16 years of Piping & Pipelines Project Management/Project Execution experience in the Industries like Refineries, Hydrocarbon, Petrochemical and Oil&Gas(Cross Country Pipelines, Booster Pump stations, Oil Station, Gas Station, Up-Stream flow Lines).

EDUCATIONAL QUALIFICATIONS
- 1989; Bachelor of Technology (Mechanical) - 70% from Kakatiya University, Warangal, India
- 1997; P.G.Diploma in TQM & ISO9000 - 60% from A.P. Productivity Council, Hyderabad
Certificate Courses
- 2001; Diploma in Quality Control & ISO 9000 - 64% from NIILEM, Chennai
- 2001; ASNT Level-II (RT, UT, MPT & PT) - 86% from Kalva Engineers, Chennai
- 2003; Supervising Safety course from Galfar, Oman
- 2003; Permit to Work Applicant course from NTI-Oman
- 2003; H2S course

SKILLS/EXPERTISE
- Successfully used extensive supervisory experience in;
* Project Management/Project Execution for Refineries,Oil&Gas plants Process piping&utility piping viz. Carbon Steel, Alloy Steel, Stainless steel.
* Project execution for Pipelines(48" P/L,46" P/L,42" P/L,20" P/L,18" P/L,12" P/L & 4" P/L).
* Pipelines stringing, fit-ups, welding, joint coating, holiday Inspections, lowering, tie-ins,testing, re-instatements.
* Project Co-ordinations Manpower planning, Equipments planning to match project schedules, monthly reports, weekly reports, daily reports.
* Erection, commissioning of Refinery and Oil & Gas Equipments.
* Shutdown & Hook-up for Refinery, Hydrocarbon and oil and gas production facilities, processing facilities.
* Proficient in independent judgment on details of execution in selections and adaptations of alternatives for timely completion of job.
* Preparations of Quality plan, Inspection Test Plan, Proceedures, PQR &WPS for piping, pipelines, tanks & steel structurals.
* Welder Qualification witness & certifications, Radiography Interpretations & NDT activities.
* Preparations of hydrotest packages & Marking on P&ID.
* Material Inward Inspections & project related Inspections.
* Quantity measurement and material reconciliation.
* Knowledge of ASME Sections, ANSI, API & DIN codes /Standards.

PROFESSIONAL EXPERIENCE
May'04 - Present
Company: Tepe Insaat,Turkey
Post: Production Specialist.
Project Title: Baku-Tiblis-Ceyan pump station Project.
Client: British Petroleum (BP)
Project Description:
US$ 180.0 million EPC project of BTC Pump Station project.
M/s. TEPE Construction Ankara, Turkey has been enthrusted the responsibilitiy of Engineering, Procurement and Construction (EPC) activities of 1080KM P/L& 4 nos. Pump Station and one Intermediate Pigging Station for the Transportation of Crude Oil via. Baku-Tblisli-Ceyhan Pipeline of M/s. BP across Turkish territory of BTC Pipeline. Pump stations are situated at higher altitude and as high as 2600Mtrs from MSL and average dia. of Pipeline is 42". Pump Stations are designed to function normally even in the extreme climatic condition of -40¢XC.

Nature of Work:
* Worked as Production specialist(As Section Manager) in the Mechanical Department and was leading a team of pipeline Engineers & QA/QC Engineers for above Project.
* Key Focal point for all Pipelines(250KM of 46" P/L&42" PL), & Station piping.
* Estimation of tools & tackles, consumables, and equipment requirements.
* Establishing of PQR, WPS & welder Qualifications.
* Execution of pipelines activities-stringing, fit-up, welding, Field Joint Coating, Holiday test, Lowering & Tie-ins. & material receipts, fit-ups, welding, radiography, NDT, Erection Alignments, loop clearances, Hydrostatic testing, system clearances & hand over to client.
* Planning of monthly programmes, weekly programmes & Daily programmes in line with Project schedules.
* Work involves preparation of Quality Control Plans (QCP's) & Inspection Test Plan(ITP) for the various activities in complience with the requirements of Project Specifications.
* Preparation and establishment of Method Statements.
* Preparation of Welding Book, preparation of various WPS &PQR.
* Co-ordinating & Impementation of PQR's and WQT's.
* Co-ordinating for inspection and reporting of incoming Project Materials, review of MTC's and Shop Dossiers, establishing the Traceability of Materials, preparation of Inspection Reports, maintaining and updating of the records in Data Base, preparation of Quarantine material list and updating the same on weekly basis, reporting to client.
* Knowledge of various Welding Processes viz. SMAW, SAW, GTAW, GMAW. Well acquainted with the working knowledge of various Codes and Standards like ASME, ASTM, API and ANSI.

