Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #42807 next resume »»
CONTACT INFORMATION:
View contact information...

WORK HISTORY AND EXPERIENCE
January 2004 – Present
Cadmatic 3D Modelling – Amels B.V. – Vlissingen Holland

Routing of Piping, HVAC and Cableways in accommodation and machinery spaces, location of equipments and positioning of walls, floors and ceilings for various luxury yachts.

October 2003 - January 2004
AutoCAD 2000 - De Hoop Scheepswerf (Lobith) Holland

Offshore Supply Vessel
Routing of Piping, HVAC, Cableways and preperation of Composite and Workshop drawings.

October 2002 – September 2003
Cadmatic 3d modeling + Plant Design - Royal Schelde / Damen shipyards Vlissingen Holland

Modifications to an existing design of an offshore support vessel.
New liquid mud system and propulsion system with modifications to existing piping systems as required. Also modeling of insulation, floor coverings, and joiner bulkheads for a new L.P.D. vessel design for the Dutch navy

July 2001 – October 2002
Tribon 3D Modeling – Van Der Giessen De Noord Holland

Routing of various piping and ventilation systems, inside and outside machinery spaces.
Updating of database as required with piping and ventilation components.
Creation of equipments from manufacturers drawings and positioning in the 3D-model for a variety of offshore support vessels and ferries.

December 2000 – July 2001
Tribon 3D Modeling – Verolme Botlek, Holland

Design and detail of various engine room piping systems, ventilation and cabletray routing for the "Heerema Balder" Pipe Layer Conversion.

May 2000 – December 2000
Autocad 14 – H.D.W. Kiel, Germany

Preparation of O.M.S. ships systems, ventilation and cable tray co-ordination plans for South African Navy Corvettes.

September 1999 – April 2000
Micro Station 2D – Oceanco, Holland

Design of various ships systems for luxury yachts.

June 1999 – August 1999
Tribon 3D Modeling – Schifko, Hamburg Germany

Design of various pipe systems for Super Fast Ferry.

February 1999 – June 1999
Cadmatic 3D Modeling – Y.V.C. Capelle A/D Ijselle, Holland

Design of various piping systems in the engine room of the "Stril Neptun" offshore support vessel.

October 1998 – February 1999
Tribon 3D Modeling – H.D.W. Kiel, Germany

Design of piping systems for several cross bulkheads for a reefer container vessel for the "Dole" Company.

April 1998 – October 1998
Cadmatic 3D Modeling – Royal Schelde, Vlissingen, Holland

Routing of various OMS piping systems, H.V.A.C. ducting and cable trays for an air defence frigate for the Nederland Royal Navy.

April 1997 – March 1998
Tribon 3D Modeling – Verolme Scheepswerf, Heusden, Holland

Design of various piping systems for the "HAM 321" suction dredger.

January 1997 – April 1997
Tribon 3D Modeling/2D Autocad 12 – Van Dam Marine, Botleck, Holland

Training of staff personnel in the use of Tribon 2D Drafting, 3D Pipe Modeling and Structures Modeling. Also piping systems for conversion of the Petrobras XXII for Petroleo Brasileiro S.A. Brasil.

January 1996 – December 1996
Tribon 3D Modeling - Harland and Wolff, Queen's Island, Belfast

Routing of main deck piping and production liaison for B.P. Schiehallion Project. Also training of new starts in 3D piping and structures modeling on Tribon.

April 1994 – December 1995
Manual/2D Autocad 12 – Consafe Fabrications Ltd, Montrose and Aberdeen

Preparation of Production Isometrics for Sub-Sea piping and material reconciliation for the Maersk Roar, Svend/Harald and Tyra East Project. Material take offs for Shell Brent Delta Project. Production Isometrics for Texaco Erskine Tie-In Project.

January 1993 – April 1994
Manual Draughtsman – U.I.E. Scotland Ltd, Clydebank

Preparation of Production Isometrics and Systems Isometrics for hydrotest on Total Dunbar Project. Also material take offs for various tenders.

December 1991 – December 1992
Manual Draughtsman – RGC Offshore, Buckhaven

Preparation of System Isometrics for hydrotest and pipe support details for Bruce PUQ Project. Also, Production Isometrics for shell Nelson Jacket.
October 1991 – December 1991
Manual Design Draughtsman – United Distillers, Port Dundee, Scotland

Responsible for the location of new CO2 Gas Scrubber, Effluent Heat Exchanger and Filter Unit. Site Surveys required for the positioning of equipment and tie-ins to existing piping, followed by preparation of layout arrangements and piping drawings.

