Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #39073 next resume »»
CONTACT INFORMATION:
View contact information...

CAREER SUMMARY
Twenty-Nine (29) years of experience, working under various international companies in Middle East, Europe and in South East Asia countries.
* Highly professional with strong communication and leadership skills. Well organized with flexibility and common sense. Work independently under pressure and adaptable with multi national personnel at all level under different environmental conditions. Assigned on both onshore and offshore as Client, Main Contractor under Project Management and Engineering Team.
* Conversant on the application of the Quality system administration based to ISO 9000 series.
* Well versed in interpretation and implementation of AWS, ASME, ANSI, ASTM, API, BS, ABS RULES, DNV and others classifying body's codes and standards.
* Computer literate in WIN 95/98,Office 2000,MS XP and Internet task.

POSITIONS HELD
- Construction Engineer (Topsides + Marine)-Structural/Piping/Mechanical
- Piping Engineer / Supervisor
- Mechanical Commissioning Engineer / Superintendent
- Mechanical Engineer (Rotating / Static)
- Project Site Coordinator / Company Site Representative
- QA Manager
- Inspection Engineer (Section Head)
- QA/QC Engineer
- QA/QC Supervisor / Inspector
- Validation Engineer

PROJECTS ATTENDED
- 4 to 10 legged Jackets, Decks and Modules.(More than 150 units)
- FPSO, FPU, FSO Conversions.
- Topside Platforms, Pipelines & Pile Driving.
- Coating & Pipe Laying.
- Pressure and Non-Pressure Vessels.
- Storage Tanks with up to 1 million barrel capacity each.
- Cargo and Lay Barge Conversions.
- Nuclear and Thermal Plants.
- Refinery & Chemical Plants.
- Pharmaceutical Plants.

INVOLVEMENT ON ONSHORE / OFFSHORE PROJECT PHASES
Procedure Generation, Test Package Generation, Material Procurement, Design Verification, Fabrication & Welding, Construction & Erection,Inspection, Testing & Painting,Pressure(Hydro/Air/Leak) Testing,Equipment Preservation,Maintenance & Operation,Audit,Load-out, tow-out and Sea Trials,Hook-up & Installation,Equipment Installation,Platform Modification,Tie-in & Riser Installation,Pipe Laying and Pigging,Pile Driving & Shore Pulling,Dewatering / Nitrogen Lay-up,Installation Qualification(IQ),Operational Qualification(OQ),Start-up & Commissioning,Documentation Control

WORKING EXPERIENCED
July 2004 to Present
TOTAL ELF FINA - Pasir Gudang, West Malaysia - Mechanical / Commissioning Engineer

Kpono Oil And Gas Export Amenam Phase 2 (AMP2) and AMP1 Upgrading Projects For Elf Petroleum Of Nigeria Ltd.Work with Client as part of Project Management Team (PMT).Project involved are 8 legged Jacket,9000 metric tons AMP2 Topside Platform and 1400 metric tons AMP1 Compression Module.
Follow-up all Mechanical related activities covering planning, preparation, installation and pre-commissioning. Ensure contractor's compliance with design and Project specifications. Review and comment on Contractor documents, on planning updates and critical path for all activities related to mechanical works. Detect all possible delays and constraints and propose remedial action. Liaise with other disciplines to ensure consistency of the work. Review and comment on Contractor documents. Prepare mechanical related daily and weekly reports.
Review for approval Equipment Offloading and Installation Procedures. Planning of equipment installation sequence. Ensure that all pre-installation requirements were met prior to lifting and final installation of equipment. Updates all mechanical records into database. Supervise the daily site activities of Contractor and Vendor Representatives. Vendors include Rolls-Royce for Turbo Generator, THERMODYNE for Gas Compressors, SULZER for Water Injection Pumps. Witnessed pressure test, flushing and blowing. Generates on site punch list. Signing off of final leveling, alignment reports, vessel closures certificates and punch list clearing. Monitor check sheets and test sheets performance during pre-commissioning. Establish an efficient working relationship with Contractor personnel Attend weekly/monthly HSE meeting on site. Attend toolbox meetings and participate in Safety tours of yard. Ensure that all incidents and anomalies related to Mechanical are properly reported and analyzed. Ensure that HSE and QA procedures are properly implemented. Reporting directly to Construction Manager.

