Misco Jobs  |  Go to Job Seeker's Center »»   |  
 
«« previous resume Resume #51457 next resume »»
CONTACT INFORMATION:
View contact information...

Professional Experience

Over sixteen years of experience in construction projects. Almost all my work has been done independently. During my career span, I participated in various aspects of work, related to Planning, Cost/Material Controlling, Estimating, Accounting, Engineering etc. I have thorough knowledge in Windows based applications, especially in Primavera, MS Project, Suretrack and MS Access. Holding certificates in Computer PC Essentials User ID (1290260) and MS Excel 2000 (1621259) from Brain Bench. (WWW.brainbench.com), Membership in Project Management Institute ID 582724.

ECC International Dec 2004 – Nov 2006
Iraq

Project Scheduler for Northern Iraq
Kirkuk

Projects: 4040.003- K1 Training Facility Phase I (Kirkuk),4040.016 - K1 Training Facility Phase I (Kirkuk), 5171.004 - DBE Academy Phase I & II (Sulaymaniah), 4040.026 - Suse Prison (Sulaymaniah),4040.029 - Suse Prison (Sulaymaniah), 4040.024 - Police Station Renevotation, 4044.032 - Iraqi Army 2nd & 4th Division Facilities, 4040.034 - Northern Police Stations, 4040.036 - 4th Division K-1, Phase III.
Schedule Controller: Prepare schedule for new projects in Northern Iraq and implementing it. Responsible for preparing Daily / Weekly / Monthly reports, take physical progress and update the P3 schedule, based on the progress prepare invoice sheet for the client and subcontractor, monitor productivity, slippage of activities and reporting to the Project Manager. Prepare proposal schedules for the upcoming projects.

JGC Corporation Feb 2004 – Nov 2004
Yokohama, Japan

Dolphin Project (Upstream & Compression Facilities) Aug 2004 – Nov 2004
Ras laffan (State of Qatar)

Schedule Controller: Compile sub-contractor's data and prepare Daily, Weekly and Monthly reports (Progress, Manpower and Equipment). Take the physical progress and compare with the sub-contractor's reports. Update progress in P3 (Level III & Level IV). Prepare 3 Month, 3 Weeks Look-Ahead Schedules and monitor the productivity. Take progress photos and prepare the reports in PDF format (Acrobat).

Western Libya Gas Project – Wafa Desert, Libya Feb 2004 – Jul 2004
AGIP - Italy

Schedule Controller: Daily, Weekly & Monthly Reports.(System Wise Monitoring, Updating Schedules-All Levels including 3 Week Look Ahead, Preparing Productivity Reports, Assist in the provision of planning and scheduling service to the project in accordance with Contract Execution Procedures.

Chiyoda-Foster Wheeler Jun 2003 – Dec 2003
Sur, Sultanate of Oman

Oman LNG Plant - Sur Jun 2003 – Dec 2003

Planning Engineer: Assist Chiyoda-Yokohama Project Control Team for finalizing Level III schedule for the submission to the client. At site, combined the Sub-Contractor's schedule to prepare Level IV working schedule. Responsible for preparing Daily/Weekly/Monthly reports. Monitoring productivity, slippage of activities and reporting to the Controls Manager.

Al Habtoor Engineering Enterprises Co (L.L.C) Jan 1999 – May 2003
Dubai, U.A.E

Construction of ADNOC Group New H.Q – Abu Dhabi Feb 2002 – May 2003

Schedule Controller: Doing Labour Costing, preparing weekly and monthly reports. Apart from the planning works, I developed a user friendly multi-user software to control and monitor the documental transmittals using MS Access. With this software it's very easy to get information about the MAR, Method Statement, RFI and all other correspondence with the sub-contractor as well as with the clients.

