PROFESSIONAL EXPERIENCE
MAY '04 - Present
Company: Tepe Insaat, Turkey
Post: Production Specialist.
Project Title: Baku-Tiblis-Ceyan pump station Project.
Client: British Petroleum (BP)
Project Description:
US$ 180.0 million EPC project of BTC Pump Station project.
M/s. TEPE Construction Ankara, Turkey has been enthrusted the responsibilitiy of Engineering, Procurement and Construction (EPC) activities of 4 nos. Pump Station and one Intermediate Pigging Station for the Transportation of Crude Oil via. Baku-Tblisli-Ceyhan Pipeline of M/s. BP across 1080 KM stretch of Turkish territory of BTC Pipeline. Pump stations are situated at higher altitude and as high as 2600Mtrs from MSL and average dia. of Pipeline is 42". Pump Stations are designed to function normally even in the extreme climatic condition of -40¢XC.
Nature of Work:
* Working as Production Specialist(Site Manager) Production Coordinator(from May 2005 to March 2006) and looking in to various Fabrications(Piping,tanks &steel strl), QA/QC and Inspection activities for 5 stations Piping, Tanks & Steel structurals & Erection of piping & Equipments.
* Presently working as mechanical Incharge for Pumping Station(PT1) from March2006 onwards
Consists of piping, Equipments, Tanks, Steel Structurals Installations, Hydrostatic test clearances, Field changes, Re-Instatements.
* Review of P&ID, Piping Arrangement Drawings & Approving of Isometrics & Spool Drawings.
* Review of Line list & MTO.
* Preparation of Hydrotest Packages (Piping) & Marking on P&ID.
* Execution of Piping fabrications&quality approvals for 300000 Inchdia for Pumping Stations (PT1, PT2, PT3, PT4 &IPT1).
* Execution of Tanks fabrications & Quality approvals for API Tanks (17nos) & DIN-14nos Tanks)
* Execution daily Fabrication &Installation of piping, Tanks & steel structurals (1500 Tonnes).
* Hydrotesting activity follow-up & progress monitoring.
* Working for sub-systems& systems clearances.
* Systems completion activity (86 systems).
* Requirement for the various Works/ Purchase Orders to be checked & arrangements to be made available of Project Materials for carrying out production.
* Job involves review and submission of QA/QC Plans, Inspection Test Plans, Material Test Certificates to PMC (BOTAS).
Co-ordination with sites (5) and for the availability of fabricated/finished Items and required Certificates in a timely manner.
* Coordination with Engineering, Quality Control and other departments for the approval of Deviations, Change Notice and Qurries raised by Vendors/Contractors.
* Certification of measurements, billing & final Re-concilations
* Execution of pipeline inside & around station (42"& 46" P/L- 20KM).
AUG '03 - APRIL '04.
Company: Galfar Engineering & Contracting LLC, Oman
Post: Sr. Pipeline Engineer
Project Title: Installation of Pipelines for Central Oman Expansion Phase-I
Client: Petroleum Development of Oman (PDO)
Project Description:
US$ 9.5 million project for Installation of 48" P/L(19.5thk), 12" P/L(7.1thk), 4"DSS, 4" GRE pipelines and Flowlines for oil & Gas.
M/s. Galfar Engineering & Contracting LLC,Mascut, Sultanate of OMAN has been enthrusted the responsibilitiy of Engineering, Procurement and Construction (EPC) activities of 48" P/L (9KM),12" P/L(80KM), 4" DSS P/L(8KM), Flow lines(4KM), Gas Station piping.
Nature of Work:
* Worked as Sr.Pipeline Engineer(As Section Manager) worked in the Mechanical Department and was leading a team of pipeline Engineers & QA/QC Engineers for above Project.
* Key Focal point for all Pipelines(97KM), Flowlines(4KM) & Station piping(30000Inch Diameter).
* Leader from Execution side in getting Galfar qualified as DSS contractor in PDO.
* Estimation of tools & tackles, consumables, and equipment requirements.
* Establishing of PQR, WPS & welder Qualifications.
* Execution of pipeline, piping&Flow lines activities-stringing, fit-up, welding, Field Joint Coating, Holiday test, Lowering & Tie-ins & material receipts, fit-ups, welding, radiography, NDT, Erection Alignments, loop clearances, Hydrostatic testing, system clearances & hand over to client.
* Planning of monthly programmes, weekly programmes & Daily programmes in line with Project schedules.
* Work involves preparation of Quality Control Plans (QCP's) & Inspection Test Plan (ITP) for the various activities in complience with the requirements of Project Specifications.
* Preparation and establishment of Method Statements.
* Preparation of Welding Book, preparation of various WPS &PQR.
* Co-ordinating & Impementation of PQR's and WQT's.
