Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #4757 next resume »»
CONTACT INFORMATION:
View contact information...

B.E. Mechanical Engineering having graduated in the year 1990 in FIRST DIVISION from Osmania University, Hyderabad, Andhra Pradesh, INDIA.

IT Exposure

PRIMAVERA PROJECT PLANNER P3, MS PROJECTS, MS OFFICE including MS Access, MS Excel and MS Word. Can comprehend AUTOCAD drawings pertaining to Civil, Mechanical & Electrical areas.

CAREER HISTORY:

Present Employment

1. Organisation: QGM Energy LLC, Dubai (a BRITISH Company)
Period: From November 2003 till date
Position: Planning Engineer

Brief Job Profile

Presently working for a project viz. Conversion / Refurbishment of a Jack-Up Drilling Rig(In-House).

The nature of Job is as follows:

* Preparation of Preliminary & Detailed Project Schedule (at micro level) with Project Outline
* Preparation of Planned & Actual progress curve (S-Curve) indicating the Progress % on a Weekly & Monthly basis
* Preparation of Cost, Time, Resource (CTR) Analysis Reports
* Preparation of Material Status Report
* Liase with all Personnel viz. Construction Manager, Site Superintendent, Technical Design/ Engineering, Quality Control / Inspection etc.
* Preparation of Histograms
* Conduct periodic project status review meetings/discussions with Client as well as Civil & Electrical Sub-contractors to solve practical difficulties / problems at Site
* Frequent Site visits to monitor / control site activities

Brief Particulars of Previous Employment

1. Organisation: Belleli Energy S.r.l, Dubai (an ITALIAN Company)
Period: From August 2002 to September 2003
Position: Planner / Project Co-ordinator

Brief Job Profile

Worked for an EPC Project for Vopak ENOC (Phase-4 Expansion) at site (Vopak Oil Terminal) in Fujairah (one of the Emirates in UAE) in the Construction of Nine Petroleum Storage Tanks (55mtr Dia. - 2Nos., 45mtr Dia. - 2Nos., 39mtr Dia. - 2Nos., & 29mtr Dia. - 3Nos.).

The nature of Job is as follows:

* Preparation of Preliminary & Detailed Project Schedule (at micro level) with Project Outline
* Updation & Preparation of Contract Progress % on a Weekly basis
* Preparation of Planned & Actual progress curve (S-Curve) indicating the Progress % on a Weekly & Monthly basis
* Preparation of Weekly & Monthly Progress Reports
* Preparation of Drawing Transmittal Status Reports
* Preparation of Material Status Report
* Liase with all Personnel viz. Construction Manager, Site Superintendent, Technical Design/ Engineering, Quality Control / Inspection etc.
* Preparation of Two Week Look Ahead Schedules
* Preparation of Manpower Histograms
* Preparation of Database of Spools with regard to Piping works including status of fabrication in the Workshop
* Collection of Progress Photographs at Site on a Weekly basis
* Preparation of Invoices which is to be raised to Client
* Coordinate with Client as well as Suppliers / Vendors
* Conduct periodic project status review meetings/discussions with Client as well as Civil & Electrical Sub-contractors to solve practical difficulties / problems at Site
* Frequent Site visits to monitor / control site activities

2. Organisation: M.N.DASTUR & COMPANY (P) LIMITED, Chennai, INDIA
(Steel & Power Plant Consultants)
Period: From May 1998 to July 2003
Position: Senior Engineer (Mechanical)

Brief Job Profile

Role: Project Planner / Project Coordinator
Projects Associated with:

A. Captive Power Projects Capacity
* National Aluminium Company Limited - 120 MW
* Nova Petrochemicals Limited - 7 MW

B. Biomass based Power Projects Capacity
* Jocil Limited (India) - 6 MW
* Varam Power Projects Limited (India) - 6 MW
* Jocil Limited (India) - 6 MW
* Vandana Vidhyut Limited (India) - 6 MW
* Roshni Powertech Limited (India) - 6 MW
* KMS Power Private Limited(India) - 6 MW

C. Integrated Steel Plants Capacity
* Bellary Steels & Alloys Limited - 0.5 Million Ton

Brief Job Profile

The nature of Job in the project is as follows:

* Preparation of Preliminary & Overall Project Plan with Project Outline
* Preparation of Feasibility Report of the project. The various options of technology / process that could be adopted, would be analysed and reported clearly stating the viability of each.
* Preparation of Detailed Project Report.
* Coordinating in the preparation of overall plant layout.
* Providing all the input requirements to all the departments for the preparation of technical specifications
* Monitoring and Controlling the progress of the project as per the project plan prepared and any slippage foreseen in schedule would be immediately reported. This requires close coordination with all the internal departments, periodic project status review meetings, resolution of issues, coordinating with client etc.
* Holding technical / commercial discussions with vendors and preparation of appraisals
* Assisting the client in the order placement by participating in the final commercial discussions
* Holding kick-off meetings with vendors
* Coordinating with departments for the approval of Vendors¡¦ drawings
* Maintaining the updated overall project status at any point of time
* Preparation of quality documents required for project management
* Periodic Site visits of various clients to monitor / control the progress of site activities

Apart from the above, also involved in the following general activities that are not project specific

* Preparation of techno-commercial proposals for the engineering consultancy for various probable clients
* Meeting and discussing with vendors who would like to be included in the approved list of vendors of the company. Their facilities would be visited and assessed prior to approval.

