Go to Job Seeker's Center »»
Misco Jobs
Employer's Center
  • » Employer’s home
  • » Feedback
  • » Help
  • » Search Resumes
  • » Post Jobs
  • » Edit/Delete Jobs
  • » Resumes by E-mail
  • » Log In
  • » Register as Employer
  • » Lost Password
  • » Contacts
  • » Job Seeker’s Center



  • design
  • safety
  • management
  • operations
  • learning
  • environmental
  • exploration
  • siting
  • engineering
  • electrical
  • equipment
  • development
  • business
  • experience
  • mechanical
  • health
  • training
  • maintenance
  • licensing
  • drilling
  • mining
  • geologist
  • energy
  • construction
  • process

Executive Mechanical at Megasteel Sdn Bhd under repair and mainte…

« previous resume next resume »
Information:

Posted: 02 Dec 2006
Brief description: Executive Mechanical at Megasteel Sdn Bhd under repair and maintenance, As Mechanical Engineer at Stagno Tech Sdn Bhd aslo under repair and maintenance
Banting, Selangor

Resume description:

Objective:


To pursue a career that enriched knowledge in technical and management.


Work Experience:


Introduction

This report will explain the outline of my working experiences since graduation in May 1997 from University Putra Malaysia in Bachelor of Engineering (Mechanical/System). I was started to join multibillion companies Megasteel Sdn Bhd at Banting Selangor which is under Lion Group of Company in July 1997. After 6 and half year later I was left that company and joining a new company Stagno Tech Sdn Bhd based in Kuala Lumpur,

A lot of experiences were gained in both of company, which is mainly involved in tender document, installation, testing and commissioning, plant repair / maintenance and upgrading. I also had attended several in house training and external training which respect to my engineering knowledge and expertise.

The summary year of services for the Megasteel Sdn Bhd and Stagnotech Sdn Bhd

  • Megasteel Sdn Bhd
  • Position: Executive Mechanical
Period of Service: July 1997 — September 2003
  • Stagnotech Sdn Bhd
  • Position: Mechanical Engineer
Period of Service: October 2003 — Present

The duties and degree of responsibility and accountabilities for the above experience will be outline on this report.

Megasteel Sdn Bhd — Executive Mechanical
  1. 0 Project Executive (July 1997 — Mac 1999)
  2. First I was joining in Megasteel Sdn Bhd, 1 was assigned under project team to setup for new plant Megsteel Sdn Bhd worth RM 2.5 Bil. Megasteel Sdn Bhd are the first company produces the Steel Plate in Malaysia. Apart from project I was responsible to handle a few projects that were assigned by Section Head. The scopes of work for the project consist of to identify for specification, tendering and doing the comparison and evaluation such as;
  • To prepare the proposal and doing the study work to setup centralized workshop for Megasteel Sdn Bhd and provide the technical specification to purchase new Machineries with various capacity to support plant maintenance.
  • To prepare the tender document to purchase 3 units of Centrifugal Centac Air Compressor which is the capacity 5020 cfm completed with refrigerator Dryer for the capacity (11000 cfm) and also responsible to understand the P & I diagram for in plant piping and provide the compilation of bill of material for compressed air piping and auxiliaries equipment plant.
  • To prepare the tender document to purchase 30 units of low capacity (1 — 30 Ton) and 14 units of high capacity crane (40 — 280 Ton)

  1. 1 Coordinating and supervise the installation works and commissioning.
  2. Responsible to supervise, coordinate during installation work for the above project. During the installation stage my duties are;

  • Manage schedule cost by preparing and reviewing the project cost records and continuously monitoring variation order.
  • Coordinating technical specification with the civil and structure consultant.
  • Site supervision of erection, pressure test, hydrostatic test, NDT and pipe cleaning work for compress air piping and auxiliaries' equipment plant.
  • Involve in testing and commissioning for compressed air system, pressure vessel, rotation equipment, machinery etc

