B.Sc. in Electrical Engineering,
Communication & Electro-physics major,
Alexandria University, Faculty of Engineering.
(Graduated June1996)

CAREER SUMMARY:
Control Systems Engineer (6 years) experienced in the following:
- Control System design, implementation, testing and commissioning o Troubleshooting control system problems, including field instrumentation o Tuning of automatic control system loops including Boiler Control Systems o Implementation and troubleshooting of Advanced Control systems and strategy o Implementation and functional testing of Boiler Control System, Burner Management System, Motor Control System, Turbine Control System, Balance of Plant.
- Implementation and troubleshooting of Plant History systems (Honeywell PHD)
- Working on large projects and with large project teams, including E&I content o Working in a multi-cultural, cross-functional teaming environment, Currently working as the Project Control Systems Engineer of 2 large E&I projects installing and commissioning Honeywell and 3rd party systems on 8 units at 2 fossil power plants.
- Chemical, Refining, Oil and Gas Industry.

Current position:
Lead Projects Engineer, Honeywell Egypt

TECHNICAL COURSES:
25th May 05:
Experion PKS System Installation and Administration, Process Automation College, Abu Dhabi, UAE.

19th Apr.00:
3310-Application Module Implementation Course, Process Automation College, Abu Dhabi, UAE.

13th Oct. 99:
5736-TPS System Implementation & Administration Course, Process Automation College, Abu Dhabi, UAE

06th Oct. 99:
5711-GUS Implementation Differences Course,
Process Automation College, Abu Dhabi, UAE.

July 99:
Microsoft Windows NT4 Administration, at Microsoft Training Center, Cairo, Egypt.

July 99:
Honeywell TDC2000, Basic controller, at Honeywell Egypt training center in Cairo, Egypt

March to May 99:
Honeywell TDC3000, DCS system training at Honeywell Egypt training center in Cairo, Egypt, o TDC3000 functional overview o LCN Universal Station implementation o LCN / UCN Implementation and maintenance o HPM implementation o HPM maintenance o Application module implementation
On job training at Egyptian Petrochemical (EPC), VCM Extension unit

EMPLOYMENT HISTORY:

Feb. 99 to date:
Honeywell Egypt
Engineering office which support the Egyptian business, its main role is to support other well established Middle East offices in Oman, Saudi Arabia, Kuwait and the U.A.E; with systems engineering support and engineering manpower for service and commissioning.

March 98 to Jan 99:
E&I Filed Engineer at the following projects:
o Trans Gulf LPG Expansion, Ras-Bakr, Red Sea, Egypt (Petrojet Eastern, Ennpi, Gupco)
o Obaiyed Gas Field Development, Western Desert, Egypt (Elequip, Brown & Root, Bapetco)

Current Job Experience:

Jan. 04 to March 05:
Abu Qir Power Plant, Alexandria, and Abu Sultan Power Plant, Ismailia, Egypt
Technical Services, Maintenance, and Punch list completion for Honeywell System, 3rd Party Systems and Field Instruments.
Handling multinational vendors work at both plants for 3rd party systems.
Honeywell representative in all technical meetings at Egypt and USA

Sep. 01 to Dec. 03:
Abu Qir Power Plant, Alexandria, Egypt,
Project for modernization of 4 fossil units (gas/heavy oil firing), each unit is 150MW capacity.

System installation, power up, commissioning, startup and operator training, in addition to Tuning of Boiler Control and other loops.
System is consisting of 20 GUS stations, 6 redundant NIM, 23 redundant HPM, 2 Application Module for Turbine Control, LCN Extenders (LCNE) using fiber optics, GPS for network time synchronization, 4 Plant History Detail (Honeywell PHD), 1 PHD server, 2 Performance Calculation PC (Honeywell TPPM & TPRL), 8 OPC servers for MK VI – DCS interface, NT4 PDC and BDC for LAN, 4 Cyberex 20KVA UPS and Sola Power supplies for 24 VDC generation.