Internal Auditor of Department, Responsible for the Implementation of ISO Quality systems and procedures

Additional Information

Was sent under deputation to M/S RAP ENGINEERS & CONSULTANTS PTE LIMITED, SINGAPORE for a period of one month to assist in Project Management.

3. Organisation: Kraft Engineering & Projects Ltd, Chennai, India
Period: From September 1994 to May 1998
Position: Design Engineer

Projects Associated with:

Bulk Material Handling Systems pertaining to Power Plants Capacity
* EID Parry, Nellikuppam (India) - 70 TPH
* TamilNadu Newsprints & Papers Limited - 40 TPH
* Indian Rayon and Industries Ltd. - 100 TPH
* Southern Iron & Steel Co. Ltd. - 100 TPH
* Hindalco Industries - 200 TPH

Brief Job Profile

The nature of Job in the project is as follows:

* Preparation of Preliminary & Overall Project Plan with Project Outline
* Preparation of Feasibility Report of the project. The various options of technology / process that could be adopted, would be analysed and reported clearly stating the viability of each.
* Preparation of Detailed Project Report.
* Coordinating in the preparation of overall plant layout.
* Providing all the input requirements to all the departments for the preparation of technical specifications
* Monitoring and Controlling the progress of the project as per the project plan prepared and any slippage foreseen in schedule would be immediately reported. This requires close coordination with all the internal departments, periodic project status review meetings, resolution of issues, coordinating with client etc.
* Holding technical / commercial discussions with sub-vendors and preparation of appraisals
* Coordinating with departments
* Maintaining the updated overall project status at any point of time
* Periodic Site visits of various clients to monitor / control the progress of site activities

4.Organisation: Aluminium Industries Ltd., Hyderabad, India
(Bulk Material Handling Division)
Position Held: Design Engineer
Duration: From July 1993 to August 1994
Job Responsibilities: As in Sl. No. 3 above

5.Organisation: Navabharat Ferro Alloys Ltd, Hyderabad, India
(Fabrication of Pressure Vessels & Auxiliaries)
Position Held: Shift Engineer In-Charge
Duration: From May 1991 to March 1993
Job Responsibilities: Reporting to Works Manager, updating log book on a daily basis,In-Charge of Fabrication Shop &
Machine Shop. Responsible for showing Productivity on a weekly basis

Personal Particulars

Date of Birth, Age: 15.02.1969,35 years
Marital Status: Married
Nationality: Indian