May 1991 – September 1991
Manual Pipe Support Draughtsman – Scottish Rig Repairers, Invergordon

Involved in the line walking of systems on the Emerald Producer Floating Production Facility, inspecting pipe supports and the preparation of site instructions to modify supports when required.

May 1989 – April 1991
Manual Pipe Design Draughtsman – Saint John Shipbuilders, Saint John N.B. Canada

Canadian Patrol Frigate Programme. Responsible for on site resolution of lead ship problems and the design and detail of piping and HVAC modifications for follow ships, removal route drawings and procedures, also QC checking.

September 1988 – April 1989
Manual Pipe Design Draughtsman – German Marine Inc, Dartmouth N.S. Canada

Canadian Coast Guard Louise S St Laurent Re-Fit. Responsible for the design of the main engine room composite arrangement and design and detail of various pipe arrangements and details.

May 1988 – September 1988
Manual Pipe Design Draughtsman – Halifax/Dartmouth Inc, Halifax, N.S. Canada

Tracker II re-fit for Nova Scotia Clam Company. Responsible for pump room layout, design and detail of piping and HVAC drawings.

March 1986 – April 1988
Manual Pipe Design Draughtsman – M.S.E.I. Ottawa, ONT, Canada

Involved in O.M.S. composite arrangements for the Canadian Navy C.P.F. programme.

July 1985 – March 1986
Manual Pipe Design Draughtsman – Bethlehem Steel, Baltimore, Maryland, USA

US Navy Tag 31 Project. Responsible for the design of O.M.S./I.M.S. piping arrangements and details.

August 1976 – July 1985
Apprentice Draughtsman/Fitter – Yarrow Shipbuilders Ltd, Glasgow

Royal Navy Type 22 and Type 23 Frigates. Employed in the Engine Drawing Office on various machinery space piping and HVAC drawings, machinery removal arrangements and procedures, equipment stowage drawings. Full apprenticeship served and certificates gained.

