Misco Jobs
|
Go to Job Seeker's Center »»
|
«« previous resume
Resume #49681
next resume »»
CONTACT INFORMATION:
View contact information...
Hendri Bustan Construction Manager / Piping Manager
PERSONAL HOME ADDRESS - India
PROFILE
A HIGHLY ADAPTABLE PROFESSIONAL CONSTRUCTION MANAGER or PIPING MANAGER with a total of 19 years' extensive experience on Oil and Gas, Petrochemical, Refinery, Power Plant and Cement Industries. 8 Years with overseas project at Singapore, Malaysia, Taiwan, Hongkong, Thailand, and Saudi Arabia.
* Expertise in Project Planning, and Design.
* Mechanical Engineering
. * Piping and steel structure system.
* Fabrication and Erection of Boiler, Reactor, Vessel, Tank, Flare Stack
* Supervisory and team leadership competence.
* Technical problem-solving talents.
* Specialist shutdown of Petrochemical complex.
* Worked on Windows 98/XP/ME/2000, MS Word, Excel, Cad, Acces, & Planning tools.
EDUCATION & TRAINING
Elementary School in Palembang [1980 ]
* Secondary School in Jakarta [1983]
* High School in Jakarta [1986]
* University in UPN Jakarta [Un graduate-only seven month]
* Training course for Drafter by Bina Purna Indonesia
* Training course for Project Management by Petronas in Malaysia
* Training course for ISO 9001 by Samsung Engineering in Vietnam
* Training for ANSI/ASME Code[Section II,III,IV,IX]ASTM,API,DI UNI, BS,NIBC, by Bureau veritas in Vietnam [hard copy available in hand]
* Training for GRP Pipe lamination procedure by Nsguassero vendor
* Training for Safety passport by CIDB and NIOSH in Malaysia
* Training for Leadership Development Program by Thailand Management Assosiated
* Training for Gas Turbine Generator Operating System by Sollar Vendor specialist.
* Training course for Welding Inspector [CSWIP] by TWI – Sept 2005.
QUALIFICATION
* B.V.Q.I Certificate Internal Quality Auditor
* First Grade Engineering and Construction for Process system by SOS International
* Quality Management Program by Petro Vietnam management board.
* Fire Fighting System by Vendor Specialist
Curriculum Vitae of Mr. Hendri Bustan 2 of 6
GENERAL DUTIES AND RESPONSIBILITY
Directly responsibility to the site Manager on Project Preparation, Planning and work scheduling. Maintaining of Engineering, Quality Control, Document, Codes, Plant and specification at the site complying with ISO 9001.
A. ENGINEERING
1] Coordinating engineering matters with the OWNER's representatives in charge, third party and Sub contractor and Vendor
2] Interpreting design, drawings and specifications including field changes and provides technical advice to the construction groups, the site office engineering group and the Subcontractor / Vendor
3] Preparing disposition plan for discovered NCR, and specification after the OWNER's approval, cooperating with QA/QC Manager
4] Ensuring development of complete site office engineering records and asbuilt drawing with assistance of the home office engineering group.
5] Authorizing materials take-off for additional work and / or changes in the work at the site.
6] Planning and directing field engineering document control, such as receiving, printing, distribution, and filing.
7] Establishing field engineering coordination procedure and quality control procedure covering the above responsibility and activities.
8] Ensuring that the subcontracting documents are in compliance with the technical requirements for th project in the aspects of quality and quantity.
9] Reveiving field NCR and keeping Site Manager being informed at al times as to the seriousness and proposed resolution of all NCR, deviation requests and their impact on the schedule.
10] Approving, assigning identification, and ensuring that these requirements are in compliance with the quality system and project requirements.
11] Coordinating hand over procedure effors among all parties concerned, including compliation of documents required for facilities turnover to OWNER
B. QUALITY CONTROL
1] Verifiying bymonitoring / auditing / surveillance that the site activitiesrelating quality are being implementation accordance with Quality Plan.
2] Reviewing the quality related procedures supporting the Quality Plan in order to ensure suitability for the site work, and preparing procedures where appropriate.
3] Initianing, recommending, or providing solutions to the quality problems raised at site.
4] Coordinating the site internal organization as well as OWNER QA personnel for resolving quality problems and advices Site Manager for necessary actions.
5] Following up and verifying implementation of solutions to the quality problems.
6] Ensuring control of further processing, delivery, or installation of nonconforming equipment and materials deficiencies, or unsatisfactory condition until proper disposition.
