* 15+ years experience as an Instrumentation & Controls System engineer designing HMI based automated control systems, field instrumentation systems; DCS based systems, ESD systems, Fire Protection systems and low-
voltage power distribution systems for projects in the Oil & Gas industry.
* 11 years combined experience as a Project Engineer and Commissioning
Engineer on various Oil & Gas industry related projects throughout the world.
* Firm knowledge of NEC and IEC electrical codes for hazardous environments.
* Understanding of the latest (Triple Modular Redundant Architecture) PLC,
ESD system standards (IEC, 61508 TUV) and their applications.
* Familiar with all the relevant international standards, (IEC, IEE,
CENELEC, FM, CSA) and codes of practice.
* Designed I&C systems for Metering stations, FPSO¡¯s (Topsides equipment),
Natural Gas Compressor stations, Crude Oil Pumping stations, Offshore
Production platforms and Oil & Gas transportation pipelines.
* Through knowledge of oil and gas measurement principles, API metering requirements, API Offshore instrumentation requirements and control system design requirements.
* Develop Ladder-Logic instructions for PLC systems and Software functional specifications for HMI automated control systems.
* Complete knowledge of transmitters and controllers from the following manufacturers: Rosemount, Fisher, Honeywell and Yokogawa.
* Very knowledgeable with PLC systems from the following manufacturers:
Allen-Bradley, Modicon, Siemens and GE.
* Familiar with DCS systems by Rosemount (Delta-V) and Honeywell (TDC 3000).
* Through understanding of the Personal Computer environment and familiar with software programs such as: Excel, Microsoft Projects, AutoCAD 14 &
2000, PowerPoint, and Word.
* 5 years experience with open-hole and cased-hole logging and production activities in both offshore and onshore environments.
* 2 years of drilling experience on barge and offshore drilling rigs.
EDUCATION:
UNIVERSITY OF NOTRE DAME
Notre Dame, Indiana 46556
August, 1976 - May, 1981
Major: Pre-Professional Studies (Pre-Med)
Minor: Economics
Degree and Date received: Bachelor of Arts; May, 1980
Major: Electrical Engineering
Degree: Completed 83 of the 121 credit hours required Bachelor of
Science Degree in Electrical Engineering from January, 1979 through
May, 1981.
EMPLOYMENT HISTORY:
► WORLEY INTERNATIONAL INCORPORATED
13105 Northwest Freeway; Suite 200
Houston, Texas
Sr. Instrumentation & Control Systems Engineer
February, 2002 ¨C Present
▪ Developed detail functional design parameters and specifications for the instrumentation required for system integration.
▪ Designed the I&C block diagrams, bill of materials, instrument loop wiring drawings, communication interface drawings and cable schedules for the integrated instrumented control system.
▪ Designed the HMI automation system operational specifications required to meet the control system functional parameters. This task required the selection of the software system, development of software specifications for the HMI control functionality, graphics, reports, flow diagrams and I/O listings for the PLC
programming effort.
▪ Supervised the junior engineers (designers) involved with the project I&C design and testing. The systems were designed for applications in refineries, gas compressor stations, LPG
transmission pipelines, tanker loading facilities, offshore production/drilling platforms and FPSO facilities.
▪ Developed instrumentation, control system and construction engineering specifications for new project proposals. Included with this activity would be the provision of equipment specifications, equipment costs, labor hours and technical documentation.
▪ Provide technical support and supervision during HMI software development.
▪ Perform the integrated, control system Factory Acceptance Testing.
▪ Provide global on-site supervision and technical support during the construction and commissioning phase of the project.
► EMERSON CORPORATION - DANIEL SYSTEMS DIVISION
9753 Pine Lake Drive
Houston, Texas 77055
Electrical Engineer (Instrumentation & Control Systems)
November, 1999 ¨C November, 2001
▪ Evaluate and develop customer I&C system specifications into I&C
block diagrams, bills of material and detail instrumentation and control systems wiring drawings. These tasks required determining functional requirements of the specifications and to locate/evaluate manufacturers equipment required to meet the customer specifications.