Aug' 03 - April' 04.
Company: Galfar Engineering & Contracting LLC, Oman
Post: Senior Pipeline Engineer
Project Title: Installation of Pipelines for Central Oman Expansion Phase-I
Client: Petroleum Development of Oman (PDO)
Project Description:
US$ 9.5 million project for Installation of 48" P/L(19.5thk),12" P/L(7.1thk), 4" DSS, 4" GRE pipelines and Flowlines for oil & Gas.
M/s. Galfar Engineering & Contracting LLC,Mascut,Sultanate of OMAN has been enthrusted the responsibilitiy of Engineering, Procurement and Construction (EPC) activities of 48" P/L (9KM), 12" P/L(80KM), 4" DSS P/L(8KM), Flow lines(4KM), Gas Station piping.
Nature of Work:
* Worked as Senior Pipeline Engineer (As Section Manager) worked in the Mechanical Department and was leading a team of pipeline Engineers & QA/QC Engineers for above Project.
* Key Focal point for all Pipelines (97KM), Flowlines(4KM) & Station piping(30000Inch Diameter).
* Leader from Execution side in getting Galfar qualified as DSS contractor in PDO.
* Estimation of tools & tackles, consumables, and equipment requirements.
* Establishing of PQR, WPS & welder Qualifications.
* Execution of pipeline, piping & Flow lines activities-stringing, fit-up, welding, Field Joint Coating, Holiday test, Lowering & Tie-ins.&material receipts, fit-ups, welding, radiography, NDT, Erection Alignments, loop clearances, Hydrostatic testing, system clearances & hand over to client.
* Planning of monthly programmes, weekly programmes & Daily programmes in line with Project schedules.
* Work involves preparation of Quality Control Plans (QCP's)&Inspection Test Plan (ITP) for the various activities in complience with the requirements of Project Specifications.
* Preparation and establishment of Method Statements.
* Preparation of Welding Book, preparation of various WPS &PQR.
* Co-ordinating & Impementation of PQR's and WQT's.

Jan' 02 - June' 03
Company: Sudelettra Nigeria Ltd., Nigeria
Post: Fabrication Advisor / Mechanical Engineer
Project Title: Revamping and Capacity Enhancement for Oil & Gas station.
Client: Nigerian Agip Oil Company (NAOC), ENI Group.
Project Description:
US$ 8.0 million project for Installation of Multistage Turbo Compressor and Allied piping works.
M/S. Sudelettra Nigeria Ltd,Nigeria has been enthrusted the responsibilitiy of Engineering, Procurement and Construction (EPC) activities of Multistage Turbo Compresser for Ebocha oil station. Enhancing of Oil& Gas Plant capacity by providing Multistage Turbo Compresser. Low pressure Gas which is going to flare is recollected at separators out lets & send to Multi Stage Turbo Compresser (Primery Stage & Secondary Stage) for pressure enhancement. And after transported to Gas plant storage Tanks through underground Pipeline of 20" Size(20KM) for further Gas plant utilization.
In this expansion Piping (one lakh), Equipments, Pipeline (20" X20KM)&Steel Structurals (300MTS) EPC activities were carried out.

Nature of Work:

* Worked as Fabrication adviser/Mechanical Engineer(As department Manager) in the Mechanical Department and was leading a team of execution Engineers & QA/QC Engineers, supervisors & Foremans for above Project.