In addition to 3rd party systems, 4 GE Mark VI for Turbine Control and 4 Bently Nevada BN 3500 for Turbine Monitoring

Field Installation, Trouble Shooting and Functional Test of about 200 different Transmitters (Honeywell and Fisher), 8 Brooks flow meters for heavy oil, about 160 I/P, 12 Copes Vulcan Control Valves, about 300 TC and RTD, 2 SynFab Air Dryers, Fire Alarm System, Trane HVAC, New Turbine High Pressure System include 8 HP Hydraulic pumps, 16 Turbine CV, 8 Turbine IV.

Aug. to Sep. 01:
Factory Acceptance Test (FAT), at Honeywell Houston (TX40), Houston.
Customer: PSSG and Egyptian Electricity Authority
TPS system engineering done by AZ15 and TX40,
End User: Abu Qir Power Plant.

Feb. to July 01:
Honeywell US, Phoenix (AZ15) and Houston (TX40)
Detail Engineering of Abu Sultan and Abu Qir Power Plants modernization Projects, each plant contains 4 units each generates 150MW Gas/Heavy Oil fired.
I have been part of the team to implement the following:
- Transfer the old relay logic system to DCS logic in Motor Control System (MCS).
- Transfer the old relay logic system to DCS logic in Burner Management System (BMS).
- Transfer the old control schematics to DCS algorithms in Boiler Control System (BCS).
- Update the electrical drawings and Sama drawings.
- Simulation for testing MCS, BMS and BCS.
- System Database.
- System Graphics.

Dec. 00 to Jan. 01:
Oman, Petroleum Development of Oman (PDO),Alnoor Plant.
Commissioning and Start Up of Alnoor Plant.

Dec. 00:
Oman, Petroleum Development of Oman (PDO),Birba Plant.
Eng. &Commissioning of Birba New Wells Hook Up.

Nov. 00:
Oman, Petroleum Development of Oman (PDO),Yibal B, Yibal C, Yibal D, GGP, Fahud, Lekhwair Plants and Oman Cement Company
DCS Technical Services and Maintenance.

Oct. 00:
Oman, Petroleum Development of Oman (PDO),Yibal B, Yibal C, Yibal D and Lekhwair Plants.
Engineering and Commissioning Design Integrity of Smokeless Flare, which includes implementation of Database, Logic, Graphics

July to Sep.00:
Western Desert Gas Development projects (WDGD)Khalda Petroleum Co. (KPC)
Tarek, Salam, Sumpetco Gas Plants.
Site Assistance and DCS technical support for the 3 remote Gas Plants TPS system.

May to June 00:
Oman, Petroleum Development of Oman (PDO),Yibal B Plant.
FSC and CCC Integration with DCS for Yibal B Compressors Control.

April 00:
Oman, Petroleum Development of Oman (PDO), SADAD Plant.
Engineering & Commissioning of Crude Oil Export Pumps, which includes implementation of Database, Logic, Graphics

Feb. 00:
Factory Acceptance Test (FAT), at Honeywell France (FR01), Paris.
Customer: Foster Wheeler France,
TPS system engineering done by Honeywell France,
End User: Alexandria Mineral Oils Co. (AMOC)

Dec. 99 to Jan.00:
Western Desert Gas Development projects (WDGD), March 00
Khalda Petroleum Co. (KPC)Tarek, Salam, Sumpetco Gas Plants.
TPS system installation, power-up, commissioning, startup and operator training for 3 remote Gas Plants TPS systems each include three GUS stations, one redundant NIM, three redundant HPMs and Honeywell Safeguarding System (FSC).

Oct. to Dec. 99:
Amerya Petroleum refining Co. (APRC)
Main Contractor: Petrofac LLC, Texas
Naphtha Isomerisation unit
TPS system installation, power-up, commissioning, startup and operator training for new TPS system, including three GUS stations, one redundant NIM, one PHD, and on redundant HPM.