Sept.2003 - July 2004
SCHERING-PLOUGH LTD - Singapore - Commissioning Engineer

Pharmaceutical- Multi Product Plant Phase-2 (MPP-2) Project.
Work with Client. Project involves the 6-storey building including the offsite structures which compose of several pharmaceutical machinery and equipment.
Participate in system/safety walk down and generate / clear punch list as required. Pressure /Leak test of systems. Commissioning and start-up in charge of several designated systems such as but not limited to Plant/Breathing/Instrument air,Process,Potable Water, Hot Water, Chilled Water, Steam and Condensate, Process and Hydrogen Vent, Tetrachloride and Borane.
Coordinate with Validation Group for IQ and OQ related issue. Implement the GMP and maintenance of Commissioning Dossiers. Raised Field Design Change Notice (FDCN) as required. Review and sign-off Mechanical Completion Dossiers, Precommissioning and Commissioning Dossiers. Reporting to Commissioning/Validation Manager.

Nov.2000 to August 2001
JACOBS LEND LEASE PTE.LTD. - Singapore - QA Manager

Schering Plough Biotech And Tablet Facilities Projects. Managed the Main Contractor QA Department involving 27 Sub Contractors with 7 QA/QC personnel directly under my supervision. Review / generates / approved the Company Project Quality Plan. Review / scrutinize / approved the Field Design Change Notice (FDCN), Contractors quality and Inspection Test plans. Monitor and maintain Good Manufacturing Practice (GMP). Coordinate with Validation and Commissioning groups on IQ and OQ activities. Reporting directly to Project Manager.

Nov. 1998 - Nov.2000:
MARITIMA OVERSEAS INCORPORATED - Singapore

November.1998 to September1999 -Project (Site) Coordinator /Company Rep.- (P-37, P-38, P-40)
September 1999 to January 2000 - Construction Supervisor - Onboard P-37
January 2000 to November 2000 - Commissioning Supervisor - Onboard P-40

FPSO P-37, FSO-P-38 and FPU P-40 - Conversion For PETROBRAS at JURONG SHIPYARD. Work for Main Contractor. Assigned in several sub- contractor yards during the fabrication, construction, testing, painting and installation of topside facilities involving 8 modules, 35 pressure vessels. Responsible in reviewing for approval all construction, inspection and testing procedures, personnel evaluation, raising queries, daily management of site activities, audit and evaluation of project performance and documentation control. Identify and monitor all extra works. Witnessed and approved painting, pressure testing, chemical cleaning, flushing and borescope inspection. Interpret RT films. Liaise with contractors and to our management all contractual issues as required. Reporting to Construction Manager.

ONBOARD P-37, Supervised and monitored the shipyard contractor activities during the hook-up and installation of topside facilities involving modules, various equipment, tower cranes, erection of structural and piping components. Oversee the preservation of equipment and instruments. Lead the team of 12 personnel overseeing maintenance of equipment and instrument, generation and clearing of punch list, mechanical alignment, flushing, and pressure testing works. In charge of material procurement from warehouse and onboard personnel allocation. Work extended up to vessel sea trial. Coordinate with Shipyard Manager on all onboard work related matters. Reporting to Construction Manager.

ONBOARD P-40, Lead the team of 6 Mechanical personnel. Supervise and monitor thousand of valve tightness check (VET), calibration and function test of valves and instruments. pump electrical parameters and alignment, Verify completeness of all pipeworks prior to commissioning. Start-up and commissioning of utilities and process systems, emergency generators, and HVAC units, Reporting to Commissioning Manager.