  1. 0 Plant Maintenance (April 99 — September 2003)
  2. After the plant was completed and I was assigned under Utility Department which is consist of a few area
  • Centralized Workshop/Utilities

As a leader I was responsible to taking care one supervisor and 10 technicians will report under me. My job scopes are monitoring all the work for fabrication and machine that was requested by other department. I also responsible to make sure the entire work request to be complete within the time required. Continuously part for machining the equipment such as Mould and Shear Blade from Mould and Segment Shop Dept will monitor closely in order to avoid any cause of delayed. To provide and establish the Standard Operation Procedure (SOP) for the technician and also conduct in house training for them in order to increase their competency and efficiency. To carry out the plant modification such for upgrading and fabrication/machining parts requested by end user/plant department. Beside the workshop the others scope of work involved in maintenance such centralized air condition system — chiller, cooling tower, AHU, etc all type of air condition units… To prepare the workshop activities to the monthly report and submit to the head of department.

.


  • Dust Collector System/Water Treatment plant/Air Compressor
  • I have 2 supervisors and 12 technicians to doing the maintenance for dust collector system/water treatment plant and air compressor system. This system integrated to the whole production line and cause of the failure this system will cause of interruption the plant operation. So apart from that the following equipment need to carry out for maintenance. The main equipments as follows:

Dust Collector System (Fan & Duct)
Booster Fan (800 kW) 2 Nos
Main Fan (1000Kw) 6 Nos
Filter Bag for Bag House 2 Sets
Chain Belt

Air Compressor Room
Centrifugal Compressor (5020 cfm) 4 units
Refrigerant Dryer 1 unit
Cooling Tower 1 unit

Water Treatment Plant System
Centrifugal Pump
Cooling Tower Fan
Gear Boxes

The extents of my job scope as follows
  • Lubrications on the plant o Schedule On PM
  • Condition Monitoring o Bearing, Fan, Motor Vibration analysis o Lubrication o Water and Air Flow analysis o Non-Destructive Testing (NDT)
  • — Thickness Gauge
— Dry Pen
  • Equipment Major Repair and Overhaul o Pump o Gear Boxes o Impeller for Main Fan and Booster Fan

  • Store Management for Spare Part availability
  • Root Cause Analysis
  • Plant Equipment Improvement

Lubrication
Parts of preventive maintenance task in the plant are to do periodic lubrication change, lubrication improvement and oil analysis. Oil and grease are vital for rotating equipment and a CMMS program like lube oil change is needed for it's to run smoothly and life longer. For some big single critical equipment or oil circulation systems in large volume, periodic changes is unsuitable thus oil analysis is required to determine the oil condition whether the properties ok or not for equipment to withstand.

Condition Monitoring
All the data came from bearing Vibration, Oil temperature for Main Fan and Booster Fan, pressure differential for filter bags for Bag house, water cool duct temperature and etc will monitor and recorded by Siemens S5 PLC program. All the parameter has been set and configure by manufacturer for example the bearing vibration for main fan and booster fan not exceed to 7 mm/sec, oil temperature not exceed 70 C. The alarm will triggered if there any abnormalities or deviation from normal running condition and action to be taken in order to rectify the problem.
For the certain equipment the manual checking will implement by technician and recorded to the log sheet.
Beside that also the static equipment need to monitor such as compressed air piping, pressure vessel for the DOSH Inspection.
The CMMS (Centralized Maintenance Monitoring System) is the database that to assist and monitor planning of the maintenance for the equipment.

Equipment Major Repair and Overhaul
In Order to gets good the maintenance, the planning for major repair need to establish in order to increase the equipment availability and life span. In this case, the equipment that need to major repair/overhaul will identify form the condition monitoring. Before implementing any major repair work the scope of work need to establish and identify whether require external contractor/specialist, spare part availability etc. The implementation the engineering practice required during the major repair or overhaul.