Shangri-La Hotel Development Project - Dubai Sep 2001 – Feb 2002

Planning Engineer: Doing Labour Costing for this project. Analyzing the effect of Labour Cost with the forecast and actual and reporting it to the project director weekly along with different histograms of manpower, steel and concrete. Updating a database prepared myself using MS Access to control the delivery of Concrete, Reinforcement and Precast. Using this report to compare the original invoice submitting from the sub-contractor for the preparation of Monthly Invoice.

Planning Department Jun 2000 – Sep 2001
(Carpentry & Joinery / Steel Fabrication Division)

Planning Engineer: Worked alone as Planning Engineer for preparing detailed production and installation programs for Carpentry & Steel Division. Monitoring progress of Shop Drawing Approvals, Mockup & Materials, Production, Delivery of Materials to site, Manpower Allocation, Installation & Cost Controlling using Primavera.

Marina Mall – Abu Dhabi Aug 2000 - Feb 2001
Resi. Complex for Sheikh Sultan Bin Zayed Al Nahyan Aug 2002 - Feb 2001
Wadi Al Hatta Filling Station Nov 2002 - Jan 2001
Dubai Cruise Terminal Oct 2000 - Dec 2000
Awir Filling Station Oct 2000 - Nov 2000
Dubai Internet City Phase I Sep 2000 - Oct 2000
Ajman Retail City Centre Jul 2000 - Aug 2000

Planning Department (Head Office) Jan 2000 – Jun 2000

Planning Engineer: Worked for various projects preparing Detailed Construction Programs in Primavera.

Dubai International Airport Project Jan 1999 – Dec 1999

Planning Engineer: One of the planners of the Project Control Team. Activities included are planning and scheduling through Primavera, taking physical progress and analyzing with sub-contractors progress reports, preparing weekly & monthly progress reports along with graphs for submitting to client. In the Concourse Building, I controlled the entire vaulted ceiling & hotel room progress for Project Control. After the completion, I was transferred to the Head Office.

Foster Wheeler International Corporation Dec 1995 – Dec 1998
EQUATE – Ethylene Glycol Project
Shuaiba, Kuwait

Planning Engineer: One of the key planners of the Project Control Team and responsible for Planning and Scheduling for the Ethylene Glycol Plant construction project being executed for EQUATE at Al Shuaiba, Kuwait. Activities included are planning and scheduling through Primavera, Construction Progress Analysis and reporting through detailed study of quantities and man-hours spent, Piping Material Control, Interface with sub-contractors, Group Discussions and Weekly Meetings for Project Planning, Prepare programs in MS Access (eg. Hydro testing, Welding Progress, Material Requirements/Arrival Dates), prepare all kinds of graphs and schedules for bidding purpose, prepare presentation/slides for the new project using PowerPoint, receive/send data's through AS400 to Italy and Kuwait, participate and analyze feasibility studies, prepare all kinds of conferencing through internet, administrating the flow of data's, troubleshooting hardware & software problems, evaluating & implementing software packages.

Dywidag Saudi Arabia Ltd. Apr 1991 – Sep 1995

Saudi Cement Company (HCP) Nov 1993 - Sep 1995
National Methanol Company (MTBE) May 1992 - Oct 1993
Air Separation Plant (NIGC) Apr 1991 - Apr 1992

Scheduler/EDP Administrator: Scheduling & Monitoring the progress of different sites, assist the Estimator for preparing the Tender Documents, preparing invoice for the client and internal progress in Primavera, submit the progress report to Commercial Manager, administrating the flow of data's, troubleshooting hardware and software problems, evaluating & implementing software packages.