View contact information...
«« previous resume next resume »»
Search Results (Resumes 1951 to 2000 of 7054)Go to Search Parameters...
Brief Description
Automation Specialist with more than seven years of experience with Allen Bradley (Rockwell Automation PLC (ControlLogix, PLC-5), HMI (RSView, PanelView), and Emerson DeltaV DCS.
To absorb all qualities of good professional with my technical thoughts contribute towards organization.
Wireline logging operator, logging tools rig-up,rig-down,servicing,trouble shooting and repair. modular sampling tool speacialist (mdt
Instrumentation engineer/engineering manager, 7 years experience
INtools Implementation, • INtools PSR Customization, • SQL Query writing• INtools Support• INtools/SPPID Training to users• SPPID Implementation• Smart Plant Electrical
Proven excellent planning, communication, reporting skills,investigative and analytical skills, troubleshooting, maintenance skills. proven first class health safety and environment culture
A multi-disciplined, goal orientated and experienced Commissioning Manager and Engineer with excellent communication, organisational and personnel management skills on advanced technology, high value, schedule critical and high profile projects.
19 years of welding experience, oil and gas fabrication. superintendent, engineer, inspector.
I have diversified vast professional experience in the construction industry. Have managed and worked with complex competitive challenge projects and have implemented them successfully with efficiency and quality. Expertise in Project Manger, Expertise in Checker, Expertise in Project
Objective : A suitable position in project planning & controls or allied departments providing the opportunity to make a good contribution to your organization goals through continued development of professional skills, hard work and application of acquired knowledge.Experience total - 12 years
Electrical Maintenance Engineer - Has 12 Years Experience.
More than 10 years experince in the field of Welding Inspection. Presently working with Saudi Aramco as Sr. Project Inspector.
NUCLEAR SAFETY ENGINEER / NEBOSH INTERNATIONAL
Around sixteen years of extensive experience in Instrumentation and Control Systems for chemical and petrochemical industry that includes project engineering work, installation and testing, commissioning and maintenance of DCS / PLC systems.
Control systems engineer with 8 years background in the oil@gas industry
Microstation 2D & 3D Designer
Welding Supervisor: SSCL.DME (3years welding), WI (QA/QC), Safety qualified,21years Experience, worked with ASME, AWS, API standard in Major EPC Industries such as Onshore, Upstream ,Petro-chemicals (Offshore piping & Structures, Oil & Gas Piping, Steam Boiler Piping, HP vessels & Storage Tanks) .
experienced in processing seismic data, land/marine, onshore/offshore, 2D/3D, QC/QA analysis, strong in first break picking, velocity analysis, multiple attenuation, promax, green moutain, mesa softwares.
Instrument Design Engineer
I am currently seeking an overseas position in the petrochemical industry. I am focusing on China, S.E. Asia, Australia, New Zealand, Mexico and S. America. I have 17 years of experience managing the design and construction of capital projects in the petrochemical industry.
SUMMARY 95 - Present Varied positions See detailed CV Exxon Mobil Transfield Worley JV (TW JV) Halliburton TW JV Brown & Root (Thailand) Kavaerner Norway AOC North Sea United Construction Woodside Aust
Oil and Gas Gas processing and NGL recovery On-line optimization of petrochemical plants advanced process control Information Technology
I have extensive experience in project evaluation and execution from conceptual phase to abandonment. Strong background in production operations and production enhancement. Recent work in the area of technology identification. Extensive experience in asset team management in the upstream business.
Seeking employment in the Environmental Industry. I hold Bachelor and Masters degree in Petroleum Engineering and will complete another Masters degree in Hydrogeology by 05/02.
Chemist, Inorganic, Organometallic, Organic
Work Experience -15 Years well established organization for inspection activities, Project co-ordination Inspection , QA/QC / Welding / Mechanical /Piping /Painting & Pipe lay Barge Deep sea Sub-Marine Pipeline project.
I have 20 Yrs exp., after Dip. in Mech. engg. & Safety Engineer/Officer have 12 yrs exp., mainly in the field of Oil, Gas, Petrochemical & power plants industries in maintanance, shutdown & construction works in India & Gulf countries.
I am a reservoir simulation engineer with experience in both compositional and black oil. Additional skils include geostatistics, petrophysical evaluation and cased hole log anaylsis including production logs.
20+ years shipbuilding and offshore piping and ventilation routing.
I would like to be considered for the post as above or any position which is suitable or related with my qualifications and experiences in your company. I have more than 6 years of working experience in several industries which is related in Oil & Gas offshore and onshore. Currently I am working
A highly motivated, professionally determined Petroleum Engineer with six years diversified working experience with oil and gas exploration and production Company in all aspects of well completions and production engineering.
I have completed diplomo in electrical and elcetronics .First I have worked in erection and maintenance in 110kv substation.second I have worked in wind power plant..Here my job was maintenance and Troubleshooting of wind turbine generator.Now I am working erection and commissioning of oil field.
PDMS Pipe Designer
To apply for a role where I can demonstrate and expand my Drilling skills within the oil and gas drilling industry
Competent Mechanical Engineer with specialization Thermal Coating Systems and Insulation (Cryogenic/Cold, Hot, Acoustic).Having around 06 years of progressive working experience in the construction fields of Oil & Gas, Petrochemicals Plant, Steel manufacturing Plant
Service, commissioning, start-up, construction in Instrumentation and Control
I have more than 8 Years working experience of power plant operation, since April 2000 I am working in the CHASHMA NUCLEAR POWER PLANT as plant operator.
Skills Summary ; Project Management , Computer/ Software programmes savvy, Quality Orientation, Work and Industrial Safety standards, a Quality Assurance/Quality Control Inspector.
Mechanical engineer-3year experience
A professional and dedicated Mechanical Engineer with 3 years Oil & Gas Industry experience, including expertise in Design (CAD), Structural Analysis (FEA), GD&T, ASME Code, Excellent communication and interpersonal skills with strong analytical and practical field engineering experience.
Wellsite drilling engineer
My professional experience is based on Supervision of oil field operations, quality and maintenance of inyection systems with chemical products. I´ve wide and strong knowledge on oil production processes and constantly technical consultantship to the costumers about of the chemical treatment .
QA/QC Coating Inspector
working as csu saferty officer in sabic,I am having Industrial safety diploma from annamalai university.chennai
A highly determined and skilled Mechanical Engineer with over 15+ years of overseas and in country experience in performing Piping Construction Supervision, in Oil/Gas process plants and pipelines projects too.
Seismic Analysis: AVO, spectral decomposition, Seismic Inversion, attribute analysis, Shallow Hazards Analysis, Geopressure.
An Electrical Engineer
Application for the post of – Mechanical, Plumbing & Piping Engineer
Oil exploration and production. Selection of drill sites, drilling operations, open hole logging evaluation, sample and paleontological analysis, vertical and horizontal drilling activities.
I have 6.5 years experience in Instrumentation and Control System Engineering. Involved in Proposal works, Basic Engineering Design, Detail Engineering Design, start-up, pre-commissioning and commissioning activities. Experienced with DCS and ESD System.
First   1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   36   37   38   39   [ 40 ]   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
CATEGORIES: Engineering/Technicians;
INDUSTRIES: Petroleum/Oil/Gas;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com