CONTACT INFORMATION:
View contact information...
PERSONAL DETAILS:
Date of Birth 20/03/1959
Citizenship: United Kingdom
-------------------------------------------
QUALIFICATIONS:
MSc Structural Engineering - University of Westminster - UK
BSc Structural Engineering - Sharif University - Iran
UK Chartered Structural Engineer (MIStructE)
UK Chartered Marine Engineer (MIMarE)
-------------------------------------------
SUMMARY
senior offshore/structural engineer with seventeen years experience in design, analysis and reassessment of offshore and onshore structures. He has broad experience in the offshore oil & gas industry (in North Sea and Middle East) and has been in charge of structural design for numerous projects. His experiences include design and analysis of floating platforms (FPSO, FPU), fixed offshore platforms (jackets, topsides), export and utility modules, boxed girders and plated structures, turret structures, aluminium structures, use of GRP in offshore structures and in-depth studies on boat impact, dynamic behaviour and fatigue assessment of offshore structures. He has worked for major oil & gas companies (consultants and operators) and has solid experience in multi-discipline projects. He is familiar with the majority of European and American codes and has been in charge of preparing the specifications and design basis for several offshore projects. He has wide experience in using computer programs like SESAM, ASAS, STAAD-III and SACS.
-------------------------------------------
EMPLOYMENT HISTORY
-------------------------------------------
July 2000 Qatar Petroleum (QP)
Present Technical Services Department
QP/MAERSK - Installation of Subsea Pipeline and new 20" Riser on NFA Riser Treatment Platform
Responsible for the execution and supervision of structural works for above project.
QP - BH/MM Fields - Reassessment and Maintenance of Existing Offshore Facilities
Responsible for reassessment and modification of several platforms in Qatar offshore fields.
QP Standard Committee - Preparation of Structural Design Specifications
Responsible for producing QP specifications for design of fixed offshore platforms.
BP/TECHNIP - Al-Rayyan Oil Field Development: Modifications on Utility Platform
Responsible for the structural audit of the above project.
QP North Field Development: Metocean Studies for PS-4 facilities and Halul island
Responsible for the project execution and supervision of the above work.
------------------------------------------------------------------------
March - June 2000 Genesis Oil & Gas (Aker Maritime), UK
KOREA NATIONAL OIL CORPORATION - Conceptual Design of Donghae Platform.
Involved in the conceptual design (in-place & load-out) of a 165m steel platform for KNOC.
------------------------------------------------------------------------
July 98 - Jan 2000 Odebrecht Oil & Gas, UK
CONOCO UK - Structural Modification of Piperacks for Macculloch FPSO.
Responsible for the re-assessment and modification of the piperacks for Macculloch FPSO.
CONOCO UK - Structural Modification of Compressor Skid for Macculloch FPSO.
Responsible for the reassessment of the compressor skid for Macculloch production ship.
CONOCO UK - Design of Minimum Facility Platforms
Involved in design of jackets for two minimum facility platforms (Europa & JX) in North Sea.
AMOCO - King Spar Development: Feasibility Study on Use of GRP Caissons
Responsible for the feasibility study for use of Glass Reinforced Plastic (GRP) for 15 caissons on Amoco's King Spar platform.
-----------------------------------------------------------------------------
May 97 - June 98 Umoe Oil & Gas, Norway
NORSK HYDRO - Troll Oil Gas Province - Design & Fabrication of Riser Balcony for Troll-C Floating Production Unit (FPU).
Responsible for the design of riser balcony for the Troll-C semisubmersible platform.
NORSK HYDRO - Troll Oil Gas Province - Design & Fabrication of Pig Launcher Platform and Equipment supports for Troll-C Floating Production Unit (FPU).
Responsible for the design of the pig launcher platform and supports for riser pull-in winch.
-----------------------------------------------------------------------------
Sept 91 - April 97 SLP Engineering, UK
CONOCO UK - Macculloch Field Development, Design & Fabrication of Turret Housing for FPSO.
Responsible for the design of Turret Deckhouse for a floating production and storage tanker..
CONOCO UK - Design and Fabrication of Boulton Platform.
