementation of work scope for relocation of drilling equipment from North Rankin A Platform to Goodwyn A Platform on North West Shelf (WA). Reviewed design details for constructability, prepared fabrication and installation work packs. On site project management, QC inspection, ensured Safety policies carried according to clients Safety Management System, assisted with project commissioning & close-out. Site Workforce – 20 Personnel
Jan 98 – June 00 BROWN & ROOT-AOC (Perth)Offshore Project Superintendent Responsible to project manager - Drill Rig Refurbishment Project on Goodwyn “A” & North Rankin “A” Platforms for Woodside Offshore Petroleum. Commenced with development of construction and installation Workpacks. Completed cost estimate and project scheduling review for NRA Platform following cost blow-out. Mobilised to GWA Platform for offshore construction phase. Transferred to NRA Platform and continued project as Piping Field Engineer solving installation clashes, completing quality control (QC) inspection and documentation and completion of As Built details. Also responsible for updating of planning and scheduling details on offshore facilities. Site - Workforce – 60 Personnel
July 97 – Jan 98 BROWN & ROOT (Singapore) (Seconded form AOC)Offshore Project Superintendent. UNOCAL Thailand. Supervised fabrication and installation of piping, vessels and associated process facilities for the water treatment facilities on Satun Platform in the Gulf of Thailand. Work included development of the construction workpacks, expediting and receival of materials, NDT checking, (QC), weld mapping, material certification, organization of labour and equipment. Completed “As Built” mark-up on completion of project. Site Workforce – 35 Personnel
July 96 – July 97 AOC AUSTRALIAProject Superintendent Responsible to the Project manager for the development of construction workpacks, procurement of materials, organization of prefabrication, arrangement of verification of weld procedures and welder qualification testing, compilation of project estimates in accordance with corporate estimating norms and mobilisation of labour and equipment. Involved work in the project office as well as site management and supervision. Projects included:§ Upgrade Produced Water Disposal Facilities - Thevenard Island (Chevron).§ Installation Tower Flare & upgrade of Pit Flare - Thevenard Island (Chevron).§ Installation of Wellhead Facilities & Flow Lines - Thevenard Island (Chevron).§ Installation Agincourt Field Onshore Facilities -Varanus Island. (Apache Energy) Site Workforce – Varied 20 to 50 Personnel
Oct 95 – June 96 BEXTON PROJECT MANAGERS & ENGINEERS Subcontracts Supervisor. Seconded to BOS Australia as Subcontracts Supervisor for piping prefabrication phase of Sulphuric Acid Plant at WMC’s Kalgoorlie Nickel Refinery (Completed Feb ‘96). Seconded to CMPS&F as Piping Supervisor on site at RGC’s Synthetic Rutile Plant at Narngulu (WA). Responsible for piping installation. On SHREP upgrade within existing plant (Completed April ‘96). Project coordinator for Gnangara Sand Plant Design and Installation. Site Workforce – 15 Personnel
Mar 95 – Oct 95 UNITED CONSTRUCTION (KARRATHA) WESTERN AUSTRALIAProject Field Piping Supervisor - LPG Process Facilities constructed on Burrup Peninsular. Responsible for all hydro & pneumatic pressure testing of Pipework, arranged and supervised “Hot Tapping” of all tie-ins on project. Completed approx. 150 systems tests. Site Workforce – 12 Personnel
Sept 94 – Mar 95 SIGNET ENGINEERING (PERTH) WESTERN AUSTRALIATechnical Representative. Responsible to the Project Manager for answering all piping & structural technical queries by Fabrication Contractor for Hamersley Irons Further Fines Treatment Project at Paraburdoo. Early project work included clash checking with other disciplines and detailed checks of piping layouts and isometrics.
June 94 – Sept 95 WOODS WATT & ASSOCIATES (PERTH) WESTERN AUSTRALIATechnical Representative. Completed technical query liaison between shop detailers and fabricator associated with MOGAS expansion BP Refinery Kwinana.
June 87 – May 94 WOODSIDE OFFSHORE PETROLEUM (PERTH)Construction Supervisor managing project to repair and reinstate Oil Contaminated Water piping system in DomGas plant Karratha WA. Involved in design evaluation, calling of tenders, tender review and procurement of materials. Transferred to site managed project. Continued as Construction Supervisor on Production Headers replacement project NRA Platform with duplex stainless steel pipework. May 1990 transferred to Karratha as Senior Supervising Designer with responsibility to assist project engineers with design and implementation of engineering change proposals for onshore and offshore facilities.
Dec 85 – April 87 KAVAERNER BRUG A.S. (NORWAY)Site Supervisor on construction of Norsk Hydro’s Oseberg A Platform module 6 & 8 & Oseberg C Platform Gas Compression Module. Responsible for supervision of yard fabricating secondary steelwork. Transferred to mechanical completion & preservation group.
Sept 85 – Dec 85 AOC INTERNATIONAL ABERDEEN (SCOTLAND)Field Engineer for hook up and commissioning of molecular sieve module on Fulmar “A” Platform, duties included hydotesting, equipment re-instatement, final punch listing.