▪ Develop detailed design and wiring drawings for all related instrumentation and low voltage electrical equipment required for the system design. This task also included the procurement of state-
of-the-art electronic components and software necessary to build the automated control system.
▪ Supervised the junior engineers (designers) involved with the project I&C design and testing. These instrumentation systems and automated control packages were designed for use in refineries, offshore/onshore production facilities, tanker loading facilities and FPSO facilities.
▪ I have a through understanding of reading and interpreting P&ID¡¯s,
Piping Details and Isometric drawings.
▪ For proposals I had to evaluate customer system specifications in order to generate proposal packages for potential projects. I was responsible for specifying and pricing all instrumentation, power distribution, software development & hardware and labor hours. Meet with customers to discuss design implementation and system performance requirements. These tasks required determining engineering content of the specifications and locate and evaluate vendor equipment required to meet the customer specifications. I
was also responsible for the I&C technical write-up for these proposals.
▪ Develop software specifications for the HMI package utilizing
Wonderware and Allen-Bradley Controlview graphical interface packages.
▪ I was also responsible for monitoring software development, completion and testing.
▪ Provide technical support and supervision during control system fabrication and system testing.
EMERSON CORPORATION ¨CPERFORMANCE SOLUTIONS
8301 Cameron Road
Austin, Texas 78754
Electrical Engineer (Instrumentation & Control Systems)
August, 1998 ¨C November, 1999
▪ In this position I performed the same activities and responsibilities as described above for the electrical engineering position at Daniel Systems Division. In addition, I worked with
Fisher-Rosemount Delta-V systems.
► SMITH SYSTEMS OPERATIONS - FMC
737 North Padre Island Drive
Corpus Christi, Texas 78469
Project Manager - Americas Project Team
December, 1996 ¨C June, 1998
▪ Managed all financial and fabrication aspects related to international projects that were delivered to various locations throughout the world in such countries as Saudi Arabia, Kuwait,
Indonesia, Russia, Singapore and Nigeria.
▪ Primary responsibilities were; to interface with the customer to resolve any technical, delivery and commercial issues; review and clarify project specifications; coordinate engineering activities;
coordinate the fabrication of the mechanical and electrical equipment; provide and maintain the schedule for the project;
coordinate the system testing and customer acceptance; manage the project budget.
▪ Collating and adjusting project data for presentation of monthly project status reports.
▪ Travel to customer locations to interface directly with the end-
user and resolve contractual, technical and commercial issues.
International Field Service / Test Department Manager
August, 1996 - December, 1996
▪ Supervised and coordinated the activities of a 9-man, international field service department. The major activities of this position was to organize the service engineer¡¯s field assignments; develop service contracts with domestic and international customers.
▪ Provide technical support to the service engineers and provide technical support to the customer.
▪ Travel overseas to customer locations to perform field support duties on critical projects as required.
▪ Focal point for resolving outstanding issues between the customers,equipment in the field and the project teams.
▪ Assist with the supervision and coordination of the activities of the test technicians and provide technical support during system testing.
▪ Supervise and coordinate the activities of the Smith Systems Parts
Operation.
Electrical (Instrumentation & Control System) Engineer - Systems
Division
September, 1988 - August, 1996
▪ Responsibilities and job duties were identical to the description given for my position as an Electrical Engineer for Emerson ¨C
Daniel Systems Division, from November, 1999 to November, 2001.
► SCHLUMBERGER WELL SERVICES
2353 Energy Avenue
Alice, Texas 78439
General Field Engineer
May, 1986 - December, 1987
▪ Supervised well-site operations and field personnel associated with open-hole exploration and cased-hole production, oil and gas well logging and interpretation services.
▪ Operated a computerized field service unit that utilized telemetry communications and data acquisition systems.
▪ Trouble-shooting electrical equipment / computer system and seeing to their repair, quarterly maintenance and calibration.
▪ Conducted sales contacts with clients and was involved with the purchasing of electrical and mechanical supplies needed for the daily operations of assigned unit.
▪ District Radiation Engineer and Safety Coordinator.