Involved in the design of the jacket structure for a minimum facility platform in the Boulton field.
AMERADA HESS - South Arne Development, Conceptual Design of Topside Structures.
Involved in the conceptual design of an 8000 Te integrated topside structure for a GBS (Gravity Based Structure) platform in the Danish sector of the North Sea.
ARCO BRITISH LTD - Trent & Tyne Development, Design & Fabrication of Topside Structures.
Involved in the design of two integrated topside structures.
ARCO BRITISH LTD - Trent & Tyne Development, Design of Jacket Structures.
Responsible for the preliminary design of two jacket structures for the above project.
SHELL UK - Upgrading of the Southern North Sea Platforms Using SESAM - In-place Analysis of Platforms Clipper-PW, Clipper-PT and Sean-RD.
Responsible for upgrading of above platforms by performing static analysis using program SESAM.
SHELL UK - Upgrading of the Southern North Sea Platforms Using SESAM - Spectral Fatigue Analysis of Platforms Clipper-PW, Clipper-PT, Leman F and Sean-RD.
Responsible for spectral fatigue analysis for above platforms using program SESAM.
SHELL UK: Brent Delta - Post-processing of Box-Girders using SESAM & GIRCHK.
Involved in the post-processing of the box-girder structures (to BS5400) for the Brent Delta platform using program SESAM & In-house software GIRCHK.
SHELL UK - Design & Fabrication of Export Module for Fulmar Platform.
Involved in the design of an export module attached to the Fulmar platform.
PHILLIPS PETROLEUM - Structural Reassessment of Platform 48/29C
Responsible for upgrading the jacket structure for the above platform using program ASAS.
HAMILTON OIL CO. - DA Platform, Supply and Installation of GRE Caissons.
Responsible for design of 3 Glass Reinforced Epoxy (GRE) caissons attached to DA platform.
STATOIL - Statfjord 'B'- Design and Installation of Aluminium Compression Module.
Responsible for design of an aluminium compression module.
PHILLIPS PETROLEUM -Structural reassessment of platform 52/5A for new compressor package.
Responsible for reassessing the 52/5A platform to undertake an additional compressor package.
SHELL UK - Leman Flanks, Conceptual Design of Tripod Platform
Involved in the conceptual design of a monotower tripod platform in the North Sea.
PHILLIPS PETROLEUM - Platform 52/5A - Boat Impact study on Grout Filled Frames.
Involved in boat impact studies on grout filled members for the above platform.
ELF ENTERPRISE - Claymore Platform - Design of Aluminium Bridge.
Responsible for the study on different proposal regarding the shape and structure of the bridge,
-----------------------------------------------------------------------------
Jan 90 - Sept 91 Wimpey Group, Offshore Engineering Dept, UK
HEALTH & SAFETY - Joint Industry Project - Aluminium Design Guide
Involved in the study on the new code of practice for design of aluminium structures (BS8118) and providing design examples accordingly.
SHELL UK - Upgrading of Platforms LEMAN-BP, LEMAN-CP & LEMAN-AK.
Responsible for spectral fatigue analysis for above platforms using program SESAM.
PHILLIPS PETROLEUM - Structural Reassessment of Platform 48/29-FTP
Responsible for the reassessment and modification of the above platform including, a) Jacket Reanalysis:
b) Riser Protection Design:
c) Bridge Strengthening:
BRITISH PETROLEUM - Blast resistance assessment of accommodation modules & barrier walls.
Involved in assessment of the blast resistance for the topside modules of the platforms BP Forties.
RANK XEROX LTD - Design of Laboratory Building
Involved in the preliminary design of the Rank Xerox headquarters buildings in London.
-----------------------------------------------------------------------------
Jan 87 - Mar 88 Tehran-Berkeley Civil Engineering, Iran
Iranian Ministry Of Oil - Construction Project of Port of Tahery.
Responsible for the environmental studies for the above site in the Gulf region. Duties included, a) Marine hydraulic studies:
b) Seismic risk analysis:
Iranian Naval Force - Repair design of the "Shipping docks" at the port of Bandarabbas.
Responsible for structural analysis and preparing the procedures for repair of the Dry Docks.