* Key Focal point for all Mechanical activities-piping, pipeline, equipments, steel structurals.
* Ensuring of PQR, WPS & WQT are in place.
* Responsible for job execution with day to day activities for fabrication, piping, spool erection, hydrotesting.
* Responsible for job execution of pipeline (20" size-20KM) stringing, welding, field Joint Coating, holiday Testing, Lowering& tie-ins.
* Fabrication & Installation of 100000 Inch-dia piping completed in record time.
* Erection of piping, alignments carried out.
* Erection of Equipments, alignments carried out.
* Prepared QA/QC Plan, Inspection Test Plan, Method statements for the execution of awarded contract.
* Prepared detailed construction schedule, monthly, weekly & daily programme in line with the contract schedule.
* Estimation of Machinery, Manpower Requirements in line with project schedule.
* Estimation & Compliance of Material Take Off Reports.
- Coordination with Document and Planning department to ensure that Drawing & Material are made available in time at site.
- Supervision of construction activities performed as per the agreed Quality Plan to ensure compliance with the specifications, drawings, contractual commitments like work procedure, mobilization of resources & safety regulation.
* Preparation of Hydrotest Packages based on P&ID and Line list.
* Preparation of Check/ Punch List for Mechanical Clearance of Piping, Loops, sub System,systems as per P&ID, GAD's, & Support Index.& releasing them for Hydrostatic testing and witnessing same.
* Coordination with Client for various pre-commissioning activities like Hydrojetting, Nitrogen Purging.
* Maintaining Documents as per ISO requirements. Coordination for Handing over of As Built Records to Client.
* Working knowledge of codes & standards viz. API, ANSI, ASTM.

Apr' 98 - Jan' 02
Company: Engineers India Ltd., India
Post: Engineer (Mechanical)
Project Title1: DHDS project for Refinery expansion project.
Project Title2: Sulfur recovery project for Refinery expansion project.
Project Title3: K.G.Basin Pipeline Project, GAIL, Rajhamandri, A.P, India.
Client: Chennai Petroleum company ltd. (CPCL)
Project Description:
Engineers India Ltd is an ISO Certified Govt. of India Premier Consultancy Organisation in the diversified fields of Oil and Gas Exploration,Construction of Refineries, Petrochemicals Plants, Cross Country Pipelines, Ports, Harbours, Terminals, Jetties & Infrastructure Technologies.
- K.G.Basin pipeline(18" P/L & 12" P/L) project for vijjeswaram power plant & Nagarjuna Fertiliser corporation Ltd. M/s.Gas Authourity Of India Ltd(GAIL), Rajahmandry, Andhra Pradesh, India.

Nature of Work:
As a Mechanical Engineer from EIL was looking after the Unit Piping / Mechanical works of the newly constructed Diesel Hydrogen De-sulfurisation(DHDS) Plant for M/S. Chennai
* Laying of Natural Gas pipeline (18" P/LX19KM) from Take-off point to NFCL.
* Laying of Natural Gas pipeline(12" P/LX125KM) from tatipaka to Vijjeswaram.
Work Experience:
* To Review QA/QC Plan, Inspection Test Procedure submitted by the Contractor for the Execution of awarded contract.
* Contractors detailed construction schedule, monthly, weekly & daily programme in line with the contract schedule.
* Identifying Drawings (P&ID, GAD&ISO), line list & checking for technical Integrity.
* Estimation of Manpower & Machinery Requirements.
* Checking of Material Take Off (MTO) Reports.
* Supervision of fabrication & erection daily activities of,
Piping fabrication - materialreceipt, fit- up, welding, radiography/NDT, Blasting, Painting 0f spools & release for erection.
Piping Erection - Erection of spools, alignments, supports installations, loop clearances, Hydrotesting, system clearances, pre-commissioning & system handover to client.
Equipments: Erection, Alignments, grouting, Internal installations, connection of pipings & steel structural plotforms, ladders.
Pipelines - Coated pipes used. stringing, fit-ups, welding, Radiography, Joint coating,Holiday test, Lowering, Hydrotesting & System hand over to client.
* Co-ordination with other departments to ensure timely release of site work front to the Contractors.
- Inspection of incoming material at Warehouse.
* Inspection and witnessing the Sand Blasting and painting works on Line Pipes for various services.
* Supervision of construction work performed by the contractors as per the agreed Quality Plan to ensure compliance with the specification, drawing, contractual commitments like work procedure, mobilization of resources & safety regulation.
* Preparation of Check/ Punch List for Mechanical Clearance of Piping, Loops, System as per GAD's, Support Index and P & ID & releasing them for Hydro/ Pneumatic testing to be carried out as per Line Schedule.
- Certification of measurements, billing & final Re-concilations.
* Maintaining Documents as per ISO requirements. Coordination for Handing over of As Built Records to Client.
* Working knowledge of codes & standards viz.ASME, API, ANSI, ASTM.
- Laying of pipelines(18" P/L & 12" P/L) day to day activities of stringing, fit-ups with Internal Clamp, welding, radiography, Field Joint Coating, Holiday Tests, Lowering, Tie-in joints, back filling, pigging, hydrostatic testing, resorations & hand overs to client(GAIL).