Aug. 1996 - Oct. 1997:
MC CONNELL DOWELL (SEA) PTE.LTD. - Singapore - Piping Engineer

Upgrading Of Du Pont Adi-Pure Chemical Plant At Pulau Sakra-Singapore
Lead the team of 23 construction crew including 2 supervisors for construction, coordination, supervision and monitoring of piping related works. Generate the weekly work schedule and manpower allocation. Material procurement as per Isometric MTO, raising engineering queries, updates the as built drawings. Monitor, implement and coordinate with construction group to enhance the progress with in the schedule. Reporting directly to Construction Manager.

May 1996-July 1996:
PLANT ENGINEERING PTE.LTD. - Singapore - Mechanical Superintendent

Extension Of Make-Up Gas Compressor For Mobil Refinery And Upgrading Of Hydro Cracker And Crude Distillation For Shell Refinery. In charge of 30-construction and inspection team during shutdown and maintenance works. Plan and schedule sequence of line hydro testing. Responsible for work scheduling and progress evaluation, manpower allocation, material procurement and safety related aspects. Reporting directly to Project Manager.

Aug. 1995-April 1996:
ALLSEAS ENGINEERING B.V -Singapore - Piping Supervisor

Conversion Of Bulk Carrier "Solitaire"To Pipelay Barge At Sembawang Shipyard -Singapore. Working with the owner. In charge and supervise the pipework activities covering 4 engine rooms and cargo hull areas. Responsible for material procurement, manpower allocation, coordination with the inspection and construction group. Witnessed system pressure testing and chemical cleaning. Reporting to Piping Superintendent.

all inspections related report

Nov 1994 - Dec 1994:
EUROPEAN MARINE CONTRACTOR (EMC)-Spain - QC Engineer

EMPL-EUROPE 90 kms.22“ diameter Submarine Line From Gibraltar Spain to Morocco Onboard Castoro 6 and 2.Working with the Main Contractor. Monitoring of shift welding activities including parameter check and generates daily report.

Nov. 1993 - June 1994:
EUROPEAN MARINE CONTRACTOR (EMC) - China - - QA/QC Engineer

ARCO China 707 kms.28"Dia.Hong Kong Trunkline and 100 kms.14"dia.Hainan Island Pipeline Onboard Semac-1.Working with the Main Contractor. Monitoring of shift welding activities including parameter checks and generates daily report.

March 1992-June 1992:
EMC - SAIPEM JV - North Sea - QA/QC Inspector

On Board Semac-1, worked for the Main Contractor- EMC/SAIPEM during pipelaying of 25 kms.40"diameter ZEEPIPE line for STATOIL of Norway and 30 kms. North Beryl Gas Pipeline for MOBIL SAGE OF U.K. Welding inspection including parameter check. Generates daily report.
January 1980-October 1991 Twelve (12) Years Service
National Petroleum Construction Company, Abudhabi, U.A.E.
- Construction (Field) Engineer / Company Representative
- Inspection (Qa/Qc)-Engineer / Section Head

Construction Engineer (Structural/Piping) /Company Site Representative
Represent the company on off based projects during the fabrication and construction of 4 wellhead platforms for TOTAL ABK at Gulp Piping Company yard. Production Platforms offshore modification in ZADCO field onboard SEP 250 in U.A.E, pile driving, installation and hook-up of jackets, wellheads and heli decks in Zakum field and Separator platform in BUNDOQ field onboard CB3 in QATAR. pipelines and shore pulling of ARAMCO projects in Abu Ali, Jubail, K.S.A.
Responsible on Site Project Management and Engineering of contractor scope of works, provide supports and technical assistance on contractual matters, material procurement, review and approval of extra works, control of manpower supply, monitoring and generation of progress and performance reports. Reporting directly to Project Manager.