Curriculum Vitae of Mr. Hendri Bustan 3 of 6
7] Educating Vendors / Subcontractors to follow the project quality requirements at site
8] Participating in the various meetings at the site with Vendors / Subcontractors and confirm Vendor / Subcon to follow the project quality requirements.
9] Participating in meetings at the site with OWNER to discuss the quality of the project and any problems that have proposed resolution.
10] Maintaining close communication with Site Manager with regard to the site quality matters.
11] All site QC related activities in coordination with the field engineering and construction group.
12] Coordinating quality related matter with OWNER's representatives, third party, Vendors and Subcontractor.
13] Interpreting drawing and specification related to the quality control and clarifies with field engineering group as required.
14] Monitoring the Subcontractor's implementation of inspection and testing, coordinates therefore with OWNER.
C. MATERIAL CONTROL
1] Planning and preparing project field procurement procedures.
2] Representing field procurement in contact with OWNER.
3] Representing procurement in contact with project personnel involving planning and problem resolution at the site.
4] Coordinating and participating in field procurement activities, such as preparation of bidders list, review of requisitions, and approval of bid summaries / commitment
5] Troubleshooting and resoling puschasing and expediting problems at site
6] Obtaining import and re-exporting authorizations or licenses from government offices such as ministry of finance,customshouse, and port authority.
7] Receiving and verifying the shipping documents and prepares import or temporary import declarations.
8] Preparing detailed schedules for off-loading and inland transportation based on documents showing actual shipping status.
9] Supervising the custums clearance supervisor in inspection cargo on ship and conforming with shipofficers on landing method and sequence, supervises discharging work.
10] Conforming transportation route and method for heavy and long cargoes.
11] Receiving inspection of all the materials and equipment with assistance of field discipline engineer
12] Storage and maintenance:
- Receiving procedure for the materials and equipment
-
- Storage location and space plan
Curriculum Vitae of Mr. Hendri Bustan 4 of 6
- Requirements of storage maintenance for each material and equipment
-
- Requirements of handling materials and equipment
-
- Requirements of identification and inventory control
-
- Procedure for overage, shortage and damage control
-
- Releasing and returning procedures for the materials and equipment
D. DOCUMENT CONTROL
1] The pertinent issues of appropriate documents shall be available at all location where operations essential to the effective functioning of the quality system are performed.
- Obsolute documents are promptly removed from all points of issue
-
- Revisions shall made by the originating discipline, reviewed, and approved by the same as the original
2] Revised document shall be identified by revision number and date with identification marking on the revised parts.
- Transmittal and receipt shall log it on and review the following:
* Number of document
* Sequence for revision numbering
* Date of revision / Transmttal
- Distribution and Review:
* Distribution Log shall be prepared and maintained to control the document distribution.
* Distribution Log shall be indicate the number of copies f each document to be provide to responsible personnel in each discipline
3] Voiding Old Drawing
Shall be assure that superseded documents are withdrawn from use and in case of the old documents to b retained, they shall be marked 'VOID' on receipt of new revision.