* Tracking the daily reports and ensuring the preparation of History Sheets, coordinating with NDT agency for ensuring the adequate resources are mobilised in a timely manner. Coordinating with client for day to day field inspection activities.
* Preparation of final payments & re-consilation records.Knowledge of various Welding Processes viz. SMAW, SAW, GTAW, GMAW. Well acquainted with the working knowledge of various Codes and Standards like ASME, ASTM, API and ANSI.
JAN '02 - JUNE '03
Company: Sudelettra Nigeria Ltd., Nigeria
Post: Mechanical Engineer / Fabrication Advisor
Project Title: Installation of Multistage Turbo Compressor for Oil & Gas station.
Client: Nigerian Agip Oil Company (NAOC), ENI Group.
Project Description:
US$ 8.0 million project for installation of Multistage Turbo Compressor and allied piping works.
M/S. Sudelettra Nigeria Ltd, Nigeria has been enthrusted the responsibilitiy of Engineering, Procurement and Construction (EPC) activities of Multistage Turbo Compresser for Ebocha oil station. Enhancing of Oil& Gas Plant capacity by providing Multistage Turbo Compresser. Low pressure Gas which is going to flare is recollected at separators out lets & send to Multi Stage Turbo Compresser( Primery Stage & Secondary Stage) for pressure enhancement. And after transported to Gas plant storage Tanks through underground Pipeline of 20" Size (20KM) for further Gas plant utilization.
In this expansion piping (one lakh), equipments, Pipeline (20" X20KM)& steel structurals (300MTS) EPC activities were carried out.
Nature of Work:
* Worked as Fabrication adviser/Mechanical Engineer(As department Manager) in the Mechanical Department and was leading a team of execution Engineers & QA/QC Engineers, supervisors & Foremans for above Project.
* Key Focal point for all Mechanical activities-piping, pipeline, equipments, steel structurals.
* Ensuring of PQR,WPS & WQT are in place.
* Responsible for job execution with day to day activities for fabrication, piping, spool erection, hydrotesting.
* Responsible for job execution of pipeline(20" size-20KM) stringing, welding, field Joint Coating, holiday Testing & Lowering.
* Fabrication & Installation of 100000 Inch-dia piping completed in record time.
* Erection of piping, alignments carried out.
* Erection of Equipments, alignments carried out.
* Prepared QA/QC Plan, Inspection Test Plan, Method statements for the execution of awarded contract.
* Prepared detailed construction schedule, monthly, weekly & daily programme in line with the contract schedule.
* Preparation of P&ID,Piping Arrangement Drawings,Isometrics & Weld maps(spool Drawings) and take approvals from client(Nigerian Agip Oil Company).
* Estimation of Machinery, Manpower Requirements in line with project schedule.
* Estimation & Compliance of Material Take Off Reports.
* Co-ordination with other departments at site to ensure timely release of site work front to other project activities.
* Coordination with Document and Planning department to ensure that Drawing & Material are made available in time at site.
* Inspection of incoming material at Warehouse& timely release of same to fabricate.us services.
* Supervision of construction activities performed as per the agreed Quality Plan to ensure compliance with the specifications, drawings, contractual commitments like work procedure, mobilization of resources & safety regulation.
prearation of Hydrotest Packages based on P&ID and Line list.
* Preparation of Check/ Punch List for Mechanical Clearance of Piping, Loops, sub System, systems as per P&ID, GAD's & Support Index.& releasing them for Hydrostatic testing and witnessing same.
* Coordination with Client for various pre-commissioning activities like Hydrojetting, Nitrogen Purging.
* Maintaining Documents as per ISO requirements. Coordination for Handing over of As Built Records to Client.
* Working knowledge of codes & standards viz. API, ANSI, ASTM.
APR '98 - JAN '02
Company: Engineers India Ltd., India
Post: Engineer (Mechanical)
Project Title1: DHDS project for Refinery expansion project.
Project Title2: Sulfur recovery project for Refinery expansion project.
Project Title3: K.G.Basin Pipeline Project, GAIL, Rajhamandri, A.P, India.
Client: Chennai Petroleum company ltd. (CPCL)
Project Description:
Engineers India Ltd is an ISO Certified Govt. of India Premier Consultancy Organisation in the diversified fields of Oil and Gas Exploration,Construction of Refineries,Petrochemicals Plants, Cross Country Pipelines, Ports, Harbours, Terminals, Jetties & Infrastructure Technologies.
* US$ 180.0 million EPC project of Diesel Hydrogen De-sulpurisation(DHDS) Project for Refinery Expansion. Enhancement of Diesel Quality by redusing sulfer quantity in Diesel. Project Consisting of Hydrogen Unit, Reformer unit, Diesel Unit, Sulfer Recovery unit(SRU), Compresser House, Nitrogen plant, air compressers, Waste treatment plant, cooling Towers.