Education

B.Tech – Civil 1991
University of Kerala, India

Master of Computer Applications 1998 – 1990
Computer Society of India

View contact information...
«« previous resume next resume »»
Search Results (Resumes 5051 to 5100 of 6396)Go to Search Parameters...
Brief Description
Processing and Borehole Geology Interpretation (OBDT, HALS, FMI, UBI and OBMI). Preparation of Interactive CD-ROM of final reports for customer. Graphic Design. Graphic Visualization
I'm a young Petroleum Engineer with capacity of leadership, creativity, good interpersonal relationships, constant bring up to date and easiness for the learning of specialized software, also ending up contributing new ideas mainly for the oil industry in the development of projects.
Experience Summary 4 Years Experience in various projects involving Fiber optic networks for APSWAN (Andhra Pradesh State Wide Area Network), JTM (Jasmine Telia Mobiles), TATA Teleservises HTIL(Hughes Telecom) Project and Reliance Infocom Project.
AWS-CWI 30 years in the Welding Field - Pipeline, Fabrication, Piping/Structural - Onshore and Offshore - Domestic and International
15+ years of Senior Project Engineer and Corporate Industrial Engineering Manager experience with a strong background in Supply Chain Logistics that has saved tens of millions of dollars.
API 510 / CSA Level 1 Welding Inspector. Construction Coordinator
Project Management, Oil & Gas Industry, Civil Costing, Planing and Estimation
I worked as a supervisor and foreman on suspension bridge projects in asia and europe and posses,rigging,banking,slinging skills. I also have experience as a ultrasonic operator and posses a ASNT level 2 US cert. I have current OLF,BOSIET,HUET and medical certs and am available to work immediately
Oil field experience as field engineer, total of 10 plus years, 7 years in Middle East, worked in Kuwait, Oman, Egypt & UAE, Electronics Engineer, good exposure to IT, with driving license of GCC countries.
Thorough knowledge in Primavera, MS Project and MS Office
Manage 20 maintenance personel on repair of equipment and building ,order arts and maintain inventory, prioritize and issue work orders.
Conducted individual and group tutorials for Project 350 mathematics courses
I am a fresh chemical engineer with spelization in alcohol technology
I am Mechanical Engineer, with great experience in diesel and gasoline engines,heavy machinery, Forklifts, Excavators, hydraulic systems,fluids transportation,Compressors, Gas Turbines (Aviation), Steam Turbines, electric generators,machinery purchase,maintenance schedules
Professional Qualifications: BE Sales & Marketing Open, City & Guilds Mechanical Technician,ONC Pipe Maintenance & Instillation,NVQ Level I, II, III Quality Auditing,Diploma supervisory management Team Leadership I & II,
Surgical Emergencies :- Road Traffic accident, crush injuries, blunt trauma abdomen,Head injury, liver tear, gunshot, spleen rupture, face injuries, stab injuries, spinal cord compression, assult injuries, burn injuries etc.n Medical Emergencies :Myocardial Infraction, COPD, sun stroke, snake etc.
Indian Engineer with B.E in Electronics and Instrumentaation Engineering also had Completed diploma in Computer Technology Experience in the field of beverages and also paper Industries currently working as instrument technician in Abudhabi national paper mill U.A.E
Experienced AutoCAD Engineer
I am a fresh Civil engineer having one year of field experience in Pakistan and have specialty in human factor-agronomy’s can speak 6 languages. Seeking a challenging career opportunity all around the world in the field of OIl, Gas and Petroleum. I have a strong hold on GIS.
Joint Venture : Till Mar. 2001 was REPSOL. And From 23/3/2001 till Now APACHI.
Sr. Exploration-Development Geologist, worldwide experience, interested in a domestic or U.S.-based international staff position with your Company.
Professional, qualified and experienced Australian land and hydrographic surveyor
hse&ff certificate EU valid civil defence certificate, able to work among multinational teams. self starter, dinamic,
Electrical Engineer- Masters Degree 3+ years Experience
12 years Experience in Project QA/QC Management
Geological engineer studied drilling engineering, well logging, reservoir engineering, geotechnical engineering and i have a driving license
CIPS qualified MSc MBA MCMI graduate, Oracle, negotiations, IT, tendering, software licensing