Iranian National Gas Company – Conceptual Design of Oil Platforms in the Caspian Sea.
Involved in the preliminary studies for construction of the gravity based platforms in Caspian Sea.
Esfahan Regional Electricity Co. - Construction Project of "Hanna" and "Choghakhor" Dams.
Responsible for carrying out the Earthquake Engineering studies for the site region.
----------------------------------------------------------------------------
1985-86 "Vezva" Civil Engineering, Iran
Responsible for analysis and design of residential buildings in Teheran.
----------------------------------------------------------------------------
REFERENCE Available on request
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 851 to 900 of 6635)
Go to Search Parameters...
Brief Description
Qualified safety professional with proven national and international track record, demonstrated, through a successful 11-year safety and health management career, his ability to lead poorly performing facilities to top quartile performance.
Instrument Technician with over 25 years experience in Project Engineering, Field Instrumentation, Inspection, PLC’s, and DCS’s. Experienced in a broad field of Hazardous and Volatile plants such as Hydrogen plants, LPG, Methyl Methacrolate and Resin plants as well as offshore platforms on the Natio
I have 23 years experience of Siemence steam Turbine & generator, Mitsui Steam turbine & generator, Ebara Pumps ,B&W boiler, Desalination Unit Inspection , Condition monitoring,Overhauling,Preventive Maintenance, work.
API 510 vessel inspector
Experienced in gas lift design, well optimization, nodal analysis, well integrity, surveillance techniques, trouble shooting, water shut-off, formation damage evaluation and treatment, interpretation of production logging , PVT & multiphase flow, water injection project, and witness rigless operati
Reservoir engineering, development plan and management of upstream projects.Exceptional communication & interpersonal skills,In depth experience, in strategic planning, identifying new opportunities, execution of business plan, managing policies, problem solving, motivation and training,
I am having experience in Both static & rotating equipments
Instrumentation / Control system engineer
BE Chemical
I have 15 years of overseas experience in safety, fire prevention, IH and operations engineering. I am very flexible, a self starter, I work well in multi-cultural environments and have excellent problem solving abilities.
I AM INCLUDING MY RESUME SUMMARY WITH MY RESUME.
International employer with business operations located in Europe, South East Asia, and the USA that is in need of a tech savvy liaison for quality assurance validation of electronics and telecom equipment/applications.
I have over 22 years of experience in the drilling industry, and have worked in 21 countries. I have an extensive background in all aspects of drilling engineering, completions, production testing, well planning, contracts, operations, and logistics in remote land and offshore operations.
25 years exploration and production experience. Maintenance engineer.
Chartered offshore/structural engineer with seventeen years experience in design, analysis and reassessment of offshore and onshore structures in the in the North Sea and Middle East.
Exploration-Project Geologist, Petroleum Geologist, Well Site Geologist,
Highly motivated, results oriented with extensive and broad experience in the petroleum industry ranging from producing operations, reservoir and production engineering to management of a large technical staff.
Objective: Employment in petroleum production engineering, rig supervision, production operations supervision, or project management where seasoned experience, effective logistics, HSE practices, and practical technology can be brought together to attain corporate objectives.
Seeking challenging and rewarding career that will utilize my 13 years' work experience in the Oil Services Industry and more than 20 years of Physics, Mathematics and Computer knowledge.
I am interested in a position in the EHS field. I have a degree from University of Findlay
My experiences in mechanical works covered maintenance/construction of oil/gas processing plant and power plants. See attached Resume.
Over 14 Years of Strong Experience in Project Management, Estimation, Design & Procurement in Petroleum OIL,LUBES, Gas, and HVAC System.
Progressive and diversified experience in operation of gas pipeline transmission and oil field production. Proven track record in: Legal negotiations; Operations supervision; Budget management; System design; Project management; Conflict resolution.
Consulting Services Plant Construction & Modifications Reliability Inspections & Risk Assessment Maintenance Programs Pressure Equipment Design QA /QC Management Project Engineering & Management Procurement of Equipment Repairs and Alterations of Pressure Vessels and Storage Tanks.
