CONTACT INFORMATION:
View contact information...

PERSONAL DETAILS:

Date of birth 11/08/48
Nationality British
Languages English and basic Vietnamese
Position Pipeline/Plant Commissioning Engineer

EDUCATION:
Open University Engineering Solids – 1st year
Open University Mathematics Foundation Module
Open University Science Foundation Module
Military City & Guilds Telecommunications and Radio Principles 3rd yr
Military Army Certificate of Education Senior Certificate
School Standard Education

TRAINING:
Process Basic Process Engineering – 3 mths - Shell Expro
Production Gas compression and operation, Tank farm operation, Crude distillery operation
Production Oil Operations & Production, Instruments Supervisors Course - 6 mths
Pipeline ERS Coat and Wrap Inspector (Certificate Expired)
Fabrication Basic Welding Arc, MIG, TIG and Oxycetalene
Safety Offshore Safety, BP ASA Trained, Shell PICWS Approved, BP Safe System Of Work
Offshore Survival Combined Offshore Survival & Fire Fighting, Free Fall Lifeboat and Skyscape
Supervision Foundation course for Supervisors
Communication Modern Business Writing & Introduction to Communication skills

EXPERIENCE SUMMARY:

24 years in the Oil and Gas Industry. 12 as Shell Expro Staff, 12 as a Contractor. Initially trained as a Production Supervisor for the Sullom Voe Terminal, Shetland, becoming instead a Senior Terminal Inspector looking after the interests of Brent System partners. Moved to Aberdeen as the Assistant Pipeline Supervisor Northsea, responsible for operational pigging and internal pipeline maintenance and inspection.

I have primarily worked as a Client Representative/Project Manager on a number of Major Pipeline Projects for Shell Chemicals UK, Shell Nigeria, Statoil Norway, Phillips Petroleum Norway, BP Vietnam and Phillips Petroleum UK. Projects that I have been involved in or wholly reponsible for the precommissioning and commissioning of are:- Nam Con Son, Magnus EOR, Asgard A & B, Renee/Rubie, Ekofisk Bypass, Haltenpipe, Sleipner Vest, Troll Oljeror, Zeepipe Phase's I & II, Europipe I & II, North West Ethylene Pipeline etc.

Responsiblities have covered most aspects of Pipeline Construction, Operation, Inspection, Precommissioning and Commissioning both Onshore and Offshore from Conceptual Design, Engineering, Procedure Development, Risk Analysis, Hazid/op, Scheduling, Planning, Contractor Management, and Field Supervision. Activities Include the precommissioning and commissioning of product Export and Reception Facilities both onshore and offshore.

Products/chemicals handled have been, Oil, Gas, Condensate, Diesel, Ethylene, Nitrogen, Glycol, Methanol, Caustic Soda, Air, Steam and Water. Pipelines have ranged in size from 3" to 40", and 1.0 Km to 815 Km in length. They have included Hard Pipe, Flexible risers and hoses and Composite pipe laid as stand alone systems, piggy backed or in bundles at elevations from -3000 ft to +1600 ft wrt sea level and at pressures ranging from 0 to 650 bar.

Sound knowledge of the Oil and Gas industry. Proven Project Management, & Supervisory skills. Good Engineering & Problem Solving skills. Adaptable. Self motivated & can work alone or as part of a team.
Fully Computer Literate. Good technical mind and able to learn quickly and undertake new challenges.

2004 SHELL NIGERIA EXPLORATION AND PRODUCTION COMPANY NIGERIA
to
Present LEAD PROJECT ENGINEER – BONGA GEP PROJECT

Responsibilities

Lead Project Engineer responsible for the precommissioning of the 87 km 16" Bonga Gas Export Pipeline, and the associated deep water Flowlines connected to the Bonga FPSO. The Bonag is moored in 1000m of water. The work involves managing the operations including third party interfaces, planning, scheduling, engineering, procedure review, risk assessment and Contractor supervision onshore and offshore. The scope involves Flooding, cleaning gauging, hydrotesting, dewatering, drying and nitrogen filling.

