Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #3118 next resume »»
CONTACT INFORMATION:
View contact information...

Objective
Personal Data and Summary of the Main Professional Activities
Personal Data

Nationality: Brazilian
Status in the US: Permanent Resident (Green Card)
Personal Status: Married. Two sons (20 and 16 years old)

Date: May/2003

Professional Data

Education & Courses
- Graduated in Mechanical & Metallurgical Engineering - UFRJ (Rio de Janeiro Federal University) Brazil, 1971-1975
- Inspection and Equipment Engineering - Petrobras 1976-1977
- Non-Destructive Testing (NDT) Level I and II ASNT - Magnaflux Corporation - USA
- X-rays: Use and Interpretation - Kodak, USA 1980
- Oil Production Engineering - Petrobras, Brazil 1989
- Welding Engineering - COPPE/UFRJ (Basic MsC Program), 1980/1981
- Ultrasonic Inspection - Welding Institute, England
- Economical Engineering Principles - UFRJ, 1994
- Electric Submersible Systems - Training in USA Plants (Hughes Centrilift and Baker Lift Systems). USA, 1986.
- Down Hole Safety Valves (DHSV) Course and Training in USA Plants (Camco, Baker Safety Systems and Otis). Performance Tests and Application. USA, 1984 -1986
- Down Hole Safety Valves (DHSV) Course held by OTIS/Halliburton. Practicing and Training Course. USA, 1988
- Production Packer - Course held by OTIS/Halliburton. USA. 1988
- Quality Management International - QMI Assessor Training Course, ABS, England, 1994
- Progressive Cavity Pumping Systems: Design, Operation and Performance Optimization, Software and Training - CFER/Petrobras 1994
- Reliability – Petrobras -1994
- Optimization Program for Artificial Lift - Otacto/Canada, 1997
- Progressive Cavity Pumping Systems: Design, Operation and Performance Optimization, Software and Training - CFER/Canada 1998 (updating)

Professional Experience

General Activities
- 1977 –1979 Metallurgy and Material Specification Regarding the Global Nationalization Program of Equipment - Petrobras.
- Specification of Spare Parts and Usual Equipment of the Oil Transportation Ships and Vessels of Petrobras Fleet.
- Welding Inspection by NDT Methods in Pressure Vessels and Heat Exchangers (Ultrasonic, X-rays, Magnetic Particles and Dye Check).
- Developing of welding procedures to recovery Anchors for ships.
- Assessments of the Potential Supplies in Brazilian Market to Compound the Petrobras Vendor List for Oil Production Activities. 1978 - 1982
- 1982 -1990 Petrobras' Equipment Development
- Program to Develop Brazilian Companies to Replace Imported Equipment and Material for Oil Industry, such as: Multiplex pumps, Plunger Pumps, Packers, Bridge Plugs, DHSV, ESP, Sucker Rods Pumps, Special Sucker Rods for PC Pump Application, PC Pump Systems, Non-API Sucker Rods Under Torsional and Tension Loads for PC Pump Applications
- 1990 –1996 PC Pump Systems - Management, Design and Installation of PCPs for Oilfield Applications.
- PC Pump Systems - National Oilwell (USA), Manager of Engineering Services - Providing Technical Support to Partners Suppliers, End Users, Oilfield and Applications Engineers 1996 – 1998.
- 1998 to 2001 – Providing Consulting for Netzsch Group for Progressive Cavity Pump Systems in general encompassing bench testing and modeling, training, academic and application courses, dimensioning, selection and application engineering for downhole (single and multilobes PC Pump designs) and surface components (right angle and vertical drive heads) with Built-in Hydraulic and Mechanical Backspin devices.
- 12/2001 to 08/2002 – PC Pump System engineer at Case Services. Prepared the engineering manual and fundamentals concerning the PC Pump Systems to support the design and analysis. Prepared also all drawings for the existing artificial lift product developed by Case (csPC Pump, csGasLift, csBeam, csSubs (ESP), Plunger Lift and illustrations for EFM.
- 08/2002 to date – Work at eP-Solutions as a Optimization Specialist for PC Pump Systems. Prepared programs in VB to make analysis of PC Pump Systems based on surface parameters (Axial Load and/or Torque), well completion and fluid properties. Prepared complete PCP System Troubleshooting.