* K.G.Basin pipeline(18" P/L&12" P/L) project for vijjeswaram power plant & Nagarjuna Fertiliser corporation Ltd. M/s.Gas Authourity Of India Ltd(GAIL), Rajahmandry, Andhra Pradesh, India.
NATURE OF WORK:
As a Mechanical Engineer from EIL was looking after the Unit Piping / Mechanical works of the newly constructed Diesel Hydrogen De-sulfurisation(DHDS) Plant for M/S. Chennai Petroleum Corporation Limited, Chennai, Tamilnadu, India. Main units of the Complex are Hydrogen Unit, Diesel Unit, Sulfer recovery unit(SRU), Compresser House, Nitrogenplant, air compressers, Waste treatment plant. These Plants consisting of about 6 lakh Inch Diameter welding, about 120 Equipments (Exchangers, Storage vessels, Pumps, heaters, columns. Reactors etc), Storage Facilities viz. Storage Tanks (cap. 32,000 Cu. M each), Associated Piping up to and including Piping for Hydrocarbon(Diesel), Compressor House and Integrated Offsite Facilities viz. Air Separation (Nitrogen/ Oxygen) Plant, Air Compressor House, Raw/ Service/ Drinking/ Fire Fighting Water Plant.
* Laying of Natural Gas pipeline (18" P/LX19KM) from Take-off point to NFCL.
* Laying of Natural Gas pipeline(12" P/LX125KM) from tatipaka to Vijjeswaram.
WORK EXPERIENCE:
* To Review QA/QC Plan, Inspection Test Procedure submitted by the Contractor for the Execution of awarded contract.
* Contractors detailed construction schedule, monthly, weekly & daily programme in line with the contract schedule.
* Identifying Drawings (P&ID,GAD&ISO), line list & checking for technical Integrity.
* Estimation of Manpower&Machinery Requirements.
* Checking of Material Take Off (MTO) Reports.
* Supervision of fabrication & erection daily activities of Piping fabrication,
Material receipt, fit-up, welding, radiography/ NDT, Blasting, Painting 0f spools & release for erection. Piping Erection. Erection of spools, alignments, supports installations,loop clearances, Hydrotesting, system clearances, pre-commissioning & system handover to client.
Equipments: Erection, Alignments, grouting, Internal installations, connection of pipings & steel structural plotforms, ladders.
Pipelines - Coated pipes used. stringing, fit-ups, welding, Radiography, Joint coating, Holiday test, Lowering, Hydrotesting & System hand over to client.
* Coordination with other departments to ensure timely release of site work front to the Contractors.
* Coordination with Document and Planning department to ensure that Drawing & Material are made available in time at site.
* Inspection of incoming material at Warehouse.
* Inspection and witnessing the Sand Blasting and painting works on Line Pipes for various services.
* Supervision of construction work performed by the contractors as per the agreed Quality Plan to ensure compliance with the specification, drawing, contractual commitments like work procedure, mobilization of resources & safety regulation.
* Preparation of Check/ Punch List for Mechanical Clearance of Piping, Loops, System as per GAD's, Support Index and P & ID & releasing them for Hydro/ Pneumatic testing to be carried out as per Line Schedule.
* Coordination with Client for various pre-commissioning activities like Hydrojetting,Nitrogen Purging.
* Certification of measurements, billing & final Re-concilations.
* Maintaining Documents as per ISO requirements. Coordination for Handing over of As Built Records to Client.
* Working knowledge of codes & standards viz. ASME, API, ANSI, ASTM.
MAY '95 - APR '98
Company: Petron Engineering Construction ltd., India
Post: Engineer (Mechanical)
Project Title1: Piping works for refinery expansion of CPCL Nagapatnam.
Project Title2: Shutdown work for CPCL Refinery.
Client: Chennai Petroleum company ltd. (CPCL).
Project Description:
US$ 5.2 million piping works for refinery expansion and shutdown works in various units at different time period.
M/S. Madras Refineries Ltd, Nagapatnam, Tamilnadu, India has expansion of units in Refinery. It Consists of Main units of the Complex are Naptha, Captive Power Plant (64.5 MW), Terminal/ Storage Facilities, Associated Piping up to and including Piping for Hydrocarbon Unloading Jetty, Compressor House and Integrated Offsite Facilities viz. Air Separation (Nitrogen/ Oxygen) Plant, Air Compressor House, Raw/ Service/ Drinking/ Fire Fighting Water Plant.
Responsibilities & Achievements:
* As a Mechanical Engineer was looking after the Offsite Piping / Mechanical works of the newly constructed Nagapatnam Refinery Complex of M/s. Madras Refineries,Nagapatnam,Tamil Nadu,India.
* Preparation of Quality plan, ITP submitted for client approvals.
* Preparation of detailed construction schedule, monthly, weekly & daily programme in line with the contract schedule.