Aug. to Sept. 99:
Egyptian Petrochemical Company (EPC),
Transfer TDC2000 to TDC3000 system.
Highway Gateway (HG) database building, all old graphics rebuilding, hardware Installation, commissioning, start up, verification and test of all points transferred.

June to July 99:
DCS Technical Services and Maintenance for local customers located in Alexandria, o Alexandria Carbon Black (ACBC), o Egyptian Petrochemical Company (EPC), o Alexandria Petroleum Company (APC) spent oil and lube oil complex.

March to June 99:
Egyptian Petrochemical Co. (EPC)
Main Contractor: Krupp Uhde, Germany
Venyl Chloride Monumer (VCM) extension unit
Site Assistance of TPS system installation, power-up, commissioning, startup and operator training.
System is consisting of two GUS stations, one redundant NIM, one redundant HG connected to the running TDC2000 system, and one redundant HPM.

March 99:
Alex Petroleum Company (APC),
Spent Oil and Lube Oil Complex.
Heat and Material Balance Programs verification

Available Personnel References at Honeywell:

Dieter Roy, Program Manager, dieter.roy@honeywell.com
Paul Wiley, TX57, Senior Project Manager, paul.wiley@honeywell.com
Terry Clarkson, TX57, Senior Lead Engineer, terry.Clarkson@honeywell.com