PC Pumps System - Experience
- Installation of the First PC Pumps in Brazil for high viscosity crudes - 1982/1983
- Coordination of the Program to Develop PC Pump Systems in Brazil 1983/1996.
- Programs to Develop Alternative Brazilian Suppliers to PC Pump Systems. 1985/1996.
- Development of Performance Tests Procedures Under Simulated Conditions. Development and Updating of Comparative Graphic Representation for PC Pump Testing Performance 1985/1998.
- Management, Installation and Performance Tests of Pioneer Breakthrough PC Pump Projects: Even Wall Stator, Hydraulic Free Pump, Insert PCP and Metal-to-Metal PCP.
- Coordination and Installation of the First Hydraulic Free Pump Comprising Even Wall Stator, Petrobras 1994.
- Installation of the First Metal-to-Metal in Downhole Oilfield Application, California, USA, 1997 - National Oilwell.
- Sizing and Dimensioning Conventional and New Geometry Design of PC Pump Systems for Oilfield Applications.
- Selection of the Hybrid Electrical Submersible Progressive Cavity Pumps to Undergo Field Tests. Petrobras, 1994/1996.
- Manager of Engineering Services for PC Pump Systems. National Oilwell (USA). Technical Support to Partners Suppliers and Field and Applications Engineers 1996 – 1998.
- Development of Analytic Equation to Determine the Theoretical Displacement of Elliptical Tri-Lobe (2/3) PCP Geometry as Function of ellipse Diameters D and d.

Research and Development in PCP
- Development of simulation tests under Run Dry conditions and for different types of fluids and speeds.
- Development of Mathematical Models related Pump Speed x Temperature of the elastomer as function of the type of fluid being pumped before running dry.
- Development of Mathematical Models to predict the fluid pressure losses as function of fluid properties, tubing and rod sizes.
- Considerations about running a PC Pump under Pumping-Off conditions. Carried out extensive simulation tests under operating conditions. The associated findings of this study allows to break up old paradigms concerning the application of PC Pumps. 1998 to date. Presented a Paper about this subject during the SPE ATW – 2001 Puerto la Cruz.
- Development and Performing Simulation Tests to Determine the Pressure Distribution Along the PC Pump Stator to Predict the Fail Mode Associated to Run Dry or High GOR. Mono-Phase (Liquid) and Dual-Phase (Liquid & Gas) Fluid Simulations. Started 2000.
- Developing comparative studies between tight and loose fit rotor/stator configurations and modeling starting torque x running torque: a prospective tool to predict the PC Pump performance in the field.

Overall Experience with PC Pumps
- Development and Application of Pump Performance Graphic Representation concerning All Involved Parameters. Theoretical and Actual Performance Comparative Results for Electric Submersible Progressive Cavity Pump Systems (ESPCP), for Petrobras, in the Following Manufacturers:

- Netzsch Mohnopumpen (Multilobe Design) & ODI (Electric Motor, Seal) and Brinkmann (Gear Box), in Hanover and Waldkraiburg, Germany, 1996.
- BMW (Single Lobe Design) & REDA (Electric Motor, Seal), in Bartlesville, OK, USA, 1996.
- Geremia (Two Single Lobe in Parallel Configuration) & Centrilift (Electric Motor, Seals, Gear Reducer) in Mendoza, Argentina, 1996.

- Evaluating Potential Oilfields for PCPs throughout Venezuela and Trinidad&Tobago, in order to select the proper PC Pump Systems. National Oilwell, 1997.
- Selection and Installation of Multilobe PC Pumps in Water Wells (Hot Springs - Onsen Wells), in Japan. National-Oilwell 1997.
- Selection, Installation and Follow Up of Multilobe PC Pumps in Argentina Oilfields.
- Design, Selection, Installation and Follow Up of Multilobe PC Pumps in Brazilian Oilfields.