2003 SHELL PRODUCTION & DEVELOPMENT COMPANY NIGERIA
to
2004 LEAD PROJECT ENGINEER – OGGS PROJECT

Responsibilities

Lead Project Engineer resposible for the precommissioning of the 268 km 32" OGGS Trunkline, and the associated 99.0 km 24" Forcados Yokri pipeline. The work involved managing the operations including, third party interfaces, planning, scheduling, engineering, procedure review, risk assessment and Contractor supervision onshore and offshore. The scope involved Flooding, cleaning gauging, hydrotesting, dewatering, drying and nitrogen filling.

2002 BP VIETNAM
to
2003 COMPANY REPRESENTATIVE - NAM CON SON PROJECT

Responsibilities: -

All aspects of the precommissioning and commissioning activities associated with 4.7km. 16" diameter flowline from subsea wells to the Lan Tay Platform and the 372km. 26" diameter export pipeline and export facilities from the Lan Tay platform to the onshore reception facilities at the Dinh Co Terminal, including third party interfaces, scheduling, engineering, procedure review, risk assessment and Contractor supervision onshore and offshore. The scope included Subsea Flexible Hoses, Subsea Templates, Topside Pipework, 13% Chrome Flowlines for oil gas/condensate production at a water depth of 120 m.

2001 BJ PROCESS & PIPELINE SERVICES ABERDEEN, UK
to
2002 SENIOR PROJECT ENGINEER - BP's MAGNUS EOR PROJECT

Responsibilities:-

Detailed engineering and work procedure preparation for the dewatering, glycol conditioning and nitrogen pressurising of BP's 210 km 20" East of Shetland gas trunkline and the dewatering, air drying and nitrogen pressurising of BP's 189 km West of Shetland Gas Trunkline.

Establishing the work site at Sullom Voe Terminal including, BJ/SVT/BP interfaces, temporary water supply, equipment laydown and bunded areas. Overall supervision and control of the dewatering & drying operations based at Sullom Voe Terminal.

2000 STATOIL NORWAY
to
2001 COMPANY REPRESENTATIVE - ASGARD 'A' PROJECT

Responsibilities:-

All aspects of the precommissioning and commissioning activities associated with Phase II of the Asgard 'A' Floating Production Storage and Offloading (FPSO) facility, including third party interface, scheduling, engineering, procedure review, hazop and Contractor supervision onshore and offshore. The scope included Topside Pipework, Subsea Templates, Bundled Flowlines for oil production and gas injection including Bundle Heating Medium and Methanol service lines at a water depth of 325 m.

Supervising the precommissioning and commissioning activities associated with the Asgard B facility (as above) including the provision of technical support and problem solving as and when required.

Verification, testing and modification of the pigs used in the above activities to confirm their reliability and fitness for purpose.

1999 PHILIPS PETROLEUM UK ABERDEEN
to
2000 COMPANY REPRESENTATIVE - RENEE/RUBIE PROJECT

Responsibilities carried out on behalf of PPCo U.K.: -

Management and field supervision of the Pre-commissioning Operations associated with the Subsea Rubie Pipelines and associated Subsea Manifold.

Management of the Pre-commissioning Sub Contractor covering Engineering, Procedure Development, Hazid/Hazop, Equipment Testing, Scheduling, Safety, Budget including Supervision and Control of field activities.

Third party interface with associated partners and Platform Operators/Management.

Client Representative on Stolt Comex Seaway's dive vessel Seaway Condor for hydrotest, pre-commissioning and associated post lay works covering trenching, umbilical positioning and mattress installation.

1999 ASIAN MARINE CONTRACTORS Ltd NORWAY, DUBAI, SINGAPORE
to
2000 SENIOR PROJECT ENGINEER - TECH SUPPORT ONGC NF RISER PROJECT

Responsibilities carried out on behalf of AMC Ltd:-

Providing technical support to AMC Ltd on the Remotely Operated Isolation Plug (ROIP) and piggability of ONGC's 26" and 30" Oil and Gas Pipelines in Bombay as part of the NF Riser Replacement Project.

Norway - Witness the pre-mobilisation and final acceptance trials of the Remotely Operated Isolation Plug at the manufacturers base in Stavanger and confirmed piggability of tool through the platform topside pipe work and riser features.