Inspection (QA/QC)-Engineer / Section Head
Covering both onshore and offshore. Directly supervise several Inspectors, technicians and clerical personnel during the fabrication, construction, load out, hook-up and installation works at Sadiyat Fabrication Yard and several onshore and offshore oil fields with in U.A.E, Qatar and K.S.A.
Responsible on the preparation and generation of PQR, WPS, QC plans, Implementation of QA Manual, QA/QC Procedures and pressure testing procedures, auditing, works scheduling, personnel allocations, personnel recruitment, training, performance evaluation and documentation control. Monitor the ongoing inspection and pressure testing activities. Coordinate with project department and Client representatives. Reporting to QA Manager.

COUNTRIES ASSIGNED and CLIENTS:
* UAE Clients: ADNOC, ADCO, ADMA OPCO, ZADCO, BUNDUQ COMPANY LTD, TPG, ADOC, YEPCO/CCICL/GULF INTERSTATE, TOTAL, APSL SERETE, UDECO, WORLEY ENGINEERING, AMERADA HESS AND F.R. HARRIS.
* Qatar Clients: CCICL, QGPC, TPG and BETCHEL.
* KSA Clients: ARAMCO and AOC (Arabian Oil Company).

PROJECTS ASSIGNED:

ONSHORE:
* Fabrication, Construction, Modification, Mechanical Installation, Inspection, Testing and Pre-Commissioning of 140 to 150 units of offshore structures such as Piling, Jackets, Decks, Modules and other topsides facilities at Sadiyat Fabrication and Contractor yards in Abu Dhabi, U.A.E.
* Fabrication and Construction of Single Point Mooring (SPM) buoys for. Das Island
* Fabrication of Gas Recycling and Injection System structures for Habshan Gas field.
* Fabrication of sub-sea "PLEM"(60'x30') for Yemen offshore facilities.
* Fabrication and Construction of 4-nos.1 million bbl capacity each Crude oil floating roof storage tanks at Jebel Dhana.and Tank No. 5 at Zirku Island U.A.E.
* Material inspection of pipes at Al Qhatani Yard Dammam and Rastanura Port K.S.A.
* Pipe laying and hydro testing of 4", 8" and 10" Diameter of 150 kms. spur lines at Dukan oil field, Qatar.
* Pipe laying, shore pulling, hydro testing and nitrogen lay-up of 20" diameter main line at Abu Ali Island, Jubail, K.S.A.
* Trenching, concrete testing and pouring of pipelines in Dukan, Qatar and Jubail, K.S.A.

OFFSHORE:
* Pipe laying, pigging, nitrogen lay-up of thousand kilometers in accumulative lengths.
* Inspection, Pressure Testing and Commissioning
* Offshore Topside construction, modification, tie-ins, piling, installation and hook-up of well heads and its facilities in Zakum fields in U.A.E. and BUNDOQ field in QATAR.
* Activities carried-out on board SEP 250, DLB 1000, CB3, PLB 648, P-280 and ORELIA. Field covered are in U.A.E. (Zakum, Bundoq, Mubaras, Zirku and Das Island), in K.S.A. (Marjan, Berri, Zuluf, Abu Safah and Khafji) and in Qatar (Bulhanine oil field)

COUNTRIES ASSIGNED and CLIENTS:
* U.A.E Clients: ADNOC, ADCO, ADMA OPCO, ZADCO, BUNDUQ COMPANY LTD, TPG, ADOC, YEPCO/CCICL/GULF INTERSTATE, TOTAL, APSL SERETE, UDECO, WORLEY ENGINEERING, AMERADA HESS and F.R. HARRIS.
* Qatar Clients: CCICL, QGPC, TPG and BETCHEL.
*K.S.A. Clients: ARAMCO AND AOC (Arabian Oil Company).