New Activities in PC Pumps
- Management and Coordinating a Program to Enable the Spread of PC Pump Systems for applications in Steam Stimulated Wells. National Oilwell, 1998.
- Coordinating a Program to Develop and Apply A New Technology to Manufacture Even Wall Stators. National, USA, 1998 to 1999.
- Installation of the first two prototypes of even wall PC Pumps, featuring mechanical formed multilobe design geometry, into Petrobras oilfields. Jun 2000.
- Developing and Performing Run Dry Simulation Tests with PC Pumps of Different Diameters to achieve the limits of their application under "Pumping-Off" conditions. Effect of the Pump Speed and Lubricant Properties of the Fluid. 1988 to date.
- Developing and Performing Simulation Tests to Determine the Pressure Distribution Along the PC Pump Stator to Predict the Fail Mode Associated to Run Dry or High GOR. Mono-Phase and Bi-Phase Fluid Simulations. Started 2000 to date.
- Development of logics and programs in VB for PC Pump System Analysis based on surface parameters: Axial Load or Torque as function of well completion and fluid properties. 2003.

Training & Courses in PC Pumps - Instructor
- Current Instructor of PC Pumps within the Program of Artificial Lift Systems developed by UNAM (Universidad Nacional de Mexico) for Pemex, providing a complete theoretical PC Pump Course, encompassing single and multilobe designs, fundamentals, analysis, torque calculations (hydraulic, friction and resistive torques), applications, etc.

Technical Papers
- Author of Wrought and Forged Stainless Steels (18-8) and Cast Stainless Steel (AISI CF-8 and AISI CF-8M) - Specifications, Properties and Structures" – Edited by Petrobras – 1977.
- Comparative Cost Analysis Between PC Pumps and Conventional Lift Systems Based on Parameters of Life Cycle Costs. Petrobras 1994.
- PC Pump Systems: A Growing Technical and Economical Alternative Method for Oil Artificial Lift – Latin American Oil and Gas Seminar - CONEXPO/ARPEL 1994.
- ESPCP - Performance Tests Procedures, Graphic Display Representation and Results.
- PC Pump System Manual: Principles, Equations, Installation and Troubleshooting. Prepared for Netzsch Group, 1998/2000.
- PC Pump Engineering Handbook: concepts, types, applications and design. 1998-2000
- Starting Torque x Running Torque – Influence of the dimensional parameters between rotor and stator. Study presented at Petrobras Workshop, held in Aracaju-SE, Brazil, 2000.
- Application of PC Pumps under Pumping-Off Conditions: Limitations and Possibilities to Optimize Oil Production by Using PC Pumps in Artificial Lift Projects – Paper presented in the Rio Oil & Gas Expo and Conference, October 16 to 19, 2000, held by IBP: Brazilian Petroleum Institute, Rio de Janeiro, Brazil.
- PC PUMPS under Pumping-Off Conditions: Limitations and Possibilities to Optimize Production in Artificial Lift. Paper similar also presented at the PCP - Applied Technology Workshop (ATW), held by SPE - Society of Petroleum Engineers, in Puerto la Cruz, Jan /2001, Venezuela.
- PumpSelect - Program to Select PC Pumps based on operational inputs such as: flow, pump depth, API Gr, viscosity, dynamic fluid level, tubing and rod sizes, flow line pressure, BSW, etc. This program delivers QxDP and TxDP performance curves featuring the required speed to reach the actual operating targeted point - and also the related total torque and axial loads -, enabling the selection of drive heads, as well.