Dubai - Verified cleaning and gauging pig design for piggability through platform topside pipework and riser features. Engineered and Supervised changes to pigs to ensure fitness for purpose.

Singapore - Determined and demonstrated piggability of the topside isolation check valves and pig trap isolation valves using scale drawing for client. Carried out Hazid/Hazop on isolation procedures.

1997 BJ SERVICES LTD ABERDEEN
to
1998 SENIOR ISOLATIONS ENGINEER - EKOFISK II BYPASS PROJECT –

Responsibilities:-

Engineering and development of the Subsea Ambient Isolation concepts for the 36" Norpipe gas pipeline and the 36" Teesside oil pipeline, including the development and testing of the Ambient Isolation Pigs used for the isolation.

Third party interface at senior management level with personnel from the Project, Offshore Platforms, Onshore Terminals and Operations addressing Engineering and Operations issues.

Supervision of a team of Project Engineers involved in the preparation of Isolation Procedures and providing Technical Support to the project team involved in other associated pipeline activities.

Overall supervision of the offshore teams responsible for the installation and positioning of the 36" Emden and 34" Teesside Isolation Pig Trains at Ekofisk including recovery of the 36" pigs at the B11 Platform during startup of the Emden gas line.

Engineering of the Subsea Radioactive Isotope monitoring system and preparation of the Isotope teams Logistics Plan for the overall project.

1996 STATOIL NORWAY
to
1997 COMPANY REPRESENTATIVE - HALTENPIPE/SLEIPNER PIPELINE PROJECTS

Responsibilities:-

Haltenpipe:-

Management of all Pre-commissioning and Commissioning activities associated with 252km, 16" Haltenpipe Gas Pipeline including the Topside Export Pipework on the Heidrun platform and the Onshore Terminal Facilities at Tjeldbergodden. The pipeline was commissioned with gas at 120 barg.

Management of Statoil's RFO Contractor covering Engineering, Procedure Development, Hazid/Hazop, Equipment Testing, Safety, Budget and Supervision and Control of field operations.

Third party interface with both Offshore Platform and Onshore Terminal Management and Operations Personnel, covering Engineering, Control and Supervision of Operations.

Sleipner:-

Company Site Representative providing Onshore and Offshore Technical Support, Procedure Review, Hazid/Hazop and Field Supervision during the pre-commissioning and commissioning of the Sleipner West 20" stainless steel pipeline.

1995 STATOIL NORWAY
to
1996 COMPANY REPRESENTATIVE - EUROPIPE/ZEEPIPE IIA/TROLL OIL

Responsibilities:-

Troll Oil:-

Engineering and development of the Landfall Pipeline, Riser Gauging and Pipeline Tow Cable Installation concept, including Management and Field Supervision of the Riser Gauging and initial Tow Cable Installation Project.

Engineering and development of the Wet Buckle Contingency Package including Management and Field Supervision of Operations during Dropped Pipeline Recovery.

Management of all Pre-commissioning and Commissioning activities associated with 85km, 525m deep, 16" Troll Oil Pipeline including the Topside Export Pipework on the Troll Bravo Platform, the Flexible Riser, the Subsea Riser Base Manifold and the Onshore Terminal Facilities at Mongstad.

Management of Statoils RFO Contractor covering Engineering, Procedure Development, Hazid/Hazop, Equipment Testing, Safety, Budget and Supervision and Control of Field Operations.

Third party interface with both Offshore Platform and Onshore Terminal Management and Operations Personnel, covering Engineering, Control and Supervision of Operations.

Europipe:-

Company Representative providing Technical Support, for the Onshore Terminal and Offshore Platform including Procedure Review and Hazid/Hazop including Field Supervision and Control on the Draupner Platform during the pre-commissioning and commissioning of the 625km, 40" Europipe Pipeline.

Sleipner:-

Company Representative providing Technical Support for the Onshore Terminal and Offshore Platform including Procedure Review and Hazid/Hazop including Field Supervision and Control on the Sleipner Platform during the pre-commissioning and commissioning of the 303km, 40" Zeepipe II Pipeline.