MAY' 95 - Apr' 98
Company: Petron Engineering Construction ltd., India
Post: Engineer (Mechanical)
Project Title1: Piping works for refinery expansion of CPCL Nagapatnam.
Project Title2: Shutdown work for CPCL Refinery.
Client: Chennai Petroleum company ltd. (CPCL).
Project Description:
US$ 5.2 million piping works for refinery expansion and shutdown works in various units at different time period.
M/S. Madras Refineries Ltd, Nagapatnam, Tamilnadu, India has expansion of units in Refinery. It Consists of Main units of the Complex are Naptha, Captive Power Plant (64.5 MW), Terminal/ Storage Facilities, Associated Piping up to and including Piping for Hydrocarbon Unloading Jetty, Compressor House and Integrated Offsite Facilities viz. Air Separation (Nitrogen/ Oxygen) Plant, Air Compressor House, Raw/ Service/ Drinking/ Fire Fighting Water Plant.

Responsibilities & Achievements:
* As a Mechanical Engineer was looking after the Offsite Piping / Mechanical works of the newly constructed Nagapatnam Refinery Complex of M/s. Madras Refineries,Nagapatnam,Tamil Nadu,India.
* Preparation of Quality plan, ITP submitted for client approvals.
* Preparation of detailed construction schedule, monthly, weekly & daily programme in line with the contract schedule.
* Identifying Drawings (P&ID,GAD&ISO), line list & checking for technical Integrity.
* Estimation of Manpower & Machinery Requirements.
* Supervision of fabrication & erection daily activities of,
Piping fabrication fit-up, welding, NDT, Blasting, Painting 0f spools& release for erection.
Piping Erection. Erection of spools, alignments, supports installations, loop clearances, Hydrotesting, system clearances, pre-commissioning & system handover to client.
Equipments: Erection, Alignments,grouting, Internal installations, connection of pipings & steel structural plotforms, ladders.
* Execution of Piping 225000 Inchdia for Naptha unit, Hydrogen Unit.
* Individually handled 3 nos Shutdown, executed in span of year and all completed in scheduled period.

Jan' 93 - May' 95
Company: Kitty Steels Ltd., India
Post: Engineer (Mechanical)
Project Title1: Piping works for refinery expansion of HPCL, Vizag.
Project Title2: Offsite piping works for refinery expansion of HPCL, Vizag
Client: Hindustan Petroleum Corporation ltd. (HPCL)
Project Description:
US$ 2.2 million piping works for refinery expansion.
Responsibilities & Achievements:
* Preparation of method statements in line with project specifications.
* Preparations PWPS and conducting PQR. Conducting of Welder Qualification Tests.
* Execution of day to day piping fabrication and Erection activities. i,e. Material Inspections, Fit- ups, welding, Radiography, Blasting, painting activities.
* Execution of awarded contract, monthly, weekly & daily programme in line with the contract schedule & Identifying Drawing, Machinery, Manpower Requirements. Coordination with other contractors at site to ensure timely release of site work front to the Contractors. Coordination with client and other departments.
* Execution of Piping fabrications 80000 inchdia for Naptha plant & Off-sites.
* Execution of piping Erections of released spools for same units.
* Execution of 36 km firewater line.
b) Fabrication, Erection and Hydrotesting of Fire Water Distribution Network consisting of 36 km. of Aboveground/ Underground CTE coated pipeline (up to 42" Dia.) and including Fire Fighting Network for all units & offsites. Erection of Fire Water Pumps.

Sep' 90 - Dec' 92
Company: ACC-Babcock Ltd., India
Post: Engineer (Mechanical)
Project Title: Piping & steel structural works for 250x2 MW S.Gandhi Thermal Power station.
Client: Madhya Pradesh Electricity Board (MPEB).
Project Description:
US$ 5.6 million piping works for 250MW X 2 units.
M/s.Acc-Babcock Ltd has constructed two numbers of 250MW Thermal Power stations of Madhya Pradesh electricity board(MPEB).
Power Plant Consisting of furnace, boiler, drums, pulverisers, down comers, headers, feed water tubes, precipetaters, chimney, pumps, motors, ID Fan & FD Fan.
Responsibilities & Achievements:
* Working as Mechanical Engineer and looking in to various Fabrications & Erection activities of piping, Equipments&steel structurals.
* Implementation of detailed construction schedule, monthly, weekly & daily programme in line with the contract schedule.
* Execution daily Fabrication & Installation of piping, equipments & steel structurals.
* Certification of measurements, billing & final Re-concilations
* Execution of Headers, Down comers and Furnace Piping.
* Fabrication & Erection of 8000 MT Structure for Pulvarisers, ESP, ducts etc.
* Maintaining the time bounded forecasting schedules as per schedule.