View contact information...
«« previous resume next resume »»
Search Results (Resumes 1201 to 1250 of 7054)Go to Search Parameters...
Brief Description
Charted Engineering marien & mechanical engineering with PHD in Engineering management,20 Years experience as senior corrosion engineer in mining and petroleum industries. With 15 years in engineering management. Specialist engineer coating and Cp design.
I am a Project Manager/Mechanical Engineer with 33 years experience in both, International & local projects.
2003-2004 Veco Engineering Abu Dhabi 2002-2003 ABB s.r.l. Romania 2001-2002 ABB s.r.o. Czech Republic 2000-2001 T.I.A.b , Romania 1999-2000 Progeco Sistemi Group, Italia 1998-1999 I.P.I.P. , Romania 1980-1998 Upetrom S.A. Romania
Directing and maintaining the QHS&E efforts of the Region, to conform to Company policy, regulatory, and customer’s requirements. Developing Region policies, procedures, and related documentation. Interact with client HSE departments to ensure understanding of HSE Systems.
Ist class Chemical Engineer with vast experience in operation , Project Management , Engineering Management , Commissioning Management in Fertilizer , Petrochemical and refinery field.
Mechanic Engineer
A Uk based professional Chemical/ Process Engineer with 20 years experience in various aspects of Plant Operations and Design. Looking for ex-pat status or home based job/contract. Special interests include Environmental Engineering, solid/ liquid separations and wastewater treatment.
DCS system engineering design, configuration, installation & commissioning.
Take up Senior Corporate Management Level challenging position with multi-million Heavy industries
Develop and evaluate fire hazard analysis,various types of fire protection/detection and suppression systems, scope development, review of deliverables, identify user interface requirements and project coordination
Polyester, Nylon,extrusion,plant management, manufacturing, sales
Experienced, proficient and highly qualified Senior QA Engineer/Manager, able to provide 30 years of QA and QC experience in a wide range of disciplines within the oil and gas sector. Would consider a long term posting (if possible) in the UAE, Malaysia, Thailand, Singapore, Japan or Vietnam.
Dear Sir, I am looking for a job.Thanks for your email,
Over 30 years in oil and gas pipeline inspection. Welding and NDE CSWIP 3.2 CSWIP RT UT MT + ATTO
Petroleum engineer with 28 years experience. Primarily field exploitation but includes drilling, production, reservoir and facilities. Overseas for 14 years working on properties in Pakistan, Indonesia and New Zealand. Able to work under conditions with little support staff or management supervision
I have a Bachelors degree in Chemical Eng with over 20 years experience in Safety, Chemical Plant Operations and Process Engineering in multi national chemical companies like EXXON, Ciba-Geigy, & Shell. Presently working as Senior Process Safety Engineer with a leading company in Saudi Arabia
M. Tech (Electrical Engineering) Over 17 years experience in Design, construction and commissioning in Oil & Gas, Petrochemilcal and Power plant
32+ years Civil Engineering experience on Public Works, Utilities, Industrial, Commercial and Residential projects. Experienced in streets, highways, water systems, sanitary & industrial sewers, airports, site development, grading, drainage, underground piping and specifications
Drilling Engineer . I worked as a well site-drilling engineer, drilling supervisor, operations drilling engineer, drilling superintendent and promoted to drilling engineer specialist, after receiving PhD in Operations Management
Mechanical Engineer (degree) having over 24 years experience in Planning and Maintenance in large petrochemicals, oil/gas facilities. Specialized in Maintenance Planning and CMMS (Maximo).
I am a qualified Electrical engineer with a vast exposure of more than 21 years in the field of Detailed Engineering ,Operation /Maintenance,Erection/commissioning,Testing etc in search of a suitable job in UAE,Qatar,Oman
Sr. Piping/Hvac Designer with over 25 years of experience with a solid 3D modeling experience mainly in AutoCad. Currently studying Cadworx at home using a tutorial from Cadworx.
Mechanical/Petroleum Engineer with 20+ years of experience in artificial lift applications encompassing ESP and PCP (mainly Progressive Cavity Pumps). Development of programs to select PC Pumps and automation/controlling of PC Pump Systems based on surface data such as axial load and/or torque.
Principal Process/Facilities Engineer and Project Engineer/Manager Bachelor's Degree Chemical Engineering University of Oklahoma 1976 and MBA Studies Registered Professional Engineer American Institute of Chemical Engineers Gas Processors Association
Control, Safety Systems and Instrumentation Design / Maintenance / Operations Engineer