View contact information...
«« previous resume next resume »»
Search Results (Resumes 2751 to 2800 of 6396)Go to Search Parameters...
Brief Description
Cost Engineer with exposure to Planning. Russian-mother tongue. English - fluent. Arabic - working knowledge
13 Years Strong Experience & Exposure in The Arena Of I&C Systems Successfully handled numerous large scale projects Worked with SCADA, PLCs and DCS Strong at commissioning, testing, documentation and handling of O&M Effectively led teams to deliver positive and timely results
13 yrs Professional Exp.which include Project Management, Engineering and Estimation. Responsible for the Implementation of QMS(ISO9001-2000). Countries of Work Exp: India,Singapore,UAE Languages Known:English,Hindi,Kannada,Tamil & Telugu.
Sap Basis consultant with 1.2 years of experience
Stability Analysis, Motion Analysis and Mooring Analysis of Ships and Offshore Structures
+1 YEAR EXPERIENCE IN PIPING DESIGN CURRENTLY IN DUBAI
I have completed my Diploma in Automobile Engineering (D.A.E.) with first class. Since then I have been relentlessly working to up date my knowledge in my field. Hence I have worked with various organizations on the same relevant line of work
LNG project cost controller , Project Field Change order preparation, vendors Back Charge notification, Warranty issues notification, bid and invoice evaluation. certificates management as per milestone completion and invoice approval.
7+ Yrs experience in PIPING (Power 5 Years, Process 2 Years),Capable to work with International standards like ANSI ,ASME,ASTM,BS,API etc and with Design code like ANSI 31.1, ANSI 31.3, ANSI 31.4. ANSI 31.8 etc,and with On shore/OFF shore ,Piping/pipeline (Power, Process, Oil & Gas ) with various
BS in electronic engineering and working as an electrical maintenance engr. key skills includes fault diagnosis and maintenace & troubleshooting of inverters,plc, sensors etc
HVAC Designer
I graduated from Middle East Technical University- Petroleum&Natural Gas Engineering department in 2006. Then, I started to work in a local petroleum company in Turkey as a drilling engineer. I was responsible from all the drilling operations in the field . Now , I am working as a mud engineer.
Completed B-Tech degree in Electrical & Electronics in the year 2006 with 70% aggregate from Caarmel Engineering College,Pathanamthitta,Kerala.17months in the field of Construction Supervision of E & I
Sr production engineer work in offshore and onshore seeking new job for more knowledge
Mechanical Engineer with 3 years design experience as well as field work experience. Skills include PVElite, AutoCAD, ASME Sec VIII Div 1. Field work experience maintenance & calibration, QC management, instrumentations, quality control log
SCADA Programming and Interfacing, PLC Programming and Interfacing, AC Drives Communication, HMI Programming and Communication .
MATERIALS ENGINEER/CONTROLLER/SPECIALIST-CATALOGUING-INVENTORY-PREPARE PURCHASE DESCRIPTION-ERP-SAP MM-CMT-STRING-E-SPIR-MMS Etc.
I am a CWI, Level II in MT, UT, PT and RT film interpretation. I have US and overseas QA/QC project and manufacturing supervisory experience in the construction, petroleum, mining and aerospace industries. References and copies of certs. will be provided upon request.
Professional trainings and practices in Geological and Mining Institutes including well site practices, modeling of gas reservoirs and underground gas storage production, geological prospecting and drilling geophysics, control properties of mud-logging and cementation
Team Leader Shift Supervisor, Trainer: Operation at Refinery Processing Plants, Remote Oil & Gas Production Field and High Pressure Systems at NGL Processing Facilities LPG Plant including Petroleum & Petrochemical Utilities. Professional member MInstLM & MCMI UK, MBA Prod. Ops. Management, BSc, BA
Comprehensive practical and commercial experience since 1997 in every aspect of cathodic protection systems on all types of structures, comprising detailed design preparation / engineering calculations and Preparation of proposals with design etc.
Diploma in chemical eng
Piping Draughtsman
Petroleum Engineer with 3 years experience in offshore drilling and completions operations supported by various trainings and certificates.
I ahve gained knowledge in the field of exploration and production. I have also done a course IADC WELL CAP which is internationally acclaimed.
SAP Basis Professional
DCS, Instrumentation, HMI, SCADA, PLC, Control System, Metering System
SCADA/ Substation automation with 3+years experince
Drilling Engineering Work Experience in high pressured directional wells : 3 Years, Sales and Services Experience: Recently joined a month ago
Condition Monitoring Management Consultant
Working as a Piping Engineer on software PDS with 3 years of experience. Worhing on oil &gas,chemical etc. projects
Versatile IT Project Manager with > 15 yrs experience in the IT and Upstream Petroleum Industry implementing IT solutions (including software, hardware, firmware);evaluating and recommending solution options, supervising solution implementation, and QA. Able to deliver Projects on time and on budget
Subsea Project Engineer - Project Management - Deep Water Installation
Twelve (12) years of diversified working experience in Quantity Surveying/Measurement, Cost Estimation, Cost Control/Monitoring and Contract Administration of miscellaneous projects relevant to Oil & Gas and Petrochemical Industries.
Sr. Field Engineer, 20+ years, excellent customer service skills, electro-mechanical repair, maintenance
Operations, Business Developement, Canada,International experience, North Africa, Saudi, Kazakhstan, Russia.
I'm a diploma holder in Chemical technology having 12 yrs of experience in petrochemical field worked as Junior Engineer in Ammonia synthesis plant of all sections of desulphurization, catalytic reforming,CO2 removal, synthesis reactor, refrigeration, ammonia storage with adequate HSE practices
I am a mechanical technician I can do all rotary and stationary equipment jobs.
my expertise are using any release of autocad, rhinoceros for 3d and GHS for stability calculation.
Highly skilled professional, experienced as MAINTENANCE AND RELIABILITY LEADER for designing, manufacturing, maintaining and disposing assets, exceeding the expected performance and minimizing the impact to the environment with optimal cost.
Degree and diploma in chemical engineering.
Experienced in developing and delivering drilling plans, including wellbore and casing design,mud program,cementing program, directional plan, completion design, leading risk assessments, developing safety programs for workover, drilling and completion operations on exploration and development wells
Mechanical discipline. Construction LNG / Power / Oil and Gas. Middle Management .
Thirteen years of experience in quality and safety management roles of oil and gas industry, project management of Tension Leg Platform (TLP), semi-submersible floating production, FPSOs, and involved as an engineering project manager for designing various mechanical equipment systems for re
Electrical and instrument project manager construction, design and inspection
Overhauling of Rotating equipments e.g pumps, compressors, gas turbines etc. in an oilfield
Rotating Equipment Mechanical Engineer
Senior Geologist (16+ years oil and gas experience), graduated in geology from University of Kansas in 1987.
Having 15 years of experience in oil and gas construction and maintenance feild, with Diploma in Industrial safety, Environmental management
Piping stress analysis usisng CAESAR-II, support engineering, pipe thickness calculation, pressure balance in PIPENET software, etc
First   Prev   51   52   53   54   55   [ 56 ]   57   58   59   60   61   62   63   64   65   66   67   68   69   70   71   72   73   74   75   76   77   78   79   80   81   82   83   84   85   86   87   88   89   90   91   92   93   94   95   96   97   98   99   100   Next   Last
Seach Parameters

Change search parameters...
CATEGORIES: Engineering/Technicians;
INDUSTRIES: Petroleum/Oil/Gas;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com