Store Management for Spare Part availability
Spare parts availability is very important for maintenances and cause of the lack of spare will effect to the plant operation. In the Megasteel Sdn Bhd they are using the System AS 400 to monitor the spare inventory in order to control minimum level of stock.

Root Cause Analysis
The repetitive problem on equipment during production will causes of the down time and this issue will rise up during department meeting chaired by Head Department every week. Certain cases required specialist to discuss and find the best solution to avoid the repetitive problem occurred.

Plant Equipment Improvement
To study and prepare the proposal for upgrading of the system such as
  • To study air consumption for the whole plant and proposed to install additional unit due to high demanding for plant equipment. Also to modify the additional new piping line for refrigerant air dryer for maintenance excess.
  • To design a new piping above ground for Fire hydrant System due to existing piping having repetitive problem such leaking, broken etc.
  • To design and install additional LPG piping for Nozzle Burner at point Caster 16 m Platform and +0 m ground floor for Ladle preheat.
  • To design and install new piping for carbon powder for the Furnace at Steel Melt Shop.

Stagnotech Sdn Bhd
Position: Mechanical Engineer
Period of Service: October 2003 — Present

I was join Stagnotech Sdn Bhd ealrly or October 2003 as Mechanical Engineer and responsible to prepare the Participate in daily, weekly, 3 monthly, yearly, and 5 yearly planning processes order 100% functionality for Ride Car, Flight Simulator system and etc at Petrosains KLCC. To monitor condition for drive belt pulley, structure track, hydraulic pump in good condition by regular checking as stated in Central Monitoring Maintenance System (CMMS).To prepare the root cause analysis for any cases of breaks down of the system and finds out the solution to avoid the same case happen. I also appointed as Internal Auditor for ISO 9001-2000. Keep monitoring the spare available. To prepare the department activities to the monthly report and submit to the head of department.



Education & Certification:


Bac.Eng (Mechanical/Syetem)

Additional Information:


Plant Maintenance Exposed

Total Preventive Maintenance:
— Management method in schedule, frequency, work requests a work instruction.

Familiarization:
— Tool and equipment for maintenance.
— Precision alignment procedure.
— Various types of pump and accessories.
— Control and manual valve.

Technical specification:
— Material of construction and fabrication specification.
— Mechanical tolerance.
— Bolts and nuts, belts and chain standard.
— Bearing specification.
— Material specification.

Management Course

— Problem solving and decision-making — Kepnor Tregor Method.
— Managing finance — setting and achieving budget.
— Managing project.
— Managing strategically.
— Managing skill.
— Managing operation — manufacturing.
— Emergency Respond Plan (ERP) -Niosh

Computer Skills:

— Microsoft office and Lotus Application — intermediate.
— AutoCAD 2000
  • Management/OS Software: CMMS Oracle, Lotus Approach, AS 400 IBM
  • Setup and install new hardware and software for PC

Contact information:

« previous resume next resume »