4] Field sketches and As built drawing. All as built documents shall be marked " AS-BUILT" in a conspicuous manner and shall be stored separately from active documents
Curriculum Vitae of Mr. Hendri Bustan 5 of 6
EMPLOYMENT
PERIOD COMPANY PROJECT NAME LOCATION POSITION
APR - 2006 to PRESENT SAMSUNG ENGINEERING SAUDI ARABIA Co,.Ltd TANEE ETHYLENE PROJECT AL JUBAIL SAUDI ARABIA PIPING SUPERINTENDENT
AUG - 2005 to APR - 2006 PT. INDOSAKTI MITRATAMA BOHAI PHASE II FPSO DEVELOPMENT PROJET PT.SEMBAWANG BATAM - INDONESIA PROJECT MANAGER
AUG - 2004 to AUG - 2005 RED SEA ENGINEERING [THAILAND] Co,Ltd GAS SEPARATION PROJECT - 1 SONGKHLA - CHANA - THAILAND QA/QC MANAGER
APR - 2004 to AUG - 2004 PFCE ENGINEERING [M] Sdn.Bhd SHUTDOWN MLNG II MODULE 2 & 6 SARAWAK BINTULU MALAYSIA TURN ARROUND MANAGER
SHUTDOWN FOR EXPORT TERMINAL - 1 TERENGGANU MALAYSIA TURN ARROUND MANAGER
SHUTDOWN FOR PERWAJA STEEL KEMAMAN MALAYSIA TURN ARROUND MANAGER
AUG - 2002 to APR - 2004 SAMSUNG ENG [Vietnam] Co,.Ltd FERTILIZER [UREA & AMMONIA] PHU MY-VUNG TAU VIETNAM QA/QC ENGINEER
MAR - 2002 to AUG - 2002 ZENG HUAT ENG [M] Sdn.Bhd EXPANSION OF GPP 2,3 AND 4 KERTEH-TERENGGANU MALAYSIA CONTRUCTION MANAGER
APR - 2001 to MAR 2002 JJ - TECH [M] Sdn.Bhd SHUTDOWN FOR MTBE CHEMICAL KUANTAN - MALAYSIA TURN ARROUND MANAGER
SHUTDOWN FOR AMMONIA PLAN KERTEH-TERENGGANU MALAYSIA TURN ARROUND MANAGER
SHUTDOWN FOR PERWAJA STEEL KEMAMAN MALAYSIA TURN ARROUND MANAGER
VESSEL FABRICATION FOR MLN 3 TERENGGANU MALAYSIA CONTRUCTION MANAGER
MAR - 2000 to MAR - 2001 HL - ENGINEERING [M] Sdn.Bhd OLEFINS - MOP PROJECT KERTEH-TERENGGANU MALAYSIA SENIOR PIPING PLANNING ENGINEER
JAN - 1998 to FEB - 2000 ROTARY ENGINEERING Co., Ltd LONZA & MBS SAKRA ISLAND SINGAPORE SENIOR QA/QC ENGINEER
AUG - 1997 to JAN - 1998 PT.CENDRAWASIH ANEKA INDAH FABRICATION MODULE AND VESSEL MOBIL OIL BATAM YARD INDONESIA PROJECT MANAGER
OCT - 1994 to JUL - 1997 PT.JAYA KENCANA
And
PT. Wooil Indonesia CEMENT KUJANG UNIT 6 BOGOR WEST JAVA INDONESIA CONSTRCUTION MANAGER
SUNKYONG KERIS INDONESIA TANGERANG INDONESIA PIPING SUPERINTENDENT
BAKRIE KASUE I - PET PROJECT CILEGON INDONESIA FIELD ENGINEER
LUB OIL - PENZOIL BEKASI INDONESIA QA/QC ENGINEER
AUG - 1993 to SEPT - 1994 PT. GEMA SEMBROWN ARCO & ATTACA DECK CILEGON INDONESIA QA/QC SUPERVISOR
UNOCAL 76 DECK CILEGON INDONESIA QA/QC SUPERVISOR
MARATHON DECK CILEGON INDONESIA QA/QC SUPERVISOR
Curriculum Vitae of Mr. Hendri Bustan 6 of 6
PERIOD COMPANY PROJECT NAME LOCATION POSITION
APR - 1991 to JUL - 1993 PT.TAIYO SINAR RAYA TEKHNIK ECTEM PROJECT TANGERANG INDONESIA PIPING SUPERVISOR
SUMMI RUBBER BEKASI INDONESIA PIPING SUPERVISOR
POLYPROPYLENE PENI - NUSANTARA CILEGON INDONESIA QC INSPECTOR
FEB - 1990 to MAR - 1991 PT. DECORIENT INDONESIA LNG BONTANG UNIT - D KALIMANTAN-BORNEO INDONESIA QC DEPARTEMENT
MAY - 1986 to JAN - 1990 RELATED UNDER 19 PROJECT FABBRICATION OF VESSEL,PIPING,MODULE CILEGON INDONESIA FABRICATOR CLASS "A"
CODE & STANDARDS
ANSI / ASME B31.1, B31.3, B31.4, B31.8 API 1104, Flow Line Welding and Inspection ASME IX, API RP 14E, API 620, API 650, API SPEC 6D & Others related DI UNI & DEP Codes & Standards.
JOB EXPERIENCE
1] Process piping, Utility piping, Flowline & Wll head pipe work
2] Pressure Vessel & Tank
3] Vessel, Tank & pump pipe trim / trim line
4] Steel structure for all category [Jacket,platform,module,piperack]
5] Hot Tapping, Tie – Ins, & Hook-ups
6] Pressure Test, Holiday / Pin holes test, Precommisioning & Commisioning
7] Installation of Vessel, Tank, and modification of associated
8] Fabrication and installation of Flare stack, Filter, Heat Exchanger& Column
9] Piping associated structural work, support, guides, pipe shoe, anchors wear plate and sleves.