PROJECTS ASSIGNED:

ONSHORE:
* Fabrication, Construction, Modification, Mechanical Installation, Inspection, Testing and Pre-Commissioning of 140 to 150 units of offshore structures such as Piling, Jackets, Decks, Modules and other topsides facilities at Sadiyat Fabrication and Contractor yards in Abu Dhabi, U.A.E.
* Fabrication and Construction of Single Point Mooring (SPM) buoys for. Das Island
* Fabrication of Gas Recycling and Injection System structures for Habshan Gas field.
* Fabrication of sub-sea "PLEM"(60'x30') for Yemen offshore facilities.
* Fabrication and Construction of 4-nos.1 million bbl capacity each Crude oil floating roof storage tanks at Jebel Dhana.and Tank No. 5 at Zirku Island U.A.E.
* Material inspection of pipes at Al Qhatani Yard Dammam and Rastanura Port K.S.A.
*Pipe laying and hydro testing of 4", 8" and 10" Diameter of 150 kms. spur lines at Dukan oil field, Qatar.
* Pipe laying, shore pulling, hydro testing and nitrogen lay-up of 20" diameter main line at Abu Ali Island, Jubail, K.S.A.
* Trenching, concrete testing and pouring of pipelines in Dukan, Qatar and Jubail, K.S.A.

OFFSHORE:
* Pipe laying, pigging, nitrogen lay-up of thousand kilometers in accumulative lengths, tie-in, Topside construction, Modification, Pile driving, Hook-up and installation, Inspection, Pressure Testing and Commissioning on board SEP 250, DLB 1000, CB3, PLB 648, P-280 and ORELIA. Field covered are in U.A.E. (Zakum, Bundoq, Mubaras, Zirku and Das Island), in K.S.A. (Marjan, Berri, Zuluf, Abu Safah and Khafji) and in Qatar (Bulhanine oil field)

Aug. 1976-Dec. 1979:
ENG'G. AND CONST'N CORP. ASIA (ECCO-ASIA)- Philippines - Quality Control Engineer
Undergone an on the job training / course on all types of NDT such as RT, UT, MPI, DP as per ASNT-TC-IA, Stress Relieving and Destructive testing intended for Nuclear Plant Project sponsored by Westinghouse International (U.S.A.). Had been qualified as level - II on all types of NDT last 1979.
* Projects are; Construction of 650 MW NUCLEAR Power Plant-Philippines.
* Fabrication and pre-erection of 160 feet steel truss Bridge-Philippines.
* 18" Diameter Pipe laying owned by MISC-Philippines.
* Pipe coating of 18" to 72" Diameter at IPI, Philippines.
* Maintenance of power plant and Mill Digester-PICOP - Philippines.

PROFESSIONAL and TECHNICAL QUALIFICATIONS
* Mechanical Engineer-5 Years Course-Graduated 1975,W.I.T.,Iloilo,Philippines
* CSWIP Welding Inspector (Grade 3.1), Abington, U.K. since 1984 expired 1999
* Level 11 as per ASNT-TC-1A on RT, MPI, DP and UT
* Member-American Welding (AWS) U.S.A.
* Registered European Welding Federation (EWF)-Inspector Level 4 -Cert. No. EW/GB/00663

SEMINARS AND TRAININGS
* First Aid Training Level 2
TOTAL ELF FINA-Malaysia - (June 2004)
* Good Manufacturing Practice (GMP) Seminar.
* Good Documentation Practice (GDP) Seminar
* Certificate of Permit to Work Training.
Schering Plough Singapore - (September 2003)
Foster Wheeler Eastern Pte.Ltd. - Singapore (June 2002)
* SIC (Manhole) for Supervisor Training
MOM-Occupation Safety and health Center - Singapore (June 2002)
* Exploration of Project Web
Jacobs Lend Lease - Singapore (December 2000)
* Sea Survival Course
Oriental Maritime Center, Philippines (April 1995)
* Safety and Survival Course
Maritiem Training Centrum, Rotterdam, The Netherlands (April 1992)
* Industrial Uses and Application of Radio Isotopes Course (I.U.R.C.)
Philippine Atomic Energy Commission (PAEC), Quezon City, Philippines (May 1979)
* Effective Supervision and Human Relations
MSIC, Batangas, Philippines (March 1978)
* NDT Course (RT, UT, MPI and DP) as per ASNT-TC-1A.
ECCO ASIA, Manila, Philippines (August 1977 - December 1977)
* Welding Metallurgy and Weldability of Metal
Welding Institute of the Philippines, Baesa, Quezon City Philippines (December 1976)
* Supervisory Training Program on Leadership Technique
Dacongcogon Sugar Central, Bacolod City, Philippines (February 1976)