View contact information...
«« previous resume next resume »»
Search Results (Resumes 3501 to 3550 of 6411)Go to Search Parameters...
Brief Description
Complete knowledge of administrative and managerial best practices for Planning, Sales, Design, Manufacturing, Delivery, Commissioning, Start-up and Warranty of heavy industry goods and services. Two Bachelor engineering degrees and Harvard Business School.
Process/Production technician qualified to degree level. Operation experience within petrochemical/chemical/oil&gas industries including DCS panel operations.
Labview Programmer
Chemical Engineer with MSc. degree in Polymer Science & Technology
I have 7+ years of work experience in IT as a faculty & administrator. An IT Post graduate and strength in operating IT Training Centre, franchisee development and support coupled with training program in IT, corporate, policy and soft skills like presentation, language proficiency etc.
I finished Masters in chemical and process engineering in Otto-von-Guericke University, Magdeburg, Germany and I did Bachelors in Mechanical Production and Industrial Engineering in Andhra University, India. I am skilled to learn the new things easily and perfectly.
Stress analysed all of the critical piping systems in which are under critical conditions in onshore and offshore projects including PSV''s, piping connected to rotating/static equipments/1200 kW reciprocating compressors, piping subjected to tank settlements, bridge movements and etc.
Control Systems Engineer
Confident and experienced engineering professional.Skilled communicator and determined influencer. Computer literate.
Knowledge in Autocad 14, LT2000, 2002, 2004, Pipe Designer 3D.
I have a stable work history having spent four years working as a Mechanical Engineer within the Teyseer Group in Qatar. I have a broad range of experience including project management, site and field works, tender preparation, etc. On Sep 2004, I graduated as a Petroleum Engg (Masters Degree).
Over 15 years experience as a instrumentation & control engineer in oil/gas , petrochemical industries. For the past seven years , I have been also involved in SCADA system in detailed basic engineering, integrating, commissioning and maintenance.
I am candidate who has excellent research and development skills along with good manufacturing experience.
Civil engineering graduate with 13-years of professional working experience as a Senior Document controller in gas and oil industry. A computer literate, familiar with EDMS, QVP and Plantdoc programs used in project documentation.
Profile Total of 6.5+ years of IT experience with 5.5+ years of SAP R/3 experience in ABAP Programming in the functional areas of MM, SD, PP, PM, FI & Payroll.
Proficient in physical and wet chemistry analyses using gravimetric, titrimetric, and spectrophotometric techniques. Computer Software knowledge in HYSYS,MAPLE, ASPEN, HP Chemstation, Microsoft Office, Microsoft NT.
Petroleum Engineer with 6+ years of experience in the Oil & Gas Industry. Specifically in Middle/Heavy Oil. Strong Knowledge in Production Asset Management, ESP and Gas lift Design and Operations, Horizontal and conventional wells, Cyclic Steam Injection and New Technologies for E&P Industry.
With a Hons. Diploma in Civil Engineering, I have totally 13 years of experience , 6 years experience in Large Engineering/Construction, oil & gas & Process Plants related industry and Post Diploma in Computer Application
Dear sir, I would like to submit my application form for the post of the petroleum engineer. Here is my Cv attached below. If you want to know other information or document, please let me know.
Geologist looking for employment in the Oil Industry
Oil and Gas Piping and Ppeline Designer And Expert in all Drawings and Design Related to Pipeline
More than five (5) years working experience in Non-Destructive Testing and Engineering Inspections for Onshore / Offshore and refineries industries. Worked with varios major client e.g Petronas Carigali Sdn. Bhd, Petronas Gas Berhad, Optimal Chemicals (M) Sdn. Bhd, Exxon Mobil Exploration And Produ
I am full confident about the any job of analyzer/instrumenation for detail see my resume
Good research aptitudes intellectual, potential and creativity.
Mechanical Designer Engineer
Profesional Employer with International acknowledge Certification
Continue acting in pipeline engineering construction and assembly independent of the site job and challenging new experiences.
Shaped Charge Engineer
Flow Assurance Engineer
I have 30+ years experience as a Mud Engineer, 18 years International experience. I have held positions as Country Manager, Ops. Manager, District Coordinator and Fluids Coordinator. I am experienced in all types of Water/Oil/Synthetic based fluids, Silods control and waste disposal.
Petroleum engineering with reservoir engineering & field development experience
Knowledge of fire protection systems and maintaining the safety audit system
Bachelor degree in Petroleum and Natural Gas Engineering May – 2007.
GOOD APTITUDE,COMMUNICATION SKILLS,MANAGING SKILLS,TECHNICAL SKILLS
Piping Engg. skills including
Becholar in chemical Engineering (production / project)
Around 8.50 years experience in Electrical/Instrumentation Engineering and Maintenance in the Industrial sector, extensive experience in end-to-end execution of EPC Projects including supervision of Installation, Calibration, Testing, Pre-commissioning, Operation and Maintenance of Plant Instrumenta
I'm Tommon Mathew working with mott macdonald as a project engineer in oman for various oil and gas projects.
Mechanical piping supervisor
Obtain above position in fast growing IT organization offering challenge, responsibility and advancement opportunities while utilizing my best skills in System administration
Autocad & Inventor Draftsman
A Drilling Engineer with expertise in drilling rig supervision, development of drilling, work-over and abandonment procedures. Excellent interpersonal skills combined with the ability to work collaboratively with other team members have been my formidable strengths.
B.E. Petroleum, Working in Workover Department
Diploma In Instrumentation Engineering In Aug 1988 (3 Years Duration) +Amie Eqvt To B.E
DCS Engineer With Yokogawa CS3000 experience
An effective engineer possessing good communication skills, combined with proven technical and organizational abilities. Education, qualifications and experience gained through significant design applications and management positions performed in the US and the Middle East.
Project Leadership: project development, estimation, engineering, installation, field start-up and commissioning.
Electrical and Electronic background. Experience with ESPs, Completions and Production Engineering
Well Service Supervisor or Coil Tubing Supervisor
To seek a position that maximizes my knowledge and technical expertise in the field of Petroleum Engineering & technology, Electronic mechanic, Computer system application, electronic device assembly and trouble-shooting, Design & process engineering.
First   Prev   51   52   53   54   55   56   57   58   59   60   61   62   63   64   65   66   67   68   69   70   [ 71 ]   72   73   74   75   76   77   78   79   80   81   82   83   84   85   86   87   88   89   90   91   92   93   94   95   96   97   98   99   100   Next   Last
Seach Parameters

Change search parameters...
CATEGORIES: Engineering/Technicians;
INDUSTRIES: Petroleum/Oil/Gas;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com