10] In plant, on plant & Off plant pipe work and associated structures & support modification
11] Turnarround [Shutdown] Job for Petrochemical, Refinery, and Oil & Gas Industry
- Heat Exchanger and Air Fin cooler
Open and close manhole cover, remove and reinstall bundle fuller, claning tube using the High Pressure Water Jet [HWPJ], chemical cleaning if required, and leak test for tube and shell side.
- Vessel and Column
Spading, Open and close manhole covr, remove and reinstall insulation, internal tray, and spools. Loading and unloding of catalyst, Cleaning weld seam for NDT purpose
- Reactor, boiler, Heater and flare
Open and close manhole cover, remove and reinstall insulation, cleaning weld seam for NDE purpose, Repair weldment if required.
- Reactor, boiler, Heater and flare
Open and close manhole cover, remove and reinstall insulation, cleaning weld seam for NDE purpose, Repair weldment if required.
- Control and Safety Relief Valve = Remove and reinstall after looptest
- Piping Defect = Modification and repairing including insulatio
View contact information...
«« previous resume
next resume »»
Search Results (Resumes 1901 to 1950 of 7055)
Go to Search Parameters...
Brief Description
B.Tech from IITK, 6 yr exp. in piping stress on CAESAR II, Triflex. Review of lines on PDMS & Smart review. worked with bechtel, chemtex, Citec(Finland)
A Logging Analyst in the Syrian Petroleum Company. A Petrophysicist in Al Furat Petroleum Company, responsible for many fields for all petrophysical operations and formation evaluations. Petrophysics section head, Wireline logging, perforation and core analysis contract holder.
Extensive Wonderware software experience including Industrial Application Server and System Platform products. Expert industrial PC skills. Extensive experience with Microsoft Virtual Server and Terminal Server products.
I have involved in petrochemical, oil/gas, and heavy industrial projects. I have strong academic achievements, excellent interpersonal skills, and positive attitude, Commitment and desire to perform engineering design. I am also exceptionally well organized and highly motivated and able to pull toge
To obtain a challenging position in your organization where my technical and management skills can be effectively honed and utilized and to gain practical experience in the realm of Civil/Structural Engineering.
Over Eight years of multidisciplinary Civil Engineering experience
Instrumentation & Maintenance industrial Engineer
Substation primary design engineer for high voltage substation
DEEE with 4 years Triconex Knowledge
I had passed bachelors degree in safety and fire engineering.Passed NEBOSH international certificate in occupational Safety and health.
I have 13 years in piping design and drafting field for Oil and gas industry
I possess hands on experience in developing EMS (ISO 14001) and OHSMS (OHSAS 18001) procedures in line with International best practices, performing HSE audits, leading EIA and Risk Assessment study teams, assisting in development of emergency response / contingency plans e.t.c,
Vast experience of planning, Management reporting, Refinery Economics,Vast experience in Petroleum Refining. Confident and result-oriented, Able to analyze and apply problem solving and decision-making techniques to achieve desired objectives within target deadlines.
16+ years experience HVAC Engineer with intension to work in Oil and Gas field
Sr. Projejct Document Controller-Exp of 12 years in Oil & Gas/Power Project Industry
Thirteen (13) years of extensive and diversified experience in managing and leading variety of upstream Oil & Gas handling, Chemical & Petrochemical Projects.
About 16 yrs of experience in the field of Civil Engineering Design, Construction & Inspection and Document Control for turn over (Piping Test Packages, Punch list & etc) & dbase management using MS Access program.
Electrical Intrument & Control System
Lead Mechanical Engineer, 17 years of experience in preparation of Specification/ Material Requisition/ Proposal/ Scope of Work; Design Basis and calculations, Technical & Cost Evaluation; Vendor Drawing Review, Static, Rotating and Material Handling Equipment and Mechanical Packages
Senior Piping Designer with 20+ years experience. AutoCAD, AutoPlant, Excel, Access, Word, Outlook.
Wireline supervisor or wireline consultant
Geoscientist with experience of working in a multidisciplinary team in a major E and P company. Experienced in Seismic modelling and Interpretation, and reservoir modelling. Holds an M.Sc in Petroleum Geoscience.
Process Engineer with over 11 years oil and gas engineering background. Design experience of Liquefied Natural Gas import terminals and process simulation experience of base load liquefaction trains.
Structural engineer with over 14 years experience in EPC projects (grass root and revamp) in refineries, petrochemical plants, spinning mill, cement plant & other industrial units.
OBJECTIVE: To utilize my experience in manufacturing and construction. Using various software programs, and engineering disciplines, (24,000hrs) Of AUTOCAD experience.