Petroleum/Oil/Gas resumes »
Engineering/Technicians

Resumes: 2001 — 2050 of 5214

Posted   Description
15 Dec 2006 Bachelor Degree in Mechanical (Industry)
14 Dec 2006 Petroleum engineer in Oil Production (rotation schedule)
14 Dec 2006 1
14 Dec 2006 Thorough knowledge in Primavera, MS Project and MS Office
13 Dec 2006 I have a good experience working as Wellsite Geologist for both exploration and development wells (vertical & horizontal). I am familiar with field geological operations and possess good expertise in the Winlog software program. I have good computer skills and fluent in written and spoken
12 Dec 2006 Experience and Qualifications in the following fields: Ops./Elect./Instr./Mech./Crane./Scada/Projects/F&G./Power/Compression/Safety(Nebosh ongoing)/Methode-Safety/ISO14001/9001Cert./Ops.manuals/Environmental/Shutdown/Logistics/Buyer/Revamping/NORM/SIMOPS/Hook-ups/flowline ’s
11 Dec 2006 Sr. Project Controls Planner/Scheduler
11 Dec 2006 Analyst/Technical Assistance for reservoir/production operations
08 Dec 2006 I have 15 years experience in petrochemicals plants
08 Dec 2006 I have 17 years of telecommunication company experience in all aspects wireman and engineer would you mind whatever work
05 Dec 2006 Mechanical Engineer with excellent interpersonal and computer skills, a strong supervisor able to train and motivate teams to peak performance.
05 Dec 2006 Mastery in the use of Synthetic & various kinds of water based muds which I have worked with and used in various projects for the last Seven years. Mastery in the use of Fluids Reporting and Engineering systems.
04 Dec 2006 Instrument Tech / Electrical Officer (ETO) / Electronics officer
02 Dec 2006 Executive Mechanical at Megasteel Sdn Bhd under repair and maintenance, As Mechanical Engineer at Stagno Tech Sdn Bhd aslo under repair and maintenance
Banting, Selangor
02 Dec 2006 Field Engineer, Instrument Specialist, Instrument Technician, Instrumentation and Controls, DCS, PLCs, Turbine Controls, Power Plants, Pipelines, Refinaries, Steel Mills
01 Dec 2006 Experience in ISO 9001, ISO 17025, ISO 17799, Good Laboratory Practices(GLP) systems. The ISO 17025 and GLP are mainly focussed on testing and clinical laboraories. Almost 7 years of experience in Qulaity Management Systems as well as and System Administration activities.
30 Nov 2006 Passed Bachelor of Engineering in 2002 and then completed my MBA. I am working as a senior design engineer in Instrumentation & automation field of Larsen & Toubro Limited organisation.
29 Nov 2006 PGDMS from London. A+ honours in hardware engineering. C, C++. Working knowledge of microcontroller programming and hardware languages.
29 Nov 2006 I have total eleven years experience in Oil & Gas campanies with the five years experience in EPC PROJECT and six years experience in TURNKEY & MEP PROJECTS.
28 Nov 2006 Welding Engineer, Welding Inspector CSWIP, Mechanical Engineer
28 Nov 2006 I'm mechanical engineer, I also have a mention in petroleum engineer, I did my practices in companies such as Repsol YPF, Pacifpetrol S. A, and I did visited Weatherford to get information for my thisis of degree.
26 Nov 2006 Automatic control panels design, microcontroller programming.
24 Nov 2006 As Specialist Professional Engineer (Training Engineer)/Mechanical Training Instructor supervisor grade C1, C2 in all aspects of Training and Development (coach and prepare learning materials, capacity and profile building, skill-transfer and counterpart training).
11 Oct 2011 I offer my years of experience in the Petroleum Reservoir Engineering field. I have expertise in reservoir engineering management, reservoir integrated studies, IOR projects, reserves calculations, field development planning, decline curve analysis
24 Nov 2006 corrosion failure analysis and corrosion protection
23 Nov 2006 I have ten years experience as operations/process technician in varying roles
23 Nov 2006 I&C Technician with broad experience
23 Nov 2006 Mechanical Engineer with experience in Oil, Gas and Industrial air filtration to meet ISA standards
23 Nov 2006 2D / 3D Design Consultant, 13 years Oil & Gas Experience starting with 4 year mechanical apprenticeship. Having worked in Aberdeen, Scotland and Oslo, Norway on surface and subsea production equipment (EDP, LRP, BOP, Xmas Trees, etc).