1994 STATOIL NORWAY
to
1995 SENIOR PROJECT ENGINEER - EUROPIPE/ZEEPIPE IIA PIPELINE PROJECTS

Responsibilities carried out on behalf of Statoil:-

Engineering and development of the Dewatering and Air Drying concept for the pre-installed 40", 1.5 km long Zeepipe IIA offshore Pipeline Stub prior to Pipelay, including Field Supervision of the Operation and Third Party Interface with the Pipelay Vessel.

Pre-engineering and Design of the Temporary Water Supply and Air Discharge System on the 16/11-E (Draupner) Platform for the Pre-commissioning and Commissioning of the Europipe pipelines.

Testing and development of a low DP, Hi-Seal Bi-Directional 40" Pig suitable for use during the Air Drying and Gas Filling of the Europipe Pipeline.

1993 STATOIL NORWAY
to
1994. COMPANY REPRESENTATIVE/SENIOR PROJECT ENGINEER - Y/60 PIPELINE SYSTEM

Responsibilities carried:-

Engineering and Development of the Concept for changing the service of the 250km, 20", Y60 Pipeline (which runs from the Sleipner Platform to the Karsto Terminal) from Hydrocarbon Gas to Condensate.

Preparation of Operational Procedures, Project Planning and Schedule.

Management and Control of the Service Contractors responsible for Installing and Tracking the Interface Train.

Third Party Interface with Offshore Platform and Onshore Terminal Management and Operations Personnel.

Field Supervision of Operations Offshore and Onshore including overall Monitoring and Control of the Operation.

Note: Concept Engineering and Development were completed from my Home Office in the UK during May/June, Mobilising to Norway Aug/Sept to Supervise the Operation.

1992 STATOIL SENIOR PIPELINE COMMISSIONING ENGINEER NORWAY
to
1993 SENIOR COMMISSIONING ENGINEER - ZEEPIPE PROJECT - PHASE 1

Part of Statoil's Zeepipe Pipeline Commissioning Team employed Offshore during the Pre-commissioning and Commissioning activities on the following pipeline network:-

- The 814 km, 40" Zeepipe Gas Pipeline from Sleipner to Zeebrugge
- The 30 km, 30" Gas Pipeline from Draupner to Sleipner
- The 250 km, 20" Condensate pipeline from Sleipner to the Gas Terminal at Karsto.

Responsibilities:-

Review and Revision of all Pre-commissioning and Commissioning Procedures including final Risk Evaluations i.e. Hazid/Hazop before going to the field.

Providing Technical Support to Client Representatives, Platform Management, Engineering and Operations during the Pre-commissioning of the above pipelines.
Continued….

Third Party Interface with Platform Operations and Management Personnel.

Supervision and Control of the Sleipner Operations associated with the Commissioning and Gas up of the above Pipelines.

Preparation of Close-out Documentation and Experience Reports.

1990 SHELL CHEMICALS UK. LONDON & MANCHESTER
to
1992 COMPANY REPRESENTATIVE - NORTH WEST ETHYLENE PIPELINE PROJECT

Responsibilities:-

Preparation of Procedures and Technical Specifications for Cleaning and Testing the whole 400km Pipeline from Grangemouth to Stanlow.

Company Representative responsible for Monitoring the Pre-commissioning and Commissioning activities of the 200 km Scottish section of the Pipeline, its Above Ground Installations (AGI's) and the Grangemouth Export Facility during Construction of the Pipeline.

Handling Third Party Interface with BP Project Management covering the Construction, Pre-commissioning and Commissioning of the Export Pump and Metering Facilities.

Interfacing with the Construction Managers and the Environmental, Archaeological and Safety Specialists during Construction of the Northern 200km.

Full Pipeline Mechanical Audit including the Preparation of Punchlists and associated Reinstatement Documentation.

Mechanical Reinstatement of the whole Pipeline and its associated AGI's prior to the introduction of Ethylene.

Preparation of the Commissioning and Gas-Up Procedures for the Grangemouth Facility.

Gas up of Grangemouth Pump and Metering Facility and the introduction of Ethylene into the pipeline, Including Post Commissioning Activities and Final Close-out Documentation.