July 84 – Sept 85 McDERMOTT - WHOLOHAN GRILL (JV) PERTH WESTERN AUSTRALIA Senior Structural Checker for design of below deck work platforms for remedial work to foundations on Woodside’s North Rankin A Platform.
July 82 – July 84 AOC (PERTH) WESTERN AUSTRALIA Onshore Construction Supervisor for hook-up and commissioning of Woodside’s North Rankin A Platform. Responsible to project manager for supervision of structural and piping fabrication entailing production of fabrication drawings, calling for quotes from sub-contractors, supervision of construction, procurement of materials, certification of materials, qualification of weld procedures and welders and monitoring of QA requirements.
April 82 – July 82 HEREEMA (PERTH) WESTERN AUSTRALIA Design Draftsman for installation details for North Rankin A Platform. Set out details of piling & organised Drill Rig overhaul and modification.
Jan 82 – April 82 SUB SEA INTERNATIONAL (PERTH) WESTERN AUSTRALIA Construction Supervisor for Diving Support facilities on DB Thor to facilitate diving back up for placement of North Rankin A Platform
Jan 81 – Jan 82 PETROLEEUM TECHNOLOGY PTY LTD (PERTH) WA Fabrication Supervisor for construction of drilling modules North Rankin A Platform Sembawang Shipyards (Singapore).
May 77 – Jan 81 DHP CONSULTANTS (SALE ) VICTORIA Senior Civil and Structural Draftsman. Drafting and technical assistance to Esso Australia for modifications to offshore and onshore facilities. Seconded to Esso during construction of modules at Newcastle N.S.W.
Jan 70 – May77 GHD PTY LTD (BRISBANE & MELBOURNE) Civil & Structural Draftsman.
References will be provided on request.
COMPUTER SKILLS
Competent in MS Word, Excel, PowerPoint, Project, Publisher. Outlook & Access.
Familiar with Primavera
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 1951 to 2000 of 7041)
Go to Search Parameters...
Brief Description
19 years of welding experience, oil and gas fabrication. superintendent, engineer, inspector.
I have diversified vast professional experience in the construction industry. Have managed and worked with complex competitive challenge projects and have implemented them successfully with efficiency and quality. Expertise in Project Manger, Expertise in Checker, Expertise in Project
Objective : A suitable position in project planning & controls or allied departments providing the opportunity to make a good contribution to your organization goals through continued development of professional skills, hard work and application of acquired knowledge.Experience total - 12 years
Electrical Maintenance Engineer - Has 12 Years Experience.
More than 10 years experince in the field of Welding Inspection. Presently working with Saudi Aramco as Sr. Project Inspector.
NUCLEAR SAFETY ENGINEER / NEBOSH INTERNATIONAL
Around sixteen years of extensive experience in Instrumentation and Control Systems for chemical and petrochemical industry that includes project engineering work, installation and testing, commissioning and maintenance of DCS / PLC systems.
Control systems engineer with 8 years background in the oil@gas industry
Microstation 2D & 3D Designer
Welding Supervisor: SSCL.DME (3years welding), WI (QA/QC), Safety qualified,21years Experience, worked with ASME, AWS, API standard in Major EPC Industries such as Onshore, Upstream ,Petro-chemicals (Offshore piping & Structures, Oil & Gas Piping, Steam Boiler Piping, HP vessels & Storage Tanks) .
experienced in processing seismic data, land/marine, onshore/offshore, 2D/3D, QC/QA analysis, strong in first break picking, velocity analysis, multiple attenuation, promax, green moutain, mesa softwares.
Instrument Design Engineer
I am currently seeking an overseas position in the petrochemical industry. I am focusing on China, S.E. Asia, Australia, New Zealand, Mexico and S. America. I have 17 years of experience managing the design and construction of capital projects in the petrochemical industry.
SUMMARY 95 - Present Varied positions See detailed CV Exxon Mobil Transfield Worley JV (TW JV) Halliburton TW JV Brown & Root (Thailand) Kavaerner Norway AOC North Sea United Construction Woodside Aust
Oil and Gas Gas processing and NGL recovery On-line optimization of petrochemical plants advanced process control Information Technology
I have extensive experience in project evaluation and execution from conceptual phase to abandonment. Strong background in production operations and production enhancement. Recent work in the area of technology identification. Extensive experience in asset team management in the upstream business.
Seeking employment in the Environmental Industry. I hold Bachelor and Masters degree in Petroleum Engineering and will complete another Masters degree in Hydrogeology by 05/02.
Chemist, Inorganic, Organometallic, Organic
Work Experience -15 Years well established organization for inspection activities, Project co-ordination Inspection , QA/QC / Welding / Mechanical /Piping /Painting & Pipe lay Barge Deep sea Sub-Marine Pipeline project.