20 Nov 2006 Prodigiously experienced and qualified Engineering Professional, with an enviable, global, 30-year background in the Oil & Gas Production and Processing (On-Shore and Off-Shore), Refining, Petrochemicals, Chemicals, Compression and Gas Turbines industries.
20 Nov 2006 Prodigiously experienced and qualified Engineering Professional, with an enviable, global, 30-year background in the Oil & Gas Production and Processing (On-Shore and Off-Shore), Refining, Petrochemicals, Chemicals, Compression and Gas Turbines industries
19 Nov 2006 B.Sc. in Chemical Engineering (Gas and Petrochemical); 19 years experience in process facilities (more than 17 years in oil and gas industry). The summary of major duty is design, optimization, installation and operation of process equipment.
18 Nov 2006 PROJECT/DESIGN ENGINEER FOR FIRE PROTECTION SYSTEM
20 Nov 2006 Site Construction Manager Oil and gas Industry. Over 20 years experience. Process plants, facilities and pipelines.
17 Nov 2006 I am a B. E. Chemical with an aggregate of 72.73%. I will be much pleased to work in a competitive environment on challenging assignments that shall yield the twin benefits of the jobsatisfaction and a steady-paced professional growth.
17 Nov 2006 I am an Electrical (Electronics & Communication) Engineer determined to get thru in expediting the Projects on the basis of self learning and self motivation I have the hands on experience while working as a Sr. Application/Project Engineer in Innovative Automation and Engineering Private Limited),
17 Nov 2006 I am a highly motivated and ambitious Senior Electrical Engineer who worked in Emirate, Saudi Arabia, Kuwait, Iraq & Lebanon since 1994 and interested to pursue my future professional career in your company. The scope of work I am looking for is a job in the field of Residential Industry ,
17 Nov 2006 Over 15 years of rich experience in Project Execution & Management, & Engineering in oil and gas.
15 Nov 2006 Experienced Laboratory Manager. 17 years petroleum lab experience. 12 years management experience. Extensive knowledge of ASTM IP, UOP, ISO test methods, ISO 9000, purchasing, budgeting, equipment maintenance, staff management, environmental and safety requirements in petroleum testing laboratory.
15 Nov 2006 Graduate + Diploma in Materials Management, 12 Years exp., working as Purchaser in a Global Leading EPC Company in Qatar
15 Nov 2006 Over twenty years experience spent in the oil and petrochemical industry. Experienced in all aspects of electrical commissioning operations and maintenance. With design reviews and Vendor site visits through to fats. with the ability to liase with other disciplines on gas turbine and diesel generato
13 Nov 2006 A qualified and experienced in pipeline engineer work on many EPC projects. Qualified to work on projects from the FEED studies, feasibility study, detailed design and engineering phases to full site management engineering of onshore oil & gas upstream facilities.
13 Nov 2006 Electrical Technician/Cell Phone Technician
13 Nov 2006 Piping Supervisor
11 Nov 2006 Excellent interpersonal, oral and written communication skills, Good computer skills (MS-Word, MS-Excel, MS-Power Point, MS-Access, Oracle etc.). Excellent knowledge and Training on ISO 9001, ISO 14001, OSHA and OHSAS 18001. Master degree, Diploma in Safety, Training on HSE.
11 Nov 2006 planning engineer
10 Nov 2006 All aspects of mineral processing plant construction
11 Nov 2006 Maintenance and calibration of field instrument, DCS and PLC installation, configuration, commissioning, and maintenance.
11 Nov 2006 I have total of over 10 years of experience in Documenation using EMDS with oil & gas industry
09 Nov 2006 I have been working at Total E&P Indonesie as a Well Service Supervisor since 1998 until March 2006 (supervise slickline, well testing and maintenance, electricline (perforation and logging), snubbing unit and coil tubing unit) and as a Contract Workover Barge supervisor (with workover RIG) at CNOOC
«
»
1 ... 37 38 39 40 41 42 43 44 ... 105
 

Advanced Search Parameters (Click here to show/hide search parameters form)

Experience:
Categories/Regions:
Selection:
of the words


Copyright © 1999 — 2011 Misco Jobs. All rights reserved. Contacts: support@miscojobs.com.