May' 89 - Aug' 90
Company: Dynamic Engineering Works, India
Post: Graduate Engineer Trainee
Nature of Works
* Mechanical activities-piping,equipments,steel structurals for Refinery shut down works at M/S.Madras Refineries Ltd,Madras,Tamilnadu,India.
Merugu Pochalu
* Flareline shut down works,offsite naptha transportation lines replacement,replacement of piping for exchangers.& Undergound Fire water line of 8 KM. As new ly Installed.
* Ensuring of PQR/WPS & WQT are in place.
* Responsible for job execution with day to day activities for fabrication, piping, spool erection, hydrotesting.
* Fabrication & Installation of 80000 Inch-dia piping completed.
* Erection of piping,alignments carried out.
* Execution of job to match construction schedule & monthly, weekly & daily programmes to be set and maintain in line with the contract schedule.
* Estimation of Machinery, Manpower Requirements in line with project schedule.
* Inspection of incoming material at Warehouse& timely release of same to fabricate.us services.
* Supervision of construction activities performed as per the agreed Quality Plan to ensure compliance with the specifications, drawings, contractual commitments like work procedure, mobilization of resources & safety regulation.
* Maintaining all documents and carrying out Inspection.
* Material reconciliation.

View contact information...
«« previous resume next resume »»
Search Results (Resumes 1751 to 1800 of 7051)Go to Search Parameters...
Brief Description
HND , ELECTRICAL/ ELECTRONICS ENGINEERING (Power and Machine Option)
I finish my contract in South Africa as Safety Advisor on “Polaris” Barge (Acergy) for his dry dock. I obtained my master's degree (Engineering and Chemical safety) in 2003. My career really started In 2005 in the off-shore, on the drillship “Pride Angola” where I sailed for 3 years.
I am an instrumentation and automation engineer with over 5 years experience in oil&gas, refinery and petrochemical fields, covering detail design and site installation/ precommissioning/ commissioning activities.
B-Tech in mech with 7.5 years of experience in plant design arena
Eletrical enginer for 8 yrs experince as chief enginer
Civil Structural Engineer
I have near eight years experience in field of piping design of refinery, oil and gas with position as piping lead engineer & assistant manager, furthermore I am fluent PDS, PDMS, Smart Plant Review, Plant Design Review, AutoCad, Microstation, Microsoft office, etc.
weldin inspection
Having a Diploma in Mech. Engg. with 18 years of Experience in Designer
Energetic and productive professional with broad-based experience in Maintenance Planning, Shutdown Planning and Project Management in Line with the Computerized Maintenance Management System.
I have total Twenty-one years hand on working experience in Electrical maint. and operation fields in various organization.
Control Electrical HV &LV equipment and Instrumentation Installation & Test, Cable wiring
Seeking a challenging career as a Reservoir/Petroleum/Production Engineer in an E&P Company
15 years of progressive experience and responsibility with documented success in the areas of drilling, workover, completions, engineering, operations and supervision at various organizational levels. I’m seeking a challenging position as a Drilling &/or Work-over Engineer / Superintendent.
18 years experience in process design of refinery and petrochemical units.
Over 14 Years in Maintenance planning, Shutdown/Turnaround Planning in petrochemical Industries. And also in Maintenance of various Rotating and Static Equipment ;Construction Planning including costing.
A consulting petroleum engineer / project management position in a challenging environment which requires significant technical expertise. Available for immediate travel, domestic or worldwide.
I am a Chemical Engineer having more than 18 years experience in various Oil Processing / Gas Treatment / Petrochemical Process Plants . I have 6 years of Onshore / Offshore Oil / Gas Plants Operational Experience as a Production Supervisor.
Job Title : Software Enginer Education : Ordinary Degree in Bachelor of Science Previous Employer: Motorola Australia Software Centre
Expert in understanding permeability of the carbonate reservoirs. With this help reservoir engineers can do their well level simulation rather easily. Fees are charged for every foot of well data studied. Work will be done at the place of the expert.
More than fourteen years hands-on and supervisory experience in Petroleum Refineries in Qatar, Saudi Arabia and Pakistan. Have been analyzing samples from all streams of different units. Have been acting as Lab. Group Leader during Group Leader's leave/absence.