SCHLUMBERGER OFFSHORE SERVICES
2020 North Lexington Boulevard
Corpus Christi, Texas 78469
Senior Field Engineer
February, 1985 - May, 1986
▪ At this level I performed the same activities and responsibilities as described above for a General Field Engineer with addition of also being the district Radiation Engineer.
Field Engineer
December, 1983 - January, 1985
▪ At this level I performed the same activities and responsibilities as described above for a General Field Engineer with addition of also being the district Radiation Engineer
► EXXON COMPANY, U.S.A.
1555 Poydras Street
New Orleans, Louisiana 70161
Drilling Technician
December, 1981 - March, 1983
▪ Exploration and Production, on-site supervisor, for the drilling and completion of oil and gas wells. Responsibilities were the organizing, planning and direction of overall drilling operations.
INTERESTS:
Automated control-systems design, snorkeling, remote control models. I
received a football scholarship to the University of Notre Dame and played for four years. As a result, I also enjoy coaching young men and women in both football and basketball.
References will be provided on request.
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 2351 to 2400 of 7050)
Go to Search Parameters...
Brief Description
Solid knowledge of Microsoft Office Suite, CoralDraw, Foltran, Qbasic, Visual Fox Pro and Mathcad, Autocad, Staad Pro, Sap 2000, Advanced knowledge of VISUAL BASIC applications for EXCEL, ACCES, WORD, POWER POINT, AutoCAD and STAAD PRO, electronic mail and Internet.
Fifteen years of experience in piping construction and piping engineering activities related to projects for oil production facilities, oil refining and industrial plants.
B.Eng in Chemical Engineering; Diploma in Mud (Drilling Fluids) Engineering.
Diploma in Mechanical Engineering, Diploma in Industrial Safety from Central Labour Institute- Mumbai, H2S Awareness & Rescue Operation, Safe Journey Management, Road Safety Management, Job Hazard Analysis, Permit to Work System, Gas Testing, Incident investigation & Accident reporting.
I have worked for multinational and International companies in the Middle East like General Dynamics, Babcock & Wilcox, and Delta Corporation. I look for a job as QA/QC Engineer/Specialist or Plant Manager.
I have 15+ years experience as an Instrumentation & Control Systems Design Engineer along with seven years I&C construction and commissioning experience at locations throughout the globe.
I have varied experience earned through honest means in Chemical, Oil & Gas, Petrochemical , Water treatment and other related areas by hard work, sincerity, dedication, team spirit and conviction.
A Mechanical Engineering PhD graduate seeking engineering and research work as a Mechanical Engineer.
•Ability to solve petroleum production problems involving design of petroleum production facilities •Engineering and project management experience in the oil industry •Strong planning, communication and presentation software skills
15 years experienced Mud engineer. Drilling fluids design, testing and well site engineering. Solids control equipment management
Drilling Engineer with 12 years of experience in drilling and workover supervision, including 2 years of well construction planning. Also 1 year of work as a Safety Engineer.
Electric Technical Officer (ETO)
I have over 11-year field exploitation and G&G Modeling and reservoir simulation experince and extensive competency in reservoir management, economic evaluation, reserve estimating and booking, risk analysis, welltest interpretation, well perfomance analysis and stimulations.
Slick Line Expert.
Ability to design & detail automation for DCS systems and other interfaces.
Mechanical Engineer,University Politehnica Bucharest
Technical and Application Engineering Support for the new concepts being introduced and promoted.
Having +10 years of Gas Processing, Fertilizer & Petrochemical Plants operational and supervisory experience.
Over 8 years experience as a piping team member and leader involved in oil, gas and petrochemical plants. Participated with famous European companies (Foster wheeler, Lurgi, Davy Process Technology, AKPG Kvaerner) as the main contractor, sub contractor or consortium member
Having a good experience in Export Business, Purchasing, Design, Material Planning, and Scheduling. An executive with experience in Business Development, Negotiations, Operations, Planning and Scheduling with a solid perspective of organizational priorities, potential and limitations.