More than 14 years process & project engineer experience in Oil & Gas and Oil Refinery.
CAREER OBJECTIVE A suitable, challenging, and rewarding position in Petroleum Engineering.
Working Experiences as Senior Process Engineer from 1992 - 2003 in LNG/ LPG Plant of PT. Badak NGL in Bontang East Kalimantan Indonesia. I have been working for PT. Badak NGL over 20 years. Previous Job experienced in PT. Badak as Senior Production Planning Engineer from 1983 - 1991.
ERP Consultant (functional and technical) : MFG-PRO and Progress, Axapta, Movex, SAP Software Development Project Manager : Visual Basic, Oracle, Access, SQL-Server
I have multilingual skills and am fluent at Russian, Turkish and good atdrilling
Proactive and skilled professional with a solid supervisory background and experience developed on projects in Venezuela
Good Capability and ability to get goal the project with safety, quality, planning and costing
Using FEM packages (COSMOS, ALGOR) to analyze structures and components (Stress, Stiffness, Fatigue, etc). Document drafting and review (Calculations, P&IDs, MITPs, etc.).
More than 23 years experience as Sr. rotating techn/foreman in the refinery, responsible for the repair, troubleshooting, modification, preventive and predictive maint. of all rotating equipt.; ensure safety, planning, scheduling of personnels, preparations of tools and spare parts.
Stress Analysis of critical lines connected to static as well as rotating equipments like exchangers, columns, reactors, pumps, compressors. Super high pressure steam lines, lines connected to ‘cold box’ (Cryogenic lines), and expansion loop sizing for rack lines, analysis of pressure safety valves
A highly experienced MBA professional with exceptional interpersonal and communication skills and an external extensive background in the following broad-based competencies: Procurement/Supply Chain Management Strategic Planning; Contract Negotiation; Business Development
Wire line logging: done a special six months course on wire line loggingIn which I Have studied all the logs their specifications, uses, tools, interpretation etc, like gamma ray, sp log sonic log, neutron porosity logResistivity & conductivity log, density &photo electric factor log etc.
Crude oil storage tank construction experience as per API 650/653
i am looking for dimensional survey engineer job. i have complite Diploma in Marine & Offshore Technology.i have been work for Keppel fels Shipyard 3yers. Dyna-Mac shipyard 1.5years. now working for Norce offshore in Indonesia for DLB Projct.
I Mr. Noel C. Atienza 12 almost 12 years experience in oil and gas as a senior mechanical technician, including as a machinery supervisor. I'm permanent residence in singapore
a great job seeker of electrical field
Pipeline Integrity Engineer / Project Engineer / Design Engineer
Technical Assistant to Reservoir/Production/Petroleum Engineering.
BSc Chemical Engineer Having Six Year experience in Petrochemical Industry
Currently working in SNC LAVALIN ENGG INDIA LTD. Mumbai and deputed to SNC LAVALIN EUROPE B.V. BRANCH to Shaybah, saudi arabia as a PDS ADMINISTRATOR. My job profile is related to Piping Engineering and PDS(PLANT DESIGN SOFTWARE),RIS (Relational Interface
Controls and Instrumentation Engineer / ESD-Triconex & DeltaV SIS/ 6+year Exp
Provide structural engineering, construction management, real estate due diligence and expert witness services.
Innovative Professional with 26 years of progressive experience in engineering design, maintenance planning and management, including 16 years in the Oil/Gas industry.
Over 18 years experience in construction, installation and mechanical assemblies, heavy
My background has 15 years of Heavy chemicals, Dyes, Petrochemicals process safety and Refinery Construction HSE experience in India as well as foreign countries Recently acquired NEBOSH Qualification
First
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
[ 39 ]
40
41
42
43
44
45
46
47
48
49
50
Next
Last
Seach Parameters
Change search parameters...
CATEGORIES:
Engineering/Technicians;
INDUSTRIES:
Petroleum/Oil/Gas;
Change search parameters...
Keywords:
(e.g. mining engineer)
Find results with:
ANY of the words
ALL of the words
WITHOUT the words
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to
Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.
How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".
More Frequenly Asked Questions...
Employer's Center
»
Employers Home
»
Feedback
»
Help
»
Post Jobs
»
Edit/Delete Jobs
»
Search Resumes
»
Resumes By Email
»
My Account
»
Log In
»
Log Out
©1999-2009 Misco Jobs. All rights reserved. Contact:
support@miscojobs.com