* Identifying Drawings (P&ID, GAD&ISO), line list & checking for technical Integrity.
* Estimation of Manpower&Machinery Requirements.
* Supervision of fabrication & erection daily activities of,
Piping fabrication - fit-up, welding, NDT, Blasting, Painting 0f spools& release for erection.
PipingErection
- Erection of spools, alignments, supports installations, loop clearances, Hydrotesting, system clearances, pre-commissioning & system handover to client.
Equipments: Erection, Alignments, grouting, Internal installations, connection of pipings & steel structural plotforms, ladders.
* Execution of Piping 225000 Inchdia for Naptha unit, Hydrogen Unit.
* Individually handled 3 nos Shutdown, executed in span of year and all completed in scheduled period.
* Preparation of testpacks and final documentation.
* Quantity measurement and Material reconciliation.
JAN '93 - MAY '95
Company: Kitty Steels Ltd., India
Post: Engineer (Mechanical)
Project Title1: Piping works for refinery expansion of HPCL, Vizag.
Project Title2: Offsite piping works for refinery expansion of HPCL, Vizag
Client: Hindustan Petroleum Corporation ltd. (HPCL)
Project Description:
US$ 2.2 million piping works for refinery expansion.
Responsibilities & Achievements:
* Preparation of method statements in line with project specifications.
* Preparations PWPS and conducting PQR. Conducting of Welder Qualification Tests.
* Execution of day to day piping fabrication and Erection activities, i.e. Material Inspections, Fit-ups, welding, Radiography, Blasting, painting activities.
* Execution of awarded contract, monthly, weekly & daily programme in line with the contract schedule & Identifying Drawing, Machinery, Manpower Requirements. Coordination with other contractors at site to ensure timely release of site work front to the Contractors. Coordination with client.
* Execution of Piping fabrications 80000 inchdia for Naptha plant & Off-sites.
* Execution of piping Erections of released spools for same units.
* Execution of 36 km firewater line.
b) Fabrication, Erection and Hydrotesting of Fire Water Distribution Network consisting of 36 km. of Aboveground/ Underground CTE coated pipeline (up to 42" Dia.) and including Fire Fighting Network for all units & offsites. Erection of Fire Water Pumps.
SEP '90 - DEC '92
Company: ACC-Babcock Ltd., India
Post: Engineer (Mechanical)
Project Title: Piping & steel structural works for 250x2 MW Sanjay Gandhi Thermal Power station.
Client: Madhya Pradesh Electricity Board (MPEB).
Project Description:
US$ 5.6 million piping works for 250MW X 2 units.
M/s.Acc-Babcock Ltd has constructed two numbers of 250MW Thermal Power stations of Madhya Pradesh electricity board(MPEB).
Power Plant Consisting of furnace, boiler, drums, pulverisers, down comers, headers, feed water tubes, precipetaters, chimney, pumps, motors, ID Fan & FD Fan.
Responsibilities & Achievements:
* Working as Mechanical Engineer and looking in to various Fabrications & Erection activities of piping, Equipments&steel structurals.
* Implementation of detailed construction schedule, monthly, weekly & daily programme in line with the contract schedule.
* Execution daily Fabrication &Installation of piping, equipments & steel structurals.
* Certification of measurements, billing & final Re-concilations
* Execution of Headers,Down comers and Furnace Piping.
* Fabrication & Erection of 8000 MT Structure for Pulvarisers, ESP, ducts etc.
* Maintaining the time bounded forecasting schedules as per schedule.
MAY '89 - AUG '90
Company: Dynamic Engineering Works, India
Post: Graduate Engineer Trainee
Nature of Works
* Mechanical activities-piping,equipments,steel structurals for Refinery shut down works at M/S.Madras Refineries Ltd,Madras,Tamilnadu,India.
* Flareline shut down works,offsite naptha transportation lines replacement,replacement of piping for exchangers.& Undergound Fire water line of 8 KM. As new ly Installed.
* Ensuring of PQR/WPS & WQT are in place.
* Responsible for job execution with day to day activities for fabrication, piping, spool erection, hydrotesting.
* Fabrication & Installation of 80000 Inch-dia piping completed.
* Erection of piping,alignments carried out.
* Execution of job to match construction schedule.&, monthly, weekly & daily programmes to be set and maintain in line with the contract schedule.
* Estimation of Machinery, Manpower Requirements in line with project schedule.
* Co-ordination with other departments at site to ensure timely release of site work front to other project activities.
* Coordination with Document and Planning department to ensure that Drawing & Material are made available in time at site.
* Inspection of incoming material at Warehouse& timely release of same to fabricate.us services.
* Supervision of construction activities performed as per the agreed Quality Plan to ensure compliance with the specifications, drawings, contractual commitments like work procedure, mobilization of resources & safety regulation.
* Maintaining all documents and carrying out Inspection.
* Material reconciliation.