REFERENCES:
Available upon request

View contact information...
«« previous resume next resume »»
Search Results (Resumes 601 to 650 of 7041)Go to Search Parameters...
Brief Description
I worked in Aker Shipyards Braila in Hull Design Department as ship designer. I was involved in several projects on making of hull structure drawings, workshop drawings, lines faring for different types of maritime vessels built in shipyards: cargo vessels, supply vessels, RO-RO, container vessels,
Free! 20 years experience in Control Systems design and drafting. Industries include: Refining, Petrochemicals, Pharmaceuticals, and Brewery. Working knowledge of AutoCad MicroStation, Microsoft Excel & Access, PDS modeling, SmartPlant P&ID, SmartPlant Instrumentation (INtools) and SmartPlant 3D.
Hungarian chief rig mechanic with 30 years experience
Twenty-Nine (29) years of experience, working under various international companies in Middle East, Europe and in South East Asia countries.
A diversified and experienced individual seeking opportunity in mechanical engineering / management support or related field.
Planning of all the activities of Major and Minor inspection of conventional steam turbine of various capacities from shut down to start up and over speed testing.
development of process flow diagram (PFD) and P&IDs, equipment sizing & preparation of datasheet, heat and material balance, simulation on HYSYS, process improvement, Hazop Reviews, line hydraulics, debottleknecking to improve plant performance, commissioning and pre-commissioning activities.
PLAN SUPERINTENDENT,PLANT MANAGER.SHUTDOWN MANAGER,MAINTENANCESUPRINTENDENT.TECHNICAL CONSULTANT.COMMISSIONG ENGINEER
Diploma In Civil Structural Engineering, Designer, Detail Engineering, FEED,Oil and Gas, EPC, PDMS, PDMS DRAFT, ACAD, Microstation, Review Reality, Terramodel, Windows (MS word, MS Excel & MS PowerPoint) on Windows NT & 2000 Novell environment
Casing Vibration monitoring and spectrum analysis of Rotating equipment by using data collector & analyzer (SKF Microlog CMVA60) and data manager (SKF PRISM4 1.35 / SKF Machine Analyst 2.2)
Process Engineer with 19 years experience on which 12 years of Project Engineering, and Commissioning in international team environment.
Lead the Project in Oil and Gas in different companies namely CB &I, Ajman, Maersk Oil Qatar, Kvaerner Powergas Mumbai, Tecnimont ICB Mumbai etc.
ASNT NDT LEVEL-III +CSWP+ISO LA+RSO
OSHA 30 - WCS Well Control School
Sr. Electrical Designer with AutoCAD background & some Microstation experience.
A result oriented professional with 11 years experience of quality control, Quality inspection Management,NDT-inspection and CAWI-certificate holder
10 years experience in Design, Operation & Commissioning in Well head facilities, Gas gathering and processing, Gas Compression, Gas Dehydration, Gas Sweetening NGL Production, Crude/Condensate Stabilization, Produced Water Systems Water Injection unit ,Hydrotreaters, Hydrogen Generation Units .
In my 31 years of I&E Design experience I have attained many skills. These include • MicroStation V8 • AutoCAD R2007 • SmartPlant Instr V7 • Intools • Intools • Safety Instrumented Sytems
Piping design autocad microstation ceasarII
Working as Sr.Instrument technician with OXY Qatar. Involved with Maintanenace and commissioning on offshore.
Senior Completions engineer with excellent welltesting skills.
Extensive experience in electrical installation, mechanical completion handover, pre-commissioning, commissioning and operation of FPSO, drilling rig & power plants in Africa, Asia, Middle East and South America.
Geoscience consultant for integrated studies, seismic interpretation, reservoir characterization, reservoir geophysics, and interpretive seismic processing.
QHSE + E manager worldwide
Experienced E&P Geologist cum Manager with M.Sc. (Geology) and MBA degrees with over 25 years integrated experience from discovery of new prospect to delineation and evelopment.