Mechanical Engineer with 4.5 yrs experience in Oil & Gas Industry
Masters in Industrial Chemistry , Master¡¦s Thesis -Oil well Cementing and Fluid loss admixtures for better fluid loss control and zonal isolation in oil wells. High Temperature High Pressure Filtration Cell, Consistometer, DLS, Zeta potential, TOC, GC, HPLC, Rheology, Spectrophotometers.
Wonderware Integration Expert & also In Sap xMII
Petroleum Engineer with experience in ESP & PCP installation, Well testing, Workover & Completion
My skills among others include good use of tools and ability to troubleshoot
Piping Design Stress Analysis Engineer
Calibration of Instruments,online routine and corrective maintenance,troubleshooting, field calibration, calibration in workshop, commissioning, precommissioning
Planner with primavera 3.1
Instrument engineer
Sr Rotating Equipment Engineer
Structural PDMS Designer
20 years experience in Production/Operations onshore and offshore. Ex Marine Engineer officer.
Process Engineer (Chemical Engineering)
I HAVE +10 YRS EXP IN A PETROLEUM LABORATORY OF OIL REFINERY IN INDIA,HAVE KNOWLEDGE OF TESTING ALL PETROLEUM PRODUCTS.
To seek holistic and enriching exposure in the field of technology and management with an organisation that is dedicated to say in the forefort of excellence.
I have over twenty years of experience, comprising of mechanical, piping and HVAC design, project management, construction supervision, mechanical systems startup and commissioning and board /computer drafting including PDMS, Intergraph ISDP 3D, AutoCAD and FLEX CAD on various marine, offshore pet
Pursue a career in the, Chillers Systems, Refrigeration, Air conditioning,
Proven professional experience in Manufacturing Processes in Ethylene, Ethylene Oxide, EthyleneGlycol and Ethylene Benzene, Process Design and Optimization. Experience with process control objectives to optimize unit operations.
I have degree in Civil engineering and 6 years experience with Oil & Gas Industry(Kuwait,Qatar,U.A.E,Georgia).I have valid driving licence of Qatar/U.A.E/Oman.Execution of Pipe rack foundations,Static/Rotary euipment foundations,Turbine,Boiler,Flare foundations, Control bldg and Sub station bldg.
• Over 15 years of experience in Petrophysics (Exploitation and Reservoir characterization)in clastic and complex carbonate reservoirs. • Detailed experience of acquisition, quality control, interpretation and evaluation of petrophysical (wireline, LWD and core) data.
Seeking a challenging and rewarding Chemical Engineering position with a progressive company.
handle the Project Independently, Installation Instruments* Loop Checking* Site Design *F&G System *Pre Commissioning Activities Erection of DCS,PLC *Knowledge of Analyzer System *Experienced in Senior levels *Good Leadership quality *Good interpersonal relationship
Electrical Engineer with experience in system design and maintenance planning of electrical facilities including motors, motor starters, switchgears, power distribution, and cabling.
pipelines engineer, mechanical engineer
I am presently working as a field service representative for Ecolochem International,Inc. Presently assign in an Onshore Gas Plant for Shell Exploration Philippines. I work also as a assistant driller for Sedco Forex Sclumberger.
I am a Mechanical Engineer with Master degree in Mechanical Engineering,
Objective Secure employment in the petroleum industry working in reservoir exploitation, well planning, and/or completion operations.
German R. Leal Mechanical engineer with 15 years industrial experience in Petrochemical and Oil Plants. HRSG Boiler/Plant. Piping Engineering and Design (PI&D), Flow Sheet, Plot Plan. ASME B31.1;3, 5,8, 11 ASME BPV Sect VIII. Stress Analysis CAEPIPE, Auto Pipe.
Extensively experienced with the specification, bid evaluation and purchasing of mechanical equipment and pipelines.
I am smart Lithuanian male, strong wide profile IT specialist with more than 15 years related experience and searching for the position in IT sector, where my experience and strong background in computer science can be best utilized. My main personal qualities is: calm, disciplined, communicable.
First
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
[ 48 ]
49
50
Next
Last
Seach Parameters
Change search parameters...
CATEGORIES:
Engineering/Technicians;
INDUSTRIES:
Petroleum/Oil/Gas;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com