Civil Engineer with wide and solid experience in planning and execution of remodeling projects and construction of gas station in multinational company dedicated to the commercialization of fuel and lubricant. Skilled making decisions lowers pressure. With easiness to manage teams of high acting and
Mechanical desing engineer , auto cad , catia v5
Thirteen years experience as a planner and project engineer in iron and mineral EPCM projects (project worth: $1.5 billion) in different positions including project planning and control engineer, manager of project planning department, project manager and consultant Engineer.
To apply a position as an Electrical Engineer
Experienced offshore Client Representative and qualified Hydrographic surveyor; with Master's ticket, NEBOSH, MCSE .
Project Management / Inspection / Procurement / Quality Assurance
I have ten years experience as operations/process technician in varying roles
Power Plants Commissioning , Operation, HRSG Commissioning
Power mechanical engineer, 2001, good, work as industrial hudraulic engineer for tow years
Geographical Information Systems Analyst Specialist Developer Geospatial Engineer
Drilling engineering knowledge & experience w/ differ styles of drilling, coal & coal-bed methane exploration , well-site geo & company man duties (mining & petroleum industries), geotechnical investigations on construction sites (London), recon. work for exploration programs in Australia
IT, Web Developer and Network Admistrator
Good knowledge in Electricity (+10years experiences) .High voltage ,medium voltage and low voltage experience . Good knowledge on design and simulations software (+6 years experience with AutoCAD, Visio, mathcad,mathlab ,ElectronicWorkbench,Circuitmarker,Cat. Electronic technician, …) and office s
Over 15 years working in industrial chemicals plants, shipyards, offshore, motor vessels, manufacturing facilities and bulk transfer facilities.
Analyst Developer since 1985
Automation, Controls, PLC, Logging, Wireline, Open Hole, Cased Hole, SDL, Shooting, Explosives, Radiation, Field engineer, software, programming languages, C++, Lab View
Cost Estimating, Project and Contract Management, Planning/Scheduling, Project Controls and Finance
Masters Degree in Chemical Engineering - Skilled in Process Control, Pneumatic and Electronic Equipment Operation and Troubleshooting, Simulation of Chemical Processes and Principles of Chemistry – Has Research Experience in Numerical Simulation and Chemistry -Fluent in English & German
A Certified Instrumentation and Control Engineer. Experienced and trained professional as an Instrumentation and Process Control Specialist, Operations Supervisor and Telemetry Specialist. Maintains, calibrates and troubleshoots all field and process instrumentation, analyzers, PLC, SCADA, DCS.
design, construction, detail and basic design, with Pg diplomo in marine design
fresh graduate degree of electrical and electronic engineering
Nanagement engineer power utilities oil gas construction
Mapping Draftsman, Cartographer, CAD Operator, Survey Draftperson, Mapping, Draftsman, GIS Technician, GIS Operator
First   Prev   101   [ 102 ]   103   104   105   106   107   108   109   110   111   112   113   114   115   116   117   118   119   120   121   122   123   124   125   126   127   128   Last
Seach Parameters

Change search parameters...
CATEGORIES: Engineering/Technicians;
INDUSTRIES: Petroleum/Oil/Gas;
Change search parameters...
Keywords: (e.g. mining engineer)Find results with:
Save this search parameters...
Post job with this search parameters...
Frequently Asked Questions
What's the most effective way to perform a search?
Go to Advanced Search
1. Select 'Industries', 'Categories', 'Education', and 'Experience' fields. Click 'Search' and look through results.
2. Enter one or two of the most important keywords. Click 'Search' and look through results.
3. To search within results add more keywords.

How can I find resumes that contain specific exact phrase?
To search for an exact phrase, just put quotation marks around two or more words, for example "mining engineer". Use this feature to narrow your results or to find words that can be typed differently, for example AutoCAD "Auto CAD".

More Frequenly Asked Questions...
Employer's Center


» Employers Home
» Feedback
» Help

» Post Jobs
» Edit/Delete Jobs
» Search Resumes
» Resumes By Email

» My Account
» Log In

» Log Out
 
©1999-2009 Misco Jobs. All rights reserved.  Contact: support@miscojobs.com