1985 SHELL EXPRO PIPELINE ENGINEER ABERDEEN
to
1990 OPERATIONS & FIELD SUPPORT

Staff Engineer responsible in part for providing technical support to the offshore installations and business units on the operation and maintenance of Shell/Esso's Oil and Gas gathering system in the North Sea.

1981 SHELL EXPRO UK SULLOM VOE TERMINAL
to
1985 Asst BRENT SYSTEM ENGINEER - MONITORING SVT OPERATIONS

Monitoring Sullom Voe Terminal Operations on behalf of the Brent System Partnership ensuring that the Operator allocated an Equitable Share of the Terminal's Facilities to the Brent System and that Operations/Product Quality were Optimised.

Management of the 5.5 km Land Section of the 36" Brent System Main Oil line from Cormorant Alpha to Sullom Voe, involving Interface and Liaison with Land Owners, Crown Estate Agents, including responsibility for Cathodic Protection, Wayleave and Pipeline Maintenance.

1979 SHELL EXPRO UK SULLOM VOE TERMINAL
to
1981 TRAINEE TERMINAL INSPECTOR SVT
Intensive Training by Shell Expro over a period of one year at KSLA Amsterdam, Pernis Refinery Rotterdam, and Shell Expro Aberdeen in the following subjects:-

Oil and Gas processing
Oil and Gas Metering
Basic Process design
Crude distillery operation
Continued….

Tank farm operations
Oil and LPG Tanker handling and loading
Quality measurement and product analysis
Hydrocarbon accounting.

1963 HM FORCES EUROPE
to
1979 SERGEANT. ROYAL SIGNAL's.

Senior Technician specialising in Secure Voice and Data Transmission via Satellite, Line and Radio Transmission of Multiplexed Voice and Telegraphy Links, including Line Of Site (LOS) and Tropospheric Scatter Radio Systems.