Drilling Fluid Engineer having 17 years experience
Thermal Designer Boiler Heaters
I have undertaken the Several Category of Scope & Quantity Verification for Cost Control, Invoice Claim and Change Order Claim to Client. And also, I have undertaken the several Type of Contract ; Fixed Price, Cost Reimbursable and Unit Price.
EDUCATION: B.S., Geology, The Pennsylvania State University, 1985. Experience in exploration, and geophysical well log.
Instrument Engineer with over fifteen years of experience in the Engineering, Construction & Commissioning of Instrumentation and Control Systems for Oil, Gas and Petrochemicals industries. Extensive knowledge and experience in the installation, commissioning, maintenance and trouble shooting of Ins
More than 16 years experience on electrical field
EXPERIENCES IN DESIGN, CONSTRUCTION,REVIEW,QC,PRECOMM AND COMM, COMPLETION ENGINEER
Multi tasking experienced Geologist(MSC.)/ P.Engineer(PhD), looking for positions in geology/ reservoir engineering (even on entry level). I am fluent in many languages, willing to relocate Worldwide, available immediately. Presently living in Canada.
Chemical process engineer with 18 yr's of Up- and downstream Oil & Gas experience
Lead Rotating Equipment Engineer / Lead Packaged Equipment Engineer / Condition Monitoring Senior Specialist
Chief Inspector for Pengrowth Corporation. 17+ years of experience in inspection in NDE, Plant enviroment and field. Certifications include CGSB UT II, MT II, API-510, Studying for National Board exam in December.
valve Inspector,Maintenance Supervisor.Advisor, SME
Experienced Refractory Project Manager / Construction Manager / Consutant
Autocad, Autoplant, Navigator, Navis Explorer, Autoplant Administrator, GTX Rastercad, LFM Modeller/Server, All aspects of Pipe support design, Piping Design Section Leader, Piping codes and standards, MS Access and all windows based software, skilled in all aspects of Piping design & layout.
Twenty-Plus years experience in the design, development, commissioning and maintenance of Process, Batch and Material Handling Control Systems. Experienced in a variety of industries including Petro-Chem, Food, Power Generation, Offshore Production and Land based Drilling.
Boiler Service Manager
Technician in mechanical engineering
With 15 years piping design and construction experience for onshore/offshore facilities, skidded process systems and topsides for clients such as Shell, Petrobras, MODEC, Petronas, BP, Saudi Aramco, Petrokemya, ExxonMobil, Mutineer & Exeter, CNOOC and Qatar Petroleum.
Rotating Equipment Engineeer with 15 yeras of Experience in Oil & Gas Sector
This is Esmaeil Rezaei from Iran and I have 37 Years old. I was graduated form Shiraz University with M.S. degree in chemical engineering. I have 12 years experience in petrochemical company in Shiraz city.
Subject: Application for the Post of Geologist
Experience in commissioning 5MW wartsila diesel engines, underwater mountable Thrusters, marine systems, meeting with owner and class surveyor, technical management of ships, operation and maintenance of marine systems
An Instrument & Electrical Inspector/Supervisor with 15 years of extensive experience in the field of Inspection, Engineering, Construction, Hook-up, Commissioning and Certification of various kinds of Plants such as Petrochemical Plant, Desalination Power Plant, Sewage Water Treatment Plant, Oil &
I am a graduate Mechanical Engineer with over 20 years Oil & Gas Refining industry experience, out of which about 10 years at a AMOCO fuels and lube refinery at India. I am currently working as the Mechanical Design Engineer for a prestigious mega refinery project (world¡¦s largest grassroots refine
senior geologist
First   1   2   3   4   5   6   7   8   9   10   11   12   [ 13 ]   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
CATEGORIES: Engineering/Technicians;
INDUSTRIES: Petroleum/Oil/Gas;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com