I have 20 Yrs exp., after Dip. in Mech. engg. & Safety Engineer/Officer have 12 yrs exp., mainly in the field of Oil, Gas, Petrochemical & power plants industries in maintanance, shutdown & construction works in India & Gulf countries.
I am a reservoir simulation engineer with experience in both compositional and black oil. Additional skils include geostatistics, petrophysical evaluation and cased hole log anaylsis including production logs.
20+ years shipbuilding and offshore piping and ventilation routing.
I would like to be considered for the post as above or any position which is suitable or related with my qualifications and experiences in your company. I have more than 6 years of working experience in several industries which is related in Oil & Gas offshore and onshore. Currently I am working
A highly motivated, professionally determined Petroleum Engineer with six years diversified working experience with oil and gas exploration and production Company in all aspects of well completions and production engineering.
I have completed diplomo in electrical and elcetronics .First I have worked in erection and maintenance in 110kv substation.second I have worked in wind power plant..Here my job was maintenance and Troubleshooting of wind turbine generator.Now I am working erection and commissioning of oil field.
PDMS Pipe Designer
To apply for a role where I can demonstrate and expand my Drilling skills within the oil and gas drilling industry
Competent Mechanical Engineer with specialization Thermal Coating Systems and Insulation (Cryogenic/Cold, Hot, Acoustic).Having around 06 years of progressive working experience in the construction fields of Oil & Gas, Petrochemicals Plant, Steel manufacturing Plant
Service, commissioning, start-up, construction in Instrumentation and Control
I have more than 8 Years working experience of power plant operation, since April 2000 I am working in the CHASHMA NUCLEAR POWER PLANT as plant operator.
Skills Summary ; Project Management , Computer/ Software programmes savvy, Quality Orientation, Work and Industrial Safety standards, a Quality Assurance/Quality Control Inspector.
Mechanical engineer-3year experience
A professional and dedicated Mechanical Engineer with 3 years Oil & Gas Industry experience, including expertise in Design (CAD), Structural Analysis (FEA), GD&T, ASME Code, Excellent communication and interpersonal skills with strong analytical and practical field engineering experience.
Wellsite drilling engineer
My professional experience is based on Supervision of oil field operations, quality and maintenance of inyection systems with chemical products. I´ve wide and strong knowledge on oil production processes and constantly technical consultantship to the costumers about of the chemical treatment .
QA/QC Coating Inspector
working as csu saferty officer in sabic,I am having Industrial safety diploma from annamalai university.chennai
A highly determined and skilled Mechanical Engineer with over 15+ years of overseas and in country experience in performing Piping Construction Supervision, in Oil/Gas process plants and pipelines projects too.
Seismic Analysis: AVO, spectral decomposition, Seismic Inversion, attribute analysis, Shallow Hazards Analysis, Geopressure.
An Electrical Engineer
Application for the post of – Mechanical, Plumbing & Piping Engineer
Oil exploration and production. Selection of drill sites, drilling operations, open hole logging evaluation, sample and paleontological analysis, vertical and horizontal drilling activities.
I have 6.5 years experience in Instrumentation and Control System Engineering. Involved in Proposal works, Basic Engineering Design, Detail Engineering Design, start-up, pre-commissioning and commissioning activities. Experienced with DCS and ESD System.
Prefer to jobs that generate/analyze data in quantitative or qualitative
I am a B.Tech degree holder in Instrumentation passed out from Madras Institute Of Technology, Madras, India and I am having Sixteen years of experience in the field of Instrumentation in maintenance, construction, commissioning and design in petrochemical, refinery, power plants
MS in Civil and Mechanical Engineering, in Alaska, Russian and English language, experienced in Numerical Wave Modeling, Coastal Engineering, Hydrographic Survey, adaptable to changing projects and work schedules and have a proven ability to quickly train on different subjects.
•Engineering, Project Management, Construction Management, Cost Control & Sub-Contract Co-ordination •Oil & Gas, Petro-chem, Cross country Piping •Shutdowns/ Tie-ins •Equipment Installation/ maintenance and commissioning •Structural Fabn & Erecn •Manpower and Resources Planning
I have been working in the UAE since October 2001 as Mechanical Maintenance Supervisor/Commissioning Engineer in the Oil/Gas and Power Industry. Prior to that I held senior positions in the Military as Ship's Chief Engineer, Engine Room I/C, Instructor and In charge of training.
Total work experience of 5 years as Chemical engineer. Core competency on steady state process simulation, optimization & de-bottlenecking in the field of Petrochemical & Refinery
Large Water treatment plant like RO plant, DM Plant, Ultra filtration plant, Pretreatment plant Operation, Maintenance and analysis. Large Power plant Boiler(High Pressure Boilers) Water Chemical Treatment and Analysis, Cooling Tower water chemical treatment and analysis, Environmental(Ambient air,
First
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
[ 40 ]
41
42
43
44
45
46
47
48
49
50
Next
Last
Seach Parameters
Change search parameters...
CATEGORIES:
Engineering/Technicians;
INDUSTRIES:
Petroleum/Oil/Gas;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com