View contact information...
«« previous resume next resume »»
Search Results (Resumes 1751 to 1800 of 6635)Go to Search Parameters...
Brief Description
Around 7.0 years of experience in design & construction of power plant structures, EHV indoor and outdoor sub-stations, industrial & residential structures.
Aspen 12.1, Pro II, HYSIS, DMC, CONTROL STATION
Reservoir engineer
Inspecton & certification of coating work
A highly motivated, team spirited and performance driven engineering professional with an extraordinary blend of experience in Petroleum refining industry. Recognized for keen ability for improvement in reliability of a wide range of static equipment like crude oil heaters, high temperature hydrogen
PDS, PDMS, Smart Plant Review, navis work
Proactive and versatile drafting professional with a solid reputation for generating long-term results in a short-term world. Effective problem-solver who interfaces well with management, co-workers and clients. Able to meet aggressive deadlines, juggle multiple priorities independently or in a team
Certified Internal Auditor, international auditor
Chief elecrician !!!
Material Management, Inventory control, Procurement, follow-up,Procurement Planning etc
A visionary executive with 16 years experience and proven history of outstanding performance in Industrial automation & Instrumentation in Project Design, Application and Development. Dynamic, skilled specialist with excellent record in Power, Refinery, Oil & Gas, Polyester, propylene, Pulp-Paper
Bachelor Engineering Degree, BSC Geology, 10 years oilfield experience, Mud Engineer, Data Engineer, Geologist and Reservoir Engineer
Mechanical Engineering Technologist
Well logging, seismic data interpreting, sea mapping
Work History in brief: Hay Engineering Ltd - 1985-89 Sedco Forex - 1989-94 Retsco Intenational - 1994-99 Finnco Ltd - 1999-2000 Transocean Deepwater drilling - - 2000-2003 BP-CNOOC - - 2003 - present.
Experienced Cad Manager. Primary system experience in Autocad, Multisuite, Autoplant, CadDuct, ADT33. Other systems experience in MIcrostation, PDMS, Prime Medusa. An engineering background in Structural/Civil.
Bachelors in Technology - Chemical Engineering – 14 years performing works on: Hysys, Pro-ii, Pipe Phase, Sinet, AutoCAD, AutoLISP, Micro-Station, 3Dstudio Max, Primavera, MS-Project and MS-Office products
Objective To provide solutions that will maximize productivity and profits Status
33 years in various survey disciplines. 21 years onshore and offshore experience in hydrographic, engineering & seismic survey (hands-on surveys), & more currently in the last 13 years, navigation QC and Project Management.
The last 8 years I have been working mostly in Asia in Instrument and Metering engineering and Process Supervisor positions. I am experienced in working with Nationals and using CBTA on the job training and assessment methods. I currently have a valid BOSIET certificate.
Industrial and Heavy Equipment Technician
25 years experience operator / contractor experience willing to relocate status: single
Looking for work as an instrument tech. in the oil industry.
21 years in oil & gas From Insp Eng to welding inspector Exp on new and in-service plant QA/QC & clients rep on jacket & module fabrication Senior insp sub-sea pipelines, offshore platform hook-ups Insp Eng and plant insp on oil & gas platforms Familiar with most intl. codes & standards
Interrested in rotational international opportunities in Maintenance Management or Senior Maintenence Planning positions
GIS Professional with an excellent background in Geomatic and engineering work. GIS experience included pipeline route planning utilizing GIS/DSS, land use changes utilizing GIS/RS data, advanced RS researches using Airphotos, Hyperspectral image analysis.
Electronics / Electrical Technician
24 years in Pipeline Construction, Operation, Inspection, Precommissioning and Commissioning both Onshore and Offshore
I am a Canadian citizen having 17 years solid building construction, Civil and structural design, quality Management, project management, construction Management. a dedicated team player/leader exhibiting a high level of energy and initiative under pressure.
Please see resume for full details. Thank you
Over 26 years experience, 16 of which are with major foreign oil companies employment in specialized gas field operations which have included pre-commissioning and commissioning activities in the onshore and offshore Oil and Gas industry.
to secure a responsible position as an electrical engineer.
NDT INSPECTOR
Bachelor of Technology (B.Tech) in Electrical and Electronics, Good Knowledge of Autocad, ETAP and EDSA software
I am Mechanical Engineer with 18+ years of rich experience in the field of oil & gas industry.
15 years of utility/specialty chemical management experience.
. I have strong leadership skills and proven ability to manage and motivate a team to achieve assigned results. Through my previous jobs, I have learnt to provide and maintain consistent high standards and service.
Presents and reports the project status to the top management.
I am expert in Mechatronics field.
As an ambitious, inquisitive, self motivated engineer, I have been working as a workover & completion engineer since 2004. Cementing, acidizing, fishing, drilling, offshore gas well completion, deep shore well completion are the main subjects of my experience.
07 years extensive experience holding a various positions in different phase of the projects in the field of Instrument Pre-commissioning, commissioning, start up,
I am a Mechanical Engineer and have more than 6 Years Experience in Piping Design and Stress Analysis Engineering. I have worked with CAESAR II software in developing Piping Stress Analysis and I also have substantial experience in the design of interactive CAD software; Moreover, my job involves sp
GIS/CAD specialist
As Cathodic Protection Engineer in Power Plant / Oil & Gas Industries with about 7 years experience; having knowledge on diverse Construction/Engineering Design /Commissioning/Maintenance activities with extensive experience on Cathodic Protection with NACE Level II certification.
I am searching for a job as a pipping stress and supporting engineer in KL, Malasia and I am expert in using CAESAR II and PDMS and ANSYS soft ware
Mechanical / Electrical experience in Boilers, pumps, HVAC Systems, Compressors, steam systems and ancillary services, DHW skids, Chillers, Cooling Towers, Clean steam Boilers, Purified Water Systems, waste water, Low voltage Electrical Systems, Preventive Maintenance Systems.
A highly motivated, adaptable MSc graduate.
Surface well test engineer
Structural Designer With 9Yrs. PDS,Microstation & Autocad Experience
More than 25 years experience in electrical field.
First   1   2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21   22   23   24   25   26   27   28   29   30   31   32   33   34   35   [ 36 ]   37   38   39   40   41   42   43   44   45   46   47   48   49   50   Next   Last
Seach Parameters

Change search parameters...
CATEGORIES: Engineering/Technicians;
INDUSTRIES: Petroleum/Oil/Gas;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2008 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com