A drilling professional with over 20 years experience. Able to work effectively in both field and office drilling positions with the ability to achieve results. I can offer proven technical, planning, execution, leadership, decision making, risk management and communication skills.
Wide ranging petroleum engineer with successful record in reservoir development planning/management, 17 years: BHP, PGS, BP, Agip, Burlington, Phillips, Marathon, UT Austin(1982-85), NL Baroid, international experience in Nigeria, Kuwait, Egypt, Angola, Norway, Algeria, Syria, NorthSea
Cost Engineer with gas pipeline & oilfield production background also some power plant and mining background.
Having completed my service at the age of 60 in Sept, 2000, I still want to live a busy life. Earn and live a better living exploiting 36 years of my experience in oil well drilling industry.
International Experience Superior Client Performance Evaluation
1. Project Manager for the engineering, procurement, construction and installation of Substructures (Jackets), Topsides, and Gas Compression Modules, FPSOs, Submarine Pipelines, Submarine Cables, Mooring Buoys and PLEMs ¨C Offshore Oil and Gas Industry.
Testing of sample
I have over ten years experience in oil industry for reserve reporting maintaing and updating reserve syste. Inmost recent job iI provide onsite technical support and training to geoscience professionals in major oil& gas companies.
Hazard and risk assessment, emergency procedures, preparing HSE plans, mock drills, HSE inspections and audits
Having around 11½ years of Experience in Instrumentation & Process control in various continuous process industries. [ Chemical ( 4 Years ), Petrochemical (1½ years ) & fertilizer ( 4 Years ), KNPC Shuaiba Refinery, Kuwait (1½ years)].Engineering Graduate.
Reservoir engineer software developer
Pipeline Engineer having 8 years experience in detailed and construction engineering of submarine pipelines
Preparing FEED deliverables: Process Flow diagrams, P & IDs, heat & material balance table, process equipment data sheets Generation: heat exchangers, pumps, air fin fans, instrument data sheets, Control valve Sizing calculation,
Senior Control Systems Engineer (PLC/SCADA), technically responsible for all software and hardware modifications, design review leader, functional safety assessor, HNC instrumentation & control.
All aspects of seismic data processing - signal processing, velocity modeling, migration
Sr. Production Geologist / Team Leader, New Oil
Currently working with Kuwait Oil Company working on Integrity Management with BP consultant. Advance Safety Audits in various GC’s, Booster Stations, Insurance recommendations, QRA recommendations, HSEMS implementation and Audits.
Maintenance / Relaibility / Rotating Equipment Planning Engineer - Suitable Position
Self-motivated and with 16 years experience. Have a strong background in the major aspects of Petroleum engineering, workover program design and implementation, production management, Seeking challenging position as Workover & Drilling Rig Supervisor, underbalanced drilling Engineer, Production Eng.
Corrosion Engineering consultant
Resume of a Graduate Control & Instrumentation engineer with 20 years experience
Electronic Engineer with over 20 years experience with specialisation in Process control analytical instrumentation. Worked in oil/gas, chemical, fertilizer, steel, Power/desalination industries.
I have total 21 yrs of experience from oil to IT industry and worked on various post i.e. Planning engineer, Application engineer, Sap pp consultant, Oil refinery production supervisor, oil terminal incharege etc. I worked on various International companies.
I am a Mechanical engineer with 20 years experiences in design of all kinds of piping & fixed equipment design & stress analysis work. I used softwares like CODECALC, CEASER, PVELITE, partly STAAD & ALGOR. My experiences are in oil and gas, power, onshore as well as offshore.
I have a total of 23 years experience as a Reservoir Management and Reservoir Simulation Engineer. I have worked in UK, North Africa and the Middle East on carbonate reservoirs.
Work experience involved twenty-five years as a petroleum engineer for fossil energy, coalbed methane recovery, and environmental remediation. Major projects involved insitu combustion, steam flooding, carbon dioxide injection and polymer flooding.
First
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
[ 18 ]
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Next
Last
Seach Parameters
Change search parameters...
CATEGORIES:
Engineering/Technicians;
INDUSTRIES:
Petroleum/Oil/Gas;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2008 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com