EXPERIENCE:Experienced in the design of the following systems: Fiscal Oil and Gas Metering,Offshore / Onshore,Fire & Gas/ESD,DCS, SCADA ,Telecommunication,Compressor Anti-Surge,Subsea Controls,Thruster Controls,Ballast Controls,Dynamic Positioning Systems,Hydroacoustics,Winch Controls.
Pipeline Engineers, Project Engineers, Project Managers
design of telecommunication systems namely SDH, DWDM backbone, OTN transmission systems, Microwave communication systems, FTTH systems like GPON, Metro point-to-point Ethernet, PAGA systems, UHF radio, CCTV, IDS systems for Service provider networks, business enterprise, Oil & Gas networks.
I am Chemical Engineer over 18 years of experience in all aspects of combined cycle chemistry, chemical/water treatment operation, quality control and analytical services as Plant Chemist/ Quality Control Supervisor in co-generation power stations. I am a Canadian citizen and willing to relocate.
Maintenance, Installation, Comissioning, Calibration, and Design And Documentation.
Manager shift Combined cycle power plant
Drilling Engineer, 10 years experience, hpht experience, Casing design, advanced well design, drilling fluids, directional drilling, drilling software,
I have 17 years of experience and presently working with Saudi International Petrochemical Co (Sipchem). I have got specialized Skills in maintenance planning and scheduling work process control, CMMS SAP R/3 PM module, Primavera P3 / MS project, RCM, Development and implementation of maintenance
Geologist with large experience in oil and gas exploration and development-Offshore experience and TDC unit manager and well site
Certified Welding Inspector (aged 30 years) with more than 10 years experience (Six years in Saudi Arabia having valid Driving License , Singapore & UAE) Oil & Gas / Petrochemical Projects & Semi-Submersible Rigs, Offshore / Onshore Process platforms seeks a challenging position in Inspection Field.
3D models PDS, Smart plant Review, PDMS, Autocad, Miicrostation, isometrics, Orthographic Drawing Production
Total 12+ years of experience (8 Years in India & 4+ Years in Middle East) in Quality Assurance / Quality Control, Inspection and Welding Engineering from Raw Material stage to Final Stage in Fabrication, Construction, during Shut Down / Maintenance, Repair / Renovation work in Oil and Gas, Petroche
Bsc of mechanical engineering 1994, onshore and offshore rigs expernice, joy stick touch screen rigs
Graduate Chemical Engineer with 08 years experience in field of Internal Corrosion and Chemical treament in oil and gas field.
Post Applied for: Planning Engineer / Sr.Planning Engineer (Primavera and MS-Project).
SOFTWARE SKILL: PRIMAVERA-P3 ,P5 ENTERPRISE , P6 PROJECT ENTERPRISE V.6.0 AND PM+
Seeking A Challenging Overseas Position in a professional org MSProj & Premevira
A highly experienced and versatile project management and professional engineer with over 15 years of engineering and project management experience in the Oil and Gas industries. Extensive experience in various types of oil and gas projects.
Algerian petroleum geologist with +8 years of experience in the area of petroleum exploration and geomechanical engineering. Looking for an international carrier in the area of petroleum geology or geomechanics
During 8 years experience in Oil & Gas industry, I was fully in charge of Reservoir Engineering. I have done 3 reservoir simulation jobs , PVT Analysis, Static Pressure Analysis, Transient Pressure Analysis, Reserve Estimation, Material Balance, Decline Curve Analysis ,field job supervisory
I am a HVAC /Electrical Lead technician with 22years experience 19 years in Multi-national oil companies both onshore and offshore for production platforms and perform preventive maintenance activities, job scheduling including preparation of JSA with relevant parties .
Electrical Engineer
Working with Multinational Oil Company HALLIBURTON WORLD WIDE LTD, in Pakistan as a Senior Service Leader.
Quality Specialist experienced in Quality Management System, being aware of specific Inspection Techniques, including NDT Techniques and offering over 25 years experience in QA/QC environment acquired in Mettallurgy and Construction (Prestressed Concrete Cylinder Pipes and Oil&Gas Inst.)
Worked for several drilling companies, service and maintenance organizations during my career. Managed large numbers of personnel in most of these companies. Known for effective time and cost saving procedures. Excellent safety record, proficient in human relation skills, self-starter, task orientat
First   1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   [ 25 ]   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
CATEGORIES: Engineering/Technicians;
INDUSTRIES: Petroleum/Oil/Gas;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com