A well rounded drilling personnel with a unique experience in drilling and completion / work over operations
Over twenty years in plants, and pipeline construction, Inspection and supervision, including several overseas assignments.
Quantity Surveyor/Estimator (Mechanical)
All descriptions of skillsand experiences are listed in resume. I am available to begin work immediately.
Instrumentation Engineer with 15 years of experience in maintenance, teaching and construction
Primavera , MS Project
A self-motivated mechanic with over twenty years worldwide experience, in mechanical/ maintenance engineering’s high-pressure environments; from marine engines, top drive, rotary tables, auxiliaries, hydraulics, and rig upgrades. I am hard working, resourceful and reliable.
Working as Geosteering engineer, meeting with client, collect data, model preparation, landing section, lateral section, steering while drilling, report. Communication to all participant while drilling execution.
i am graduate mechanical engineer having 7 years expereince in piping/structure fabrication and erection in the kingdom of bahrain.we were making the items like tanks , pressure vessels,pot shell,pipe stack , pipe racks for oil and gas sector, petrochemicals and off shore products.
I have extensive experience on Electrical Engineering studies , construction , Transmission & Distribution and Oil & Gas during my assignment on Total E&P Yemen and Petomar in Angola. Designing, modifying, and implementing electrical system my daily challenging job.
ASNT L III UT AND WELDING INSPECTOR AWS CWI QC1.
I am a Structural Designer with over 7 years experience in design of offshore and onshore oil facililities, building and other civil infrastructures
Seven (7) years experience in designing fire protection systems for petrochemical plants and similar industries. I am familiar with NFPA and other internationally accepted standards.
7 years experience in Mechanical maintenance
- Good at English and drilling software.
16 years of Piping & Pipelines Project Management/Project Execution experience in the Industries like Refineries, Hydrocarbon, Petrochemical and Oil&Gas(Cross Country Pipelines, Booster Pump stations, Oil Station, Gas Station, Up-Stream flow Lines).
GRADUATE MECHANICAL ENGINNER,CSWIP 3.1 WELDING INSPECTOR CERTIFIED BY TWI,UK,ASNT LEVEL II IN RT,UT,PT,MPT,IRCA UK APPROVED ISO 9001:2000 QMS LEAD AUDITOR COURSE PASSED. MORE THAN 8 YEARS EXPERIENCE IN QA/QC,WELDING INSPECTION IN EPC OIL&GAS
Making electrical design by using program ETAP such as Load Flow Study, Short Circuit, Motor Starting, Relay Coordination, Transient, and also calculation manually as a proof of the software.
Iam a Graduate Mechanical Engineer with MBA in Poduction Management and a PG. diploma in Materials Management with around 8 + Years of Experience in various MNC's (Oil & Gas, Process/Chemical, Metallurgical, Pharmaceutical.etc.).
An enthusiastic and self motivated Production and Process Engineer, with experience on production optimization and surface equipment designing and evaluation, focused on maximizing asset production capacity and productivity in the oil and gas industry.
HSE Manager, Experience in HSE studies of seismic exploration 2D and 3D since 2004 to the date
Oil and gas mechanical technician
I have diploma with 20 years experience in construction/maintenance. 10 years in oil industries maintenance, also witness commissioning and start up of new installations in the refinery. Hands on experience in 33/11/3.3kv/440v systems.Available in one month time notice period.
Specializing in ICT/SCADA planning Proven Technical & Management Expertise with 14 years Experience overseas-Kuwait and Japan.
See resume
Resume for Project engineer position
Expert INSTRUMENTATION , SCADA, TELECOM , DCS OR SAP / ERP , DESIGN , ENGINEERING , PROJECT MANAGEMENT , OPERATION AND MAINTENANCE , TECHNICAL SERVICES , ISO’S ETC
Industrial engineer, ample experience in catalytic cracking technology and liquefied natural gas, seeks position to apply knowledge acquired as researcher over past four years. Having lived in Latin America and Western Europe, have developed effective multi-cultural skills.
Chemical engineer with over eight years experience in an oil refinery. Utilize exemplary leadership, time-management, critical thinking/analysis, problem resolution, written/verbal communication and human resources management skills to plan and schedule operational, production and dispatch facility
First   1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   [ 36 ]   37   38   39   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
CATEGORIES: Engineering/Technicians;
INDUSTRIES: Petroleum/Oil/Gas;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com